Solicitation Amendment FA557521R00040003.pdf
PDF 375 KB Posted
- Solicitation number
- FA557521R0004
About this file
This is a solicitation for a Multiple Award Construction Contract (MACC)/Indefinite-Delivery Indefinite-Quantity (IDIQ) at Moron AB, Sevilla, Spain. The contract will have a base period of five years and two optional one-year periods. The minimum guaranteed amount for each awarded contract is $500 equivalent in Euros, and the total maximum amount for all contracts is $45,000,000. The seed project is to renovate Meeting Hall Building 105, estimated between $500,000-$1,000,000 upon funding availability. Companies must be authorized under Spanish law to carry out government works and use Spanish materials, labor, and equipment whenever feasible per the defense cooperation agreement between Spain and the U.S. The solicitation is issued by the Department of the Air Force United States Air Forces in Europe - Air Forces Africa.
View the file
Other files
Show all 34
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NUMBER 5. REQUISITION/PURCHASE REQUEST NUMBER 6. PROJECT NUMBER
7. ISSUED BY CODE 8. ADDRESS OFFER TO
9. FOR INFORMATION
CALL:
a. NAME b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)
SOLICITATION
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)
11. The contractor shall begin performance within calendar days and complete it within calendar days after receiving award, notice to proceed. This performance period is mandatory negotiable. (See ).
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and copies to perform the work required are due at the place specified in Item 8 by (hour) local time (date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
b. An offer guarantee is, is not required.
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d. Offers providing less than calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
STANDARD FORM 1442 (REV. 8/2014)
Prescribed by GSA - FAR (48 CFR) 53.236-1(d)
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES", indicate within how many calendar days after award in Item 12b.)
12b. CALENDAR DAYS
YES NO
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NUMBER 2. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
3. DATE ISSUED PAGE OF PAGES
FA557521R00040
003 1 of 595/5/2021
A013635 MACC-IDIQ
FA5575
FA5575 496 ABS PK DA LGC
APO AE 09643-6585
PSC 62 UNIT 6585
APO, AE 09643-6585
United States Germain Duarte, Email: germain.duarte.1@us.af.mil Telephone:
314-722-8717
FA5575 496 ABS PK DA LGC
PSC 62 UNIT 6585
APO AE 09643-6585
APO AE 09643-6585
United States
Germain Duarte, Germain Duarte 314-722-8717
Project Title: Multiple Award Construction Contract (MACC)/Indefinite-Delivery Indefinite-Quantity (IDIQ) at Moron AB, Sevilla, Spain
The Pertinent MACC acquisition information is as follows:
a. Contract Type: Indefinite-Delivery Indefinite Quantity (IDIQ)
b. Period of Performance: A base period of five (5) years and two (2) – one (1) year option periods
c. Number of Contracts: Target of five (5) awardees
d. Min/Max: The minimum guaranteed amount for the life of each awarded contract is $500.00 (equivalent in EURO); the total aggregate maximum amount expendable for all awarded contracts is $45,000,000.00
The seed project in this solicitation is a tangible work which the Government will award as the first task order under the new MACC as the result of this source selection. See Attachment 3a Seed Project Renovate Meeting Hall Bldg. 105 - Solicitation Details.
Information in Block 11 and 12 of this solicitation pertains to the seed project task order.
Magnitude for the seed project is estimated between $500,000.00 and $1,000,000.00; upon availability of funds.
In accordance with the Agreement of Defense and Cooperation between the Kingdom of Spain and the United States of America, any contract resulting from this notice/solicitation can only be entered into with companies authorized to carry out these activities in Spain under Spanish law. Companies must meet the requirements established by Spanish legislation for execution of Government works. In addition, in accordance with the Agreement of Defense Cooperation between the U.S.A. and the Kingdom of Spain, Annex 6, Article 1 (5) " Spanish material, labor, and equipment shall be used whenever feasible and consistent with the requirements".
10 520
FAR 52.211-10
1 3:30 PM
6/9/2021
AMOUNTS
OFFER (Must be fully completed by offeror)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NUMBER (Include area code)
16. REMITTANCE ADDRESS (Include only if different than Item 14.)
CODE FACILITY CODE
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within calendar days after the date offers are due. (Insert any number equal to or greater than theminimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT
NUMBER
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE
21. ITEMS ACCEPTED:
AWARD (To be completed by Government)
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return copies to issuing office.) Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to thiscontract.
29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)
31a. NAME OF CONTRACTING OFFICER (Type or print)
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA
BY
31c. DATE
STANDARD FORM 1442 (REV. 8/2014) BACK
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) ( ) 41 U.S.C. 3304(a) ( )
26. ADMINISTERED BY 27. PAYMENT WILL BE MADE BY
SEE ITEM 14
SEE SCHEDULE OF PRICES
5/20/2021
5/26/2021
5/26/2021
Email: adan.jaime.1@us.af.mil Telephone: 722-8528
FA557521R00040003
Section A - Solicitation/Contract Form
Section B - Supplies or Services and Prices/Cost
Additional Information/Notes
Item Supplies/Service Quantity Unit Unit Price Amount
The ordering base period shall be for five
(5) years from the date of contract award.
Indefinite Delivery/Indefinite Quantity (IDIQ) Multiple Award Construction Contract (MACC) for U.S. Air Force Support, Moron AB, Sevilla, Spain. The Contractor shall provide all supervision, materials, equipment, labor, and any other incidental related work to perform the construction services specified in the basic contract, as supplemented in each task order.
The task orders will range from $2,000 to $5,000,000 (equivalent in EUROS) and will vary in project complexity, however each task will generally range from $20,000 to $3,000,000 (equivalent in EUROS), but may be other amounts by mutual agreement of the Government and contractor.
Refer to FAR 52.216-19 for order limitations. Task orders will be solicited and awarded in Euros only.
Product Service Code: Z2JZ Firm Fixed Price
1 Lot
Option Line Item
Option Year One (1) Period; Shall be for One Year (1).
Indefinite Delivery/Indefinite Quantity (IDIQ) Multiple Award Construction Contract (MACC) for U.S. Air Force Support, Moron AB, Sevilla, Spain. The Contractor shall provide all supervision, materials, equipment, labor, and any other incidental related work to perform the construction services specified in the basic contract, as supplemented in each task order.
The task orders will range from $2,000 to $5,000,000 (equivalent in EUROS) and will vary in project complexity, however each task will generally range from $20,000 to $3,000,000 (equivalent in EUROS), but may be other amounts by mutual agreement of the Government and contractor.
Refer to FAR 52.216-19 for order limitations. Task orders will be solicited and awarded in Euros only.
Product Service Code: Z2JZ Firm Fixed Price
1 Lot
Option Year Two (2) Period: shall be for One Year (1).
Indefinite Delivery/Indefinite Quantity (IDIQ) Multiple Award Construction Contract (MACC) for U.S. Air Force Support, Moron AB, Sevilla, Spain. The Contractor shall provide all supervision, materials, equipment, labor, and any
Option Line Item other incidental related work to perform the construction services specified in the basic contract, as supplemented in each task order.
The task orders will range from $2,000 to $5,000,000 (equivalent in EUROS) and will vary in project complexity, however each task will generally range from $20,000 to $3,000,000 (equivalent in EUROS), but may be other amounts by mutual agreement of the Government and contractor.
Refer to FAR 52.216-19 for order limitations. Task orders will be solicited and awarded in Euros only.
Product Service Code: Z2JZ Firm Fixed Price
1 Lot
DFARS Clauses Incorporated by Reference
Number Title Effective Date 252.229-7005 Tax Exemptions (Spain). 2012-03
DFARS Clauses Incorporated by Full Text
252.229-7004 Status of Contractor as a Direct Contractor (Spain). 1997-06
As prescribed in 229.402-70(d), use the following clause:
STATUS OF CONTRACTOR AS A DIRECT CONTRACTOR ( SPAIN ) (JUN 1997)
(a) "Direct Contractor," as used in this clause, means an individual, company, or entity with whom an agency of the United States Department of Defense has executed a written agreement that allows duty-free import of equipment, materials, and supplies into Spain for the construction, development, maintenance, and operation of Spanish-American installations and facilities.
(b) The Contractor is hereby designated as a Direct Contractor under the provisions of Complementary Agreement 5, articles 11, 14, 15, 17, and 18 of the Agreement on Friendship, Defense and Cooperation between the United States Government and the Kingdom of Spain , dated July 2, 1982 .
The Agreement relates to contracts to be performed in whole or part in Spain , the provisions of which are hereby incorporated into and made a part of this contract by reference.
(c) The Contractor shall apply to the appropriate Spanish authorities for approval of status as a Direct Contractor in order to complete duty-free import of non-Spanish equipment, materials, and supplies represented as necessary for contract performance by the Contracting Officer. Orders for equipment, materials, and supplies placed prior to official notification of such approval shall be at the Contractor's own risk. The Contractor must submit its documentation in sufficient time to permit processing by the appropriate United States and Spanish Government agencies prior to the arrival of the equipment, materials, or supplies in Spain . Seasonal variations in processing times are common, and the Contractor should program its projects accordingly. Any delay or expense arising directly or indirectly from this process shall not excuse untimely performance (except as expressly allowed in other provisions of this contract), constitute a direct or constructive change, or otherwise provide a basis for additional compensation or adjustment of any kind.
(d) To ensure that all duty-free imports are properly accounted for, exported, or disposed of, in accordance with Spanish law, the Contractor shall obtain a written bank letter of guaranty payable to the Treasurer of the United States, or such other authority as may be designated by the Contracting Officer, in the amount set forth in paragraph (g) of this clause, prior to effecting any duty-free imports for the performance of this contract.
(e) If the Contractor fails to obtain the required guaranty, the Contractor agrees that the Contracting Officer may withhold a portion of the contract payments in order to establish a fund in the amount set forth in paragraph (g) of this clause. The fund shall be used for the payment of import taxes in the event that the Contractor fails to properly account for, export, or dispose of equipment, materials, or supplies imported on a duty-free basis.
(f) The amount of the bank letter of guaranty or size of the fund required under paragraph (d) or (e) of this clause normally shall be 5 percent of the contract value. However, if the Contractor demonstrates to the Contracting Officer's satisfaction that the amount retained by the United States Government or guaranteed by the bank is excessive, the amount shall be reduced to an amount commensurate with contingent import tax and duty-free liability. This bank guaranty or fund shall not be released to the Contractor until the Spanish General Directorate of Customs verifies the accounting, export, or disposition of the equipment, material, or supplies imported on a duty-free basis.
(g) The amount required under paragraph (d), (e), or (f) of this clause is ____see Section H .
(h) The Contractor agrees to insert the provisions of this clause, including this paragraph (h), in all subcontracts.
(End of clause)
Section C - Description/Specifications/Statement of Work
Requirements The United States Air Force intents to award a Firm Fixed Price Multiple Award Construction Contract (MACC) Indefinite-Delivery, Indefinite-Quantity (IDIQ) for sustainment, restoration, and modernization for general construction projects in support of the 496th Civil Engineer Flight(496th CE). Construction projects to be performed under this MACC include, but are not limited to, new construction of buildings and structures, alteration and repair of buildings, structures, roads, grounds, roofs, specialty construction, utilities, demolition of structures and building and miscellaneous construction services including hazardous material waste removal (i.
e. asbestos, lead based paint, etc.). Types of facilities may include administrative, industrial, maintenance, warehouses, communications, personnel support, recreation, lodging, medical, training, ranges, roads, etc. Lead or asbestos abatement may be required. Work may also include design/build from concept to full 100% design.
In-house design capability or ready access to design capability is a must for projects under this MACC.
Description of work will be identified in each individual task order.
Section D - Packaging and Marking
Section E - Inspection and Acceptance FAR Clauses Incorporated by Reference
Number Title Effective Date 52.246-12 Inspection of Construction. 1996-08
DFARS Clauses Incorporated by Reference
Number Title Effective Date 252.245-7001 Tagging, Labeling, and Marking of Government-Furnished Property. 2012-04
0001 Inspection and Acceptance Location Both Destination Instructions: Construction Management Office will perform daily inspections of the worksite
DoDAAC: F3N7A0 Cage:
DunsNumber:
Duns4Number:
CountryCode: USA
712 CES CER
AF BPN NO MILSBILLS PROCESSES
UNIT 6585 BLDG 202 MORON AB
, APO AE 09643 6585
UNITED STATES
OfficeCode:
Input at time of award per task order Email: Input at time of award per task order Telephone: Input at time of award per task order
Option Line Item 1001 Inspection and Acceptance Location Both Destination Instructions: Construction Management Office will perform daily inspections of the worksite
DoDAAC: F3N7A0 Cage:
DunsNumber:
Duns4Number:
CountryCode: USA
712 CES CER
AF BPN NO MILSBILLS PROCESSES
UNIT 6585 BLDG 202 MORON AB
, APO AE 09643 6585
UNITED STATES
OfficeCode:
Input at time of award per task order Email: Input at time of award per task order Telephone: Input at time of award per task order
Option Line Item 1002 Inspection and Acceptance Location Both Destination Instructions: Construction Management Office will perform daily inspections of the worksite
DoDAAC: F3N7A0 Cage:
DunsNumber:
Duns4Number:
CountryCode: USA
712 CES CER
AF BPN NO MILSBILLS PROCESSES
UNIT 6585 BLDG 202 MORON AB
, APO AE 09643 6585
UNITED STATES
OfficeCode:
Input at time of award per task order Email: Input at time of award per task order Telephone: Input at time of award per task order
Section F - Deliveries or Performance
Delivery Schedule Ship To Address
Delivery Schedule From date of lead time event to completion of performance 60 Month Date of Award
Place of Performance DoDAAC: F3N7A0 Cage:
DunsNumber:
Duns4Number:
CountryCode: USA
712 CES CER
AF BPN NO MILSBILLS PROCESSES
UNIT 6585 BLDG 202 MORON AB
, APO AE 09643 6585
UNITED STATES
OfficeCode:
Input at time of award per task order Email: Input at time of award per task order Telephone: Input at time of award per task order
Period of Performance From
15 JUL 2021
To
14 JUL 2026
Option Line Item 1001 Delivery Schedule Ship To Address
Delivery Schedule From date of lead time event to completion of performance 12 Month CLIN Only - Date of Option Exercised
Place of Performance DoDAAC: F3N7A0 Cage:
DunsNumber:
Duns4Number:
CountryCode: USA
712 CES CER
AF BPN NO MILSBILLS PROCESSES
UNIT 6585 BLDG 202 MORON AB
, APO AE 09643 6585
UNITED STATES
OfficeCode:
Input at time of award per task order Email: Input at time of award per task order Telephone: Input at time of award per task order
Period of Performance From
15 JUL 2026
To
14 JUL 2027
Option Line Item 1002 Delivery Schedule Ship To Address
Delivery Schedule From date of lead time event to completion of performance 12 Month CLIN Only - Date of Option Exercised
Place of Performance DoDAAC: F3N7A0 Cage:
DunsNumber:
Duns4Number:
CountryCode: USA
712 CES CER
AF BPN NO MILSBILLS PROCESSES
UNIT 6585 BLDG 202 MORON AB
, APO AE 09643 6585
UNITED STATES
OfficeCode:
Input at time of award per task order Email: Input at time of award per task order Telephone: Input at time of award per task order
Period of Performance From
15 JUL 2027
To
14 JUL 2028
Section G - Contract Administration Data
DFARS Clauses Incorporated by Reference
Number Title Effective Date 252.204-7006 Billing Instructions. 2005-10 252.232-7003 Electronic Submission of Payment Requests and Receiving Reports. 2018-12 252.232-7008 Assignment of Claims (Overseas). 1997-06 252.236-7000 Modification Proposals--Price Breakdown 1991-12
DFARS Clauses Incorporated by Full Text
252.232-7006 Wide Area WorkFlow Payment Instructions. 2018-12
As prescribed in 232.7004(b), use the following clause:
WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)
(a) As used in this clause-Definitions.
"Department of Defense Activity Address Code (DoDAAC)" is a six position code that uniquely identifies a unit, activity, or organization.
"Document type" means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).
"Local processing office (LPO)" is the office responsible for payment certification when payment certification is done external to the entitlement system.
"Payment request" and "receiving report" are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(b) The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as Electronic invoicing.
authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(c) To access WAWF, the Contractor shall-WAWF access.
(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and
(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.
(d) The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice WAWF training.
Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the "Web Based Training" link on the WAWF home page at https://wawf.eb.mil/
(e) Document submissions may be via web entry, Electronic Data Interchange, or File Transfer WAWF methods of document submission.
Protocol.
(f) The Contractor shall use the following information when submitting payment requests and receiving reports WAWF payment instructions.
in WAWF for this contract or task or delivery order:
(1) The Contractor shall submit payment requests using the following document type(s):Document type.
(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.
(ii) For fixed price line items-
(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.
Construction Payment Invoice
(Contracting Officer: Insert applicable invoice and receiving report document type(s) for fixed price line items that require shipment of a deliverable.)
(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.
Not Applicable
(Contracting Officer: Insert either "Invoice 2in1" or the applicable invoice and receiving report document type(s) for fixed price line items for services.)
(iii) For customary progress payments based on costs incurred, submit a progress payment request.
(iv) For performance based payments, submit a performance based payment request.
(v) For commercial item financing, submit a commercial item financing request.
(2) ) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.
(f) [Note: The Contractor may use a WAWF "combo" document type to create some combinations of invoice and receiving report in one step.]
(3) The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in Document routing.
WAWF when creating payment requests and receiving reports in the system.
Routing Data Table*
Field Name in WAWF Data to be entered in WAWF
Pay Official DoDAAC DETERMINED PER INDIVIDUAL TASK
ORDER
Issue By DoDAAC FA5575
Admin DoDAAC FA5575
Inspect By DoDAAC DETERMINED PER INDIVIDUAL TASK
ORDER
Ship To Code N/A
Ship From Code N/A
Mark For Code N/A
Service Approver (DoDAAC) DETERMINED PER INDIVIDUAL TASK
ORDER
Service Acceptor (DoDAAC) DETERMINED PER INDIVIDUAL TASK
ORDER
Accept at Other DoDAAC N/A
LPO DoDAAC N/A
DCAA Auditor DoDAAC N/A
Other DoDAAC(s) N/A
(*Contracting Officer: Insert applicable DoDAAC information. If multiple ship to/acceptance locations apply, insert "See Schedule" or "Not applicable.")
(**Contracting Officer: If the contract provides for progress payments or performance-based payments, insert the DoDAAC for the contract administration office assigned the functions under FAR 42.302(a)(13).)
(4) The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in Payment request.
accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.
(5) The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F.Receiving report.
(g) WAWF point of contact.
(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.
DETERMINED PER INDIVIDUAL TASK ORDER
(Contracting Officer: Insert applicable information or "Not applicable.")
(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.
Section H - Special Contract Requirements
** Section H "Bank Letter of Guarantee" shall apply to Task Orders only**
BANK LETTER OF GUARANTEE
Within ten (10) calendar days after the date of contract award, the Contractor shall furnish the Contracting Officer a Bank Letter of Guarantee for the performance of the work in the amount specified below. Failure to furnish the letter of guarantee will be considered nonconforming and the contract may be terminated for default in accordance with FAR 52.249-10 in Section I.
Amount of Contract Bank Letter Under $100,000.00 None (or Euro equivalent) $100,000.00 - $500,000.00 12% of award amount (or Euro equivalent) $500,000.00 and over 10% of award amount (or Euro equivalent)
The Bank Letter of Guarantee will be dated as of the contract date or as soon thereafter as possible. The Bank Letter of Guarantee shall state that a guarantee has been issued against the awarded contract and that the following conditions are in force:
1. When presented by a representative of the U.S. Government against debts due, redemption cannot be contested.
2. The value of the guarantee is to be cited in Euros.
3. The Bank Letter of Guarantee shall also state that the bank agrees and consents that the contract may be modified by change order or supplemental agreement without affecting the validity of the Bank Letter of Guarantee.
The Contracting Officer will not issue the Notice to Proceed until approval and acceptance of the Bank Letter of Guarantee. The Bank Letter of Guarantee will continue in effect throughout the performance period. During the warranty period an amount equal to 10% of the original contract price shall be applicable.
52.246-21 Warranty of Construction.
As prescribed in 46.710(e)(1), the contracting officer may insert a clause substantially as follows in solicitations and contracts when a fixed-price construction contract (see 46.705 (c)) is contemplated, and the use of a warranty clause has been approved under agency procedures:
Warranty of Construction (Mar 1994)
(a) In addition to any other warranties in this contract, the Contractor warrants, except as provided in paragraph
(i) of this clause, that work performed under this contract conforms to the contract requirements and is free of any defect in equipment, material, or design furnished, or workmanship performed by the Contractor or any subcontractor or supplier at any tier.
(b) This warranty shall continue for a period of 2 years from the date of final acceptance of the work. If the Government takes possession of any part of the work before final acceptance, this warranty shall continue for a period of 2 years from the date the Government takes possession.
(c) The Contractor shall remedy at the Contractor's expense any failure to conform, or any defect. In addition, the Contractor shall remedy at the Contractor's expense any damage to Government-owned or controlled real or personal property, when that damage is the result of-
(1) The Contractor's failure to conform to contract requirements; or
(2) Any defect of equipment, material, workmanship, or design furnished.
(d) The Contractor shall restore any work damaged in fulfilling the terms and conditions of this clause. The Contractor's warranty with respect to work repaired or replaced will run for 2 years from the date of repair or replacement.
(e) The Contracting Officer shall notify the Contractor, in writing, within a reasonable time after the discovery of any failure, defect, or damage.
(f) If the Contractor fails to remedy any failure, defect, or damage within a reasonable time after receipt of notice, the Government shall have the right to replace, repair, or otherwise remedy the failure, defect, or damage at the Contractor's expense.
(g) With respect to all warranties, express or implied, from subcontractors, manufacturers, or suppliers for work performed and materials furnished under this contract, the Contractor shall-
(1) Obtain all warranties that would be given in normal commercial practice;
(2) Require all warranties to be executed, in writing, for the benefit of the Government, if directed by the Contracting Officer; and
(3) Enforce all warranties for the benefit of the Government, if directed by the Contracting Officer.
(h) In the event the Contractor's warranty under paragraph (b) of this clause has expired, the Government may bring suit at its expense to enforce a subcontractor's, manufacturer's, or supplier's warranty.
(i) Unless a defect is caused by the negligence of the Contractor or subcontractor or supplier at any tier, the Contractor shall not be liable for the repair of any defects of material or design furnished by the Government nor for the repair of any damage that results from any defect in Government-furnished material or design.
(j) This warranty shall not limit the Government's rights under the Inspection and Acceptance clause of this contract with respect to latent defects, gross mistakes, or fraud.
(End of clause)
FAR Clauses Incorporated by Full Text
52.236-1 Performance of Work by the Contractor. 1984-04
As prescribed in 36.501(b), insert the following clause:
Performance of Work by the Contractor (Apr 1984)
The Contractor shall perform on the site, and with its own organization, work equivalent to at least an average of twenty percent (20%) percent of the total amount of work to be performed under the contract. This percentage may be reduced by a supplemental agreement to this contract if, during performing the work, the Contractor requests a reduction and the Contracting Officer determines that the reduction would be to the advantage of the Government.
Section I - Contract Clauses FAR Clauses Incorporated by Reference
Number Title Effective Date 52.202-1 Definitions. 2020-06 52.203-3 Gratuities. 1984-04 52.203-5 Covenant Against Contingent Fees. 2014-05 52.203-6 Restrictions on Subcontractor Sales to the Government. 2020-06 52.203-7 Anti-Kickback Procedures. 2020-06 52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity. 2014-05 52.203-10 Price or Fee Adjustment for Illegal or Improper Activity. 2014-05 52.203-12 Limitation on Payments to Influence Certain Federal Transactions. 2020-06 52.203-13 Contractor Code of Business Ethics and Conduct. 2020-06
52.203-17 Contractor Employee Whistleblower Rights and Requirement To Inform Employees of Whistleblower Rights. 2020-06
52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements. 2017-01 52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber Content Paper. 2011-05 52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards. 2020-06 52.204-13 System for Award Management Maintenance. 2018-10 52.204-18 Commercial and Government Entity Code Maintenance. 2020-08
52.204-23 Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities. 2018-07
52.209-6 Protecting the Government's Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment. 2020-06
52.209-9 Updates of Publicly Available Information Regarding Responsibility Matters. 2018-10 52.209-10 Prohibition on Contracting with Inverted Domestic Corporations. 2015-11 52.210-1 Market Research. 2020-06 52.211-13 Time Extensions. 2000-09 52.215-2 Audit and Records-Negotiation. 2020-06 52.215-8 Order of Precedence-Uniform Contract Format. 1997-10 52.222-50 Combating Trafficking in Persons. 2020-10 52.223-5 Pollution Prevention and Right-to-Know Information. 2011-05 52.223-18 Encouraging Contractor Policies to Ban Text Messaging While Driving. 2020-06 52.225-13 Restrictions on Certain Foreign Purchases. 2008-06 52.228-2 Additional Bond Security. 1997-10 52.228-11 Pledges of Assets. 2018-08 52.229-6 Taxes-Foreign Fixed-Price Contracts. 2013-02 52.229-12 Tax on Certain Foreign Procurements. 2020-06 52.232-8 Discounts for Prompt Payment. 2002-02 52.232-17 Interest. 2014-05 52.232-18 Availability of Funds. 1984-04 52.232-27 Prompt Payment for Construction Contracts. 2017-01 52.232-33 Payment by Electronic Funds Transfer-System for Award Management. 2018-10 52.232-39 Unenforceability of Unauthorized Obligations. 2013-06 52.232-40 Providing Accelerated Payments to Small Business Subcontractors. 2013-12 52.233-1 Disputes. 2014-05 52.233-3 Protest after Award. 1996-08 52.233-4 Applicable Law for Breach of Contract Claim. 2004-10 52.236-2 Differing Site Conditions. 1984-04 52.236-3 Site Investigation and Conditions Affecting the Work. 1984-04 52.236-5 Material and Workmanship. 1984-04 52.236-6 Superintendence by the Contractor. 1984-04 52.236-7 Permits and Responsibilities. 1991-11 52.236-8 Other Contracts. 1984-04
52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements. 1984-04
52.236-10 Operations and Storage Areas. 1984-04 52.236-11 Use and Possession Prior to Completion. 1984-04 52.236-12 Cleaning Up. 1984-04 52.236-13 Accident Prevention. 1991-11 52.236-15 Schedules for Construction Contracts. 1984-04 52.236-17 Layout of Work. 1984-04 52.236-21 Specifications and Drawings for Construction. 1997-02 52.236-26 Preconstruction Conference. 1995-02 52.242-13 Bankruptcy. 1995-07 52.242-14 Suspension of Work. 1984-04 52.243-4 Changes. 2007-06 52.244-6 Subcontracts for Commercial Items. 2020-11 52.245-1 Alternate I Government Property. - (Alternate I) 2017-01
52.245-9 Use and Charges. 2012-04 52.247-5 Familiarization with Conditions. 1984-04 52.247-12 Supervision, Labor, or Materials. 1984-04 52.247-15 Contractor Responsibility for Loading and Unloading. 1984-04 52.247-16 Contractor Responsibility for Returning Undelivered Freight. 1984-04 52.247-68 Report of Shipment (REPSHIP). 2006-02 52.249-2 Termination for Convenience of the Government (Fixed-Price). 2012-04 52.249-2 Alternate I Termination for Convenience of the Government (Fixed-Price). - (Alternate I) 2012-04 52.249-10 Default (Fixed-Price Construction). 1984-04
DFARS Clauses Incorporated by Reference
Number Title Effective Date 252.203-7000 Requirements Relating to Compensation of Former DoD Officials 2011-09
252.203-7001 Prohibition on Persons Convicted of Fraud or Other Defense-Contract-Related Felonies. 2008-12
252.203-7002 Requirement to Inform Employees of Whistleblower Rights. 2013-09
252.203-7003 Agency Office of the Inspector General. As prescribed in 203.1004(a), use the following clause: 2019-08
252.204-7003 Control of Government Personnel Work Product. 1992-04 252.204-7012 Safeguarding Covered Defense Information and Cyber Incident Reporting. 2019-12 252.204-7015 Notice of Authorized Disclosure of Information for Litigation Support. 2016-05
252.204-7018 Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services. 2020-11
252.205-7000 Provision of Information to Cooperative Agreement Holders 1991-12
252.209-7004 Subcontracting with Firms that are Owned or Controlled by the Government of a Country that is a State Sponsor of Terrorism. 2019-05
252.211-7007 Reporting of Government-Furnished Property. 2012-08 252.222-7002 Compliance with Local Labor Laws (Overseas). 1997-06 252.222-7004 Compliance with Spanish Social Security Laws and Regulations. 1997-06 252.222-7006 Restrictions on the Use of Mandatory Arbitration Agreements. 2010-12 252.223-7006 Prohibition on Storage, Treatment, and Disposal of Toxic or Hazardous Materials. 2014-09 252.223-7008 Prohibition of Hexavalent Chromium. 2013-06 252.225-7002 Qualifying Country Sources as Subcontractors. 2017-12 252.225-7012 Preference for Certain Domestic Commodities. 2017-12 252.225-7016 Restriction on Acquisition of Ball and Roller Bearings. 2011-06 252.225-7041 Correspondence in English. 1997-06 252.225-7048 Export-Controlled Items. 2013-06 252.232-7010 Levies on Contract Payments. 2006-12
252.232-7017 Accelerating Payments to Small Business Subcontractors-Prohibition on Fees and Consideration. 2020-04
252.233-7001 Choice of Law (Overseas). 1997-06 252.243-7001 Pricing of Contract Modifications. 1991-12 252.243-7002 Requests for Equitable Adjustment. 2012-12 252.244-7000 Subcontracts for Commercial Items. 2020-10 252.245-7000 Government-Furnished Mapping, Charting, and Geodesy Property. 2012-04 252.245-7002 Reporting Loss of Government Property 2021-01 252.245-7003 Contractor Property Management System Administration 2012-04 252.246-7004 Safety of Facilities, Infrastructure, and Equipment for Military Operations. 2010-10
FAR Clauses Incorporated by Full Text
52.204-1 Approval of Contract. 1989-12
As prescribed in , insert the following clause:4.103
APPROVAL OF CONTRACT (DEC 1989)
This contract is subject to the written approval of [identify title of designated agency official here] and shall not be binding the Contracting Officer until so approved.
52.204-19 Incorporation by Reference of Representations and Certifications. 2014-12
As prescribed in , insert the following clause.4.1202(b)
INCORPORATION BY REFERENCE OF REPRESENTATIONS AND CERTIFICATIONS (DEC 2014)
The Contractor’s representations and certifications, including those completed electronically via the System for Award Management (SAM), are incorporated by reference into the contract.
(End of clause)
52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment.
2020-08
As prescribed in , insert the following clause:4.2105(b)
PROHIBITION ON CONTRACTING FOR CERTAIN TELECOMMUNICATIONS AND VIDEO SURVEILLANCE SERVICES OR
EQUIPMENT (AUG 2020)
As used in this clause-(a) Definitions.
means intermediate links between the core network, or backbone network, and the small subnetworks at the edge of the network ( ,Backhaul e.g.
connecting cell phones/towers to the core telephone network). Backhaul can be wireless (e.g., microwave) or wired ( , fiber optic, coaxial cable, e.g.
Ethernet).
means The People's Republic of China.Covered foreign country means–Covered telecommunications equipment or services
Telecommunications equipment produced by Huawei Technologies Company or ZTE Corporation (or any subsidiary or affiliate of such (1) entities);
For the purpose of public safety, security of Government facilities, physical security surveillance of critical infrastructure, and other (2) national security purposes, video surveillance and telecommunications equipment produced by Hytera Communications Corporation, Hangzhou Hikvision Digital Technology Company, or Dahua Technology Company (or any subsidiary or affiliate of such entities);
Telecommunications or video surveillance services provided by such entities or using such equipment; or(3)
Telecommunications or video surveillance equipment or services produced or provided by an entity that the Secretary of Defense, in (4) consultation with the Director of National Intelligence or the Director of the Federal Bureau of Investigation, reasonably believes to be an entity owned or controlled by, or otherwise connected to, the government of a covered foreign country.
means–Critical technology
Defense articles or defense services included on the United States Munitions List set forth in the International Traffic in Arms (1) Regulations under subchapter M of chapter I of title 22, Code of Federal Regulations;
Items included on the Commerce Control List set forth in Supplement No. 1 to part 774 of the Export Administration Regulations under (2) subchapter C of chapter VII of title 15, Code of Federal Regulations, and controlled-
Pursuant to multilateral regimes, including for reasons relating to national security, chemical and biological weapons proliferation, (i) nuclear nonproliferation, or missile technology; or
For reasons relating to regional stability or surreptitious listening;(ii)
Specially designed and prepared nuclear equipment, parts and components, materials, software, and technology covered by part 810 of (3) title 10, Code of Federal Regulations (relating to assistance to foreign atomic energy activities);
Nuclear facilities, equipment, and material covered by part 110 of title 10, Code of Federal Regulations (relating to export and import of (4) nuclear equipment and material);
Select agents and toxins covered by part 331 of title 7, Code of Federal Regulations, part 121 of title 9 of such Code, or part 73 of title (5) 42 of such Code; or
Emerging and foundational technologies controlled pursuant to section 1758 of the Export Control Reform Act of 2018 (50 U.S.C. (6) 4817).
means arrangements governing the physical connection of two or more networks to allow the use of another's Interconnection arrangements network to hand off traffic where it is ultimately delivered ( , connection of a customer of telephone provider A to a customer of telephone e.g.
company B) or sharing data and other information resources.
means an inquiry designed to uncover any information in the entity's possession about the identity of the producer or Reasonable inquiry provider of covered telecommunications equipment or services used by the entity that excludes the need to include an internal or third-party audit.
means cellular communications services ( , voice, video, data) received from a visited network when unable to connect to the Roaming e.g.
facilities of the home network either because signal coverage is too weak or because traffic is too high.
means any component necessary for the proper function or performance of a piece of equipment, system, or Substantial or essential component service.
.(b) Prohibition (1) Section 889(a)(1)(A) of the John S. McCain National Defense Authorization Act for Fiscal Year 2019 (Pub. L. 115-232) prohibits the head of an executive agency on or after August 13, 2019, from procuring or obtaining, or extending or renewing a contract to procure or obtain, any equipment, system, or service that uses covered telecommunications equipment or services as a substantial or essential component of any system, or as critical technology as part of any system. The Contractor is prohibited from providing to the Government any equipment, system, or service that uses covered telecommunications equipment or services as a substantial or essential component of any system, or as critical technology as part of any system, unless an exception at paragraph (c) of this clause applies or the covered telecommunication equipment or services are covered by a waiver described in FAR 4.2104.
(2) Section 889(a)(1)(B) of the John S. McCain National Defense Authorization Act for Fiscal Year 2019 (Pub. L. 115-232) prohibits the head of an executive agency on or after August 13, 2020, from entering into a contract, or extending or renewing a contract, with an entity that uses any equipment, system, or service that uses covered telecommunications equipment or services as a substantial or essential component of any system, or as critical technology as part of any system, unless an exception at paragraph (c) of this clause applies or the covered telecommunication equipment or services are covered by a waiver described in FAR 4.2104. This prohibition applies to the use of covered telecommunications equipment or services, regardless of whether that use is in performance of work under a Federal contract.
This clause does not prohibit contractors from providing-(c) Exceptions.
A service that connects to the facilities of a third-party, such as backhaul, roaming, or interconnection arrangements; or(1)
Telecommunications equipment that cannot route or redirect user data traffic or permit visibility into any user data or packets that such (2) equipment transmits or otherwise handles.
Reporting requirement.(d) In the event the Contractor identifies covered telecommunications equipment or services used as a substantial or (1) essential component of any system, or as critical technology as part of any system, during contract performance, or the Contractor is notified of such by a subcontractor at any tier or by any other source, the Contractor shall report the information in paragraph (d)(2) of this clause to the Contracting Officer, unless elsewhere in this contract are established procedures for reporting the information; in the case of the Department of Defense, the Contractor shall report to the website at https://dibnet.dod.mil. For indefinite delivery contracts, the Contractor shall report to the Contracting Officer for the indefinite delivery contract and the Contracting Officer(s) for any affected order or, in the case of the Department of Defense, identify both the indefinite delivery contract and any affected orders in the report provided at https://dibnet.dod.mil.
The Contractor shall report the following information pursuant to paragraph (d)(1) of this clause(2)
Within one business day from the date of such identification or notification: the contract number; the order number(s), if applicable; (i) supplier name; supplier unique entity identifier (if known); supplier Commercial and Government Entity (CAGE) code (if known); brand; model number (original equipment manufacturer number, manufacturer part number, or wholesaler number); item description; and any readily available information about mitigation actions undertaken or recommended.
Within 10 business days of submitting the information in paragraph (d)(2)(i) of this clause: any further available information about (ii) mitigation actions undertaken or recommended. In addition, the Contractor shall describe the efforts it undertook to prevent use or submission of covered telecommunications equipment or services, and any additional efforts that will be incorporated to prevent future use or submission of covered telecommunications equipment or services.
The Contractor shall insert the substance of this clause, including in all (e) Subcontracts. this paragraph (e) and excluding paragraph (b)(2), subcontracts and other contractual instruments, including subcontracts for the acquisition of commercial items.
(End of clause)
52.211-10 Commencement, Prosecution, and Completion of Work. 1984-04
As prescribed in , insert the following clause in solicitations and contracts when a fixed-price construction contract is contemplated. The 11.404(b) clause may be changed to accommodate the issuance of orders under indefinite-delivery contracts for construction.
COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)
The Contractor shall be required to (a) commence work under this contract within (DETERMINED PER INDIVIDUAL TASK ORDER) [Contracting Officer insert number] calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and
(c) complete the entire work ready for use not later than .* The time stated for completion shall (DETERMINED PER INDIVIDUAL TASK ORDER) include final cleanup of the premises.
* The Contracting Officer shall specify either a number of days after the date the contractor receives the notice to proceed, or a calendar date.
(End of clause)
52.211-12 Liquidated Damages-Construction. 2000-09
As prescribed in , insert the following clause in solicitations and contracts:11.503(b)
LIQUIDATED DAMAGES-CONSTRUCTION (SEPT 2000)
If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the (a) Government in the amount of [Contracting Officer insert amount] for each calendar day of (DETERMINED PER INDIVIDUAL TASK ORDER) delay until the work is completed or accepted.
If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. (b) These liquidated damages are in addition to excess costs of repurchase under the Termination clause.
(End of clause)
52.216-18 Ordering. 2020-08
As prescribed in 16.506(a), insert the following clause:
Ordering (Aug 2020)
(a) Any supplies and services to be furnished under this contract shall be ordered by issuance of delivery orders or task orders by the individuals or activities designated in the Schedule. Such orders may be issued from award date specified in the contract through end of contract completion date.
(b) All delivery orders or task orders are subject to the terms and conditions of this contract. In the event of conflict between a delivery order or task order and this contract, the contract shall control.
(c) A delivery order or task order is considered “issued†when-
(1) If sent by mail (includes transmittal by U.S. mail or private delivery service), the Government deposits the order in the mail;
(2) If sent by fax, the Government transmits the order to the Contractor's fax number; or
(3) If sent electronically, the Government either-
(i) Posts a copy of the delivery order or task order to a Government document access system, and notice is sent to the Contractor; or
(ii) Distributes the delivery order or task order via email to the Contractor's email address.
(d) Orders may be issued by methods other than those enumerated in this clause only if authorized in the contract.
(End of clause)
52.216-19 Order Limitations. 1995-10
As prescribed in 16.506(b), insert a clause substantially the same as follows:
Order Limitations (Oct 1995)
(a) Minimum order. When the Government requires supplies or services covered by this contract in an amount of less than $500.00, the Government is not obligated to purchase, nor is the Contractor obligated to furnish, those supplies or services under the contract.
(b) Maximum order. The Contractor is not obligated to honor-
(1) Any order for a single item in excess of $5,000,000.00;
(2) Any order for a combination of items in excess of $5,000,000.00; or
(3) A series of orders from the same ordering office within 5 days that together call for quantities exceeding the limitation in paragraph (b)(1) or (2) of this section.
(c) If this is a requirements contract (i.e., includes the Requirements clause at subsection 52.216-21 of the Federal Acquisition Regulation (FAR)), the Government is not required to order a part of any one requirement from the Contractor if that requirement exceeds the maximum-order limitations in paragraph (b) of this section.
(d) Notwithstanding paragraphs (b) and (c) of this section, the Contractor shall honor any order exceeding the maximum order limitations in paragraph (b), unless that order (or orders) is returned to the ordering office within 3 days after issuance, with written notice stating the Contractor's intent not to ship the item (or items) called for and the reasons. Upon receiving this notice, the Government may acquire the supplies or services from another source.
(End of clause)
52.216-22…