AMD1 SPECIFICATIONS (ENG) - QUUG 07-1022.pdf

PDF 126 KB Posted

Attached to
Small Aircraft Hangar Repair Federal contract opportunity
Solicitation number
FA557525B0001
Issued by
Department of the Air Force United States Air Forces in Europe - Air Forces Africa

About this file

This document is a detailed technical specification for interior lighting (Section 26 51 00) for Project QUUG 07-1022, an EDI Small Aircraft Hangar project at Moron Air Base in Spain. The specification covers LED luminaires with multiple fixture types, including ceiling surface mounted, ceiling mounted 60x60, ceiling mounted LED, and ceiling recessed LED, with specific requirements for watts, lumens, color temperature, and expected lifetime. Key technical requirements include LED drivers with constant-current operation, IP65 protection index, DALI 0-10V control, and a minimum 5-year manufacturer's warranty. The specification also mandates emergency backup battery kits providing 90 minutes of power, occupancy and daylight sensors with network connectivity, and requires comprehensive testing and verification of lighting systems, including field tests performed in the presence of the Contracting Officer.

View the file

Other files for this federal contract opportunity

Other files attached to Small Aircraft Hangar Repair, newest first.
File Type Posted
AMD1 SCHEDULE OF MAT - QUUG 07-1022.xlsx XLSX spreadsheet
QandA - QUUG 07-1022.pdf PDF
AMD1 ESPECIFICACIONES (ESP) - QUUG 07-1022.pdf PDF
Solicitation - FA557525B0001.pdf PDF
AMD1 DRAWINGS - QUUG 07-1022.pdf PDF
Solicitation - FA557525B0001.pdf PDF
ATTACHMENT 4 COST ESTIMATE_BLANK QUUG 07-1022.xlsx XLSX spreadsheet
ATTACHMENT 6 - Section L.pdf PDF
ATTACHMENT 7 - Section M.pdf PDF
ATTACHMENT 3 ESPECIFICACIONES (Esp) QUUG 07-1022.pdf PDF
ATTACHMENT 5 SCHEDULE OF MATERIAL SUB.xlsx XLSX spreadsheet
ATTACHMENT 2 SPECIFICATIONS (Eng) QUUG 07-1022.pdf PDF
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT QUUG 07-1022 – AMENDMENT 1

26 51 00 - 1

SECTION 26 51 00

INTERIOR LIGHTING

PART 1 - GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

NATIONAL FIRE PROTECTION ASSOCIATION(NFPA)

NFPA 70 (2017) NATIONAL ELECTRICAL CODE

MINISTERIO DE INDUSTRIA, TURISMO YCOMERCIO

ASOCIACIÓN ESPAÑOLA DE NORMALIZACIÓN Y CERTIFICACIÓN

(AENOR)

UNE-EN 60598-1:2015 (2015) LUMINARIAS. PARTE 1: REQUISITOS

GENERALES Y ENSAYOS.

1.2 RELATED REQUIREMENTS

Materials not considered to be luminaires or luminaire accessories are specified in Section

26 20 00 INTERIOR DISTRIBUTION SYSTEM. Luminaires and accessories mounted on exterior surfaces of buildings are specified in Section 26 56 00 EXTERIOR LIGHTING.

1.3 SUBMITTALS:

Submit the following:

Product Data

LED Luminaires

Luminaire Light Sources

LED Drivers

Occupancy sensor

Combined Occupancy-Daylight Sensor

26 51 00 - 2

Shop Drawings

Lighting Control System

Certificates

Luminaire Useful Life Certificate:

Submit certification from the manufacturer indicating the expected useful life of the luminaires provided. The useful life shall be directly correlated from the test required in UNE-EN60598-1:2015.

Thermal properties of the specific luminaire and local ambient operating temperature and conditions shall be taken into consideration.

Spare parts delivery Certificate:

Submit certification of the delivery of the Luminaires Extra Stock.

Field Test Report

Lighting Fixtures

Lighting control devices

Closeout Submittals

LED Luminaire Warranty

1.4 QUALITY ASSURANCE

1.4.1. Luminaire Design Data

a. Provide safety certification and file number for the luminaire family that must be listed, labeled, or identified per the applicable codes. Applicable testing bodies are determined by the AENOR (Asociación Española de Normalización y Certificación), and UL

(Underwriters Laboratories). The named certification can be replaced by the CE label or other approved by the Contracting Officer.

b. Provide long term lumen maintenance projections for each LED luminaire. Data used for projections must be obtained from testing.

1.4.2. Standard Products

Provide materials and equipment that are products of manufacturers regularly engaged in the production of such products which are of equal material, design and workmanship.

26 51 00 - 3

Products shall have been in satisfactory commercial or industrial use for 2 years prior to bid opening.The 2-year period shall include applications of equipment and materials under similar circumstances and of similar size. The product shall have been on sale on the commercial market through advertisements, manufacturers' catalogs, or brochures during the 2-year period. All components of the lighting system shall be purchased with time enough to avoid unexpected and undesirable delays in the work progress.

1.4.2.1 Alternative Qualifications

Products having less than a 2-year field service record will be acceptable if a certified record of satisfactory field operation for not less than 6000 hours, exclusive of the manufacturers' factory or laboratory tests, is furnished.

1.4.2.2 Material and Equipment Manufacturing Date

Products manufactured more than 6 months prior to date of delivery to site shall not be used, unless specified otherwise.

1.4.2.3 Energy Efficiency

Submit data indicating lumens per watt efficacy and color rendering index of light source.

1.5 WARRANTY

The equipment items shall be supported by service organizations which are reasonably convenient to the equipment installation in order to render satisfactory service to the equipment on a regular and emergency basis during the warranty period of the contract.

1.5.1. LED Luminaire Warranty

a. Provide a written 5 year on-site replacement warranty for material, fixture finish, and workmanship. On-site replacement includes transportation, removal, and installation of new products.

(1) Include finish warranty to include failure and substantial deterioration such as blistering, cracking, peeling, chalking, or fading.

(2) Material warranty must include:

(a) All drivers.

26 51 00 - 4

(b) Replacement when more than 10 percent of LED sources in any lightbar or subassemblies are defective or non-starting.

b. Warranty period must begin on date of beneficial occupancy. Provide the Contracting

Officer with signed warranty certificates prior to final payment.

1.6 SHOP DRAWINGS

The contractor shall provide shop drawings with the precise location, connection and diagrams of the occupancy and daylighting sensors, based on the manufacturer's technical documentation, to ensure proper system operation, correct calibration and automation of lighting levels that meet the requirements of the project drawings as well as UFC 3-530-

01.

1.7 EXTRA STOCK

Provide spare parts, minimum 5% of each type of device (rounding up).

PART 2 -PRODUCTS

2.1 PRODUCT COORDINATION

Products and materials not considered to be luminaires, luminaire controls, or associated equipment are specified in Section 26 20 00 INTERIOR DISTRIBUTION SYSTEM.

Luminaires, luminaire controls, and associated equipment for exterior applications are specified in Section 26 56 00 EXTERIOR LIGHTING.

2.2 LED LUMINAIRES

Furnish all lighting fixtures complete, including lamps in the quantity, type and wattage indicated on the drawings. The shapes and dimensions of the lighting fixtures' details are indicative of the general type desired but are not intended to restrict selection of the fixtures from any particular manufacturer.

LIST OF INTERIOR LUMINAIRES:

TYPE C - CEILING SURFACE MOUNTED LED

MODEL: LEC SL TRAFALGAR 120 6000T or similar approved

WATTS: 47W

MIN.LUMENS: 5200 Lm

TEMPERATURE COLOR: 4000K

CRI: >80

VOLT/HZ: 100-240/60

EXPECTED LIFETIME: L80 B10 > 50.000 h (25ºc)

MOUNTING: SURFACE MOUNTED

26 51 00 - 5

IP CODE: IP66

TYPE B - CEILING MOUNTED 60x60 LED

MODEL: LEC SL CORDUBA MICROPRISMAT ECO NEUTRO MP 60X60

4200 M or similar approved

WATTS: 38W

MIN.LUMENS: 3700 Lm

TEMPERATURE COLOR: 4000K

CRI: >80

VOLT/HZ: 100-240/60

EXPECTED LIFETIME: L80 B10 > 50.000 h (25ºc)

MOUNTING: CEILING MOUNTED

IP CODE: IP41

TYPE D - CEILING MOUNTED LED

MODEL: LEC SL LINCE VERSO 6M 37000 H6 or similar approved

WATTS: 297 W

MIN.LUMENS: 30300 Lm

TEMPERATURE COLOR: 5600K

CRI: >70

VOLT/HZ: 100-240/60

EXPECTED LIFETIME: L80 B10 50.000 h (25ºc)

MOUNTING: SUSPENDED MOUNTED

IP CODE: IP67

TYPE A - CEILING RECESSED LED

MODEL: LEC SL LEVANTE 140 3000 N or similar approved

WATTS: 18 W

MIN.LUMENS: 1500 Lm

TEMPERATURE COLOR: 4000K

CRI: >80

VOLT/HZ: 100-240/60

EXPECTED LIFETIME: L80 B10 50.000 h (25ºc)

MOUNTING: RECESSED IN CEILING

2.3 EXIT SIGNS

EXIT SIGN – WALL MOUNTED

MODEL: LITHONIA LIGHTING LQM SW3R 120/277 EL N SD

or similar approved

WATTS: 0.92 W

TYPICAL LIFETIME OF LED SOURCE: 10 YEARS

TYPICAL LIFETIME OF NICKEL-CADMIUM

BATTERY: 7-9 YEARS

MOUNTING: UNIVERSAL WALL-MOUNTED

CERTIFICATIONS: UL LISTED FOR DAMP

LOCATIONS, NEC, OSHA, UL 924 AND NFPA 101

26 51 00 - 6

STANDARDS. NEMA PREMIUM CERTIFIED. MEETS

ALL APPLICABLE FCC REQUIREEMNTS.

2.4 FACTORY APPLIED FINISH

Electrical equipment shall have factory-applied painting systems.

2.5 DRIVERS

2.5.1 LED Drivers

LED drivers must be electronic, Class 1, constant-current type and comply with the following requirements:

a. Drive current to each individual LED shall not exceed 600 mA, plus or minus 10 percent.

b. Shall be rated to operate between ambient temperatures of minus 30 degrees and 50 degrees C.

c. Shall be designed to operate on the voltage system to which they are connected, 100- 240 volts.

d. Operating frequency shall be: 50 or 60 Hz.

e. Shall be RoHS-compliant.

f. Shall be equipped with over-temperature protection circuit that turns light source off until normal operating temperature is achieved.

g. Output power (watts) and luminous flux (lumens) as shown in luminaire schedule for each luminaire type to meet minimum luminaire efficacy (LE) value provided.

h. Power Factor (PF) greater than or equal to 0.9 over the full dimming range.

i. Current draw Total Harmonic Distortion (THD) of less than 20 percent.

j. Class A sound rating.

k. Minimum 5 year manufacturer's warranty.

l. Integral thermal protection that reduces or eliminates the output power if case temperature exceeds a value detrimental to the driver.

m. IP65 Protection Index.

n. Fully-dimmable using DALI 0-10V control.

o. Drivers shall be specifically approved for use by the corresponding luminaire`s manufacturer.

2.6 EMERGENCY BACKUP BALLAST OR BATTERY KIT

Provide emergency backup battery kits for those luminaires marked in drawings with an "E" letter. Emergency battery kits shall provide a backup power source for lighting fixture

26 51 00 - 7 during an emergency event for at least 90 minutes. Emergency kit shall have the following features as a minimum:

a. Emergency supply time: 90 minutes minimum.

b. Working voltage: 120 volt.

c. Maximum output power: 30 W.

d. Maximum AC input (120V): 92 mA, 9.6 Watts e: Battery: sealed, free maintenance, Ni-Cd.

f. Time of battery recharge: 48 hours.

g. Working temperature rating: 0ºC to 50ºC

h. Visual and manual means of monitoring system operation (pilot light and switch test)

i. Warranty: 5-year warranty

2.7 OCCUPANCY AND DAYLIGHT SENSORS

Capacity to dim and switch the lights in a room or area on occupancy and available daylight, with options for local override, parallel operation and network links to building management systems. Capacity may be enlarged with additional expansion sensors.

Possibility to link more than 20 units in parallel to cover larger areas. Shall use DALI communications protocol in accordance with EN62386 and shall be able to control the lighting fixtures to be installed. Capacity to control window and corridor lighting fixtures separately. With LED indicator for energy usage. Compatible with LED drivers.

Manufacturer shall provide an appropriate gateway, as long as it is compatible with the system that is finally installed, for program/reconfigure/repair the lighting control system.

Voltage 120/277 VAC, white color. Full coverage shall provide hand and arm motion detection for office and administration type areas and walking motion for industrial areas, warehouses, storage rooms and hallways. Set timing and light level at the typical work plane for each specific area as indicated in UFC 3-530-01.

PART 3 - EXECUTION

3.1 INSTALLATION

Electrical installations shall conform to REBT, NFPA 70, and to the requirements specified herein. Electrical drawing and all project documentation shall be followed.

Set lighting fixtures square, level, and aligned, and secure in accordance with manufacturers' directions and approved drawings. Mounting heights specified or indicated shall be to bottom of fixture for ceiling-mounted fixtures and to center of fixture for wall-mounted fixtures. Exact installation of the fixtures shall be approved on site prior to installation, where applicable, after coordination with ceiling type, style and model where it is to be installed. Install interior fixtures attached to structural or resistant elements.

26 51 00 - 8

3.2 FIELD TEST REPORT

Demonstrate that all lighting fixtures and their accessories operate satisfactorily in the presence of the Contracting Officer.

Perform operational tests in the presence of the Contracting Officer and in accordance with referenced standards in this section, and including the following for every space of the sector:

- Lighting function operating toggle switches.

Submit a test report including results of the field test.

3.2.1 Lighting Control Verification Tests

Verify lighting control system and devices operate according to approved sequence of operations. Verification tests are to be completed after commissioning.

a. Verify occupancy sensors operate as described in sequence of operations. Provide testing of sensor coverage, sensitivity, and time-out settings in all spaces where sensors are placed. This is to be completed only after all furnishings have been installed.

b. Verify photosensors operate as described in sequence of operations. Provide testing of sensor coverage, aiming, and calibration in all spaces where sensors are placed. This is to be completed only after all furnishings have been installed.

3.2.2 Emergency Lighting Test

Interrupt power supply to demonstrate proper operation of emergency lighting. If adjustments are made to the lighting system, re-test system to show compliance with standards.

***END OF SECTION***

File details come from the government source that posted it. Updated .