This document is a Memorandum for RFQ Interested Parties providing responses to vendor questions regarding Solicitation FA527024QB007 for an Access Control System.

The key details are:

  • The solicitation requires the installation of a new access control system (ACS) and upgrade of the current ACS software, database conversion, site control units, and infrastructure.
  • The current system is proprietary technology of DAQ Electronics, LLC and the new equipment and system must seamlessly integrate with the existing DAQ hardware and software.
  • Parts and system are not required to be from DAQ specifically, but must ensure full integration with the current DAQ-based system.
  • The solicitation is being issued by the Department of the Air Force Pacific Air Forces.

View the file

Other files

File Type Posted
RFQ 0005.pdf PDF
Question Response Form 11 Jun 24.pdf PDF
RFQ 0004.pdf PDF
Question Response Form 3 Jun 24.pdf PDF
RFQ 0003.pdf PDF
Question Response Form 4 Jun 24.pdf PDF
Question Reponse Form.pdf PDF
RFQ 0002.pdf PDF
SOW (17 May 24).pdf PDF
Question Submission Form.docx DOCX document
RFQ.pdf PDF
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

30 May 24

MEMORANDUM FOR RFQ INTERESTED PARTIES

FROM 18 CONS/PKB

SUBJECT: Receipt of Question(s) from Vendor Regarding RFQ FA527024QB007, Access Control System

The following are questions submitted by a vendor on 30 May 24 for the subject requirement. The Government’s responses are recorded in blue:

1. Based on the SOW, can you confirm that the only acceptable access control system is DAQ?

Reference SOW, 17 May 24, pg. 2, “The current system is proprietary technology of DAQ Electronics, LLC. The new equipment and system must seamlessly integrate with the current equipment/system that are not being upgraded or replaced to ensure that all facilities can be monitored and controlled by the S-2”.

Parts and system are not required to be DAQ but seamless integration into current DAQ hardware and software is required.