Attachment 3f Seed Project Renovate Meeting Hall Bldg. 105 - Technical Proposal Requirements__3 pgs.__Dated 24 Dec 2020.pdf
PDF 210 KB Posted
- Solicitation number
- FA557521R0004
About this file
This document outlines the requirements for a Multiple Award Construction Contract at Moron Air Base in Seville, Spain. The contract will be an Indefinite-Delivery, Indefinite-Quantity agreement with a base period of five years and two optional one-year extensions. The Air Force plans to award contracts to five contractors, with a minimum guarantee of $500 and maximum expenditure of $45 million over the life of the awarded contracts.
The first task order will be to renovate a meeting hall building and is estimated to cost between $500,000 and $1 million. Bidders must hold the necessary certification from the Spanish Ministry of Economy and Finance for construction work categories involving demolition, structures, masonry, finishes, flooring, insulation, casework, metal work, utilities, lighting, HVAC, plumbing, and fire suppression. At least 20% of the work must be self-performed by the prime contractor. Contractors must comply with requirements in the Defense Cooperation Agreement between Spain and the United States regarding use of Spanish labor and materials.
View the file
Other files
Show all 34
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE AIR FORCE
86TH AIRLIFT WING (USAFE)
24 December 2020
MEMORANDUM FOR 496 ABS/PK
FROM: 496 ABS/CENDM
SUBJECT: Technical Proposal Requirements for Project QUUG 06-1003, Renovate Meeting
Hall, B105
1. Request that the bidders and/or their subcontractors hold an updated Certificate of
Classification issued by the "Registro de Contratistas de Obras del Estado" of the "Ministerio de Economía y Hacienda", covering the following groups, subgroups, and categories. The certificate holder must execute the activities related to the certificate.
Group Subgroup Category C 1 2 C 2 2 C 4 2 C 6 2 C 7 2 C 8 2 C 9 2 E 1 2 I 1 2 I 5 2 I 6 2 I 7 2 J 2 2 J 4 2 K 9 2
Certificate of Classification C12 corresponds to work activities related to demolitions with an annual average cost is greater than 150,000 euros and no greater than 360,000 euros.
Certificate of Classification C22 corresponds to work activities related to bearing walls and concrete structures with an annual average cost is greater than 150,000 euros and no greater than 360,000 euros.
Certificate of Classification C42 corresponds to work activities related to masonry, pargeting and finishes with an annual average cost is greater than 150,000 euros and no greater than 360,000 euros.
Certificate of Classification C62 corresponds to work activities related to interior pavement, flooring and tiling with an annual average cost is greater than 150,000 euros and no greater than 360,000 euros.
Certificate of Classification C72 corresponds to work activities related to insulation and waterproofing with an annual average cost is greater than 150,000 euros and no greater than 360,000 euros.
Certificate of Classification C82 corresponds to work activities related to caseworks and interior doors with an annual average cost is greater than 150,000 euros and no greater than 360,000 euros.
Certificate of Classification C92 corresponds to work activities related to metal works with an annual average cost is greater than 150,000 euros and no greater than 360,000 euros.
Certificate of Classification E12 corresponds to work activities related to water and sewer main works and which annual average cost is greater than 150,000 euros and no greater than 360,000 euros.
Certificate of Classification I12 corresponds to work activities related to lighting, illuminations and beaconing with an annual average cost is greater than 150,000 euros and no greater than 360,000 euros.
Certificate of Classification I52 corresponds to work activities related to high voltage distribution and transformer sub-stations which annual average cost is greater than 150,000 euros and no greater than 360,000 euros.
Certificate of Classification I62 corresponds to work activities related to low voltage distribution with an annual average cost is greater than 150,000 euros and no greater than 360,000 euros.
Certificate of Classification I72 corresponds to work activities related to telecommunications and radioelectric installations works and which annual average cost is greater than 150,000 euros and no greater than 360,000 euros.
Certificate of Classification J22 corresponds to work activities related to Heating, Ventilation and Air Conditioning works and which annual average cost is greater than 150,000 euros and no greater than 360,000 euros.
Certificate of Classification J42 corresponds to work activities related to interior plumbing and sewer works and which annual average cost is greater than 150,000 euros and no greater than 360,000 euros.
Certificate of Classification K92 corresponds to work activities related to fire suppression works and which annual average cost is greater than 150,000 euros and no greater than 360,000 euros.
2. Request that the main Contractor perform on the site, and with its own organization, work equivalent to at least 20 percent of the total amount of work to be performed under the contract.
JOSE M. ZUMÁRRAGA
Mechanical Engineer
| 2020-12-23T11:16:22+0100 | |
| ZUMARRAGA-CARMONA.JOSE.MARIA.1392442568 |