This document outlines a Multiple Award Construction Contract (MACC) solicitation for construction services at Moron Air Base in Sevilla, Spain. The solicitation seeks up to five awardees to complete a broad range of design-build, sustainment, maintenance, repair, alteration, renovation and minor construction projects at the base over a five-year base period and two one-year option periods. A minimum of $500 and maximum of $45 million may be awarded across all contracts. The seed project is renovating a meeting hall estimated between $500,000 to $1 million upon funding availability. Contractors must be authorized under Spanish law to carry out defense-related work and utilize Spanish labor and materials where feasible per the U.S.-Spain Defense Cooperation Agreement.

View the file

Other files

File Type Posted
Solicitation Amendment FA557521R00040003.pdf PDF
Attachment 5 Rev. 1 Section L Instructions Conditions Notices to Offerors or Quoters___ 11 pgs.__Dated 26 May 2021.pdf PDF
Amendment FA557521R00040003 SF 30.pdf PDF
Attachment 14 Final Questions and Answers.pdf PDF
Solicitation Amendment FA557521R00040002.pdf PDF
Amendment FA557521R00040002 SF 30.pdf PDF
Attachment 6 Rev. 1 Section M Evaluation Factors for Award___ 9 pgs_ Dated 26 May 2021.pdf PDF
Attachment 13 Questions and Answers Form.xlsx XLSX spreadsheet
Attachment 5 Rev. 1 Section L Instructions Conditions Notices to Offerors or Quoters___ 11 pgs.__Dated 26 May 2021.pdf PDF
Amendment 1- FA557521R00040001 SF 30.pdf PDF
Conformed Solicitation - FA557521R00040001.pdf PDF
Attachment 5 Section L Instructions Conditions and Notices to Offerors or Quoters___ 11 pgs.__Dated NA.pdf PDF
Attachment 13 Questions and Answers Form.xlsx XLSX spreadsheet
Attachment 3g Seed Project Renovate Meeting Hall Bldg. 105 - Liquidated Damages__2 pgs.__Dated 1 May.pdf PDF
Attachment 3 Seed Project No. QUUG 06-1003, Renovate Meeting Hall Bldg. 105 Statement of Work (SOW)__86 pgs.__Dated 24__Dec__2020.pdf PDF
Attachment 3b Seed Project Renovate Meeting Hall Bldg. 105 - 1 of 3 Concept Drawings__4 pgs.__Dated 24 Dec 2020.pdf PDF
Attachment 9 List of Possible Certifications__4 pgs.__Dated June 2020.pdf PDF
Attachment 10 Integrated Natural resources Management Plan for Moron Air Base__204 pgs.__Dated 2015-2020.pdf PDF
Attachment 6 Section M Evaluation Factors for Award___ 9 pgs..pdf PDF
Attachment 2 Special Contract Requirements__7 pgs__Dated NA.pdf PDF
Attachment 7 Designed Requirements___10 pgs.___Dated June 2020.pdf PDF
Attachment 12 Architectural Compatibility Plan__51 pgs.__ Dated December 2019.pdf PDF
Attachment 3c Seed Project Renovate Meeting Hall Bldg. 105 - 2 of 3 As-Built Record Drawings__20 pgs.__Dated 2 Jan 1958_Part2.pdf PDF
Attachment 3c Seed Project Renovate Meeting Hall Bldg. 105 - 2 of 3 As-Built Record Drawings__20 pgs.__Dated 2 Jan 1958_Part1.pdf PDF
Attachment 3 Seed Project No. QUUG 06-1003, Renovate Meeting Hall Bldg. 105 Statement of Work (SOW)__86 pgs.__Dated 24 Dec 2020.pdf PDF
Attachment 3a Seed Project Renovate Meeting Hall Bldg 105 - Solicitation Details__1pg.__Dated NA.pdf PDF
Attachment 3d Seed Project Renovate Meeting Hall Bldg. 105 - 3 of 3 Drawings 98-1008__4 pgs.__26 Feb 1999.pdf PDF
Attachment 8 General Conditions __36 pgs.__Dated June 220.pdf PDF
Attachment 4 Seed Project Renovate Meeting Hall Bldg. 105 - Blank Cost Estimate (Price Worksheet)__NA __Dated 4 Feb 2021.xlsx XLSX spreadsheet
Attachment 11 Final Governing Standards for Spain__252 pgs.__Dated May 2014.pdf PDF
Attachment 5 Section L Instructions Conditions and Notices to Offerors or Quoters__11 pgs.__Dated NA.pdf PDF
Solicitation FA557521R0004.pdf PDF
Attachment 3e Seed Project Renovate Meeting Hall Bldg. 105 - Schedule of Materials__1 pg.__24 Dec 2020.xlsx XLSX spreadsheet
Attachment 3f Seed Project Renovate Meeting Hall Bldg. 105 - Technical Proposal Requirements__3 pgs.__Dated 24 Dec 2020.pdf PDF
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GENERAL PROVISIONS

FOR

MULTIPLE AWARD CONSTRUCTION

CONTRACT (MACC)

MORÓN AIR BASE, SPAIN

4 June 2020

TABLE OF CONTENTS

SECTION

TITLE PAGE

1 TITLE 3

2 PROGRAM DESCRIPTION 3

3 DRAWING REQUIREMENTS 4

4 GOVERNMENT FURNISHED EQUIPMENT AND

MATERIALS

5 REMOVAL AND REPLACEMENT RESPONSIBILITY 5

6 LIQUIDATED DAMAGES 5

7 GOVERNMENT LIABILITY 5

8 ANNEXES 6

9 ABBREVIATIONS 6

NOTE: The general provisions described below provide an overview for the Multiple Award

Construction Contract (MACC). Further requirements are described in attachments:

Attachment 2 – Special Contract Requirements

Attachment 7 - Design Requirements

Attachment 8 - General Conditions

Attachment 9 - List of Possible Certifications

Attachment 10 - Integrated Natural Resources Management Plan

Attachment 11 - Environmental Final Governing Standards

Attachment 12 - Architectural Compatibility Plan

1. TITLE: Multiple Award Construction Contract (MACC)

2. PROGRAM DESCRIPTION

2.1. The MACC program is required in support of the 496th Air Base Squadron (496th ABS), located on Morón Air Base (MAB) Spain.

2.2. All work shall be in conformance with the drawings and specifications provided by 496

ABS Civil Engineering Flight to include: the furnishing of all materials, labor, plant, tools, equipment, transportation; the execution of services, including engineering/technical design support; and the incidentals thereof.

2.3. The MACC is an Indefinite-Delivery, Indefinite-Quantity (IDIQ) contract for execution of a broad range of design-build, sustainment, maintenance, repair, alteration, renovation and minor construction projects, to include residential and commercial work for the Morón Air Base Military

Community.

2.4. Performance of services will be accomplished by the contractor through individual Task

Orders (TOs). The project scope on each TO will be identified by the Government. A Task Order

Request for Proposal (TORFP) will be issued to define specific project requirements involving design-build or build only requirements. TO execution will be directed by one of the following work elements:

(a) Work Element No. 1, Construction Effort Without Design Needed:

The contractor will be provided with a Statement of Objectives (SOO) with minimal supporting documentation. After the TO award, the contractor shall commence and execute construction

IAW with the TO requirements.

(b) Work Element No. 2, Construction Effort With Government Design Package Provided:

The contractor will be provided an adequate design document package to execute the construction requirement only IAW the TO. The package will include the SOW, drawings, technical specifications, and any other preliminary data.

(c) Work Element No. 3, Design-Build Effort:

The contractor will be provided with a previously accomplished pre-concept or concept design effort, including available drawings, specifications, and/or design analysis. Contractor shall complete a detailed design IAW TO requirements. Construction shall commence upon approval of design and be completed IAW TO requirements.

2.5. All construction work, specifications, SOWs, drawings, and other contract requirements shall be performed in strict accordance with the most current editions of the relevant Spanish, US and NATO standards and regulations.

2.6. The work will typically include tasks involving a variety of multiple different trades in construction above and below the ground.

2.7. The contractor shall furnish all personnel, labor, equipment, tools, materials, supervision, and other items and services necessary to design, manage, and accomplish a broad range of repair, alteration, and/or new construction work on various real property facilities.

2.8. The contractor shall have a design and construction staff available to respond to the requirements of this multi-discipline IDIQ type contract. The contractor shall provide project management, project design/engineering, on-site supervision, quality control, and administration.

The contractor shall have at least one English-speaking person available on site.

2.9. Upon issuance of a TO, the contractor shall submit relevant work plans, samples, brochures, manufacturer data, subcontractor list, applicable certifications for contractor and subcontractor personnel, product data sheets, drawings, progress schedule and certificates of materials relative to the construction execution to the Contracting Officer (CO) for approval prior to execution of the project, IAW design criteria/specifications and TO requirements. Timelines for design and/or construction will be specified in each TO.

3. DRAWING REQUIREMENTS

3.1. EXISTING CONDITION DRAWINGS (INCLUDING UTILITIES)

3.1.1. Drawings documenting existing underground utilities are available upon request. Any utility line shown on the record drawings or made known to the contractor damaged during construction work shall be repaired immediately by the contractor at no additional cost to the Government.

3.1.2. The Government does not guarantee the accuracy or adequacy of existing record drawings.

It shall be the contractor's responsibility to verify all existing conditions and measurements prior to starting work on each TO.

4. GOVERNMENT FURNISHED EQUIPMENT AND MATERIALS

4.1. The Government may provide Government-furnished Material (GFM) and Government-furnished equipment (GFE) to be used on certain TOs. In such cases, this material/equipment shall be received by the contractor and must be excluded from the TO price.

4.2. The contractor shall be responsible for transporting the GFM/GFE from the Government storage area to the work site as indicated on the task order.

4.3. The contractor shall assume financial risk and responsibility for the loss or damage to

Government-furnished property.

4.4. The contractor shall follow the instructions of the CO regarding all Government-furnished property that was not consumed in performance of a TO.

5. REMOVAL AND REPLACEMENT RESPONSIBILITY

The contractor shall be responsible for the replacement or repair of all existing finished surfaces, utilities, equipment, landscapes, grounds, and structures or parts thereof that the contractor has damaged, removed, or cut into in order to perform the work specified. Removed items to be reinstalled shall be stored by the contractor, free from damage, until reinstalled at no additional cost to the Government.

6. LIQUIDATED DAMAGES

CO may request payment of liquidated damages if the contractor fails to complete the work within the time specified in the TO without an excusable delay. The amount to be paid will be determined by the CO and Civil Engineering for each TO.

7. GOVERNMENT LIABILITY

The Government shall not be liable for any loss or damage to the contractor's property, including consumable stock, or for expenses incidental to such loss or damage. The contractor shall file a report of the loss with the Base Security Police (Building 110).

8. ATTACHMENTS:

The following attachments shall be used by the Contractor in the performance of this contract.

Attachments TITLE # PAGES

2 Attachment 2 - Special Contract Requirements 7

7 Attachment 7 - Design Requirements 10

8 Attachment 8 - General Conditions 36

9 Attachment 9 – List of possible Certifications 4

Attachment 10 - Integrated Natural Resources Management Plan for Morón Air Base

11 Attachment 11 - Final Governing Standards for Spain, May 2014 252

12 Attachment 12 - Architectural Compatibility Plan for Morón AB 51

9. ABBREVIATIONS

AB Air Base

ACP Architectural Compatibility Plan

AF Air Force

AFI Air Force Instruction

AFCEC Air Force Civil Engineer Center

AT/FP Anti-Terrorism / Force Protection

C&D Construction and Demolition

CFR Code of Federal Regulations

CM Contract Manager

CO Contracting Officer

CoE Corps of Engineers

DOD Department of Defense

EMCS Energy Monitoring and Control System

EN European Standard

GFE Government Furnished Equipment

GFM Government Furnished Material

GPP Green Procurement Program

EPA Environmental Protection Agency

FGDB File Geodatabase

FMSS Federal and Military Specifications and Standards

GIS Geo Information System

GSU Geographically Separated Unit

IAW In Accordance With

IDIQ Indefinite-Delivery, Indefinite-Quantity

ISO International Organization for Standardization

MACC Multiple Award Construction Contract

MAB Morón Air Base

MFH Military Family Housing

MIL-HDBK Military Handbook

NFPA National Fire Protection Association

OSI Office of Special Investigations

PCB Polychlorinated Biphenyl

PM Project Manager

POC Point of Contact

QCM Quality Control Manager

QCP Quality Control Plan

QMP Quality Management Program

OSHA Occupational Safety and Health Administration

PGDB Personnel Geodatabase

SDSFIE Spatial Data Standards for Facilities, Infrastructure and Environment

STD Standard

SOO Statement of Objectives

SOW Statement of Work

TIA Telecommunications Industry Association

TORFP Task Order Request for Proposal

TSB Technical System Bulletins

UFC Unified Facilities Criteria

UFGS Unified Facilities Guide Specifications

USEPA U.S. Environmental Protection Agency

WGS World Geodetic System

File details come from the government source that posted it. Updated .