RFI Planning Approval.pdf
PDF 178 KB Posted
- Solicitation number
- FA557026R0001
About this file
This is a Request for Information (RFI) from the 422 Civil Engineer Squadron regarding planning actions for the Install Security Fence BstJ project (Project Reference: AWJB 25-1006, RFI Reference: 003), dated April 17, 2026.
The contractor submitted two planning inquiries to 422 CES with a need-by date of April 23, 2026: (1) Environmental Impact Studies and (2) Mitigations Licenses. Darran Griffiths of 422 CES responded on April 23, 2026, providing the following information: Environmental Impact Studies have not been formally undertaken because the intent is to follow the land abutting existing hard standing as much as possible; where the route deviates (such as the area southwest of the Installation near the Electrical substation), Environmental Subject Matter Experts (SMEs) will be available to consult as work progresses, and the route remains open to deviation to allow maximum flexibility for the contractor with Enviro SME support in determining the optimum route at each stage. Regarding Mitigations Licenses, an indicative route has been prepared to exclude any works within the prescribed 30-meter stand-off distance to any badger setts or indicators of badger activity, so the Environmental SME has confirmed this license is not required; however, the Environmental SME will remain available for consultation during work progress, including on-site and in-person during the installation phase. Section 3 of the RFI (Review) remains incomplete with no recorded reviewer, review date, acceptance status, or closure date.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Request For Information (RFI)
422 Civil Engineer Squadron Page 1 of 2
Project Title: Install Security Fence BstJ Project Ref: AWJB 25-1006
RFI Title: Planning Actions RFI Ref: 003
Date Raised: 17-April-2026
SECTION 1 - REQUEST
Request By: Contractor
Addressed To: 422 CES
Description:
Environmental Impact Studies
Mitigations Licenses
Need By Date: 23-April-2026
Attachments:
SECTION 2 - RESPONSE
Response By: Darran Griffiths, 422 CES
Date of Response: 23-April-2026
Description:
Environmental Impact Studies: Have not been undertaken as intent is to follow the land abutting the existing hard standing as much as possible. Where route deviates (e.g. area at SW of Installation by Electrical substation), Environmental SME’s will be available to consult as work progresses. Route is open to deviation to allow as much latitude for contractor as possible and Enviro SMEs will aid determine optimum route at each stage of the works.
Mitigations Licenses: Indicative route has been prepared to exclude any works within the prescribed 30m stand-off to any badger setts / indicators of badger activity. Therefore, the Environmental SME has confirmed this license is not required, but, per response above, will be available to consult as work progresses, including on site / in person during the installation phase.
Attachments:
SECTION 3 – REVIEW
Description:
422 Civil Engineer Squadron Page 2 of 2
Reviewed By:
Date of Review:
Response Accepted:
Date of Closure:
| AWJB 25-1006 |
| Project Ref: |
| Install Security Fence BstJ |
| Project Title: |
| 003 |
| RFI Ref: |
| Planning Actions |
| RFI Title: |
| 17-April-2026 |
| Date Raised: |
| SECTION 1 - REQUEST |
| Contractor |
| Request By: |
| 422 CES |
| Addressed To: |
| Description: |
| 23-April-2026 |
| Need By Date: |
| Attachments: |
| SECTION 2 - RESPONSE |
| Darran Griffiths, 422 CES |
| Response By: |
| 23-April-2026 |
| Date of Response: |
| Description: |
| Environmental Impact Studies: Have not been undertaken as intent is to follow the land abutting the existing hard standing as much as possible. Where route deviates (e.g. area at SW of Installation by Electrical substation), Environmental SME’s will be available to consult as work progresses. Route is open to deviation to allow as much latitude for contractor as possible and Enviro SMEs will aid determine optimum route at each stage of the works. |
| Mitigations Licenses: Indicative route has been prepared to exclude any works within the prescribed 30m stand-off to any badger setts / indicators of badger activity. Therefore, the Environmental SME has confirmed this license is not required, but, per response above, will be available to consult as work progresses, including on site / in person during the installation phase. |
| Attachments: |
| SECTION 3 – REVIEW |
| Description: |
| Reviewed By: |
| Date of Review: |
| Response Accepted: |
| Date of Closure: |
File details come from the government source that posted it. Updated .