Attachment 3e Seed Project Renovate Meeting Hall Bldg. 105 - Schedule of Materials__1 pg.__24 Dec 2020.xlsx
XLSX spreadsheet 36 KB Posted
- Solicitation number
- FA557521R0004
About this file
This document provides details for a Multiple Award Construction Contract (MACC)/Indefinite-Delivery Indefinite-Quantity (IDIQ) opportunity at Moron AB, Sevilla, Spain. The solicitation seeks up to five awardees for a base period of five years and two one-year option periods to complete construction and facility improvement projects. A minimum $500 guarantee and maximum $45 million expenditure is established across all contracts. The seed project is renovating Building 105's meeting hall estimated between $500,000 to $1 million upon funding availability. Only Spanish companies authorized for government works under Spanish law may be awarded. In accordance with defense agreements, Spanish materials, labor and equipment shall be used whenever feasible and consistent with requirements.
View the file
Other files
Show all 34
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Material Submittals Schedule
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER | ||
| QUUG 06-1003 | PROJECT TITLE |
RENOVATE MEETING HALL, 105
SOLICITATION / CONTRACT NO.
| (To be completed by Project Engineer) | (To be completed by Contract Administrator) | ||||||||||||||
| NUMBER OF COPIES REQUIRED | |||||||||||||||
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATION | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | SCHEDULES, LISTINGS, REPORTS, PLANS | TECHNICAL DATA | TEST REPORTS | FIELD REPORTS | REQUIRED SUBMISSION DATE |
fergusog: Enter the due date from the Contractor (MM/DD/YY)
DATE RECEIVED IN CONTRACTING
fergusog: Enter the date received from the Contractor. (MM/DD/YY)
DATE TO CIVIL ENGINEERING
fergusog: Enter the date submittal was given to CE for review. (MM/DD/YY)
RETURN SUSPENSE DATE
fergusog: Enter the date the submittal is due back from CE
(MM/DD/YY)
SUBMITTAL NUMBERS
fergusog: Enter the Submittal Number
DATE CONTRACTOR NOTIFIED CONTRACTOR RESUBMITTAL
fergusog: Enter Resubmittal Number
FINAL APPROVAL
fergusog: Enter the submittal final approval date
(MM/DD/YY)
REMARKS
fergusog: Enter any comments pertaining to the submittal
APPROVED
fergusog: Enter date the Contractor was notified of submittal approval
(MM/DD/YY)
fergusog: Enter Resubmittal Number
DISAPPROVED
fergusog: Enter date the Contractor was notified of submittal disapproval
(MM/DD/YY)
fergusog: Enter the submittal final approval date
(MM/DD/YY)
fergusog: Enter any comments pertaining to the submittal
| PART 11 -GENERAL CONDITIONS | |||
| 01 | Warranty letter | 4 | Acceptance+15 |
| 02 | Construction Schedule | CNTP+7 | |
| 03 | Progress Schedule | 4 | CNTP+10 |
| 04 | Work Plan | CNTP+7 | |
| 05 | Mobility Plan | 4 | CNTP+15 |
| 06 | Project Sign | CNTP+15 | |
| 07 | Quality Control Plan | 4 | CNTP+15 |
| 08 | Environmental Protection Plan | 4 | CNTP+15 |
| 09 | DD Form 1354 | 4 | FI+15 |
| 10 | Waste & construction debris management | 4 | Final Inspection |
| 11 | As-Built drawings | 4 | FI+15 |
| 12 | Spatial Data | 4 | As Built+10 |
| 13 | Key Staff | 4 | DNTP+15 |
| 14 | Health and safety Plan | 4 | CNTP +15 |
| PART 12 - SMALL PROJECT DESIGN-BUILD PROGRESS SCHEDULES | |||
| 15 | Design-Build Schedule | 1 | DNTP+10 |
| 16 | Monthly Updates | 1 | Every 1st of month |
| DB Contractor shall complete list of submittals when developping final constructiohn specifications, including those outlined in the Performance Technical Specifications provided with the SOW |