ATTACHMENT 5 SCHEDULE OF MATERIAL SUB.xlsx
XLSX spreadsheet 115 KB Posted
- Attached to
- Small Aircraft Hangar Repair Federal contract opportunity
- Solicitation number
- FA557525B0001
About this file
This document is a detailed Schedule of Material Submittals for a Small Aircraft Hangar Repair project (QUUG 07-1022) at Moron Air Base, Spain. The comprehensive spreadsheet outlines over 300 specific material and documentation submittals required across multiple construction sections, including structural, electrical, mechanical, plumbing, fire protection, and architectural elements. Each line item specifies the type of submittal required, such as shop drawings, manufacturer's certifications, test reports, warranty documentation, installation plans, and technical data, with specific timing requirements relative to project milestones like contract award (AC) or final inspection (FI).
The associated federal contract opportunity indicates the project is valued between $1-5 million, with bids due by 14:00 hours local time on 13 June 2025. The solicitation is specifically restricted to local Spanish sources authorized to perform government construction work, emphasizing the use of Spanish material, labor, and equipment where feasible. The project is being executed by the Department of the Air Force, United States Air Forces in Europe - Air Forces Africa, with a pre-proposal conference/site visit scheduled for 27 May 2025. Notably, the government warns that funds are not currently available, and they reserve the right to cancel the solicitation at any time.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| QandA - QUUG 07-1022.pdf | ||
| AMD1 ESPECIFICACIONES (ESP) - QUUG 07-1022.pdf | ||
| AMD1 SPECIFICATIONS (ENG) - QUUG 07-1022.pdf | ||
| AMD1 SCHEDULE OF MAT - QUUG 07-1022.xlsx | XLSX spreadsheet | |
| AMD1 DRAWINGS - QUUG 07-1022.pdf | ||
| Solicitation - FA557525B0001.pdf | ||
| ATTACHMENT 6 - Section L.pdf | ||
| ATTACHMENT 7 - Section M.pdf | ||
| Solicitation - FA557525B0001.pdf | ||
| ATTACHMENT 4 COST ESTIMATE_BLANK QUUG 07-1022.xlsx | XLSX spreadsheet | |
| ATTACHMENT 2 SPECIFICATIONS (Eng) QUUG 07-1022.pdf | ||
| ATTACHMENT 3 ESPECIFICACIONES (Esp) QUUG 07-1022.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Material Submittals Sch. (ENG)
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER | |||
| QUUG 07-1022 | PROJECT TITLE: | |||
| REPAIR SMALL AC MNT HANGAR B1422 | SOLICITATION / CONTRACT NO. |
FA5575-23-F-0026
| (To be completed by Project Engineer) | (To be completed by Contract Administrator) | ||||||||||||||
| NUMBER OF COPIES REQUIRED | |||||||||||||||
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATION | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | SCHEDULES, LISTINGS, REPORTS, PLANS | TECHNICAL DATA | TEST REPORTS | FIELD REPORTS | REQUIRED SUBMISSION DATE |
fergusog: Enter the due date from the Contractor (MM/DD/YY)
DATE RECEIVED IN CONTRACTING
fergusog: Enter the date received from the Contractor. (MM/DD/YY)
DATE TO CIVIL ENGINEERING
fergusog: Enter the date submittal was given to CE for review. (MM/DD/YY)
RETURN SUSPENSE DATE
fergusog: Enter the date the submittal is due back from CE
(MM/DD/YY)
SUBMITTAL NUMBERS
fergusog: Enter the Submittal Number
DATE CONTRACTOR NOTIFIED CONTRACTOR RESUBMITTAL
fergusog: Enter Resubmittal Number
FINAL APPROVAL
fergusog: Enter the submittal final approval date
(MM/DD/YY)
REMARKS
fergusog: Enter any comments pertaining to the submittal
APPROVED
fergusog: Enter date the Contractor was notified of submittal approval
(MM/DD/YY)
fergusog: Enter Resubmittal Number
DISAPPROVED
fergusog: Enter date the Contractor was notified of submittal disapproval
(MM/DD/YY)
fergusog: Enter the submittal final approval date fergusog: Enter any comments pertaining to the submittal
| SECTION 01 11 01 | ||||||||||||||
| 01 | Warranty letter | 1 | Acceptance+15 | |||||||||||
| 02 | Construction Schedule | 1 | AC+7 | |||||||||||
| 03 | Progress Schedule | 1 | AC+10 | |||||||||||
| 04 | Work Plan | 1 | AC+7 | |||||||||||
| 05 | Mobility Plan | 1 | AC+15 | |||||||||||
| 06 | Project Sign | 1 | AC+15 | |||||||||||
| 07 | Quality Control Plan | 1 | AC+15 | |||||||||||
| 08 | Environmental Protection Plan | 1 | AC+15 | |||||||||||
| 09 | DD Form 1354 | 1 | FI + 15 | |||||||||||
| 10 | Waste & construction debris management | 1 | Final Inspection (IF) | |||||||||||
| 11 | As-Built drawings | 1 | FI + 15 | |||||||||||
| 12 | Spatial Data | 1 | As Built+10 | |||||||||||
| 13 | Key Staff | 1 | AC+15 | |||||||||||
| 14 | Health and safety Plan | 1 | AC+15 | |||||||||||
| SECTION 01 11 02 | ||||||||||||||
| 15 | Work Phasing Plan | 1 | Commencement of work - 15 | |||||||||||
| 16 | Utilities shut off Plan | 1 | Commencement of work - 15 | |||||||||||
| 17 | Salvage plan | 1 | AC + 15 | |||||||||||
| 18 | Operation & Maintenance (O&M) Manuals | 1 | FI + 15 | |||||||||||
| SECTION 02 41 01 | ||||||||||||||
| 19 | Existing Conditions | 1 | ||||||||||||
| 20 | Demolition and Deconstruction Plan | 1 | ||||||||||||
| 21 | Receipts | 1 | ||||||||||||
| 22 | Waste Management Plan | 1 | ||||||||||||
| 23 | Delivery and disposal Certificate of Waste from Construction and Demolition | 1 | ||||||||||||
| SECTION 03 30 00 | ||||||||||||||
| 24 | Reinforcement | 1 | ||||||||||||
| 25 | Concrete mix design | 1 | 1 | |||||||||||
| 26 | Compressive strength tests | 1 | ||||||||||||
| 27 | Slump Tests | 1 | ||||||||||||
| SECTION 04 20 00 | ||||||||||||||
| 28 | Precast concrete blocks | 1 | 1 | |||||||||||
| 29 | Lintels in concrete blocks | 1 | 1 | |||||||||||
| SECTION 05 05 23.16 | ||||||||||||||
| 30 | Welding Electrodes and Rods | 1 | ||||||||||||
| 31 | Certified Welder Performance Qualifications | 1 | ||||||||||||
| 32 | Welder Procedures | 1 | ||||||||||||
| 33 | External Weld Inspection Report | 1 | ||||||||||||
| SECTION 05 12 00 | ||||||||||||||
| 34 | Steel Structure Erection Drawings | 1 | ||||||||||||
| 35 | Shop Primer | 1 | ||||||||||||
| 36 | Non-shrink Grout | 1 | ||||||||||||
| 37 | Electrowelded Grating | 1 | ||||||||||||
| 38 | Steel | 1 | ||||||||||||
| 39 | Bolts, Nuts, and Washers | 1 | ||||||||||||
| 40 | Hangar Sliding Doors Substructure | 1 | 1 | |||||||||||
| 41 | GSA Door Structure | 1 | 1 | |||||||||||
| 42 | Structural Steel Repairs Proposal | 1 | ||||||||||||
| 43 | Erection Plan | 1 | ||||||||||||
| 44 | Wedge Anchors | 1 | ||||||||||||
| SECTION 05 30 00 | ||||||||||||||
| 45 | Steel Deck installation and execution | 1 | ||||||||||||
| 46 | Deck Units | 1 | 1 | |||||||||||
| 47 | Accessories | 1 | ||||||||||||
| 48 | Mechanical Fasteners | 1 | ||||||||||||
| SECTION 05 52 00 | ||||||||||||||
| 49 | Handrail components | 1 | ||||||||||||
| SECTION 07 00 00.01 | ||||||||||||||
| 50 | Fall arresting system | 1 | 1 | 1 | 1 | 1 | 1 | 1 | ||||||
| 51 | Manufacturer's installer qualification | 1 | ||||||||||||
| SECTION 07 21 13 | ||||||||||||||
| 52 | Board Insulation | 1 | ||||||||||||
| 53 | Air Barrier Coating | 1 | ||||||||||||
| 54 | Seam tape | 1 | ||||||||||||
| 55 | Protection Board Insulation or coating | 1 | ||||||||||||
| 56 | Air-tight sealant/pipes/ducts | 1 | ||||||||||||
| 57 | Sealing sleeves for conduits | 1 | ||||||||||||
| 58 | Board Insulation | 1 | ||||||||||||
| 59 | Adhesive | 1 | ||||||||||||
| SECTION 07 27 10 | ||||||||||||||
| 60 | Air Barrier System Product Data | 1 | ||||||||||||
| 61 | Inspection Report | 1 | ||||||||||||
| 62 | Air Barrier Inspector | 1 | ||||||||||||
| SECCIÓN 07 41 00 | ||||||||||||||
| 63 | Roofing Panels | 1 | 1 | 1 | 1 | |||||||||
| 64 | Siding Panels | 1 | 1 | 1 | 1 | |||||||||
| 65 | Flashing | 1 | ||||||||||||
| 66 | Supports and Accesories | 1 | 1 | |||||||||||
| 67 | Fasteners | 1 | 1 | 1 | ||||||||||
| 68 | Gutters | 1 | ||||||||||||
| 69 | Downspouts | 1 | ||||||||||||
| SECTION 07 81 00 | ||||||||||||||
| 70 | Spray-Applied Waterborne Intumescent Coating | 1 | ||||||||||||
| 71 | Fire Resistance Rating | 1 | ||||||||||||
| 72 | Evaluation Reports | 1 | ||||||||||||
| 73 | Installer Qualifications | 1 | ||||||||||||
| 74 | Preparation Report | 1 | ||||||||||||
| 75 | Manufacturer's Inspection Report | 1 | ||||||||||||
| 76 | QC Specialist's Inspection Report | 1 | ||||||||||||
| 77 | Statement of Accordance with Manufacturer's Recommendations | 1 | ||||||||||||
| SECTION 07 84 00 | ||||||||||||||
| 78 | Firestopping Materials | 1 | ||||||||||||
| 79 | Firestopping Materials Installer Qualifications | 1 | ||||||||||||
| SECTION 07 92 00 | ||||||||||||||
| 80 | Sealants, Primers and Bond Breakers | 1 | ||||||||||||
| SECTION 08 11 13 | ||||||||||||||
| 81 | Steel Door Manufacture's Catalog Data | 1 | ||||||||||||
| SECTION 08 14 00 | ||||||||||||||
| 82 | Manufacture's Catalog Data | 1 | ||||||||||||
| SECTION 08 34 16.10 | ||||||||||||||
| 83 | Manufacturer's Qualifications | 1 | ||||||||||||
| 84 | Installer's Qualifications | 1 | ||||||||||||
| 85 | Manufacturer's Representative Qualifications | 1 | ||||||||||||
| 86 | Warranty | 1 | ||||||||||||
| 87 | Hangar doors | 1 | 1 | 1 | 1 | 1 | 1 | 1 | ||||||
| 88 | Components and accessories | 1 | ||||||||||||
| 89 | Motors | 1 | ||||||||||||
| 90 | Engineering calculations. Fasteners for Siding Panels | 1 | ||||||||||||
| 91 | Signage adjacent to doors | 1 | ||||||||||||
| 92 | Erection Plan | 1 | ||||||||||||
| 93 | Operating Tests | 1 | ||||||||||||
| SECTION 08 51 13 | ||||||||||||||
| 94 | Manufacture's Catalog Data | 1 | 1 | 1 | ||||||||||
| 95 | Aluminium windows | 1 | 1 | |||||||||||
| SECTION 08 71 00 | ||||||||||||||
| 96 | Hardware Items | 1 | ||||||||||||
| 97 | Installation | 1 | ||||||||||||
| SECTION 08 81 00 | ||||||||||||||
| 98 | Glass units | 1 | 1 | 1 | ||||||||||
| 99 | Glass Setting and sealing materials | 1 | 1 | |||||||||||
| SECTION 09 24 23 | ||||||||||||||
| 100 | Plaster | 1 | ||||||||||||
| 101 | Manufacturers instructions | 1 | ||||||||||||
| SECTION 09 29 00 | ||||||||||||||
| 102 | Standard Gypsum boards | 1 | 1 | 1 | ||||||||||
| 103 | Cement board | 1 | 1 | 1 | ||||||||||
| 104 | Fire rated Gypsum board | 1 | 1 | 1 | ||||||||||
| 105 | Moisture Resistant gypsum board | 1 | 1 | 1 | ||||||||||
| 106 | Accesories, profiles and joints for gypsum boards | 1 | ||||||||||||
| 107 | Adhesive for cement bonded board | 1 | ||||||||||||
| SECTION 09 30 10 | ||||||||||||||
| 108 | Porcelanic gres floor tile. | 1 | 1 | |||||||||||
| 109 | Non-slip porcelanic gres floor tile. | 1 | 1 | |||||||||||
| 110 | Porcelanic gress wall tile | 1 | 1 | |||||||||||
| 111 | Adhesives | 1 | ||||||||||||
| 112 | Joint Sealants | 1 | ||||||||||||
| 113 | Grout for Joints | 1 | ||||||||||||
| SECTION 09 51 00 | ||||||||||||||
| 114 | Gypsum boards | 1 | 1 | 1 | 1 | |||||||||
| 115 | Acoustical tile | 1 | 1 | |||||||||||
| 116 | Suspension system. | 1 | 1 | |||||||||||
| 117 | Registers | 1 | ||||||||||||
| SECTION 09 67 23.14 | ||||||||||||||
| 118 | Epoxi coating | 1 | 1 | 1 | ||||||||||
| 119 | Selfleveling mortar | 1 | 1 | |||||||||||
| 120 | Gasket bottom joint | 1 | 1 | |||||||||||
| 121 | Primer coating for joints | 1 | 1 | 1 | ||||||||||
| 122 | Self-leveling polyurethane sealer for joints | 1 | 1 | 1 | ||||||||||
| 123 | Roller Floor | 1 | 1 | |||||||||||
| 124 | Homologación del Aplicador por el Fabricante | 1 | ||||||||||||
| SECTION 09 90 00 | ||||||||||||||
| 125 | Coatings | 1 | 1 | 1 | 1 | |||||||||
| 126 | Sealant | 1 | ||||||||||||
| SECTION 10 14 00.20 | ||||||||||||||
| 127 | Detail Drawing of interior signace | 1 | ||||||||||||
| 128 | Interior Signace | 1 | ||||||||||||
| SECTION 10 28 13 | ||||||||||||||
| 129 | Installed plumbing fixtures | 1 | 1 | |||||||||||
| SECTION 10 44 16 | ||||||||||||||
| 130 | Fire Extinguishers | 1 | 1 | 1 | ||||||||||
| 131 | Wall Brackets | 1 | ||||||||||||
| SECTION 21 13 13 | ||||||||||||||
| 132 | Automatic sprinklers | 1 | 1 | |||||||||||
| 133 | Piping and accesories | 1 | 1 | |||||||||||
| 134 | Pipe hangers and supports | 1 | ||||||||||||
| 135 | Fire Riser components | 1 | ||||||||||||
| 136 | Backflow Preventer | 1 | ||||||||||||
| 137 | Gate Valve | 1 | ||||||||||||
| 138 | Fire Pumps | 1 | ||||||||||||
| 139 | Draft courtains | 1 | ||||||||||||
| 140 | Qualifications of installer | 1 | ||||||||||||
| 141 | Qualifications of designer and Inspector | 1 | 1 | |||||||||||
| 142 | Sprinkler system hydraulic calculation | 1 | ||||||||||||
| 143 | Sprinkler system layout and supports | 1 | ||||||||||||
| 144 | As-built drawings | 1 | ||||||||||||
| SECTION 22 00 00 | ||||||||||||||
| 145 | Reduced Pressure Backflow preventer | 1 | ||||||||||||
| 146 | Valves and accessories | 1 | ||||||||||||
| 147 | High-density polyethylene piping | 1 | ||||||||||||
| 148 | Polypropylene PP-RP Piping | 1 | ||||||||||||
| 149 | Galvanized steel Piping | 1 | ||||||||||||
| 150 | Accessories for polyethylene and polypropylene pipe connections | 1 | ||||||||||||
| 151 | Pipe Cap | 1 | ||||||||||||
| 152 | Filter | 1 | ||||||||||||
| 153 | Rigid PVC piping | 1 | ||||||||||||
| 154 | Floor drain, floor and wall cleanouts and traps | 1 | ||||||||||||
| 155 | Emergency shower and eyewash station | 1 | ||||||||||||
| 156 | Water Heater | 1 | ||||||||||||
| 157 | Oil water separator | 1 | ||||||||||||
| 158 | Hangar Doors Drain System | 1 | 1 | |||||||||||
| 159 | Plumbing support system | 1 | ||||||||||||
| SECTION 22 15 26.00 20 | ||||||||||||||
| 160 | Piping and Tubing Fittings | 1 | ||||||||||||
| 161 | Valves Adapters | 1 | ||||||||||||
| 162 | Pressure gages | 1 | ||||||||||||
| 163 | Compressed Air System | 1 | ||||||||||||
| 164 | Tightness Test | 1 | ||||||||||||
| 165 | Welding Procedures and Qualifications | 1 | ||||||||||||
| 166 | Air receivers | 1 | ||||||||||||
| SECTION 23 07 00 | ||||||||||||||
| 167 | Domestic cold-water piping insulation. | 1 | ||||||||||||
| 168 | Domestic hot water piping insulation | 1 | ||||||||||||
| 169 | Refrigerant piping insulation | 1 | ||||||||||||
| 170 | HVAC Duct insulation | 1 | ||||||||||||
| SECTION 23 30 00 | ||||||||||||||
| 171 | Sheet metal rectangular/circular ducts | 1 | 1 | |||||||||||
| 172 | Circular flexible ductwork | 1 | ||||||||||||
| 173 | Diffusers | 1 | ||||||||||||
| 174 | Air intakes / Exhaust grilles | 1 | ||||||||||||
| 175 | Ducted Split Units | 1 | ||||||||||||
| 176 | Control System (including wiring, diagrams, panels and all related accessories) | 1 | ||||||||||||
| 177 | Pipes | 1 | ||||||||||||
| 178 | Thermostats | 1 | ||||||||||||
| 179 | Control Panels | 1 | ||||||||||||
| 180 | Duct supports and seismic bracing if required | 1 | ||||||||||||
| 181 | Control diagrams of air conditioning system | 1 | ||||||||||||
| 182 | Performance Tests | 1 | ||||||||||||
| 183 | Testing, adjusting and balancing of air conditioning systems | 1 | ||||||||||||
| 184 | Manufacturer’s representative Certificate | 1 | ||||||||||||
| SECTION 26 11 16 | ||||||||||||||
| 185 | Prefabricated Transformer Shelter | 1 | 1 | |||||||||||
| 186 | Transformer | 1 | ||||||||||||
| 187 | HV switchgear | 1 | ||||||||||||
| 188 | HV Cable | 1 | ||||||||||||
| 189 | Spare parts | 1 | ||||||||||||
| 190 | Field Quality Control | 1 | ||||||||||||
| 191 | Transformer Loss Report | 1 | ||||||||||||
| 192 | Contractor company qualification certificate for HV Lines | 1 | ||||||||||||
| 193 | Installer's individual qualification certificate for HV lines | 1 | ||||||||||||
| 194 | Transformer Routine Test | 1 | ||||||||||||
| SECTION 26 20 00 | ||||||||||||||
| 195 | Rigid Metal Conduit and fittings RMC | 1 | ||||||||||||
| 196 | Electrical Metal Tubing | 1 | ||||||||||||
| 197 | Flexible nonmetal (NM) conduits | 1 | ||||||||||||
| 198 | Flexible Metal Conduit (FMC) | 1 | ||||||||||||
| 199 | Junction and pull boxes. | 1 | ||||||||||||
| 200 | Receptacles and toggle switches | 1 | ||||||||||||
| 201 | Wires and cables | 1 | ||||||||||||
| 202 | Circuit breakers | 1 | ||||||||||||
| 203 | Panel boards | 1 | 1 | 1 | ||||||||||
| 204 | Panelboard, switchboard and meter enclosures | 1 | ||||||||||||
| 205 | Meters | 1 | ||||||||||||
| 206 | 400Hz solid state frequency converter | 1 | ||||||||||||
| 207 | Manual Transfer Switch | 1 | 1 | |||||||||||
| 208 | Surge Protection Device (SPD) | 1 | ||||||||||||
| 209 | Safety Switch | 1 | ||||||||||||
| 210 | Aircraft power cable assembly | 1 | ||||||||||||
| 211 | Dry-type Transformer | 1 | ||||||||||||
| 212 | Hangar door motor | |||||||||||||
| 213 | Wiring diagrams | 1 | ||||||||||||
| 214 | Devices Subject to Manual Operation | 1 | ||||||||||||
| 215 | 1000-Volt Wiring Test | 1 | ||||||||||||
| 216 | Grounding System Test | 1 | ||||||||||||
| 217 | e. Electrical equipment calibration certificates | 1 | ||||||||||||
| SECTION 26 41 00 | ||||||||||||||
| 218 | Overall lightning protection system | 1 | ||||||||||||
| 219 | Each major component | 1 | ||||||||||||
| 220 | Air Terminals | 1 | ||||||||||||
| 221 | Conductors | 1 | ||||||||||||
| 222 | Ground Rods | 1 | ||||||||||||
| 223 | Lightning Protection System Hardware | 1 | ||||||||||||
| 224 | Cable and air terminals fixation fittings | 1 | ||||||||||||
| 225 | Exothermic welding | 1 | ||||||||||||
| 226 | Strike Counter Device | 1 | ||||||||||||
| 227 | Grounding test wells/test bars | 1 | ||||||||||||
| 228 | Lightning Protection and Grounding System Test | 1 | ||||||||||||
| SECTION 26 51 00 | ||||||||||||||
| 229 | LED Luminaires | 1 | 1 | |||||||||||
| 230 | Luminaire Light Sources | 1 | ||||||||||||
| 231 | LED Drivers | 1 | ||||||||||||
| 232 | Occupancy sensor | 1 | 1 | |||||||||||
| 233 | Combined occupancy and Daylight sensor | 1 | 1 | |||||||||||
| 234 | Luminaire Useful Life Certificate | 1 | ||||||||||||
| 235 | Spare parts delivery Certificate | 1 | ||||||||||||
| 236 | Lighting fixures | 1 | ||||||||||||
| 237 | Lighting control devices | 1 | ||||||||||||
| SECTION 26 56 00 | ||||||||||||||
| 238 | LED Luminaires | 1 | 1 | |||||||||||
| 239 | Lighting contactor | 1 | ||||||||||||
| 240 | LED Drivers | 1 | ||||||||||||
| 241 | Luminaire Useful Life Certificate | 1 | ||||||||||||
| 242 | Spare parts delivery Certificate | 1 | ||||||||||||
| 243 | Lighting Fixtures | 1 | ||||||||||||
| 244 | Lighting Control Devices | 1 | ||||||||||||
| SECTION 27 10 00 | ||||||||||||||
| 245 | Cable trays | 1 | ||||||||||||
| 246 | Conduits, boxes and accessories | 1 | ||||||||||||
| 247 | Telecommunications Grounding Busbar (TGB) | 1 | ||||||||||||
| SECTION 28 31 70 | ||||||||||||||
| 248 | Interior Combined Fire Alarm/Mass Notification System. | 1 | 1 | |||||||||||
| 249 | Fire Alarm Control Panel (FACP) | 1 | ||||||||||||
| 250 | Autonomous Control Unit (ACU) | 1 | ||||||||||||
| 251 | Smoke sensor | 1 | ||||||||||||
| 252 | Wiring and cable | 1 | ||||||||||||
| 253 | Conduits | 1 | ||||||||||||
| 254 | System monitoring | 1 | ||||||||||||
| 255 | Addressable interface devices | 1 | ||||||||||||
| 256 | Audio-visual alarm devices (strobes) | 1 | ||||||||||||
| 257 | Manual pull stations | 1 | ||||||||||||
| 258 | Valve monitor switches (tamper switches) | 1 | ||||||||||||
| 259 | Retardant Chamber Pressure Switch | 1 | ||||||||||||
| 260 | Flame detectors | 1 | 1 | |||||||||||
| 261 | Test Procedures | 1 | ||||||||||||
| 262 | Qualifications of installer | 1 | ||||||||||||
| 263 | Record of completion | 1 | ||||||||||||
| 264 | Verification of Compliant Installation | 1 | ||||||||||||
| SECTION 31 00 00 | ||||||||||||||
| 265 | Artificial Graded-Aggregate | 1 | ||||||||||||
| 266 | Backfill material | 1 | ||||||||||||
| SECTION 32 04 22 | ||||||||||||||
| 267 | Geotextile | 1 | ||||||||||||
| 268 | Execution control | 1 | ||||||||||||
| SECTION 32 05 10 | ||||||||||||||
| 269 | Aggregates origin control | 1 | 1 | 1 | ||||||||||
| 270 | Job mix formula | 1 | ||||||||||||
| 271 | Test section | 1 | 1 | |||||||||||
| 272 | Acceptance control | 1 | ||||||||||||
| SECCIÓN 33 30 00 | ||||||||||||||
| 273 | PVC pipe and fittings | 1 | ||||||||||||
| 274 | Round manhole. | 1 | ||||||||||||
| 275 | Round manhole frame and cover. | 1 | ||||||||||||
| 276 | Sewer pipe protection film and sealant. | 1 | ||||||||||||
| 277 | Plan and topographic profile for new pipe installation. | 1 | ||||||||||||
| SECTION 33 71 02 | ||||||||||||||
| 278 | Precast underground Concrete Structures, Manholes | 1 | 1 | 1 | 1 | |||||||||
| 279 | Manhole frames and covers | 1 | 1 | 1 | 1 | |||||||||
| 280 | Conduits and spacers | 1 | ||||||||||||
| 281 | Underground Low Voltage Cables and conductors | 1 | 1 | |||||||||||
| 282 | Warning and identification tape | 1 | ||||||||||||
| 283 | Ground wires | 1 | ||||||||||||
| 284 | Pre-manufactured Low-voltage splices | 1 | ||||||||||||
| 285 | Grounding Test/Bar Wells | 1 | ||||||||||||
| 286 | Grounding Bars | 1 | ||||||||||||
| 287 | Ground Rods | 1 | ||||||||||||
| 288 | Exothermic Welding | 1 | ||||||||||||
| 289 | Manufacturer's Instructions | 1 | ||||||||||||
| SECTION 33 82 00 | ||||||||||||||
| 290 | Conduits | 1 | ||||||||||||
| 291 | Manholes | 1 | ||||||||||||
| 292 | Warning and identification tape | 1 | ||||||||||||
| SECTION 41 22 13 | ||||||||||||||
| 293 | General Arrangement Drawings | 1 | ||||||||||||
| 294 | Structural Design | 1 | 1 | |||||||||||
| 295 | Mechanical Design | 1 | 1 | |||||||||||
| 296 | Electrical Design | 1 | 1 | |||||||||||
| 297 | Bridge Crane Runway Beam check | 1 | ||||||||||||
| 298 | Contractor's Self-Test | 1 | ||||||||||||
| 299 | Crane Installation Plan | 1 | ||||||||||||
| 300 | Operation Instructions | 1 |
&"Arial,Negrita"&8QUUG 07-1022 Schedule of Material Submittals, MARCH 2025 Page &P of &N
Resumen Muestras de Mat. (ESP)
| RESUMEN MUESTRAS DE MATERIAL | NÚMERO PROYECTO: | ||
| QUUG 07-1022 | TÍTULO DE PROYECTO: |
REPARAR HANGAR DE MANTENIMIENTO PEQUEÑA AERONAVE B1422
SOLICITACIÓN / CONTRATO NO.
FA5575-23-F-0026
| (A cumplimentar por el ingeniero del proyecto) | (A cumplimentar por administrador del contrato) | ||||||||||||||
| NUMBER OF COPIES REQUIRED | |||||||||||||||
| LÍNEA NÚMERO | PARTIDA O DESCRIPCIÓN DE PARTIDA, REFERENCIA DEL CONTRATO, TIPO DE PRESENTACIÓN | CERTIFICADO DE CUMPLIMIENTO | PLANOS DE TALLER | MUESTRAS | SELECCIÓN DE COLOR | RECOMENDACIONES DEL FABRICANTE | GARANTÍA DEL FABRICANTE | DATOS DE CATÁLOGO | INSTRUCCIONES DE FUNCIONAMIENTO | PROGRAMAS, LISTADOS, INFORMES, PLANES | DATOS TÉCNICOS | PRUEBAS | INFORMES DE TRABAJOS DE CAMPO | FECHA DE ENTREGA |
fergusog: Enter the due date from the Contractor (MM/DD/YY)
FECHA RECEPCIÓN EN CONTRATACIÓN
fergusog: Enter the date received from the Contractor. (MM/DD/YY) FECHA EN INGENIERíA CIVIL fergusog: Enter the date submittal was given to CE for review. (MM/DD/YY)
FECHA LÍMITE DE DEVOLUCIÓN
fergusog: Enter the date the submittal is due back from CE
(MM/DD/YY)
NÚMERO DE MUESTRA
fergusog: Enter the Submittal Number
FECHA NOTIFICACIÓN A CONTRATISTA SEGUNDA PRESENTACIÓN DEL CONTRATISTA
fergusog: Enter Resubmittal Number
APROBACIÓN FINAL
fergusog: Enter the submittal final approval date
(MM/DD/YY)
OBSERVACIONES
fergusog: Enter any comments pertaining to the submittal
APROBADO
fergusog: Enter date the Contractor was notified of submittal approval
(MM/DD/YY)
fergusog: Enter Resubmittal Number
DESAPROBADO
fergusog: Enter date the Contractor was notified of submittal disapproval fergusog: Enter the submittal final approval date fergusog: Enter any comments pertaining to the submittal
| SECCIÓN 01 11 01 | ||||||||||||||
| 01 | Carta de garantía | 1 | Aceptación+15 | |||||||||||
| 02 | Plan de obra | 1 | AC+7 | |||||||||||
| 03 | Programa de avance de obras | 1 | AC+10 | |||||||||||
| 04 | Plan de obra | 1 | AC+7 | |||||||||||
| 05 | Plan de movilización | 1 | AC+15 | |||||||||||
| 06 | Cartel de proyecto | 1 | AC+15 | |||||||||||
| 07 | Plan de control de calidad | 1 | AC+15 | |||||||||||
| 08 | Plan de protección medioambiental | 1 | AC+15 | |||||||||||
| 09 | Formulario DD 1354 | 1 | IF + 15 | |||||||||||
| 10 | Certificado de gestión de residuos y escombros | 1 | Antes de Inspección final (IF) | |||||||||||
| 11 | Planos As-Builts | 1 | IF + 15 | |||||||||||
| 12 | Datos espaciales | 1 | As Built+10 | |||||||||||
| 13 | Personal Clave | 1 | AC+15 | |||||||||||
| 14 | Plan de salud y seguridad | 1 | AC+15 | |||||||||||
| SECCIÓN 01 11 02 | ||||||||||||||
| 15 | Plan de Fases del Trabajo | 1 | Comienzo de los Trabajos - 15 | |||||||||||
| 16 | Plan de cortes de suministros | 1 | Comienzo de los Trabajos - 15 | |||||||||||
| 17 | Plan de recuperación | 1 | AC + 15 | |||||||||||
| 18 | Manuales de Operación y Mantenimiento | 1 | IF + 15 | |||||||||||
| SECCIÓN 02 41 01 | ||||||||||||||
| 19 | Condiciones Existentes | 1 | ||||||||||||
| 20 | Plan de Demoliciones y Desmontaje | 1 | ||||||||||||
| 21 | Comprobantes de Recepción (Albaranes) | 1 | ||||||||||||
| 22 | Plan de Gestión de Residuos | 1 | ||||||||||||
| 23 | Certificado de Entregas y Eliminación de Residuos de Construcción y Demolición | 1 | ||||||||||||
| SECCIÓN 03 30 00 | ||||||||||||||
| 24 | Refuerzos | 1 | ||||||||||||
| 25 | Diseño de la mezcla de hormigón | 1 | 1 | |||||||||||
| 26 | Pruebas de resistencia a compresión | 1 | ||||||||||||
| 27 | Pruebas de consistencia | 1 | ||||||||||||
| SECCIÓN 04 20 00 | ||||||||||||||
| 28 | Bloques de hormigón prefabricados | 1 | 1 | |||||||||||
| 29 | Dinteles en muros de bloques | 1 | 1 | |||||||||||
| SECCIÓN 05 05 23.16 | ||||||||||||||
| 30 | Calificaciones del Procedimiento de Soldadura | 1 | ||||||||||||
| 31 | Cualificaciones de Soldador Certificado | 1 | ||||||||||||
| 32 | Procedimientos de Soldadura | 1 | ||||||||||||
| 33 | Informe de Inspección Externa de las Soldaduras | 1 | ||||||||||||
| SECCIÓN 05 12 00 | ||||||||||||||
| 34 | Planos de montaje de la estructura de acero | 1 | ||||||||||||
| 35 | Imprimación en taller | 1 | ||||||||||||
| 36 | Mortero sin retracción | 1 | ||||||||||||
| 37 | Rejilla electrosoldada | 1 | ||||||||||||
| 38 | Acero | 1 | ||||||||||||
| 39 | Pernos, Tuercas y Arandelas | 1 | ||||||||||||
| 40 | Subestructura de las puertas correderas del hangar | 1 | 1 | |||||||||||
| 41 | Estructura puerta GSA | 1 | 1 | |||||||||||
| 42 | Propuesta de Reparación del Acero Estructural | 1 | ||||||||||||
| 43 | Plan de Montaje | 1 | ||||||||||||
| 44 | Anclajes de Cuña | 1 | ||||||||||||
| SECCIÓN 05 30 00 | ||||||||||||||
| 45 | Instalación y ejecución de Forjado Colaborante | 1 | ||||||||||||
| 46 | Unidad de perfil de chapa metálica | 1 | 1 | |||||||||||
| 47 | Accesorios | 1 | ||||||||||||
| Fijaciones mecánicas | 1 | |||||||||||||
| 48 | SECCIÓN 05 52 00 | |||||||||||||
| 49 | Componentes de pasamanos | 1 | ||||||||||||
| SECCIÓN 07 00 00.01 | ||||||||||||||
| 50 | Sistema anticaídas | 1 | 1 | 1 | 1 | 1 | 1 | 1 | ||||||
| 51 | Cualificacióin del instalador del fabricante | 1 | ||||||||||||
| SECCIÓN 07 21 13 | ||||||||||||||
| 52 | Panel de aislamiento | 1 | ||||||||||||
| 53 | Recubrimiento de barrera de aire | 1 | ||||||||||||
| 54 | Cinta de costura | 1 | ||||||||||||
| 55 | Panel de protección, aislamiento o revestimiento | 1 | ||||||||||||
| 56 | Sellador hermético / tuberías / conductos | 1 | ||||||||||||
| 57 | Manguitos de sellado para conductos | 1 | ||||||||||||
| 58 | Aislamiento de placa | 1 | ||||||||||||
| 59 | Adhesivo | 1 | ||||||||||||
| SECCIÓN 07 27 10 | ||||||||||||||
| 60 | Datos de producto | 1 | ||||||||||||
| 61 | Informe de Inspección | 1 | ||||||||||||
| 62 | Inspector de Barreras de hermeticidad | 1 | ||||||||||||
| SECCIÓN 07 41 00 | ||||||||||||||
| 63 | Paneles de cubierta | 1 | 1 | 1 | 1 | |||||||||
| 64 | Paneles de Fachada | 1 | 1 | 1 | 1 | |||||||||
| 65 | Remates | 1 | ||||||||||||
| 66 | Accesorios y Soportes | 1 | 1 | |||||||||||
| 67 | Fijaciones | 1 | 1 | 1 | ||||||||||
| 68 | Canalones | 1 | ||||||||||||
| 69 | Bajantes | 1 | ||||||||||||
| SECCIÓN 07 81 00 | ||||||||||||||
| 70 | Sistema de recubrimiento intumescente | 1 | ||||||||||||
| 71 | Clasificación de resistencia al fuego | 1 | ||||||||||||
| 72 | Informes de evaluación | 1 | ||||||||||||
| 73 | Certificados del instalador | 1 | ||||||||||||
| 74 | Informe de preparación | 1 | ||||||||||||
| 75 | Informe de inspección del fabricante | 1 | ||||||||||||
| 76 | Informe de Inspección del Especialista en QC | 1 | ||||||||||||
| 77 | Declaración de Conformidad con las Recomendaciones del Fabricante | 1 | ||||||||||||
| SECCIÓN 07 84 00 | ||||||||||||||
| 78 | Materiales de cortafuegos | 1 | ||||||||||||
| 79 | Cualificaciones del instalador | 1 | ||||||||||||
| SECCIÓN 07 92 00 | ||||||||||||||
| 80 | Selladores, imrpimaciones y disolventes de adherencia | 1 | ||||||||||||
| SECCIÓN 08 11 13 | ||||||||||||||
| 81 | Datos del catálogo del fabricante | 1 | ||||||||||||
| SECCIÓN 08 14 00 | ||||||||||||||
| 82 | Datos del catálogo del fabricante | 1 | ||||||||||||
| SECCIÓN 08 34 16.10 | ||||||||||||||
| 83 | Cualificaciones del fabricante | 1 | ||||||||||||
| 84 | Cualificaciones del instalador | 1 | ||||||||||||
| 85 | Cualificaciones del representante del fabricante | 1 | ||||||||||||
| 86 | Garantía | 1 | ||||||||||||
| 87 | Puertas de hangares | 1 | 1 | 1 | 1 | 1 | 1 | 1 | ||||||
| 88 | Componentes y accesorios | 1 | ||||||||||||
| 89 | Motors | 1 | ||||||||||||
| 90 | Cálculos de ingeniería. Fijaciones para paneles de revestimiento | 1 | ||||||||||||
| 91 | Señalización adyacente a las puertas | 1 | ||||||||||||
| 92 | Plan de montaje | 1 | ||||||||||||
| 93 | Ensayos de funcionamiento | 1 | ||||||||||||
| SECCIÓN 08 51 13 | ||||||||||||||
| 94 | Datos del catálogo del fabricante | 1 | 1 | 1 | ||||||||||
| 95 | Ventanas de aluminio | 1 | 1 | |||||||||||
| SECCIÓN 08 71 00 | ||||||||||||||
| 96 | Herrajes | 1 | ||||||||||||
| 97 | Installation | 1 | ||||||||||||
| SECCIÓN 08 81 00 | ||||||||||||||
| 98 | Unidades de vidrio | 1 | 1 | 1 | ||||||||||
| 99 | Materiales de fijación y sellado | 1 | 1 | |||||||||||
| SECCIÓN 09 24 23 | ||||||||||||||
| 100 | Enlucido de cemento | 1 | ||||||||||||
| 101 | Instrucciones del fabricante | 1 | ||||||||||||
| SECCIÓN 09 29 00 | ||||||||||||||
| 102 | Placas de yeso estándar | 1 | 1 | 1 | ||||||||||
| 103 | Placa de cemento | 1 | 1 | 1 | ||||||||||
| 104 | Placa de yeso ignífuga | 1 | 1 | 1 | ||||||||||
| 105 | Placa de yeso hidrófuga | 1 | 1 | 1 | ||||||||||
| 106 | Accesorios perfiles y juntas para placaas de yeso | 1 | ||||||||||||
| 107 | Adhesivo para placaas de cemento | 1 | ||||||||||||
| SECCIÓN 09 30 10 | ||||||||||||||
| 108 | Pavimento de gres porcelánico | 1 | 1 | |||||||||||
| 109 | Pavimento antideslizante de gres porcelánico | 1 | 1 | |||||||||||
| 110 | Revestimiento de gres porcelánico en paredes | 1 | 1 | |||||||||||
| 111 | Adhesivos | 1 | ||||||||||||
| 112 | Sellantes de juntas | 1 | ||||||||||||
| 113 | Mortero para juntas | 1 | ||||||||||||
| SECCIÓN 09 51 00 | ||||||||||||||
| 114 | Techos de placa de yesos | 1 | 1 | 1 | 1 | |||||||||
| 115 | Placas acústicas | 1 | 1 | |||||||||||
| 116 | Sistema de cuelgue | 1 | 1 | |||||||||||
| 117 | Registros | 1 | ||||||||||||
| SECCIÓN 09 67 23.14 | ||||||||||||||
| 118 | Recubrimiento epoxi | 1 | 1 | 1 | ||||||||||
| 119 | Mortero autonivelante | 1 | 1 | |||||||||||
| 120 | Fondo de junta | 1 | 1 | |||||||||||
| 121 | Imprimación para juntas | 1 | 1 | 1 | ||||||||||
| 122 | Sellador de poliuretano autonivelante para juntas | 1 | 1 | 1 | ||||||||||
| 123 | Suelo rodante | 1 | 1 | |||||||||||
| 124 | Approval of the Applicator by the Manufacturer | 1 | ||||||||||||
| SECCIÓN 09 90 00 | ||||||||||||||
| 125 | Pinturas de revestimiento | 1 | 1 | 1 | 1 | |||||||||
| 126 | Sellador | 1 | ||||||||||||
| SECCIÓN 10 14 00.20 | ||||||||||||||
| 127 | Plano de detalle de señalización interior | 1 | ||||||||||||
| 128 | Señalización interior | 1 | ||||||||||||
| SECCIÓN 10 28 13 | ||||||||||||||
| 129 | Accesorios de fontanería instalados | 1 | 1 | |||||||||||
| SECCIÓN 10 44 16 | ||||||||||||||
| 130 | Extintores de incendio | 1 | 1 | 1 | ||||||||||
| 131 | Soportes de pared | 1 | ||||||||||||
| SECCIÓN 21 13 13 | ||||||||||||||
| 132 | Rociadores automáticos | 1 | 1 | |||||||||||
| 133 | Tuberías y accesorios | 1 | 1 | |||||||||||
| 134 | Soportes y colgadores de tuberías | 1 | ||||||||||||
| 135 | Tubería principal contra incendios | 1 | ||||||||||||
| 136 | Válvulas antirretorno | 1 | ||||||||||||
| 137 | Válvulas de compuerta | 1 | ||||||||||||
| 138 | Bombas contra incendios | 1 | ||||||||||||
| 139 | Cortinas cortafuego | 1 | ||||||||||||
| 140 | Cualificaciones del instalador | 1 | ||||||||||||
| 141 | Cualificaciones del diseñador y del inspector | 1 | 1 | |||||||||||
| 142 | Cálculo hidráulico del sistema de rociadores | 1 | ||||||||||||
| 143 | Trazado y soportes del sistema de rociadores | 1 | ||||||||||||
| 144 | Planos "As-Built" | 1 | ||||||||||||
| SECCIÓN 22 00 00 | ||||||||||||||
| 145 | Prevención de reflujo de presión reducida | 1 | ||||||||||||
| 146 | Válcula y accesorios | 1 | ||||||||||||
| 147 | Tuberías de polietileno de alta densidad | 1 | ||||||||||||
| 148 | Tubería de polipropileno PP-RP | 1 | ||||||||||||
| 149 | Tubería de acero galvanizado | 1 | ||||||||||||
| 150 | Accesorios para conexiones de tuberías | 1 | ||||||||||||
| 151 | Tapa de tubería | 1 | ||||||||||||
| 152 | Filtro | 1 | ||||||||||||
| 153 | Tubería rígida de PVC | 1 | ||||||||||||
| 154 | Desagües de suelo, limpiezas y trampillas | 1 | ||||||||||||
| 155 | Estación Ducha de Emergencia y lavaojos | 1 | ||||||||||||
| 156 | Calentador de Agua | 1 | ||||||||||||
| 157 | Separador de grasas | 1 | ||||||||||||
| 158 | Sistema de drenaje de las puertas del hangar | 1 | 1 | |||||||||||
| 159 | Soportes para sistemas de fontanería | 1 | ||||||||||||
| SECTION 22 15 26.00 20 | ||||||||||||||
| 160 | Accesorios de tuberías | 1 | ||||||||||||
| 161 | Adaptadores de válvulas | 1 | ||||||||||||
| 162 | Manómetros | 1 | ||||||||||||
| 163 | Sistema de aire comprimido | 1 | ||||||||||||
| 164 | Prueba de estanqueidad | 1 | ||||||||||||
| 165 | Procedimientos de soldadura y cualificaciones | 1 | ||||||||||||
| 166 | Receptores de aire | 1 | ||||||||||||
| SECCIÓN 23 07 00 | ||||||||||||||
| 167 | Aislamiento de tuberías de agua fría sanitaria | 1 | ||||||||||||
| 168 | Aislamiento de tuberías de caliente fría sanitaria | 1 | ||||||||||||
| 169 | Aislamiento de tuberías de refrigerante | 1 | ||||||||||||
| 170 | Aislamiento de conductos HVAC | 1 | ||||||||||||
| SECCIÓN 23 30 00 | ||||||||||||||
| 171 | Conductos rectangulares/circulares de chapa | 1 | 1 | |||||||||||
| 172 | Conductos circulares flexibles | 1 | ||||||||||||
| 173 | Difusores | 1 | ||||||||||||
| 174 | Tomas de aire/rejillas de escape | 1 | ||||||||||||
| 175 | Unidades divididas con conductos | 1 | ||||||||||||
| 176 | Sistema de control | 1 | ||||||||||||
| 177 | Tuberías | 1 | ||||||||||||
| 178 | Termostatos | 1 | ||||||||||||
| 179 | Paneles de control | 1 | ||||||||||||
| 180 | Soportes de conductos y arriostramiento sísmico | 1 | ||||||||||||
| 181 | Diagramas de control del sistema de aire acondicionado | 1 | ||||||||||||
| 182 | Prueba de rendimiento | 1 | ||||||||||||
| 183 | Prueba, ajuste y equilbtado del sistema de a.a. | 1 | ||||||||||||
| 184 | Certificado del representante del fabricante | 1 | ||||||||||||
| SECCIÓN 26 11 16 | ||||||||||||||
| 185 | Envolvente prefabricado para CT | 1 | 1 | |||||||||||
| 186 | Transformador | 1 | ||||||||||||
| 187 | Aparamenta de AT | 1 | ||||||||||||
| 188 | Cable de Alta Tensión | 1 | ||||||||||||
| 189 | Repuestos | 1 | ||||||||||||
| 190 | Control de Calidad en campo | 1 | ||||||||||||
| 191 | Informe de pérdidas del transformador | 1 | ||||||||||||
| 192 | Certificado de qualificación de la empresa contratista para lineas AT | 1 | ||||||||||||
| 193 | Certificado de qualificación individual del instalador para líneas de AT | 1 | ||||||||||||
| 194 | Prueba de rutina del transformador | 1 | ||||||||||||
| SECCIÓN 26 20 00 | ||||||||||||||
| 195 | Conducto metálico rígido | 1 | ||||||||||||
| 196 | Tubería metálica eléctrica | 1 | ||||||||||||
| 197 | Conductos flexibles no metálicos | 1 | ||||||||||||
| 198 | Conducto metálico flexible | 1 | ||||||||||||
| 199 | Cajas de empalme y extracción | 1 | ||||||||||||
| 200 | Enchufes e interruptores de palanca | 1 | ||||||||||||
| 201 | Alambres y cables | 1 | ||||||||||||
| 202 | Disyuntores | 1 | ||||||||||||
| 203 | Cuadro de distribución | 1 | 1 | 1 | ||||||||||
| 204 | Armarios de paneles, cuadros eléctricos y armarios de contadores | 1 | ||||||||||||
| 205 | Contadores | 1 | ||||||||||||
| 206 | Convertidor de frecuencia de estado sólido 400Hz | 1 | ||||||||||||
| 207 | Interruptor de transferencia manual | 1 | 1 | |||||||||||
| 208 | Dispositivo de protección contra sobretensiones (SPD) | 1 | ||||||||||||
| 209 | Interruptores de seguridad | 1 | ||||||||||||
| 210 | Conjunto de cables de alimentación de aeronaves | 1 | ||||||||||||
| 211 | Transformador tipo seco | 1 | ||||||||||||
| 212 | Motor de puertas de Hangar | 1 | ||||||||||||
| 213 | Esquemas de cableado | 1 | ||||||||||||
| 214 | Dispositivos sujetos a operación manual | 1 | ||||||||||||
| 215 | Prueba de cableado de 1000 Voltios | 1 | ||||||||||||
| 216 | Prueba del sistema de toma de tierra | 1 | ||||||||||||
| 217 | Certificados de calibración de equipos eléctricos | 1 | ||||||||||||
| SECTION 26 41 00 | ||||||||||||||
| 218 | Sistema global de protección contra el rayo | 1 | ||||||||||||
| 219 | Cada componente principal | 1 | ||||||||||||
| 220 | Terminales aéreas | 1 | ||||||||||||
| 221 | Conductores | 1 | ||||||||||||
| 222 | Picas de tierra | 1 | ||||||||||||
| 223 | Componentes de sistemas de protección contra el rayp | 1 | ||||||||||||
| 224 | Accesorios de fijación de cables y terminales de aire | 1 | ||||||||||||
| 225 | Soldadura exotérmica | 1 | ||||||||||||
| 226 | Dispositivo contador de golpes | 1 | ||||||||||||
| 227 | Pozos/picas de prueba de puesta a tierra | 1 | ||||||||||||
| 228 | Prueba del sistema de protección contra el rayo y de puesta a tierra | 1 | ||||||||||||
| SECCIÓN 26 51 00 | ||||||||||||||
| 229 | Luminarias LED | 1 | 1 | |||||||||||
| 230 | Fuentes de luz de luminarias | 1 | ||||||||||||
| 231 | Controladores LED | 1 | ||||||||||||
| 232 | Sensor de ocupación | 1 | 1 | |||||||||||
| 233 | Sensores de ocupación y de luz diurna | 1 | 1 | |||||||||||
| 234 | Certificado de vida útil de la luminaria | 1 | ||||||||||||
| 235 | Certificado de entrega de repuestos | 1 | ||||||||||||
| 236 | Pruebas de accesorios de iluminación | 1 | ||||||||||||
| 237 | Pruebas de dispositivos de control de la iluminación | 1 | ||||||||||||
| SECCIÓN 26 56 00 | ||||||||||||||
| 238 | Luminarias LED | 1 | 1 | |||||||||||
| 239 | Interruptores de iluminación | 1 | ||||||||||||
| 240 | Controladores LED | 1 | ||||||||||||
| 241 | Certificado de vida útil de la luminaria | 1 | ||||||||||||
| 242 | Certificado de entrega de repuestos | 1 | ||||||||||||
| 243 | Pruebas de accesorios de iluminación | 1 | ||||||||||||
| 244 | Pruebas de dispositivos de control de iluminación | 1 | ||||||||||||
| SECCIÓN 27 10 00 | ||||||||||||||
| 245 | Bandejas portacables | 1 | ||||||||||||
| 246 | Conductos, cajas y accesorios | 1 | ||||||||||||
| 247 | Barra colectora de toma de tierra de telecomunicaciones (TGB) | 1 | ||||||||||||
| SECCIÓN 28 31 70 | ||||||||||||||
| 248 | Sistema combinado de alarma contra incendios y notificación masiva | 1 | 1 | |||||||||||
| 249 | Panel de control de alarma de incendio (FACP) | 1 | ||||||||||||
| 250 | Unidad de control autónoma (ACU) | 1 | ||||||||||||
| 251 | Sensor de humos | 1 | ||||||||||||
| 252 | Cableado y cables | 1 | ||||||||||||
| 253 | Conductos | 1 | ||||||||||||
| 254 | Monitoreo del sistema | 1 | ||||||||||||
| 255 | Dispositivos de interfaz direccionables | 1 | ||||||||||||
| 256 | Dispositivos de alarma audiovisuales | 1 | ||||||||||||
| 257 | Estaciones de extracción manuales | 1 | ||||||||||||
| 258 | Interruptores de monitor de válvulas | 1 | ||||||||||||
| 259 | Presostato de cámara retardante | 1 | ||||||||||||
| 260 | Detectores de llama | 1 | 1 | |||||||||||
| 261 | Procedimientos de prueba | 1 | ||||||||||||
| 262 | Cualificaciones del instalador | 1 | ||||||||||||
| 263 | Registro de finalización | 1 | ||||||||||||
| 264 | Verificación de la conformidad de la instalación | 1 | ||||||||||||
| SECCIÓN 31 00 00 | ||||||||||||||
| 265 | Suelo agregado artificial | 1 | ||||||||||||
| 266 | Material de relleno | 1 | ||||||||||||
| SECCIÓN 32 04 22 | ||||||||||||||
| 267 | Geotextil | 1 | ||||||||||||
| 268 | Control de ejecución | 1 | ||||||||||||
| SECCIÓN 32 05 10 | ||||||||||||||
| 269 | Control de origen de áridos | 1 | 1 | 1 | ||||||||||
| 270 | Fórmula de trabajos | 1 | ||||||||||||
| 271 | Sección de prueba | 1 | 1 | |||||||||||
| 272 | Control de aceptación | 1 | ||||||||||||
| SECCIÓN 33 30 00 | ||||||||||||||
| 273 | Tuberías y accesorios de PVC. | 1 | ||||||||||||
| 274 | Pozo de registro circulares. | 1 | ||||||||||||
| 275 | Marco y tapa de alcantarilla circulares | 1 | ||||||||||||
| 276 | Película protectora y sellador de tuberías de alcantarillado | 1 | ||||||||||||
| 277 | Planta y perfil topográfico para la instalación de nuevas tuberías | 1 | ||||||||||||
| SECCIÓN 33 71 02 | ||||||||||||||
| 278 | Estructuras subterráneas prefabricadas de hormigón, arquetas de registro | 1 | 1 | 1 | 1 | |||||||||
| 279 | Marcos y tapas de alcantarilla | 1 | 1 | 1 | 1 | |||||||||
| 280 | Conductos y espaciadores | 1 | ||||||||||||
| 281 | Cables y conductores subterráneos de baja tensión | 1 | 1 | |||||||||||
| 282 | Cinta de advertencia e identificación | 1 | ||||||||||||
| 283 | Cables de tierra | 1 | ||||||||||||
| 284 | Empalmes de baja tensión prefabricados | 1 | ||||||||||||
| 285 | Pozos de prueba/barras de puesta a tierra | 1 | ||||||||||||
| 286 | Embarrado de puesta a tierra | 1 | ||||||||||||
| 287 | Barras de puesta a tierra | 1 | ||||||||||||
| 288 | Soldadura exotérmica | 1 | ||||||||||||
| 289 | Instrucciones del Fabricante | 1 | ||||||||||||
| SECCIÓN 33 82 00 | ||||||||||||||
| 290 | Conductos | 1 | ||||||||||||
| 291 | Arquetas | 1 | ||||||||||||
| 292 | Cinta de advertencia e identificación | 1 | ||||||||||||
| SECCIÓN 41 22 13 | ||||||||||||||
| 293 | Planos de disposición general | 1 | ||||||||||||
| 294 | Diseño estructural | 1 | 1 | |||||||||||
| 295 | Diseño mecánico | 1 | 1 | |||||||||||
| 296 | Diseño eléctrico | 1 | 1 | |||||||||||
| 297 | Comprobación viga carril puente grúa | 1 | ||||||||||||
| 298 | Autocomprobación del contratista | 1 | ||||||||||||
| 299 | Plan de instalación de grúa | 1 | ||||||||||||
| 300 | Instrucciones de funcionamiento | 1 |
&"Arial,Negrita"&8QUUG 07-1022 Resumen de muestras de material, MARZO 2025 Página &P de &N
File details come from the government source that posted it. Updated .