About this file

RFP NO. FA5613-14-R-0001 5 NOV 2013

View the file

Other files

File Type Posted
14-R-0001-0002-Amd-2.doc DOC document
FPS-Inventory-Intervals-FY11.xls XLS spreadsheet
14-R-0001-0002-Atch1-PWS-Apdx_1-22-17Dec13.xls XLS spreadsheet
14-R-0001-0002-Atch1-PWS-17Dec13.doc DOC document
Q A-Set_3-17Dec2013.doc DOC document
Attendance-PreProposal20Nov2013.pdf PDF
PreProposal-SiteVisit.pptx PPTX presentation
PreProposal_Conf_Minutes-FH-13Dec13.pdf PDF
RequirementsBriefing-KMC-FH-Maint.pptx PPTX presentation
PreProposal_Conf_Site_Visit_Q A-Atch_4-FH-13Dec13.docx DOCX document
14-R-0001-Atch1-PWS-TE_1-8-5Dec13.xls XLS spreadsheet
14-R-0001-0001-Amd-1.doc DOC document
14-R-0001-0001-RFP-5Dec2013.doc DOC document
14-R-0001-Atch1-PWS-TE2.pdf PDF
14-R-0001-0001-Atch1-PWS-Apdx_1-22-5Dec13.xls XLS spreadsheet
14-R-0001-0001-Apdx5a-ORA-Maps.pdf PDF
14-R-0001-Atch1-PWS-5Dec13.doc DOC document
14-R-0001-0001-Atch4-PPQ.doc DOC document
Q A-Set_2-5Dec2013.doc DOC document
WarrantyList-2013-2014-2015.xls XLS spreadsheet
Ltr-Amd0001-RFP-27Nov13.pdf PDF
Q A-Set_1-14Nov2013.doc DOC document
14-R-0001-Atch1-PWS-Apdx5-ORA-Inventory.pdf PDF
14-R-0001-Atch1-PWS-TE_1-8-10Oct13.pdf PDF
Cover-Ltr-RFP-5Nov13.pdf PDF
14-R-0001-Atch1-PWS-Apdx5a-ORA-Maps.pdf PDF
14-R-0001-Atch1-PWS-10Oct13.pdf PDF
14-R-0001-Atch1-PWS-TE2.pdf PDF
14-R-0001-Atch2-Sub-KTR-ConsentForm.pdf PDF
14-R-0001-Atch3-PPID.pdf PDF
14-R-0001-Atch1-PWS-Apdx_1-22-10Oct13.pdf PDF
14-R-0001-Atch4-PPQ.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

700TH CONTRACTING SQ

KAPAUN AIR STATION, GEB. 2767

D-67661 KAISERSLAUTERN

GERMANY

UNDER DPAS (15 CFR 700)

11. DELIVERY FOR FOB

RFQ

SEE SCHEDULE

14. METHOD OF SOLICITATION

IFB RFP

CODE

SEE ADDENDUM

BLOCK IS MARKED

DESTINATION UNLESS

12. DISCOUNT TERMS

(No Collect Calls)

13b. RATING

13a. THIS CONTRACT IS A RATED ORDER

X

CODE

FA5613-14-R-0001 05-Nov-2013

b. TELEPHONE NUMBER

(49) 0631-536-7635

8. OFFER DUE DATE/LOCAL TIME

12:00 PM 10 Dec 2013

5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV 3/2005)

Prescribed by GSA

FAR (48 CFR) 53.212

(TYPE OR PRINT)

(SIGNATURE OF CONTRACTING OFFICER) 31c. DATE SIGNED

ADDENDA X ARE

26. TOTAL AWARD AMOUNT (For Govt. Use Only)

22. UNIT 23. UNIT PRICE 24. AMOUNT 21. QUANTITY

CODE 10. THIS ACQUISITION IS

UNRESTRICTED

FAX: NAICS:

TEL:

CODE 18a. PAYMENT WILL BE MADE BY OFFEROR

SUCH ADDRESS IN OFFER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT

BELOW IS CHECKED

TEL.

FA5613

SIZE STD:

9. ISSUED BY

FACILITY

CODE

17a.CONTRACTOR/

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK

15. DELIVER TO CODE 16. ADMINISTERED BY

SEE SCHEDULE

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME

GABRIELE BINDER

2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER

(TYPE OR PRINT)

30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA

1 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED. X

25. ACCOUNTING AND APPROPRIATION DATA

1. REQUISITION NUMBER

19. ITEM NO. 20. SCHEDULE OF SUPPLIES/ SERVICES

SEE SCHEDULE

TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER ALL ITEMS

SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL SHEETS

SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED HEREIN.

SB

HUBZONE SB

SET ASIDE: % FOR

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

TEL: EMAIL:

3 COPIES

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

. OFFER DATED YOUR OFFER ON SOLICITATION

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN 29. AWARD OF CONTRACT: REFERENCE X

8(A)

SVC-DISABLED VET-OWNED SB

EMERGING SB

X

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

(CONTINUED)

SEE SCHEDULE

19. ITEM NO. 20. SCHEDULE OF SUPPLIES/ SERVICES 21. QUANTITY 22. UNIT 24. AMOUNT

PAGE 2 OF

23. UNIT PRICE

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f. TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

37. CHECK NUMBER

FINAL PARTIAL COMPLETE

36. PAYMENT 35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER

FINAL

33. SHIP NUMBER

PARTIAL

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT 41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV 3/2005) BACK

Prescribed by GSA

FAR (48 CFR) 53.212

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

FA5613-14-R-0001

Section SF 1449 - CONTINUATION SHEET

ITEM NO SUPPLIES/SERVICES ESTIMATED

QUANTITY

UNIT UNIT PRICE ESTIMATED AMOUNT

0001 NOT SEPARATELY

PRICED

PHASE-IN PERIOD

FFP

PHASE IN PERIOD FOR FAMILY HOUSING MAINTENANCE SERVICES AS

DESCRIBED IN THE PERFORMANCE WORK STATEMENT (PWS),

ATTACHMENT 1.

PHASE-IN PERIOD FROM 1 JUL 2014 - 30 SEP 2014

FOB: Destination

SIGNAL CODE: A

ESTIMATED

NET AMT

NOT SEPARATELY

PRICED

UNIT UNIT PRICE ESTIMATED AMOUNT

CHANGE OF OCCUPANCY MAINTENANCE (COM)

FFP

COM MAINTENANCE SERVICES SHALL BE PERFORMED FOR THE

FAMILY HOUSING UNITS DESCRIBED IN THE SUBSEQUENT PRICED

SUB-CLINS IN ACCORDANCE WITH THE PWS, ATTACHMENT 1.

(Reference PWS, Paragraph 1.3.7.17.)

BASE PERIOD: 1 OCT 2014 - 30 SEP 2015

UNIT UNIT PRICE ESTIMATED AMOUNT

0002AA 293 Unit

COM MAINTENANCE

FFP

2 BEDROOM (BR) STAIRWELL UNIT / 2 BR TOWNHOUSE

BASE PERIOD: 1 OCT 2014 - 30 SEP 2015

UNIT UNIT PRICE ESTIMATED AMOUNT

0002AB 250 Unit

COM MAINTENANCE

FFP

3 BR TOWNHOUSE / 2 BR STAIRWELL UNIT WITH DEN

BASE PERIOD: 1 OCT 2014 - 30 SEP 2015

UNIT UNIT PRICE ESTIMATED AMOUNT

0002AC 195 Unit

COM MAINTENANCE

FFP

4 BR TOWNHOUSE / 3 BR STAIRWELL UNIT WITH DEN

BASE PERIOD: 1 OCT 2014 - 30 SEP 2015

UNIT UNIT PRICE ESTIMATED AMOUNT

0002AD 3 Unit

COM MAINTENANCE

FFP

4 BR TOWNHOUSE WITH BASEMENT (R1112, R1118, R1140, R1141)

BASE PERIOD: 1 OCT 2014 - 30 SEP 2015

UNIT UNIT PRICE ESTIMATED AMOUNT

0002AE 3 Unit

COM MAINTENANCE

FFP

4 BR HOUSE WITH BASEMENT, FREE STANDING (R1010, R1012, R1013)

BASE PERIOD: 1 OCT 2014 - 30 SEP 2015

UNIT UNIT PRICE ESTIMATED AMOUNT

0002AF 5 Unit

COM MAINTENANCE

FFP

4 BR HOUSE, FREE STANDING

BASE PERIOD: 1 OCT 2014 - 30 SEP 2015

UNIT UNIT PRICE ESTIMATED AMOUNT

0002AG 1 Unit

COM MAINTENANCE

FFP

4 BR SPECIAL COMMAND POSITION (SCP) UNIT, FREE STANDING

BASE PERIOD: 1 OCT 2014 - 30 SEP 2015

UNIT UNIT PRICE ESTIMATED AMOUNT

(COM) CLEANING

FFP

COM CLEANING SERVICES SHALL BE PERFORMED FOR THE FAMILY

HOUSING UNITS DESCRIBED IN THE SUBSEQUENT PRICED SUB-CLINS

IN ACCORDANCE WITH THE PWS, ATTACHMENT 1.

(Reference PWS, Paragraph 1.3.7.18.)

BASE PERIOD: 1 OCT 2014 - 30 SEP 2015

UNIT UNIT PRICE ESTIMATED AMOUNT

0003AA 293 Unit

(COM) CLEANING

FFP

2 BR STAIRWELL UNIT / 2 BR TOWNHOUSE

BASE PERIOD: 1 OCT 2014 - 30 SEP 2015

UNIT UNIT PRICE ESTIMATED AMOUNT

0003AB 250 Unit

(COM) CLEANING

FFP

3 BR TOWNHOUSE / 2 BR STAIRWELL UNIT WITH DEN

BASE PERIOD: 1 OCT 2014 - 30 SEP 2015

UNIT UNIT PRICE ESTIMATED AMOUNT

0003AC 195 Unit

(COM) CLEANING

FFP

4 BR TOWNHOUSE / 3 BR STAIRWELL UNIT WITH DEN

BASE PERIOD: 1 OCT 2014 - 30 SEP 2015

UNIT UNIT PRICE ESTIMATED AMOUNT

0003AD 3 Unit

(COM) CLEANING

FFP

4 BR TOWNHOUSE WITH BASEMENT (R1112, R1118, R1140, R1141)

BASE PERIOD: 1 OCT 2014 - 30 SEP 2015

UNIT UNIT PRICE ESTIMATED AMOUNT

0003AE 3 Unit

(COM) CLEANING

FFP

4 BR HOUSE WITH BASEMENT, FREE STANDING (R1010, R1012, R1013)

BASE PERIOD: 1 OCT 2014 - 30 SEP 2015

UNIT UNIT PRICE ESTIMATED AMOUNT

0003AF 5 Unit

(COM) CLEANING

FFP

4 BR HOUSE, FREE STANDING

BASE PERIOD: 1 OCT 2014 - 30 SEP 2015

UNIT UNIT PRICE ESTIMATED AMOUNT

0003AG 1 Unit

(COM) CLEANING

FFP

4 BR SPECIAL COMMAND POSITION (SCP) UNIT, FREE STANDING

BASE PERIOD: 1 OCT 2014 - 30 SEP 2015

UNIT UNIT PRICE ESTIMATED AMOUNT

PAINTING

FFP

PAINTING SERVICES SHALL BE PERFORMED FOR THE FAMILY

HOUSING UNITS DESCRIBED IN THE SUBSEQUENT PRICED SUB-CLINS

IN ACCORDANCE WITH THE PWS, ATTACHMENT 1.

(Reference PWS, Paragraphs 1.3.7.2., 1.3.7.3., 1.3.7.5., and 1.3.7.6.)

BASE PERIOD: 1 OCT 2014 - 30 SEP 2015

UNIT UNIT PRICE ESTIMATED AMOUNT

0004AA 325,000 Square Meter

INTERIOR PAINT

FFP

(PWS, Paragraph 1.3.7.6.)

BASE PERIOD: 1 OCT 2014 - 30 SEP 2015

UNIT UNIT PRICE ESTIMATED AMOUNT

0004AB 4,000 Square

EXTERIOR PAINT

(PWS, Paragraph 1.3.7.6.)

BASE PERIOD: 1 OCT 2014 - 30 SEP 2015

UNIT UNIT PRICE ESTIMATED AMOUNT

0004AC 930 Square

REPAIR&PAINT EXTERIOR INSULATION/MASONRY

(PWS, Paragraph 1.3.7.5.)

BASE PERIOD: 1 OCT 2014 - 30 SEP 2015

UNIT UNIT PRICE ESTIMATED AMOUNT

PAINT AND WALL (CEILING) COVERING

FFP

PAINT AND WALL (CEILING) COVERING SERVICES SHALL BE

PERFORMED FOR THE FAMILY HOUSING UNITS DESCRIBED IN THE

SUBSEQUENT PRICED SUB-CLINS IN ACCORDANCE WITH THE PWS,

ATTACHMENT 1.

(Reference PWS, Paragraphs 1.3.7.3., 1.3.7.4., and 1.3.7.8.)

BASE PERIOD: 1 OCT 2014 - 30 SEP 2015

UNIT UNIT PRICE ESTIMATED AMOUNT

0005AA 300 Square

WALL OR CEILING COVERING

(PWS, Paragraph 1.3.7.4.)

BASE PERIOD: 1 OCT 2014 - 30 SEP 2015

UNIT UNIT PRICE ESTIMATED AMOUNT

0005AB 1,000 Square

REPLACE CERAMIC WALL TILE

(PWS, Paragraph 1.3.7.8.)

BASE PERIOD: 1 OCT 2014 - 30 SEP 2015

UNIT UNIT PRICE ESTIMATED AMOUNT

FLOORING

FFP

FLOORING SERVICES SHALL BE PERFORMED FOR THE FAMILY

HOUSING UNITS DESCRIBED IN THE SUBSEQUENT PRICED SUB-CLINS

IN ACCORDANCE WITH THE PWS, ATTACHMENT 1.

(Reference PWS, Paragraph 1.3.7.9.)

BASE PERIOD: 1 OCT 2014 - 30 SEP 2015

UNIT UNIT PRICE ESTIMATED AMOUNT

0006AA 28,000 Square

HARD WOOD FLOOR FINISH

(PWS, Paragraph 1.3.7.9.1.)

BASE PERIOD: 1 OCT 2014 - 30 SEP 2015

UNIT UNIT PRICE ESTIMATED AMOUNT

0006AB 3,000 Square

REPLACE WOOD FLOOR

(PWS, Paragraph 1.3.7.9.2.1.)

BASE PERIOD: 1 OCT 2014 - 30 SEP 2015

UNIT UNIT PRICE ESTIMATED AMOUNT

0006AC 100 Square

REPLACE WOOD PAH

(PWS, Paragraph 1.3.7.9.2.4.)

BASE PERIOD: 1 OCT 2014 - 30 SEP 2015

UNIT UNIT PRICE ESTIMATED AMOUNT

0006AD 500 Square

REPLACE CERMIC FLOOR TILE

(PWS, Paragraph 1.3.7.9.2.2.)

BASE PERIOD: 1 OCT 2014 - 30 SEP 2015

UNIT UNIT PRICE ESTIMATED AMOUNT

0006AE 150 Square

REPLACE PVC FLOOR

(PWS, Paragraph 1.3.7.9.2.3.)

BASE PERIOD: 1 OCT 2014 - 30 SEP 2015

UNIT UNIT PRICE ESTIMATED AMOUNT

0006AF 2,000 Square

CARPET MAINTENANCE

(PWS, Paragraph 1.3.7.9.4.)

BASE PERIOD: 1 OCT 2014 - 30 SEP 2015

UNIT UNIT PRICE ESTIMATED AMOUNT

0006AG 100 Square

REPLACE LAMINATE FLOOR

(PWS, Paragraph 1.3.7.9.2.6.)

BASE PERIOD: 1 OCT 2014 - 30 SEP 2015

UNIT UNIT PRICE ESTIMATED AMOUNT

0006AH 3,600 Square

REPLACE CARPET WITH CERAMIC TILE

(PWS, Paragraph 1.3.7.9.3.)

BASE PERIOD: 1 OCT 2014 - 30 SEP 2015

UNIT UNIT PRICE ESTIMATED AMOUNT

0006AJ 100 Square

REPLACE GRANITE FLOOR TILE

(PWS, Paragraph 1.3.7.9.2.7.)

BASE PERIOD: 1 OCT 2014 - 30 SEP 2015

UNIT UNIT PRICE ESTIMATED AMOUNT

0006AK 50 Square

REPLACE GARAGE FLOOR SURFACE TILE

(PWS, Paragraph 1.3.7.9.5.3.)

BASE PERIOD: 1 OCT 2014 - 30 SEP 2015

UNIT UNIT PRICE ESTIMATED AMOUNT

0006AL 50 Square

REPLACE PRIVATE WALKWAY/DRIVEWAY

(PWS, Paragraph 1.3.7.9.5.2.)

BASE PERIOD: 1 OCT 2014 - 30 SEP 2015

UNIT UNIT PRICE ESTIMATED AMOUNT

0006AM 50 Square

REPLACE PATIO SURFACE STONE TILE

(PWS, Paragraph 1.3.7.9.5.1.)

BASE PERIOD: 1 OCT 2014 - 30 SEP 2015

UNIT UNIT PRICE ESTIMATED AMOUNT

0006AN 35,000 Linear

REPLACE SILICONE BASE/FLOOR EXPANSION

JOINT

(PWS, Paragraph 1.3.7.9.2.5.)

BASE PERIOD: 1 OCT 2014 - 30 SEP 2015

UNIT UNIT PRICE ESTIMATED AMOUNT

COUNTER TOP

FFP

COUNTER TOP SERVICES SHALL BE PERFORMED FOR THE FAMILY

HOUSING UNITS DESCRIBED IN THE SUBSEQUENT PRICED SUB-CLINS

IN ACCORDANCE WITH THE PWS, ATTACHMENT 1.

(Reference PWS, Paragraph 1.3.7.10.)

BASE PERIOD: 1 OCT 2014 - 30 SEP 2015

UNIT UNIT PRICE ESTIMATED AMOUNT

0007AA 20,000 Linear Centimet er

REPLACE COUNTER TOP

BASE PERIOD: 1 OCT 2014 - 30 SEP 2015

UNIT UNIT PRICE ESTIMATED AMOUNT

VANITY AND VANITY TOP

FFP

VANITY AND VANITY TOP SERVICES SHALL BE PERFORMED FOR THE

FAMILY HOUSING UNITS DESCRIBED IN THE SUBSEQUENT PRICED

SUB-CLINS IN ACCORDANCE WITH THE PWS, ATTACHMENT 1.

(Reference PWS, Paragraph 1.3.7.11.)

BASE PERIOD: 1 OCT 2014 - 30 SEP 2015

UNIT UNIT PRICE ESTIMATED AMOUNT

0008AA 4,000 Linear

REPLACE VANITY TOP

BASE PERIOD: 1 OCT 2014 - 30 SEP 2015

UNIT UNIT PRICE ESTIMATED AMOUNT

0008AB 10 Each

REPLACE VANITY

FFP

BASE PERIOD: 1 OCT 2014 - 30 SEP 2015

UNIT UNIT PRICE ESTIMATED AMOUNT

BATHTUB AND SHOWER BASE

FFP

BATHTUB AND SHOWER BASE SERVICES SHALL BE PERFORMED FOR

THE FAMILY HOUSING UNITS DESCRIBED IN THE SUBSEQUENT

PRICED SUB-CLINS IN ACCORDANCE WITH THE PWS, ATTACHMENT 1.

(Reference PWS, Paragraphs 1.3.7.12., and 1.3.7.13.)

BASE PERIOD: 1 OCT 2014 - 30 SEP 2015

UNIT UNIT PRICE ESTIMATED AMOUNT

0009AA 7 Each

REPLACE BATHTUB

FFP

(PWS, Paragraph 1.3.7.12)

BASE PERIOD: 1 OCT 2014 - 30 SEP 2015

UNIT UNIT PRICE ESTIMATED AMOUNT

0009AB 7 Each

REPLACE SHOWER BASE

FFP

(PWS, Paragraph 1.3.7.13.)

BASE PERIOD: 1 OCT 2014 - 30 SEP 2015

UNIT UNIT PRICE ESTIMATED AMOUNT

SELF-HELP STORE MATERIALS AND OPERATIONS

FFP

SELF-HELP STORE MATERIALS AND OPERATIONS SERVICES SHALL BE

PERFORMED FOR THE FAMILY HOUSING UNITS DESCRIBED IN THE

SUBSEQUENT PRICED SUB-CLINS IN ACCORDANCE WITH THE PWS,

ATTACHMENT 1.

(Reference PWS, Paragraph 1.10.)

BASE PERIOD: 1 OCT 2014 - 30 SEP 2015

UNIT UNIT PRICE ESTIMATED AMOUNT

0010AA 12 Months

SELF-HELP STORE OPERATION RAMSTEIN

FFP

BASE PERIOD: 1 OCT 2014 - 30 SEP 2015

UNIT UNIT PRICE ESTIMATED AMOUNT

0010AB 12 Months

SELF-HELP STORE OPERATION VOGELWEH

FFP

BASE PERIOD: 1 OCT 2014 - 30 SEP 2015

ITEM NO SUPPLIES/SERVICES EST .

UNIT UNIT PRICE AMOUNT

0010AC Lot

SELF-HELP STORE SUPPLIES AND MATERIAL

COST

BASE PERIOD: 1 OCT 2014 - 30 SEP 2015

ESTIMATED COST

UNIT UNIT PRICE ESTIMATED AMOUNT

APPLIANCES

FFP

APPLIANCES SERVICES SHALL BE PERFORMED FOR THE FAMILY

HOUSING UNITS DESCRIBED IN THE SUBSEQUENT PRICED SUB-CLINS

IN ACCORDANCE WITH THE PWS, ATTACHMENT 1.

(Reference PWS, Paragraphs 1.9.7., and 1.9.8.)

BASE PERIOD: 1 OCT 2014 - 30 SEP 2015

UNIT UNIT PRICE AMOUNT

0011AA Lot

APPLIANCE, FREE STANDING

COST

BASE PERIOD: 1 OCT 2014 - 30 SEP 2015

UNIT UNIT PRICE AMOUNT

0011AB Lot

APPLIANCE, BUILT-IN

COST

BASE-PERIOD: 1 OCT 2014 - 30 SEP 2015

UNIT UNIT PRICE ESTIMATED AMOUNT

UTILITY MAINTENANCE

FFP

UTILITY MAINTENANCE SERVICES SHALL BE PERFORMED FOR THE

FAMILY HOUSING UNITS DESCRIBED IN THE SUBSEQUENT PRICED

SUB-CLINS IN ACCORDANCE WITH THE PWS, ATTACHMENT 1.

(Reference PWS, Paragraph 1.6.4.)

BASE PERIOD: 1 OCT 2014 - 30 SEP 2015

UNIT UNIT PRICE ESTIMATED AMOUNT

0012AA 25 Linear

UNDERGROUND REPAIR

BASE PERIOD: 1 OCT 2014 - 30 SEP 2015

UNIT UNIT PRICE ESTIMATED AMOUNT

INDIVIDUAL YARD MAINTENANCE

FFP

INDIVIDUAL YARD MAINTENANCE SERVICES SHALL BE PERFORMED

FOR THE FAMILY HOUSING UNITS DESCRIBED IN THE SUBSEQUENT

PRICED SUB-CLINS IN ACCORDANCE WITH THE PWS, ATTACHMENT 1.

(Reference PWS, Paragraphs 1.3.7.14., and 1.3.7.15.)

BASE PERIOD: 1 OCT 2014 - 30 SEP 2015

UNIT UNIT PRICE ESTIMATED AMOUNT

0013AA 2,000 Square

MINOR LANDSCAPING INDIVIDUAL YARD SEED

(PWS, Paragraph 1.3.7.14.1)

BASE PERIOD: 1 OCT 2014 - 30 SEP 2015

UNIT UNIT PRICE ESTIMATED AMOUNT

0013AB 2,000 Square

MINOR LANDSCAPING INDIVIDUAL YARD SOD

(PWS, Paragraph 1.3.7.14.2.)

BASE PERIOD: 1 OCT 2014 - 30 SEP 2015

UNIT UNIT PRICE ESTIMATED AMOUNT

0013AC 9,000 Square

MINOR LANDSCAPING INDIVIDUAL YARD MULCH

(PWS, Paragraph 1.3.7.14.3.)

BASE PERIOD: 1 OCT 2014 - 30 SEP 2015

UNIT UNIT PRICE ESTIMATED AMOUNT

0013AD 25,000 Square

EXTERIOR GROUNDS MAINTENANCE

(PWS, Paragraph 1.3.7.15.)

BASE PERIOD: 1 OCT 2014 - 30 SEP 2015

UNIT UNIT PRICE ESTIMATED AMOUNT

SNOW AND ICE REMOVAL

FFP

SNOW AND ICE REMOVAL SERVICES SHALL BE PERFORMED FOR THE

FAMILY HOUSING UNITS DESCRIBED IN THE SUBSEQUENT PRICED

SUB-CLINS IN ACCORDANCE WITH THE PWS, ATTACHMENT 1.

(Reference PWS, Paragraph 1.3.7.16.)

BASE PERIOD: 1 OCT 2014 - 30 SEP 2015

UNIT UNIT PRICE ESTIMATED AMOUNT

0014AA 50,000 Linear

SNOW AND ICE REMOVAL

BASE PERIOD: 1 OCT 2014 - 30 SEP 2015

UNIT UNIT PRICE ESTIMATED AMOUNT

FACILITY CLEANING

FFP

FACILITY CLEANING SERVICES SHALL BE PERFORMED FOR THE

FAMILY HOUSING UNITS DESCRIBED IN THE SUBSEQUENT PRICED

SUB-CLINS IN ACCORDANCE WITH THE PWS, ATTACHMENT 1.

(Reference PWS, Paragraphs 1.3.7.25.)

BASE PERIOD: 1 OCT 2014 - 30 SEP 2015

UNIT UNIT PRICE ESTIMATED AMOUNT

0015AA 21,008 Each

REGULAR STAIRWELL CLEANING

FFP

(PWS, Paragraph 1.3.7.25.3.)

BASE PERIOD: 1 OCT 2014 - 30 SEP 2015

UNIT UNIT PRICE ESTIMATED AMOUNT

0015AB 50 Each

EXTENSIVE CLEANING

FFP

(PWS, Paragraph 1.3.7.25.4.)

BASE PERIOD: 1 OCT 2014 - 30 SEP 2015

UNIT UNIT PRICE ESTIMATED AMOUNT

0015AC 404 Each

PERIODIC CLEANING

FFP

(PWS, Paragraph 1.3.7.25.5.)

BASE PERIOD: 1 OCT 2014 - 30 SEP 2015

UNIT UNIT PRICE ESTIMATED AMOUNT

HAZARDOUS WASTE& ABANDONED WASTE REMOVAL

FFP

HAZARDOUS WASTE AND ABANDONED WASTE REMOVAL SERVICES

SHALL BE PERFORMED FOR THE FAMILY HOUSING UNITS DESCRIBED

IN THE SUBSEQUENT PRICED SUB-CLINS IN ACCORDANCE WITH THE

PWS, ATTACHMENT 1.

(Reference PWS, Paragraphs 1.3.7.7., 1.3.7.19., 1.3.7.20., 1.3.7.22., and 1.3.7.26.)

BASE PERIOD: 1 OCT 2014 - 30 SEP 2015

UNIT UNIT PRICE ESTIMATED AMOUNT

0016AA 10 Cubic

HAZARDOUS WASTE REMOVAL

(PWS, Paragraph 1.3.7.7.)

BASE PERIOD: 1 Oct 2014 - 30 SEP 2015

UNIT UNIT PRICE ESTIMATED AMOUNT

0016AB 50 Cubic

HOUSEHOLD HAZARDOUS WASTE

(PWS, Paragraph 1.3.7.19.)

BASE PERIOD: 1 OCT 2014 - 30 SEP 2015

UNIT UNIT PRICE ESTIMATED AMOUNT

0016AC 200 Each

AUTOMOBILE TIRES AND BATTERIES

FFP

(PWS, Paragraph 1.3.7.20.)

BASE PERIOD: 1 OCT 2014 - 30 SEP 2015

UNIT UNIT PRICE ESTIMATED AMOUNT

0016AD 200 Cubic

ABANDONED TRASH REMOVAL

(PWS, Paragraph 1.3.7.22.)

BASE PERIOD: 1 OCT 2014 - 30 SEP 2015

UNIT UNIT PRICE ESTIMATED AMOUNT

0016AE 100 Each

PET RELIEF STATIONS

FFP

(INSPECTION AND BAG REPLACEMENT)

(PWS, Paragraph 1.3.7.26.)

BASE PERIOD: 1 OCT 2014 - 30 SEP 2015

UNIT UNIT PRICE ESTIMATED AMOUNT

DUST-DOWN CLEANING

FFP

DUST-DOWN CLEANING SERVICES SHALL BE PERFORMED FOR THE

FAMILY HOUSING UNITS DESCRIBED IN THE SUBSEQUENT PRICED

SUB-CLINS IN ACCORDANCE WITH THE PWS, ATTACHMENT 1.

(Reference PWS, Paragraph 1.3.7.24.)

BASE PERIOD: 1 OCT 2014 - 30 SEP 2015

UNIT UNIT PRICE ESTIMATED AMOUNT

0017AA 15 Each

DUST-DOWN CLEANING (IN UNITS)

FFP

AVERAGE HOURS PER CALL: 3.5 HOURS

BASE PERIOD: 1 OCT 2014 - 30 SEP 2015

UNIT UNIT PRICE ESTIMATED AMOUNT

SPECIAL REQUEST CLEANING

FFP

SPECIAL REQUEST CLEANING SERVICES SHALL BE PERFORMED FOR

THE FAMILY HOUSING UNITS DESCRIBED IN THE SUBSEQUENT

PRICED SUB-CLINS IN ACCORDANCE WITH THE PWS, ATTACHMENT 1.

(Reference PWS, Paragraph 1.3.7.23.)

BASE PERIOD: 1 OCT 2014 - 30 SEP 2015

UNIT UNIT PRICE ESTIMATED AMOUNT

0018AA 12 Each

SPECIAL REQUEST CLEANING

FFP

AVERAGE HOURS PER CALL: 5.5 HOURS

BASE PERIOD: 1 OCT 2014 - 30 SEP 2015

UNIT UNIT PRICE ESTIMATED AMOUNT

FIRE DAMAGE CLEANING

FFP

FIRE DAMAGE CLEANING SERVICES SHALL BE PERFORMED FOR THE

FAMILY HOUSING UNITS DESCRIBED IN THE SUBSEQUENT PRICED

SUB-CLINS IN ACCORDANCE WITH THE PWS, ATTACHMENT 1.

(Reference PWS, Paragraph 1.3.7.21.)

BASE PERIOD: 1 OCT 2014 - 30 SEP 2015

UNIT UNIT PRICE ESTIMATED AMOUNT

0019AA 2 Each

FIRE DAMAGE CLEANING

FFP

AVERAGE HOURS PER CALL: 2 HOURS

BASE PERIOD: 1 OCT 2014 - 30 SEP 2015

UNIT UNIT PRICE ESTIMATED AMOUNT

DSW AND RWP PROGRAM

FFP

DIRECT SCHEDULED WORK (DSW) AND RECURRING WORK PROGRAM

(RWP) SERVICES SHALL BE PERFORMED FOR THE FAMILY HOUSING

UNITS DESCRIBED IN THE SUBSEQUENT PRICED SUB-CLINS IN

ACCORDANCE WITH THE PWS, ATTACHMENT 1.

(Reference PWS, Paragraph 1.4., AND 1.5.)

BASE PERIOD: 1 OCT 2014 - 30 SEP 2015

UNIT UNIT PRICE ESTIMATED AMOUNT

0020AA 12 Months

DSW AND RWP - RAMSTEIN

FFP

BASIC PERIOD: 1 OCT 2014 - 30 SEP 2015

UNIT UNIT PRICE ESTIMATED AMOUNT

0020AB 12 Months

DSW AND RWP - VOGELWEH

BASE PERIOD: 1 OCT 2014 - 30 SEP 2015

UNIT UNIT PRICE ESTIMATED AMOUNT

0020AC 12 Months

DSW AND RWP - LANDSTUHL

FFP

BASE PERIOD: 1 OCT 2014 - 30 SEP 2015

UNIT UNIT PRICE AMOUNT

MATERIAL

COST

MATERIAL REQUIRED FOR THE PERFORMANCE OF FAMILY HOUSING

MAINTENANCE SERVICES SHALL BE HANDLED AS DESCRIBED IN THE

SUBSEQUENT PRICED SUB-CLINS IN ACCORDANCE WITH THE PWS,

ATTACHMENT 1.

(Reference PWS, Paragraph 1.4.1.)

BASE PERIOD: 1 OCT 2014 - 30 SEP 2015

UNIT UNIT PRICE AMOUNT

0021AA Lot

MATERIAL

COST

BASE PERIOD: 1 OCT 2014 - 30 SEP 2015

UNIT UNIT PRICE AMOUNT

OVER AND ABOVE WORK

COST

SERVICES SHALL BE PERFORMED AS DESCRIBED IN THE

SUBSEQUENT PRICED SUB-CLINS IN ACCORDANCE WITH THE PWS,

ATTACHMENT 1.

(Reference PWS, Paragraph 1.16.8.)

BASE PERIOD: 1 OCT 2014 - 30 SEP 2015

UNIT UNIT PRICE AMOUNT

0022AA Lot

OVER AND ABOVE WORK

COST

OVER AND ABOVE WORK TO BE USED FOR SERVICES WITHIN THE

SCOPE OF THE CONTRACT, BUT NOT INCLUDED IN THE SCOPE

BASELINE - REFERENCE DFARS 252.217-7028.

BASE PERIOD: 1 OCT 2014 - 30 SEP 2015

UNIT UNIT PRICE AMOUNT

BACKLOG

COST

SERVICES SHALL BE PERFORMED AS DESCRIBED IN THE

SUBSEQUENT PRICED SUB-CLINS IN ACCORDANCE WITH THE PWS,

ATTACHMENT 1.

(Reference PWS, Paragraph 1.16.7.)

BASE PERIOD: 1 OCT 2014 - 30 SEP 2015

UNIT UNIT PRICE AMOUNT

0023AA Lot

BACKLOG

COST

BACKLOG WORK FOR SERVICE CALLS, COMs AND SEPERATE BID ITEMS (SBIs) NOT COMPLETED BY THE INCUMBENT CONTRACTOR OF

THE PREVIOUS CONTRACT PRIOR TO ITS EXPIRATION DATE.

BASE PERIOD: 1 OCT 2014 - 30 SEP 2015

UNIT UNIT PRICE ESTIMATED AMOUNT

OPTION CHANGE OF OCCUPANCY MAINTENANCE (COM)

FFP

COM MAINTENANCE SERVICES SHALL BE PERFORMED FOR THE

FAMILY HOUSING UNITS DESCRIBED IN THE SUBSEQUENT PRICED

SUB-CLINS IN ACCORDANCE WITH THE PWS, ATTACHMENT 1.

(Reference PWS, Paragraph 1.3.7.17.)

1ST OPTION PERIOD: 1 OCT 2015 - 30 SEP 2016

UNIT UNIT PRICE ESTIMATED AMOUNT

1001AA 293 Unit

OPTION COM MAINTENANCE

FFP

2 BEDROOM (BR) STAIRWELL UNIT / 2 BR TOWNHOUSE

1ST OPTION PERIOD: 1 OCT 2015 - 30 SEP 2016

UNIT UNIT PRICE ESTIMATED AMOUNT

1001AB 250 Unit

OPTION COM MAINTENANCE

FFP

3 BR TOWNHOUSE / 2 BR STAIRWELL UNIT WITH DEN

1ST OPTION PERIOD: 1 OCT 2015 - 30 SEP 2016

UNIT UNIT PRICE ESTIMATED AMOUNT

1001AC 195 Unit

OPTION COM MAINTENANCE

FFP

4 BR TOWNHOUSE / 3 BR STAIRWELL UNIT WITH DEN

1ST OPTION PERIOD: 1 OCT 2015 - 30 SEP 2016

UNIT UNIT PRICE ESTIMATED AMOUNT

1001AD 3 Unit

OPTION COM MAINTENANCE

FFP

4 BR TOWNHOUSE WITH BASEMENT (R1112, R1118, R1140, R1141)

1ST OPTION PERIOD: 1 OCT 2015 - 30 SEP 2016

UNIT UNIT PRICE ESTIMATED AMOUNT

1001AE 3 Unit

OPTION COM MAINTENANCE

FFP

4 BR HOUSE WITH BASEMENT, FREE STANDING (R1010, R1012, R1013)

1ST OPTION PERIOD: 1 OCT 2015 - 30 SEP 2016

UNIT UNIT PRICE ESTIMATED AMOUNT

1001AF 5 Unit

OPTION COM MAINTENANCE

FFP

4 BR HOUSE, FREE STANDING

1ST OPTION PERIOD: 1 OCT 2015 - 30 SEP 2016

UNIT UNIT PRICE ESTIMATED AMOUNT

1001AG 1 Unit

OPTION COM MAINTENANCE

FFP

4 BR SPECIAL COMMAND POSITION (SCP) UNIT, FREE STANDING

1ST OPTION PERIOD: 1 OCT 2015 - 30 SEP 2016

UNIT UNIT PRICE ESTIMATED AMOUNT

OPTION (COM) CLEANING

FFP

COM CLEANING SERVICES SHALL BE PERFORMED FOR THE FAMILY

HOUSING UNITS DESCRIBED IN THE SUBSEQUENT PRICED SUB-CLINS

IN ACCORDANCE WITH THE PWS, ATTACHMENT 1.

(Reference PWS, Paragraph 1.3.7.18.)

1ST OPTION PERIOD: 1 OCT 2015 - 30 SEP 2016

UNIT UNIT PRICE ESTIMATED AMOUNT

1002AA 293 Unit

OPTION (COM) CLEANING

FFP

2 BR STAIRWELL UNIT / 2 BR TOWNHOUSE

1ST OPTION PERIOD: 1 OCT 2015 - 30 SEP 2016

UNIT UNIT PRICE ESTIMATED AMOUNT

1002AB 250 Unit

OPTION (COM) CLEANING

FFP

3 BR TOWNHOUSE / 2 BR STAIRWELL UNIT WITH DEN

1ST OPTION PERIOD: 1 OCT 2015 - 30 SEP 2016

UNIT UNIT PRICE ESTIMATED AMOUNT

1002AC 195 Unit

OPTION (COM) CLEANING

FFP

4 BR TOWNHOUSE / 3 BR STAIRWELL UNIT WITH DEN

1ST OPTION PERIOD: 1 OCT 2015 - 30 SEP 2016

UNIT UNIT PRICE ESTIMATED AMOUNT

1002AD 3 Unit

OPTION (COM) CLEANING

FFP

4 BR TOWNHOUSE WITH BASEMENT (R1112, R1118, R1140, R1141)

1ST OPTION PERIOD: 1 OCT 2015 - 30 SEP 2016

UNIT UNIT PRICE ESTIMATED AMOUNT

1002AE 3 Unit

OPTION (COM) CLEANING

FFP

4 BR HOUSE WITH BASEMENT, FREE STANDING (R1010, R1012, R1013)

1ST OPTION PERIOD: 1 OCT 2015 - 30 SEP 2016

UNIT UNIT PRICE ESTIMATED AMOUNT

1002AF 5 Unit

OPTION (COM) CLEANING

FFP

4 BR HOUSE, FREE STANDING

1ST OPTION PERIOD: 1 OCT 2015 - 30 SEP 2016

UNIT UNIT PRICE ESTIMATED AMOUNT

1002AG 1 Unit

OPTION (COM) CLEANING

FFP

4 BR SPECIAL COMMAND POSITION (SCP) UNIT, FREE STANDING

1ST OPTION PERIOD: 1 OCT 2015 - 30 SEP 2016

UNIT UNIT PRICE ESTIMATED AMOUNT

OPTION PAINTING

FFP

PAINTING SERVICES SHALL BE PERFORMED FOR THE FAMILY

HOUSING UNITS DESCRIBED IN THE SUBSEQUENT PRICED SUB-CLINS

IN ACCORDANCE WITH THE PWS, ATTACHMENT 1.

(Reference PWS, Paragraphs 1.3.7.2., 1.3.7.3., 1.3.7.5., and 1.3.7.6.)

1ST OPTION PERIOD: 1 OCT 2015 - 30 SEP 2016

UNIT UNIT PRICE ESTIMATED AMOUNT

1003AA 325,000 Square

OPTION INTERIOR PAINT

(PWS, Paragraph 1.3.7.6.)

1ST OPTION PERIOD: 1 OCT 2015 - 30 SEP 2016

UNIT UNIT PRICE ESTIMATED AMOUNT

1003AB 4,000 Square

OPTION EXTERIOR PAINT

(PWS, Paragraph 1.3.7.6.)

1ST OPTION PERIOD: 1 OCT 2015 - 30 SEP 2016

UNIT UNIT PRICE ESTIMATED AMOUNT

1003AC 930 Square

OPTION REPAIR&PAINT EXTERIOR INSULATION/MASONRY

(PWS, Paragraph 1.3.7.5.)

1ST OPTION PERIOD: 1 OCT 2015 - 30 SEP 2016

UNIT UNIT PRICE ESTIMATED AMOUNT

OPTION PAINT AND WALL (CEILING) COVERING

FFP

PAINT AND WALL (CEILING) COVERING SERVICES SHALL BE

PERFORMED FOR THE FAMILY HOUSING UNITS DESCRIBED IN THE

SUBSEQUENT PRICED SUB-CLINS IN ACCORDANCE WITH THE PWS,

ATTACHMENT 1.

(Reference PWS, Paragraphs 1.3.7.3., 1.3.7.4., and 1.3.7.8.)

1ST OPTION PERIOD: 1 OCT 2015 - 30 SEP 2016

UNIT UNIT PRICE ESTIMATED AMOUNT

1004AA 300 Square

OPTION WALL OR CEILING COVERING

(PWS, Paragraph 1.3.7.4.)

1ST OPTION PERIOD: 1 OCT 2015 - 30 SEP 2016

UNIT UNIT PRICE ESTIMATED AMOUNT

1004AB 1,000 Square

OPTION REPLACE CERAMIC WALL TILE

(PWS, Paragraph 1.3.7.8.)

1ST OPTION PERIOD: 1 OCT 2015 - 30 SEP 2016

UNIT UNIT PRICE ESTIMATED AMOUNT

OPTION FLOORING

FFP

FLOORING SERVICES SHALL BE PERFORMED FOR THE FAMILY

HOUSING UNITS DESCRIBED IN THE SUBSEQUENT PRICED SUB-CLINS

IN ACCORDANCE WITH THE PWS, ATTACHMENT 1.

(Reference PWS, Paragraph 1.3.7.9.)

1ST OPTION PERIOD: 1 OCT 2015 - 30 SEP 2016

UNIT UNIT PRICE ESTIMATED AMOUNT

1005AA 28,000 Square

OPTION HARD WOOD FLOOR FINISH

(PWS, Paragraph 1.3.7.9.1.)

1ST OPTION PERIOD: 1 OCT 2015 - 30 SEP 2016

UNIT UNIT PRICE ESTIMATED AMOUNT

1005AB 3,000 Square

OPTION REPLACE WOOD FLOOR

(PWS, Paragraph 1.3.7.9.2.1.)

1ST OPTION PERIOD: 1 OCT 2015 - 30 SEP 2016

UNIT UNIT PRICE ESTIMATED AMOUNT

1005AC 100 Square

OPTION REPLACE WOOD PAH

(PWS, Paragraph 1.3.7.9.2.4.)

1ST OPTION PERIOD: 1 OCT 2015 - 30 SEP 2016

UNIT UNIT PRICE ESTIMATED AMOUNT

1005AD 500 Square

OPTION REPLACE CERMIC FLOOR TILE

(PWS, Paragraph 1.3.7.9.2.2.)

1ST OPTION PERIOD: 1 OCT 2015 - 30 SEP 2016

UNIT UNIT PRICE ESTIMATED AMOUNT

1005AE 150 Square

OPTION REPLACE PVC FLOOR

(PWS, Paragraph 1.3.7.9.2.3.)

1ST OPTION PERIOD: 1 OCT 2015 - 30 SEP 2016

UNIT UNIT PRICE ESTIMATED AMOUNT

1005AF 2,000 Square

OPTION CARPET MAINTENANCE

(PWS, Paragraph 1.3.7.9.4.)

1ST OPTION PERIOD: 1 OCT 2015 - 30 SEP 2016

UNIT UNIT PRICE ESTIMATED AMOUNT

1005AG 100 Square

OPTION REPLACE LAMINATE FLOOR

(PWS, Paragraph 1.3.7.9.2.6.)

1ST OPTION PERIOD: 1 OCT 2015 - 30 SEP 2016

UNIT UNIT PRICE ESTIMATED AMOUNT

1005AH 3,600 Square

OPTION REPLACE CARPET WITH CERAMIC TILE

(PWS, Paragraph 1.3.7.9.3.)

1ST OPTION PERIOD: 1 OCT 2015 - 30 SEP 2016

UNIT UNIT PRICE ESTIMATED AMOUNT

1005AJ 100 Square

OPTION REPLACE GRANITE FLOOR TILE

(PWS, Paragraph 1.3.7.9.2.7.)

1ST OPTION PERIOD: 1 OCT 2015 - 30 SEP 2016

UNIT UNIT PRICE ESTIMATED AMOUNT

1005AK 50 Square

OPTION REPLACE GARAGE FLOOR SURFACE TILE

(PWS, Paragraph 1.3.7.9.5.3.)

1ST OPTION PERIOD: 1 OCT 2015 - 30 SEP 2016

UNIT UNIT PRICE ESTIMATED AMOUNT

1005AL 50 Square

OPTION REPLACE PRIVATE WALKWAY/DRIVEWAY

(PWS, Paragraph 1.3.7.9.5.2.)

1ST OPTION PERIOD: 1 OCT 2015 - 30 SEP 2016

UNIT UNIT PRICE ESTIMATED AMOUNT

1005AM 50 Square

OPTION REPLACE PATIO SURFACE STONE TILE

(PWS, Paragraph 1.3.7.9.5.1.)

1ST OPTION PERIOD: 1 OCT 2015 - 30 SEP 2016

UNIT UNIT PRICE ESTIMATED AMOUNT

1005AN 35,000 Linear

OPTION REPLACE SILICONE BASE/FLOOR EXPANSION

JOINT

(PWS, Paragraph 1.3.7.9.2.5.)

1ST OPTION PERIOD: 1 OCT 2015 - 30 SEP 2016

UNIT UNIT PRICE ESTIMATED AMOUNT

OPTION COUNTER TOP

FFP

COUNTER TOP SERVICES SHALL BE PERFORMED FOR THE FAMILY

HOUSING UNITS DESCRIBED IN THE SUBSEQUENT PRICED SUB-CLINS

IN ACCORDANCE WITH THE PWS, ATTACHMENT 1.

(Reference PWS, Paragraph 1.3.7.10.)

1ST OPTION PERIOD: 1 OCT 2015 - 30 SEP 2016

UNIT UNIT PRICE ESTIMATED AMOUNT

1006AA 20,000 Linear

OPTION REPLACE COUNTER TOP

1ST OPTION PERIOD: 1 OCT 2015 - 30 SEP 2016

UNIT UNIT PRICE ESTIMATED AMOUNT

OPTION VANITY AND VANITY TOP

FFP

VANITY AND VANITY TOP SERVICES SHALL BE PERFORMED FOR THE

FAMILY HOUSING UNITS DESCRIBED IN THE SUBSEQUENT PRICED

SUB-CLINS IN ACCORDANCE WITH THE PWS, ATTACHMENT 1.

(Reference PWS, Paragraph 1.3.7.11.)

1ST OPTION PERIOD: 1 OCT 2015 - 30 SEP 2016

UNIT UNIT PRICE ESTIMATED AMOUNT

1007AA 4,000 Linear

OPTION REPLACE VANITY TOP

1ST OPTION PERIOD: 1 OCT 2015 - 30 SEP 2016

UNIT UNIT PRICE ESTIMATED AMOUNT

1007AB 10 Each

OPTION REPLACE VANITY

FFP

1ST OPTION PERIOD: 1 OCT 2015 - 30 SEP 2016

UNIT UNIT PRICE ESTIMATED AMOUNT

OPTION BATHTUB AND SHOWER BASE

FFP

BATHTUB AND SHOWER BASE SERVICES SHALL BE PERFORMED FOR

THE FAMILY HOUSING UNITS DESCRIBED IN THE SUBSEQUENT

PRICED SUB-CLINS IN ACCORDANCE WITH THE PWS, ATTACHMENT 1.

(Reference PWS, Paragraphs 1.3.7.12., and 1.3.7.13.)

1ST OPTION PERIOD: 1 OCT 2015 - 30 SEP 2016

UNIT UNIT PRICE ESTIMATED AMOUNT

1008AA 7 Each

OPTION REPLACE BATHTUB

FFP

(PWS, Paragraph 1.3.7.12)

1ST OPTION PERIOD: 1 OCT 2015 - 30 SEP 2016

UNIT UNIT PRICE ESTIMATED AMOUNT

1008AB 7 Each

OPTION REPLACE SHOWER BASE

FFP

(PWS, Paragraph 1.3.7.13.)

1ST OPTION PERIOD: 1 OCT 2015 - 30 SEP 2016

UNIT UNIT PRICE ESTIMATED AMOUNT

OPTION SELF-HELP STORE MATERIALS AND OPERATIONS

FFP

SELF-HELP STORE MATERIALS AND OPERATIONS SERVICES SHALL BE

PERFORMED FOR THE FAMILY HOUSING UNITS DESCRIBED IN THE

SUBSEQUENT PRICED SUB-CLINS IN ACCORDANCE WITH THE PWS,

ATTACHMENT 1.

(Reference PWS, Paragraph 1.10.)

1ST OPTION PERIOD: 1 OCT 2015 - 30 SEP 2016

UNIT UNIT PRICE ESTIMATED AMOUNT

1009AA 12 Months

OPTION SELF-HELP STORE OPERATION RAMSTEIN

FFP

1ST OPTION PERIOD: 1 OCT 2015 - 30 SEP 2016

UNIT UNIT PRICE ESTIMATED AMOUNT

1009AB 12 Months

OPTION SELF-HELP STORE OPERATION VOGELWEH

FFP

1ST OPTION PERIOD: 1 OCT 2015 - 30 SEP 2016

UNIT UNIT PRICE AMOUNT

1009AC Lot

OPTION SELF HELP STORE SUPPLIES AND MATERIAL

COST

1ST OPTION PERIOD: 1 OCT 2015 - 30 SEP 2016

UNIT UNIT PRICE ESTIMATED AMOUNT

OPTION APPLIANCES

FFP

APPLIANCES SERVICES SHALL BE PERFORMED FOR THE FAMILY

HOUSING UNITS DESCRIBED IN THE SUBSEQUENT PRICED SUB-CLINS

IN ACCORDANCE WITH THE PWS, ATTACHMENT 1.

(Reference PWS, Paragraphs 1.9.7., and 1.9.8.)

1ST OPTION PERIOD: 1 OCT 2015 - 30 SEP 2016

UNIT UNIT PRICE AMOUNT

1010AA Lot

OPTION APPLIANCE, FREE STANDING

COST

1ST OPTION PERIOD: 1 OCT 2015 - 30 SEP 2016

UNIT UNIT PRICE AMOUNT

1010AB Lot

OPTION APPLIANCE, BUILT-IN

COST

1ST OPTION PERIOD: 1 OCT 2015 - 30 SEP 2016

UNIT UNIT PRICE ESTIMATED AMOUNT

OPTION UTILITY MAINTENANCE

FFP

UTILITY MAINTENANCE SERVICES SHALL BE PERFORMED FOR THE

FAMILY HOUSING UNITS DESCRIBED IN THE SUBSEQUENT PRICED

SUB-CLINS IN ACCORDANCE WITH THE PWS, ATTACHMENT 1.

(Reference PWS, Paragraph 1.6.4.)

1ST OPTION PERIOD: 1 OCT 2015 - 30 SEP 2016

UNIT UNIT PRICE ESTIMATED AMOUNT

1011AA 25 Linear

OPTION UNDERGROUND REPAIR

1ST OPTION PERIOD: 1 OCT 2015 - 30 SEP 2016

UNIT UNIT PRICE ESTIMATED AMOUNT

OPTION INDIVIDUAL YARD MAINTENANCE

FFP

INDIVIDUAL YARD MAINTENANCE SERVICES SHALL BE PERFORMED

FOR THE FAMILY HOUSING UNITS DESCRIBED IN THE SUBSEQUENT

PRICED SUB-CLINS IN ACCORDANCE WITH THE PWS, ATTACHMENT 1.

(Reference PWS, Paragraphs 1.3.7.14., and 1.3.7.15.)

1ST OPTION PERIOD: 1 OCT 2015 - 30 SEP 2016

UNIT UNIT PRICE ESTIMATED AMOUNT

1012AA 2,000 Square

OPTION MINOR LANDSCAPING INDIVIDUAL YARD SEED

(PWS, Paragraph 1.3.7.14.1)

1ST OPTION PERIOD: 1 OCT 2015 - 30 SEP 2016

UNIT UNIT PRICE ESTIMATED AMOUNT

1012AB 2,000 Square

OPTION MINOR LANDSCAPING INDIVIDUAL YARD SOD

(PWS, Paragraph 1.3.7.14.2.)

1ST OPTION PERIOD: 1 OCT 2015 - 30 SEP 2016

UNIT UNIT PRICE ESTIMATED AMOUNT

1012AC 9,000 Square

OPTION MINOR LANDSCAPING INDIVIDUAL YARD MULCH

(PWS, Paragraph 1.3.7.14.3.)

1ST OPTION PERIOD: 1 OCT 2015 - 30 SEP 2016

UNIT UNIT PRICE ESTIMATED AMOUNT

1012AD 25,000 Square

OPTION EXTERIOR GROUNDS MAINTENANCE

(PWS, Paragraph 1.3.7.15.)

1ST OPTION PERIOD: 1 OCT 2015 - 30 SEP 2016

UNIT UNIT PRICE ESTIMATED AMOUNT

OPTION SNOW AND ICE REMOVAL

FFP

SNOW AND ICE REMOVAL SERVICES SHALL BE PERFORMED FOR THE

FAMILY HOUSING UNITS DESCRIBED IN THE SUBSEQUENT PRICED

SUB-CLINS IN ACCORDANCE WITH THE PWS, ATTACHMENT 1.

(Reference PWS, Paragraph 1.3.7.16.)

1ST OPTION PERIOD: 1 OCT 2015 - 30 SEP 2016

UNIT UNIT PRICE ESTIMATED AMOUNT

1013AA 50,000 Linear

OPTION SNOW AND ICE REMOVAL

1ST OPTION PERIOD: 1 OCT 2015 - 30 SEP 2016

UNIT UNIT PRICE ESTIMATED AMOUNT

OPTION FACILITY CLEANING

FFP

FACILITY CLEANING SERVICES SHALL BE PERFORMED FOR THE

FAMILY HOUSING UNITS DESCRIBED IN THE SUBSEQUENT PRICED

SUB-CLINS IN ACCORDANCE WITH THE PWS, ATTACHMENT 1.

(Reference PWS, Paragraphs 1.3.7.25.)

1ST OPTION PERIOD: 1 OCT 2015 - 30 SEP 2016

UNIT UNIT PRICE ESTIMATED AMOUNT

1014AA 21,008 Each

OPTION REGULAR STAIRWELL CLEANING

FFP

(PWS, Paragraph 1.3.7.25.3.)

1ST OPTION PERIOD: 1 OCT 2015 - 30 SEP 2016

UNIT UNIT PRICE ESTIMATED AMOUNT

1014AB 50 Each

OPTION EXTENSIVE CLEANING

FFP

(PWS, Paragraph 1.3.7.25.4.)

1ST OPTION PERIOD: 1 OCT 2015 - 30 SEP 2016

UNIT UNIT PRICE ESTIMATED AMOUNT

1014AC 404 Each

OPTION PERIODIC CLEANING

FFP

(PWS, Paragraph 1.3.7.25.5.)

1ST OPTION PERIOD: 1 OCT 2015 - 30 SEP 2016

UNIT UNIT PRICE ESTIMATED AMOUNT

OPTION HAZARDOUS WASTE& ABANDONED WASTE REMOVAL

FFP

HAZARDOUS WASTE AND ABANDONED WASTE REMOVAL SERVICES

SHALL BE PERFORMED FOR THE FAMILY HOUSING UNITS DESCRIBED

IN THE SUBSEQUENT PRICED SUB-CLINS IN ACCORDANCE WITH THE

PWS, ATTACHMENT 1.

(Reference PWS, Paragraphs 1.3.7.7., 1.3.7.19., 1.3.7.20., 1.3.7.22., and 1.3.7.26.)

1ST OPTION PERIOD: 1 OCT 2015 - 30 SEP 2016

UNIT UNIT PRICE ESTIMATED AMOUNT

1015AA 10 Cubic

OPTION HAZARDOUS WASTE REMOVAL

(PWS, Paragraph 1.3.7.7.)

1ST OPTION PERIOD: 1 OCT 2015 - 30 SEP 2016

UNIT UNIT PRICE ESTIMATED AMOUNT

1015AB 50 Cubic

OPTION HOUSEHOLD HAZARDOUS WASTE

(PWS, Paragraph 1.3.7.19.)

1ST OPTION PERIOD: 1 OCT 2015 - 30 SEP 2016

UNIT UNIT PRICE ESTIMATED AMOUNT

1015AC 200 Each

OPTION AUTOMOBILE TIRES AND BATTERIES

FFP

(PWS, Paragraph 1.3.7.20.)

1ST OPTION PERIOD: 1 OCT 2015 - 30 SEP 2016

UNIT UNIT PRICE ESTIMATED AMOUNT

1015AD 200 Cubic

OPTION ABANDONED TRASH REMOVAL

(PWS, Paragraph 1.3.7.22.)

1ST OPTION PERIOD: 1 OCT 2015 - 30 SEP 2016

UNIT UNIT PRICE ESTIMATED AMOUNT

1015AE 100 Each

OPTION PET RELIEF STATIONS

FFP

(INSPECTION AND BAG REPLACEMENT)

(PWS, Paragraph 1.3.7.26.)

1ST OPTION PERIOD: 1 OCT 2015 - 30 SEP 2016

UNIT UNIT PRICE ESTIMATED AMOUNT

OPTION DUST-DOWN CLEANING

FFP

DUST-DOWN CLEANING SERVICES SHALL BE PERFORMED FOR THE

FAMILY HOUSING UNITS DESCRIBED IN THE SUBSEQUENT PRICED

SUB-CLINS IN ACCORDANCE WITH THE PWS, ATTACHMENT 1.

(Reference PWS, Paragraph 1.3.7.24.)

1ST OPTION PERIOD: 1 OCT 2015 - 30 SEP 2016

UNIT UNIT PRICE ESTIMATED AMOUNT

1016AA 15 Each

OPTION DUST-DOWN CLEANING (IN UNITS)

FFP

AVERAGE HOURS PER CALL: 3.5 HOURS

1ST OPTION PERIOD: 1 OCT 2015 - 30 SEP 2016

UNIT UNIT PRICE ESTIMATED AMOUNT

OPTION SPECIAL REQUEST CLEANING

FFP

SPECIAL REQUEST CLEANING SERVICES SHALL BE PERFORMED FOR

THE FAMILY HOUSING UNITS DESCRIBED IN THE SUBSEQUENT

PRICED SUB-CLINS IN ACCORDANCE WITH THE PWS, ATTACHMENT 1.

(Reference PWS, Paragraph 1.3.7.23.)

1ST OPTION PERIOD: 1 OCT 2015 - 30 SEP 2016

UNIT UNIT PRICE ESTIMATED AMOUNT

1017AA 12 Each

OPTION SPECIAL REQUEST CLEANING

FFP

AVERAGE HOURS PER CALL: 5.5 HOURS

1ST OPTION PERIOD: 1 OCT 2015 - 30 SEP 2016

UNIT UNIT PRICE ESTIMATED AMOUNT

OPTION FIRE DAMAGE CLEANING

FFP

FIRE DAMAGE CLEANING SERVICES SHALL BE PERFORMED FOR THE

FAMILY HOUSING UNITS DESCRIBED IN THE SUBSEQUENT PRICED

SUB-CLINS IN ACCORDANCE WITH THE PWS, ATTACHMENT 1.

(Reference PWS, Paragraph 1.3.7.21.)

1ST OPTION PERIOD: 1 OCT 2015 - 30 SEP 2016

UNIT UNIT PRICE ESTIMATED AMOUNT

1018AA 2 Each

OPTION FIRE DAMAGE CLEANING

FFP

AVERAGE HOURS PER CALL: 2 HOURS

1ST OPTION PERIOD: 1 OCT 2015 - 30 SEP 2016

UNIT UNIT PRICE ESTIMATED AMOUNT

OPTION DSW AND RWP PROGRAM

FFP

DIRECT SCHEDULED WORK (DSW) AND RECURRING WORK PROGRAM

(RWP) SERVICES SHALL BE PERFORMED FOR THE FAMILY HOUSING

UNITS DESCRIBED IN THE SUBSEQUENT PRICED SUB-CLINS IN

ACCORDANCE WITH THE PWS, ATTACHMENT 1.

(Reference PWS, Paragraph 1.4., AND 1.5.)

1ST OPTION PERIOD: 1 OCT 2015 - 30 SEP 2016

UNIT UNIT PRICE ESTIMATED AMOUNT

1019AA 12 Months

OPTION DSW AND RWP - RAMSTEIN

FFP

1ST OPTION PERIOD: 1 OCT 2015 - 30 SEP 2016

UNIT UNIT PRICE ESTIMATED AMOUNT

1019AB 12 Months

OPTION DSW AND RWP - VOGELWEH

FFP

1ST OPTION PERIOD: 1 OCT 2015 - 30 SEP 2016

UNIT UNIT PRICE ESTIMATED AMOUNT

1019AC 12 Months

OPTION DSW AND RWP - LANDSTUHL

FFP

1ST OPTION PERIOD: 1 OCT 2015 - 30 SEP 2016

UNIT UNIT PRICE AMOUNT

OPTION MATERIAL

COST

MATERIAL REQUIRED FOR THE PERFORMANCE OF FAMILY HOUSING

MAINTENANCE SERVICES SHALL BE HANDLED AS DESCRIBED IN THE

SUBSEQUENT PRICED SUB-CLINS IN ACCORDANCE WITH THE PWS,

ATTACHMENT 1.

(Reference PWS, Paragraph 1.4.1.)

1ST OPTION PERIOD: 1 OCT 2015 - 30 SEP 2016

UNIT UNIT PRICE AMOUNT

1020AA Lot

OPTION MATERIAL

COST

1ST OPTION PERIOD: 1 OCT 2015 - 30 SEP 2016

UNIT UNIT PRICE AMOUNT

OPTION OVER AND ABOVE WORK

COST

SERVICES SHALL BE PERFORMED AS DESCRIBED IN THE

SUBSEQUENT PRICED SUB-CLINS IN ACCORDANCE WITH THE PWS,

ATTACHMENT 1.

(Reference PWS, Paragraph 1.16.8.)

1ST OPTION PERIOD: 1 OCT 2015 - 30 SEP 2016

UNIT UNIT PRICE AMOUNT

1021AA Lot

OPTION OVER AND ABOVE WORK

COST

OVER AND ABOVE WORK TO BE USED FOR SERVICES WITHIN THE

SCOPE OF THE CONTRACT, BUT NOT INCLUDED IN THE SCOPE

BASELINE - REFERENCE DFARS 252.217-7028.

1ST OPTION PERIOD: 1 OCT 2015 - 30 SEP 2016

UNIT UNIT PRICE ESTIMATED AMOUNT

OPTION CHANGE OF OCCUPANCY MAINTENANCE (COM)

FFP

COM MAINTENANCE SERVICES SHALL BE PERFORMED FOR THE

FAMILY HOUSING UNITS DESCRIBED IN THE SUBSEQUENT PRICED

SUB-CLINS IN ACCORDANCE WITH THE PWS, ATTACHMENT 1.

(Reference PWS, Paragraph 1.3.7.17.)

2ND OPTION PERIOD: 1 OCT 2016 - 30 SEP 2017

UNIT UNIT PRICE ESTIMATED AMOUNT

2001AA 293 Unit

OPTION COM MAINTENANCE

FFP

2 BEDROOM (BR) STAIRWELL UNIT / 2 BR TOWNHOUSE

2ND OPTION PERIOD: 1 OCT 2016 - 30 SEP 2017

UNIT UNIT PRICE ESTIMATED AMOUNT

2001AB 250 Unit

OPTION COM MAINTENANCE

FFP

3 BR TOWNHOUSE / 2 BR STAIRWELL UNIT WITH DEN

2ND OPTION PERIOD: 1 OCT 2016 - 30 SEP 2017

UNIT UNIT PRICE ESTIMATED AMOUNT

2001AC 195 Unit

OPTION COM MAINTENANCE

FFP

4 BR TOWNHOUSE / 3 BR STAIRWELL UNIT WITH DEN

2ND OPTION PERIOD: 1 OCT 2016 - 30 SEP 2017

UNIT UNIT PRICE ESTIMATED AMOUNT

2001AD 3 Unit

OPTION COM MAINTENANCE

FFP

4 BR TOWNHOUSE WITH BASEMENT (R1112, R1118, R1140, R1141)

2ND OPTION PERIOD: 1 OCT 2016 - 30 SEP 2017

UNIT UNIT PRICE ESTIMATED AMOUNT

2001AE 3 Unit

OPTION COM MAINTENANCE

FFP

4 BR HOUSE WITH BASEMENT, FREE STANDING (R1010, R1012, R1013)

2ND OPTION PERIOD: 1 OCT 2016 - 30 SEP 2017

UNIT UNIT PRICE ESTIMATED AMOUNT

2001AF 5 Unit

OPTION COM MAINTENANCE

FFP

4 BR HOUSE, FREE STANDING

2ND OPTION PERIOD: 1 OCT 2016 - 30 SEP 2017

UNIT UNIT PRICE ESTIMATED AMOUNT

2001AG 1 Unit

OPTION COM MAINTENANCE

FFP

4 BR SPECIAL COMMAND POSITION (SCP) UNIT, FREE STANDING

2ND OPTION PERIOD: 1 OCT 2016 - 30 SEP 2017

UNIT UNIT PRICE ESTIMATED AMOUNT

OPTION (COM) CLEANING

FFP

COM CLEANING SERVICES SHALL BE PERFORMED FOR THE FAMILY

HOUSING UNITS DESCRIBED IN THE SUBSEQUENT PRICED SUB-CLINS

IN ACCORDANCE WITH THE PWS, ATTACHMENT 1.

(Reference PWS, Paragraph 1.3.7.18.)

2ND OPTION PERIOD: 1 OCT 2016 - 30 SEP 2017

UNIT UNIT PRICE ESTIMATED AMOUNT

2002AA 293 Unit

OPTION (COM) CLEANING

FFP

2 BR STAIRWELL UNIT / 2 BR TOWNHOUSE

2ND OPTION PERIOD: 1 OCT 2016 - 30 SEP 2017

UNIT UNIT PRICE ESTIMATED AMOUNT

2002AB 250 Unit

OPTION (COM) CLEANING

FFP

3 BR TOWNHOUSE / 2 BR STAIRWELL UNIT WITH DEN

2ND OPTION PERIOD: 1 OCT 2016 - 30 SEP 2017

UNIT UNIT PRICE ESTIMATED AMOUNT

2002AC 195 Unit

OPTION (COM) CLEANING

FFP

4 BR TOWNHOUSE / 3 BR STAIRWELL UNIT WITH DEN

2ND OPTION PERIOD: 1 OCT 2016 - 30 SEP 2017

UNIT UNIT PRICE ESTIMATED AMOUNT

2002AD 3 Unit

OPTION (COM) CLEANING

FFP

4 BR TOWNHOUSE WITH BASEMENT (R1112, R1118, R1140, R1141)

2ND OPTION PERIOD: 1 OCT 2016 - 30 SEP 2017

UNIT UNIT PRICE ESTIMATED AMOUNT

2002AE 3 Unit

OPTION (COM) CLEANING

FFP

4 BR HOUSE WITH BASEMENT, FREE STANDING (R1010, R1012, R1013)

2ND OPTION PERIOD: 1 OCT 2016 - 30 SEP 2017

UNIT UNIT PRICE ESTIMATED AMOUNT

2002AF 5 Unit

OPTION (COM) CLEANING

FFP

4 BR HOUSE, FREE STANDING

2ND OPTION PERIOD: 1 OCT 2016 - 30 SEP 2017

UNIT UNIT PRICE ESTIMATED AMOUNT

2002AG 1 Unit

OPTION (COM) CLEANING

FFP

4 BR SPECIAL COMMAND POSITION (SCP) UNIT, FREE STANDING

2ND OPTION PERIOD: 1 OCT 2016 - 30 SEP 2017

UNIT UNIT PRICE ESTIMATED AMOUNT

OPTION PAINTING

FFP

PAINTING SERVICES SHALL BE PERFORMED FOR THE FAMILY

HOUSING UNITS DESCRIBED IN THE SUBSEQUENT PRICED SUB-CLINS

IN ACCORDANCE WITH THE PWS, ATTACHMENT 1.

(Reference PWS, Paragraphs 1.3.7.2., 1.3.7.3., 1.3.7.5., and 1.3.7.6.)

2ND OPTION PERIOD: 1 OCT 2016 - 30 SEP 2017

UNIT UNIT PRICE ESTIMATED AMOUNT

2003AA 325,000 Square

OPTION INTERIOR PAINT

(PWS, Paragraph 1.3.7.6.)

2ND OPTION PERIOD: 1 OCT 2016 - 30 SEP 2017

UNIT UNIT PRICE ESTIMATED AMOUNT

2003AB 4,000 Square

OPTION EXTERIOR PAINT

(PWS, Paragraph 1.3.7.6.)

2ND OPTION PERIOD: 1 OCT 2016 - 30 SEP 2017

UNIT UNIT PRICE ESTIMATED AMOUNT

2003AC 930 Square

OPTION REPAIR&PAINT EXTERIOR INSULATION/MASONRY

(PWS, Paragraph 1.3.7.5.)

2ND OPTION PERIOD: 1 OCT 2016 - 30 SEP 2017

UNIT UNIT PRICE ESTIMATED AMOUNT

OPTION PAINT AND WALL (CEILING) COVERING

FFP

PAINT AND WALL (CEILING) COVERING SERVICES SHALL BE

PERFORMED FOR THE FAMILY HOUSING UNITS DESCRIBED IN THE

SUBSEQUENT PRICED SUB-CLINS IN ACCORDANCE WITH THE PWS,

ATTACHMENT 1.

(Reference PWS, Paragraphs 1.3.7.3., 1.3.7.4., and 1.3.7.8.)

2ND OPTION PERIOD: 1 OCT 2016 - 30 SEP 2017

UNIT UNIT PRICE ESTIMATED AMOUNT

2004AA 300 Square

OPTION WALL OR CEILING COVERING

(PWS, Paragraph 1.3.7.4.)

2ND OPTION PERIOD: 1 OCT 2016 - 30 SEP 2017

UNIT UNIT PRICE ESTIMATED AMOUNT

2004AB 1,000 Square

OPTION REPLACE CERAMIC WALL TILE

(PWS, Paragraph 1.3.7.8.)

2ND OPTION PERIOD: 1 OCT 2016 - 30 SEP 2017

UNIT UNIT PRICE ESTIMATED AMOUNT

OPTION FLOORING

FFP

FLOORING SERVICES SHALL BE PERFORMED FOR THE FAMILY

HOUSING UNITS DESCRIBED IN THE SUBSEQUENT PRICED SUB-CLINS

IN ACCORDANCE WITH THE PWS, ATTACHMENT 1.

(Reference PWS, Paragraph 1.3.7.9.)

2ND OPTION PERIOD: 1 OCT 2016 - 30 SEP 2017

UNIT UNIT PRICE ESTIMATED AMOUNT

2005AA 28,000 Square

OPTION HARD WOOD FLOOR FINISH

(PWS, Paragraph 1.3.7.9.1.)

2ND OPTION PERIOD: 1 OCT 2016 - 30 SEP 2017

UNIT UNIT PRICE ESTIMATED AMOUNT

2005AB 3,000 Square

OPTION REPLACE WOOD FLOOR

(PWS, Paragraph 1.3.7.9.2.1.)

2ND OPTION PERIOD: 1 OCT 2016 - 30 SEP 2017

UNIT UNIT PRICE ESTIMATED AMOUNT

2005AC 100 Square

OPTION REPLACE WOOD PAH

(PWS, Paragraph 1.3.7.9.2.4.)

2ND OPTION PERIOD: 1 OCT 2016 - 30 SEP 2017

UNIT UNIT PRICE ESTIMATED AMOUNT

2005AD 500 Square

OPTION REPLACE CERMIC FLOOR TILE

(PWS, Paragraph 1.3.7.9.2.2.)

2ND OPTION PERIOD: 1 OCT 2016 - 30 SEP 2017

UNIT UNIT PRICE ESTIMATED AMOUNT

2005AE 150 Square

OPTION REPLACE PVC FLOOR

(PWS, Paragraph 1.3.7.9.2.3.)

2ND OPTION PERIOD: 1 OCT 2016 - 30 SEP 2017

UNIT UNIT PRICE ESTIMATED AMOUNT

2005AF 2,000 Square

OPTION CARPET MAINTENANCE

(PWS, Paragraph 1.3.7.9.4.)

2ND OPTION PERIOD: 1 OCT 2016 - 30 SEP 2017

UNIT UNIT PRICE ESTIMATED AMOUNT

2005AG 100 Square

OPTION REPLACE LAMINATE FLOOR

(PWS, Paragraph 1.3.7.9.2.6.)

2ND OPTION PERIOD: 1 OCT 2016 - 30 SEP 2017

UNIT UNIT PRICE ESTIMATED AMOUNT

2005AH 3,600 Square

OPTION REPLACE CARPET WITH CERAMIC TILE

(PWS, Paragraph 1.3.7.9.3.)

2ND OPTION PERIOD: 1 OCT 2016 - 30 SEP 2017

UNIT UNIT PRICE ESTIMATED AMOUNT

2005AJ 100 Square

OPTION REPLACE GRANITE FLOOR TILE

(PWS, Paragraph 1.3.7.9.2.7.)

2ND OPTION PERIOD: 1 OCT 2016 - 30 SEP 2017

UNIT UNIT PRICE ESTIMATED AMOUNT

2005AK 50 Square

OPTION REPLACE GARAGE FLOOR SURFACE TILE

(PWS, Paragraph 1.3.7.9.5.3.)

2ND OPTION PERIOD: 1 OCT 2016 - 30 SEP 2017

UNIT UNIT PRICE ESTIMATED AMOUNT

2005AL 50 Square

OPTION REPLACE PRIVATE WALKWAY/DRIVEWAY

(PWS, Paragraph 1.3.7.9.5.2.)

2ND OPTION PERIOD: 1 OCT 2016 - 30 SEP 2017

UNIT UNIT PRICE ESTIMATED AMOUNT

2005AM 50 Square

OPTION REPLACE PATIO SURFACE STONE TILE

(PWS, Paragraph 1.3.7.9.5.1.)

2ND OPTION PERIOD: 1 OCT 2016 - 30 SEP 2017

UNIT UNIT PRICE ESTIMATED AMOUNT

2005AN 35,000 Linear

OPTION REPLACE SILICONE BASE/FLOOR EXPANSION

JOINT

(PWS, Paragraph 1.3.7.9.2.5.)

2ND OPTION PERIOD: 1 OCT 2016 - 30 SEP 2017

UNIT UNIT PRICE ESTIMATED AMOUNT

OPTION COUNTER TOP

FFP

COUNTER TOP SERVICES SHALL BE PERFORMED FOR THE FAMILY

HOUSING UNITS DESCRIBED IN THE SUBSEQUENT PRICED SUB-CLINS

IN ACCORDANCE WITH THE PWS, ATTACHMENT 1.

(Reference PWS, Paragraph 1.3.7.10.)

2ND OPTION PERIOD: 1 OCT 2016 - 30 SEP 2017

UNIT UNIT PRICE ESTIMATED AMOUNT

2006AA 20,000 Linear

OPTION REPLACE COUNTER TOP

2ND OPTION PERIOD: 1 OCT 2016 - 30 SEP 2017

UNIT UNIT PRICE ESTIMATED AMOUNT

OPTION VANITY AND VANITY TOP

FFP

VANITY AND VANITY TOP SERVICES SHALL BE PERFORMED FOR THE

FAMILY HOUSING UNITS DESCRIBED IN THE SUBSEQUENT PRICED

SUB-CLINS IN ACCORDANCE WITH THE PWS, ATTACHMENT 1.

(Reference PWS, Paragraph 1.3.7.11.)

2ND OPTION PERIOD: 1 OCT 2016 - 30 SEP 2017

UNIT UNIT PRICE ESTIMATED AMOUNT

2007AA 4,000 Linear

OPTION REPLACE VANITY TOP

2ND OPTION PERIOD: 1 OCT 2016 - 30 SEP 2017

UNIT UNIT PRICE ESTIMATED AMOUNT

2007AB 10 Each

OPTION REPLACE VANITY

FFP

2ND OPTION PERIOD: 1 OCT 2016 - 30 SEP 2017

UNIT UNIT PRICE ESTIMATED AMOUNT

OPTION BATHTUB AND SHOWER BASE

FFP

BATHTUB AND SHOWER BASE SERVICES SHALL BE PERFORMED FOR

THE FAMILY HOUSING UNITS DESCRIBED IN THE SUBSEQUENT

PRICED SUB-CLINS IN ACCORDANCE WITH THE PWS, ATTACHMENT 1.

(Reference PWS, Paragraphs 1.3.7.12., and 1.3.7.13.)

2ND OPTION PERIOD: 1 OCT 2016 - 30 SEP 2017

UNIT UNIT PRICE ESTIMATED AMOUNT

2008AA 7 Each

OPTION REPLACE BATHTUB

FFP

(PWS, Paragraph 1.3.7.12)

2ND OPTION PERIOD: 1 OCT 2016 - 30 SEP 2017

UNIT UNIT PRICE ESTIMATED AMOUNT

2008AB 7 Each

OPTION REPLACE SHOWER BASE

FFP

(PWS, Paragraph 1.3.7.13.)

2ND OPTION PERIOD: 1 OCT 2016 - 30 SEP 2017

UNIT UNIT PRICE ESTIMATED AMOUNT

OPTION SELF-HELP STORE OPERATIONS

FFP

SELF-HELP STORE MATERIALS AND OPERATIONS SERVICES SHALL BE

PERFORMED FOR THE FAMILY HOUSING UNITS DESCRIBED IN THE

SUBSEQUENT PRICED SUB-CLINS IN ACCORDANCE WITH THE PWS,

ATTACHMENT 1.

(Reference PWS, Paragraph 1.10.)

2ND OPTION PERIOD: 1 OCT 2016 - 30 SEP 2017

UNIT UNIT PRICE ESTIMATED AMOUNT

2009AA 12 Months

OPTION SELF-HELP STORE OPERATION RAMSTEIN

FFP

2ND OPTION PERIOD: 1 OCT 2016 - 30 SEP 2017

UNIT UNIT PRICE ESTIMATED AMOUNT

2009AB 12 Months

OPTION SELF-HELP STORE OPERATION VOGELWEH

FFP

2ND OPTION PERIOD: 1 OCT 2016 - 30 SEP 2017

UNIT UNIT PRICE AMOUNT

2009AC Lot

OPTION SELF HELP STORE SUPPLIES AND MATERIAL

COST

2ND OPTION PERIOD: 1 OCT 2016 - 30 SEP 2017

UNIT UNIT PRICE ESTIMATED AMOUNT

OPTION APPLIANCES

FFP

APPLIANCES SERVICES SHALL BE PERFORMED FOR THE FAMILY

HOUSING UNITS DESCRIBED IN THE SUBSEQUENT PRICED SUB-CLINS

IN ACCORDANCE WITH THE PWS, ATTACHMENT 1.

(Reference PWS, Paragraphs 1.9.7., and 1.9.8.)

2ND OPTION PERIOD: 1 OCT 2016 - 30 SEP 2017

UNIT UNIT PRICE AMOUNT

2010AA Lot

OPTION APPLIANCE, FREE STANDING

COST

2ND OPTION PERIOD: 1 OCT 2016 - 30 SEP 2017

UNIT UNIT PRICE AMOUNT

2010AB Lot

OPTION APPLIANCE, BUILT-IN

COST

2ND OPTION PERIOD: 1 OCT 2016 - 30 SEP 2017

UNIT UNIT PRICE ESTIMATED AMOUNT

OPTION UTILITY MAINTENANCE

FFP

UTILITY MAINTENANCE SERVICES SHALL BE PERFORMED FOR THE

FAMILY HOUSING UNITS DESCRIBED IN THE SUBSEQUENT PRICED

SUB-CLINS IN ACCORDANCE WITH THE PWS, ATTACHMENT 1.

(Reference PWS, Paragraph 1.6.4.)

2ND OPTION PERIOD: 1 OCT 2016 - 30 SEP 2017

UNIT UNIT PRICE ESTIMATED AMOUNT

2011AA 25 Linear

OPTION UNDERGROUND REPAIR

2ND OPTION PERIOD: 1 OCT 2016 - 30 SEP 2017

UNIT UNIT PRICE ESTIMATED AMOUNT

OPTION INDIVIDUAL YARD MAINTENANCE

FFP

INDIVIDUAL YARD MAINTENANCE SERVICES SHALL BE PERFORMED

FOR THE FAMILY HOUSING UNITS DESCRIBED IN THE SUBSEQUENT

PRICED SUB-CLINS IN ACCORDANCE WITH THE PWS, ATTACHMENT 1.

(Reference PWS, Paragraphs 1.3.7.14., and 1.3.7.15.)

2ND OPTION PERIOD: 1 OCT 2016 - 30 SEP 2017

UNIT UNIT PRICE ESTIMATED AMOUNT

2012AA 2,000 Square

OPTION MINOR LANDSCAPING INDIVIDUAL YARD SEED

(PWS, Paragraph 1.3.7.14.1)

2ND OPTION PERIOD: 1 OCT 2016 - 30 SEP 2017

UNIT UNIT PRICE ESTIMATED AMOUNT

2012AB 2,000 Square

OPTION MINOR LANDSCAPING INDIVIDUAL YARD SOD

(PWS, Paragraph 1.3.7.14.2.)

2ND OPTION PERIOD: 1 OCT 2016 - 30 SEP 2017

UNIT UNIT PRICE ESTIMATED AMOUNT

2012AC 9,000 Square

OPTION MINOR LANDSCAPING INDIVIDUAL YARD MULCH

(PWS, Paragraph 1.3.7.14.3.)

2ND OPTION PERIOD: 1 OCT 2016 - 30 SEP 2017

UNIT UNIT PRICE ESTIMATED AMOUNT

2012AD 25,000 Square

OPTION EXTERIOR GROUNDS MAINTENANCE

(PWS, Paragraph 1.3.7.15.)

2ND OPTION PERIOD: 1 OCT 2016 - 30 SEP 2017

UNIT UNIT PRICE ESTIMATED AMOUNT

OPTION SNOW AND ICE REMOVAL

FFP

SNOW AND ICE REMOVAL SERVICES SHALL BE PERFORMED FOR THE

FAMILY HOUSING UNITS DESCRIBED IN THE SUBSEQUENT PRICED

SUB-CLINS IN ACCORDANCE WITH THE PWS, ATTACHMENT 1.

(Reference PWS, Paragraph 1.3.7.16.)

2ND OPTION PERIOD: 1 OCT 2016 - 30 SEP 2017

UNIT UNIT PRICE ESTIMATED AMOUNT

2013AA 50,000 Linear

OPTION SNOW AND ICE REMOVAL

2ND OPTION PERIOD: 1 OCT 2016 - 30 SEP 2017

UNIT UNIT PRICE ESTIMATED AMOUNT

OPTION FACILITY CLEANING

FFP

FACILITY CLEANING SERVICES SHALL BE PERFORMED FOR THE

FAMILY HOUSING UNITS DESCRIBED IN THE SUBSEQUENT PRICED

SUB-CLINS IN ACCORDANCE WITH THE PWS, ATTACHMENT 1.

(Reference PWS, Paragraphs 1.3.7.25.)

2ND OPTION PERIOD: 1 OCT 2016 - 30 SEP 2017

UNIT UNIT PRICE ESTIMATED AMOUNT

2014AA 21,008 Each

OPTION REGULAR STAIRWELL CLEANING

FFP

(PWS, Paragraph 1.3.7.25.3.)

2ND OPTION PERIOD: 1 OCT 2016 - 30 SEP 2017

UNIT UNIT PRICE ESTIMATED AMOUNT

2014AB 50 Each

OPTION EXTENSIVE CLEANING

FFP

(PWS, Paragraph 1.3.7.25.4.)

2ND OPTION PERIOD: 1 OCT 2016 - 30 SEP 2017

UNIT UNIT PRICE ESTIMATED AMOUNT

2014AC 404 Each

OPTION PERIODIC CLEANING

FFP

(PWS, Paragraph 1.3.7.25.5.)

2ND OPTION PERIOD: 1 OCT 2016 - 30 SEP 2017

UNIT UNIT PRICE ESTIMATED AMOUNT

OPTION HAZARDOUS WASTE& ABANDONED WASTE REMOVAL

FFP

HAZARDOUS WASTE AND ABANDONED WASTE REMOVAL SERVICES

SHALL BE PERFORMED FOR THE FAMILY HOUSING UNITS DESCRIBED

IN THE SUBSEQUENT PRICED SUB-CLINS IN ACCORDANCE WITH THE

PWS, ATTACHMENT 1.

(Reference PWS, Paragraphs 1.3.7.7., 1.3.7.19., 1.3.7.20., 1.3.7.22., and 1.3.7.26.)

2ND OPTION PERIOD: 1 OCT 2016 - 30 SEP 2017

UNIT UNIT PRICE ESTIMATED AMOUNT

2015AA 10 Cubic

OPTION HAZARDOUS WASTE REMOVAL

(PWS, Paragraph 1.3.7.7.)

2ND OPTION PERIOD: 1 OCT 2016 - 30 SEP 2017

UNIT UNIT PRICE ESTIMATED AMOUNT

2015AB 50 Cubic

OPTION HOUSEHOLD HAZARDOUS WASTE

(PWS, Paragraph 1.3.7.19.)

2ND OPTION PERIOD: 1 OCT 2016 - 30 SEP 2017

UNIT UNIT PRICE ESTIMATED AMOUNT

2015AC 200 Each

OPTION AUTOMOBILE TIRES AND BATTERIES

FFP

(PWS, Paragraph 1.3.7.20.)

2ND OPTION PERIOD: 1 OCT 2016 - 30 SEP 2017

UNIT UNIT PRICE ESTIMATED AMOUNT

2015AD 200 Cubic

OPTION ABANDONED TRASH REMOVAL

(PWS, Paragraph 1.3.7.22.)

2ND OPTION PERIOD: 1 OCT 2016 - 30 SEP 2017

UNIT UNIT PRICE ESTIMATED AMOUNT

2015AE 100 Each

OPTION PET RELIEF STATIONS

FFP

(INSPECTION AND BAG REPLACEMENT)

(PWS, Paragraph 1.3.7.26.)

2ND OPTION PERIOD: 1 OCT 2016 - 30 SEP 2017

UNIT UNIT PRICE ESTIMATED AMOUNT

OPTION DUST-DOWN CLEANING

FFP

DUST-DOWN CLEANING SERVICES SHALL BE PERFORMED FOR THE

FAMILY HOUSING UNITS DESCRIBED IN THE SUBSEQUENT PRICED

SUB-CLINS IN ACCORDANCE WITH THE PWS, ATTACHMENT 1.

(Reference PWS, Paragraph 1.3.7.24.)

2ND OPTION PERIOD: 1 OCT 2016 - 30 SEP 2017

UNIT UNIT PRICE ESTIMATED AMOUNT

2016AA 15 Each

OPTION DUST-DOWN CLEANING (IN UNITS)

FFP

AVERAGE HOURS PER CALL: 3.5 HOURS

2ND OPTION PERIOD: 1 OCT 2016 - 30 SEP 2017

UNIT UNIT PRICE ESTIMATED AMOUNT

OPTION SPECIAL REQUEST CLEANING

FFP

SPECIAL REQUEST CLEANING SERVICES SHALL BE PERFORMED FOR

THE FAMILY HOUSING UNITS DESCRIBED IN THE SUBSEQUENT

PRICED SUB-CLINS IN ACCORDANCE WITH THE PWS, ATTACHMENT 1.

(Reference PWS, Paragraph 1.3.7.23.)

2ND OPTION PERIOD: 1 OCT 2016 - 30 SEP 2017

UNIT UNIT PRICE ESTIMATED AMOUNT

2017AA 12 Each

OPTION SPCIAL REQUEST CLEANING

FFP

AVERAGE HOURS PER CALL: 5.5 HOURS

2ND OPTION PERIOD: 1 OCT 2016 - 30 SEP 2017

UNIT UNIT PRICE ESTIMATED AMOUNT

OPTION FIRE DAMAGE CLEANING

FFP

FIRE DAMAGE CLEANING SERVICES SHALL BE PERFORMED FOR THE

FAMILY HOUSING UNITS DESCRIBED IN THE SUBSEQUENT PRICED

SUB-CLINS IN ACCORDANCE WITH THE PWS, ATTACHMENT 1.

(Reference PWS, Paragraph 1.3.7.21.)

2ND OPTION PERIOD: 1 OCT 2016 - 30 SEP 2017

UNIT UNIT PRICE ESTIMATED AMOUNT

2018AA 2 Each

OPTION FIRE DAMAGE CLEANING

FFP

AVERAGE HOURS PER CALL: 2 HOURS

2ND OPTION PERIOD: 1 OCT 2016 - 30 SEP 2017

UNIT UNIT PRICE ESTIMATED AMOUNT

OPTION DSW AND RWP PROGRAM

FFP

DIRECT SCHEDULED WORK (DSW) AND RECURRING WORK PROGRAM

(RWP)…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .