Attachment_-_3_Env_Protection_Section_30_Mar_17.pdf
PDF 2 MB Posted
- Attached to
- Repair HVAC, Bldg. 95 Federal contract opportunity
- Solicitation number
- FA5270-17-B-0003
About this file
Attachment 3 - Environmental Protection Section
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA5270-17-B-0003_-_Answers_To_RFI-_Round_1.pdf | ||
| FA5270-17-B-0003-0001.pdf | ||
| Attachment-1_Site_and_Floor_Plans.pdf | ||
| Attachment_-_7_Engineering_System_Requirements_(ESR)_24_Mar_17.pdf | ||
| Attachment_-_2_Drawing_Format_(Information)_30_Nov_16.pdf | ||
| Attachment_-_8_Other_Contract_Requirements.pdf | ||
| Attachment_-_6_General_Requirements_30_Nov_16.pdf | ||
| FA5270-17-B-0003.pdf | ||
| Attachment_-_1_Site_and_Floor_Plans_24_Mar_17.pdf | ||
| Attachment_-_5_ACM_Reports_30_Nov_16.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REPAIR HVAC, 18 CONS, B95
KADENA AIR BASE, OKINAWA, JAPAN
FA5270-17-B-0003
LXEZ 17-1395
ATTACHMENT – 3
ENVIRONMENTAL
PROTECTION SECTION
02 Mar 2017
SECTION 01 57 19
TEMPORARY ENVIRONMENTAL CONTROLS
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
U.S. DEPARTMENT OF DEFENSE (DOD)
JEGS (2016) Japan Environmental Governing Standards
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
29 CFR 1910 Occupational Safety and Health Standards
40 CFR 260 Hazardous Waste Management System: General
1.2 DEFINITIONS
1.2.1 Class I and II Ozone Depleting Substance (ODS)
Class I and II ODS are listed in JEGS Chapter 2, Table C2.T1.
1.2.2 Contractor Generated Hazardous Waste
Contractor generated hazardous waste is materials that, if abandoned or disposed of, may meet the definition of a hazardous waste. These waste streams would typically consist of material brought on site by the Contractor to execute work, but are not fully consumed during the course of construction. Examples include, but are not limited to, excess paint thinners (i.e. methyl ethyl ketone, toluene), waste thinners, excess paints, excess solvents, waste solvents, excess pesticides, and contaminated pesticide equipment rinse water.
1.2.3 Electronics Waste
Electronics waste is discarded electronic devices intended for salvage, recycling, or disposal.
1.2.4 Environmental Pollution and Damage
Environmental pollution and damage is the presence of chemical, physical, or biological elements or agents which adversely affect human health or welfare; unfavorably alter ecological balances of importance to human life; affect other species of importance to humankind; or degrade the environment aesthetically, culturally or historically.
1.2.5 Environmental Protection
Environmental protection is the prevention/control of pollution and habitat disruption that may occur to the environment during construction.
SECTION 01 57 19 Page 1
The control of environmental pollution and damage requires consideration of land, water, and air; biological and cultural resources; and includes management of visual aesthetics; noise; solid, chemical, gaseous, and liquid waste; radiant energy and radioactive material as well as other pollutants.
1.2.6 Hazardous Debris
As defined in paragraph SOLID WASTE, debris that contains listed hazardous waste (either on the debris surface, or in its interstices, such as pore structure) in accordance with JEGS. Hazardous debris also includes debris that exhibits a characteristic of hazardous waste in accordance with JEGS.
1.2.7 Hazardous Materials
Hazardous material is any material that is capable of posing an unreasonable risk to health, safety, or the environment if improperly handled, stored, issued, transported, labeled, or disposed because it displays a characteristic listed in JEGS Table C5.T1, "Typical Hazardous Materials Characteristics," or the material is listed in Table AP1.T.4, "List of Hazardous Waste/Substances/Materials." Munitions are excluded.
1.2.8 Hazardous Waste
Hazardous Waste is discarded material that may be solid, semi-solid, liquid, or contained gas, and either exhibits a characteristic of a hazardous waste as defined in JEGS section AP1.T1 through AP1.T4.
Excluded from this definition are domestic sewage sludge, household wastes, and medical wastes.
1.2.9 Installation Pest Management Consultant
Installation Pest Management Consultant (IPMC) is the professional DoD pest management personnel located at component headquarters, field operating agencies, major commands, facilities engineering field divisions or activities, or area support activities who provide technical and management guidance for the conduct of installation pest management operations. Some pest management consultants may be designated by their component as certifying officials.
1.2.10 Land Application
Land Application means spreading or spraying discharge water at a rate that allows the water to percolate into the soil. No sheeting action, soil erosion, discharge into storm sewers, or discharge into defined drainage areas (includes drainage ditches, streams, rivers, ocean, etc.)
must occur. Comply with JEGS and all applicable Federal, GOJ national or prefectural laws and regulations, and installation requirements.
1.2.11 Oily Waste
Oily waste are those materials that are, or were, mixed with Petroleum, Oils, and Lubricants (POLs) and have become separated from that POLs.
Oily wastes also means materials, including wastewaters, centrifuge solids, filter residues or sludge, bottom sediments, tank bottoms, and sorbents which have come into contact with and have been contaminated by, POLs and may be appropriately tested and discarded in a manner which is in compliance with JEGS and all applicable Federal, GOJ national or prefectural laws and regulations, and installation requirements.
SECTION 01 57 19 Page 2
This definition includes materials such as oily rags, "kitty litter" sorbent clay and organic sorbent material. These materials may be land filled provided that: It is not prohibited in JEGS and all applicable Federal, GOJ national or prefectural laws and regulations, and installation requirements; the amount generated is "de minimus" (a small amount); it is the result of minor leaks or spills resulting from normal process operations; and free-flowing oil has been removed to the practicable extent possible. Large quantities of this material, generated as a result of a major spill or in lieu of proper maintenance of the processing equipment, are a solid waste. As a solid waste, perform a hazardous waste determination prior to disposal. As this can be an expensive process, it is recommended that this type of waste be minimized through good housekeeping practices and employee education.
1.2.12 Pesticide
Pesticide is any substance or mixture of substances, including biological control agents that may prevent, destroy, repel, or mitigate pests.
1.2.13 Pesticide Treatment Plan
A plan for the prevention, monitoring, and control to eliminate pest infestation.
1.2.14 Pests
Anthropods, birds, rodents, nematodes, fungi, bacteria, viruses, algae, snails, marine borers, snakes, weeds, undesirable vegetation, and other organisms (except for microorganisms that cause human or animal disease) that adversely affect the well-being of humans or animals; attack real property, supplies, equipment, or vegetation; or are otherwise undesirable.
1.2.15 Regulated Waste
Regulated waste are solid wastes that have specific additional JEGS, Federal, or GOJ national and prefectural controls for handling, storage, or disposal.
1.2.16 Sediment
Sediment is soil and other debris that have eroded and have been transported by runoff water or wind.
1.2.17 Solid Waste
Solid waste is garbage, refuse, sludge, and other discarded materials, including solid, semi-solid, liquid, and contained gaseous materials resulting from industrial and commercial operations and from community activities. It does not include solids or dissolved material in domestic sewage or their significant pollutants in water resources, such as silt, dissolved or suspended solids in industrial wastewater effluent, dissolved materials in irrigation return flows, or other common water pollutants.
Types of solid waste typically generated at construction sites may include:
1.2.17.1 Debris
Debris is non-hazardous solid material generated during the construction, demolition, or renovation of a structure that exceeds 60 mm particle size
SECTION 01 57 19 Page 3 that is: a manufactured object; plant or animal matter; or natural geologic material (for example, cobbles and boulders), broken or removed concrete, masonry, and rock asphalt paving; ceramics; roofing paper and shingles. A mixture of debris and other material such as soil or sludge is also subject to regulation as debris if the mixture is comprised primarily of debris by volume, based on visual inspection.
1.2.17.2 Green Waste
Green waste is the vegetative matter from landscaping, land clearing and grubbing, including, but not limited to, grass, bushes, scrubs, small trees and saplings, tree stumps and plant roots. Marketable trees, grasses and plants that are indicated to remain, be re-located, or be re-used are not included.
1.2.17.3 Material Not Regulated as Solid Waste
Material not regulated as solid waste is nuclear source or byproduct materials regulated under the Federal Atomic Energy Act of 1954 as amended; suspended or dissolved materials in domestic sewage effluent or irrigation return flows, or other regulated point source discharges;
regulated air emissions; and fluids or wastes associated with natural gas or crude oil exploration or production.
1.2.17.4 Non-Hazardous Waste
Non-hazardous waste is waste that is excluded from, or does not meet, characteristic of a hazardous waste as defined in JEGS section AP1.1 or is listed as a hazardous waste in JEGS Tables AP1.T1 through AP1.T4. Excluded from this definition is medical wastes.
1.2.17.5 Recyclables
Recyclables are materials, equipment and assemblies such as doors, windows, door and window frames, plumbing fixtures, glazing and mirrors that are recovered and sold as recyclable, wiring, insulated/non-insulated copper wire cable, wire rope, and structural components. It also includes commercial-grade refrigeration equipment with Freon removed, household appliances where the basic material content is metal, clean polyethylene terephthalate bottles, cooking oil, used fuel oil, textiles, high-grade paper products and corrugated cardboard, stackable pallets in good condition, clean crating material, and clean rubber/vehicle tires. Metal meeting the definition of lead contaminated or lead based paint contaminated may not be included as recyclable if sold to a scrap metal company.
1.2.17.6 Surplus Soil
Surplus soil is existing soil that is in excess of what is required for this work, including aggregates intended, but not used, for on-site mixing of concrete, mortars, and paving. Contaminated soil meeting the definition of hazardous material or hazardous waste is not included and must be managed in accordance with paragraph HAZARDOUS MATERIAL MANAGEMENT.
1.2.17.7 Scrap Metal
This includes scrap and excess ferrous and non-ferrous metals such as reinforcing steel, structural shapes, pipe, and wire that are recovered or collected and disposed of as scrap. Scrap metal meeting the definition of
SECTION 01 57 19 Page 4 hazardous material or hazardous waste is not included.
1.2.17.8 Wood
Wood is dimension and non-dimension lumber, plywood, chipboard, hardboard. Treated or painted wood that meets the definition of lead contaminated or lead based contaminated paint is not included. Treated wood includes, but is not limited to, lumber, utility poles, crossties, and other wood products with chemical treatment.
1.2.18 Surface Discharge
Surface discharge means discharge of water into drainage ditches, storm sewers, or creeks. Surface discharges are discrete, identifiable sources and require a permit from the governing agency. Comply with JEGS and all applicable Federal, GOJ national or prefectural laws and regulations, and installation requirements.
1.2.19 Wastewater
Wastewater is the used water and solids from a community that flow to a treatment plant.
1.2.19.1 Stormwater
Stormwater is any precipitation in an urban or suburban area that does not evaporate or soak into the ground, but instead collects and flows into storm drains, rivers, and streams.
1.2.20 Wetlands
Wetlands are those areas that are inundated or saturated by surface or groundwater at a frequency and duration sufficient to support, and that under normal circumstances do support, a prevalence of vegetation typically adapted for life in saturated soil conditions.
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submittals with an "S" are for inclusion in the Sustainability Notebook, in conformance with Section 01 33 29 SUSTAINABILITY REPORTING. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Preconstruction Survey
Environmental Protection Plan; G
Dirt and Dust Control Plan; G
Employee Training Records; G
Environmental Manager Qualifications; G
SD-06 Test Reports
SECTION 01 57 19 Page 5
Laboratory Analysis
Inspection Reports
Solid Waste Management Report; G
SD-07 Certificates
Employee Training Records; G
Certificate of Competency
Solid Waste Management License
SD-11 Closeout Submittals
Waste Determination Documentation; G
Disposal Documentation for Hazardous and Regulated Waste; G
Assembled Employee Training Records; G
Solid Waste Management Report; G
Hazardous Waste/Debris Management; G
1.4 PAYMENT
No separate payment shall be made for work covered under this section.
Payment of fees associated with environmental permits, application, and/or notices obtained by the Contractor, and payment of all fines/fees for violation or non-compliance with GOJ, Federal, and local laws and regulations are the Contractor's responsibility. All costs associated with this section shall be included in the Contract price.
1.5 ENVIRONMENTAL PROTECTION REQUIREMENTS
Provide and maintain, during the life of the Contract, environmental protection as defined. Plan for and provide environmental protective measures to control pollution that develops during construction practice.
Plan for and provide environmental protective measures required to correct conditions that develop during the construction of permanent or temporary environmental features associated with the project. Protect the environmental resources within the project boundaries and those affected outside the limits of permanent work during the entire duration of this Contract. Comply with JEGS and all applicable Federal, GOJ national or prefectural laws and regulations, and installation requirements pertaining to the environment, including water, air, solid waste, hazardous waste and substances, oily substances, and noise pollution.
Tests and procedures assessing whether construction operations comply with Applicable Environmental Laws may be required. Laboratory analyses necessary to implement JEGS shall be conducted in a laboratory certified by a U.S. or GOJ regulatory authority for the applicable test method. In the absence of a certified laboratory, contact the Contracting Officer for further guidance.
SECTION 01 57 19 Page 6
1.5.1 Conformance with the Environmental Management System
Perform work under this Contract consistent with the policy and objectives identified in the installation's Environmental Management System (EMS).
Perform work in a manner that conforms to objectives and targets of the environmental programs and operational controls identified by the EMS.
Support Government personnel when environmental compliance and EMS audits are conducted by escorting auditors at the Project site, answering questions, and providing proof of records being maintained. Provide monitoring and measurement information as necessary to address environmental performance relative to environmental, energy, and transportation management goals. In the event an EMS nonconformance or environmental noncompliance associated with the contracted services, tasks, or actions occurs, take corrective and preventative actions. In addition, employees must be aware of their roles and responsibilities under the installation EMS and of how these EMS roles and responsibilities affect work performed under the Contract.
Coordinate with the installation's EMS coordinator to identify training needs associated with environmental aspects and the EMS, and arrange training or take other action to meet these needs. Provide training documentation to the Contracting Officer. The Installation Environmental Office will retain associated environmental compliance records. Make EMS Awareness training completion certificates available to Government auditors during EMS audits and include the certificates in the Employee Training Records. See paragraph EMPLOYEE TRAINING RECORDS.
1.6 SPECIAL ENVIRONMENTAL REQUIREMENTS
1.6.1 Asbestos Prohibition and Certification
a. Materials or products containing more than one-tenth of one percent (0.1 percent) by total weight, of the material or product, of asbestos shall not be used in this project. The Contracting Officer, at any time prior to acceptance of the work, or during the period designated for warranty of the work, if any, may reject materials and products that contain asbestos in excess of one-tenth of one percent by weight, and direct the removal of such materials and products from the job site, at the sole expense of the Contractor, and without additional time granted for performance of the work. After completion of this Contract, if asbestos (exceeding 0.1 percent by weight) is discovered in the products or materials (excluding items permitted by the exception) installed by the Contractor, the Government reserves the right to direct the Contractor to perform asbestos abatement and restoration work, as required, at the Contractor's sole cost.
Asbestos abatement work (removal and disposal of asbestos-containing materials and products) shall be accomplished in accordance with currently applicable Government standards for such work.
Exception: Where suitable asbestos-free substitutes do not exist for a material or product, the Contractor may use a material or product containing asbestos in the excess of 0.1 percent by weight, with prior written approval of the Contracting Officer. Submit a written request for substitution, accompanied by a certification from the manufacturer of the material or product that shall set forth, in specific detail, the amount of asbestos present in the material or product. When available, laboratory analysis of the material or product for asbestos content shall be included with the submittal.
SECTION 01 57 19 Page 7
b. The Government may conduct asbestos testing on suspected asbestos-containing materials and products excluding items permitted by the "exception", and such testing shall be conducted at the expense of the Government. However, wherever destructive testing is required, or a material or product must be utilized by the Government for testing, the Contractor shall, at its own expense, repair or replace the material or product, or the item of work that has been disturbed by testing, if the results confirm presence of asbestos exceeding 0.1 percent by weight. In the event test results indicate 0.1 percent or less asbestos content or complete absence of asbestos, the Contractor shall restore the test site to its original condition and the cost of restoration work, as approved by the Contracting Officer, shall be borne by the Government.
c. As a minimum, furnish manufacturer's certification for the items listed below, excluding items permitted by the "exception", certifying that the items are asbestos-free or do not contain asbestos in excess of 0.1 percent by weight, as applicable. However, when presence of asbestos is suspected in other products and materials used in this project, the Contractor shall be required to provide such certification for those additional items when so directed by the Contracting Officer. Asbestos certification shall be required for the items applicable to this project only.
(1) Vinyl sheet/vinyl tile flooring, including accessories and adhesives.
(2) Insulation materials, including facing.
(3) Gaskets for piping and duct work.
(4) Acoustical tiles.
(5) Firestopping materials.
(6) Fireproofing materials.
(7) Special coating, including factory applied coatings, on sheet metal roofing and siding.
(8) Wallboard for all interior and exterior appliations, including joint compounds.
(9) Adhesives (other than item 1) used in the project.
(10)Tape materials used in the project.
(11)Roofing and siding, nonmetallic.
(12)Felt materials and cushion materials.
(13)Pre-mixed mortars, grouts, leveling compounds, fillers, and other cementitious materials.
(14)Caulking and sealing materials.
d. All submittals shall be accompanied by a certification from the manufacturer of the material or product that the material or product is asbestos-free; or shalll set forth, in specific detail, the amount
SECTION 01 57 19 Page 8 of asbestos present in the material or product. Documentary evidence of laboratory analysis of the material or product for asbestos content, conducted by a qualified independent testing laboratory, shall be included with the submittal.
1.7 QUALITY ASSURANCE
1.7.1 Preconstruction Survey and Protection of Features
This paragraph supplements the Contract Clause PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND IMPROVEMENTS. Prior to start of any onsite construction activities, perform a Preconstruction Survey of the project site with the Contracting Officer, and take photographs showing existing environmental conditions in and adjacent to the site. Submit a report for the record. Include in the report a plan describing the features requiring protection under the provisions of the Contract Clauses, which are not specifically identified on the drawings as environmental features requiring protection along with the condition of trees, shrubs and grassed areas immediately adjacent to the site of work and adjacent to the Contractor's assigned storage area and access route(s), as applicable. The Contractor and the Contracting Officer will sign this survey report upon mutual agreement regarding its accuracy and completeness. Protect those environmental features included in the survey report and any indicated on the drawings, regardless of interference that their preservation may cause to the work under the Contract.
1.7.2 Regulatory Notifications
Provide regulatory notification requirements in accordance with GOJ national and prefectural laws and regulations and installation requirments.
1.7.3 Environmental Brief
Attend an environmental brief to be included in the preconstruction meeting. Provide the following information: types, quantities, and use of hazardous materials that will be brought onto the installation; and types and quantities of wastes/wastewater that may be generated during the Contract. Discuss the results of the Preconstruction Survey at this time.
Prior to initiating any work on site, meet with the Contracting Officer and installation Environmental Office to discuss the proposed Environmental Protection Plan (EPP). Develop a mutual understanding relative to the details of environmental protection, including measures for protecting natural and cultural resources, required reports, required permits, permit requirements (such as mitigation measures), and other measures to be taken.
Permits, licenses, or other forms of official approvals are not required by DoD activities and installations. Permits, licenses, or other forms of official approvals may, however, be required under GoJ law for certain contracted activities. When required, all such permits, licenses and other forms of official approval shall be obtained by the Contractor from the appropriate GoJ authorities. DoD Components shall assist Contractors when they are applying for a required permit, license or other form of official approval by providing necessary information only.
[ 1.7.4 Environmental Manager
Appoint in writing an Environmental Manager for the project site. The
SECTION 01 57 19 Page 9
Environmental Manager is directly responsible for coordinating Contractor compliance with JEGS, Federal, GOJ national and prefectural laws and regulations, and installation requirements. The Environmental Manager must ensure compliance with Hazardous Waste Program requirements (including hazardous waste handling, storage, manifesting, and disposal);
implement the EPP; ensure environmental permits are obtained, maintained, and closed out; ensure compliance with Stormwater Program requirements;
ensure compliance with Hazardous Materials (storage, handling, and reporting) requirements; and coordinate any remediation of regulated substances (lead, asbestos, PCB transformers). This can be a collateral position; however, the person in this position must be trained to adequately accomplish the following duties: ensure waste segregation and storage compatibility requirements are met; inspect and manage Satellite Accumulation areas; ensure only authorized personnel add wastes to containers; ensure Contractor personnel are trained in JEGS requirements in accordance with their position requirements; coordinate removal of waste containers; and maintain the Environmental Records binder and required documentation, including environmental permits compliance and close-out. Submit Environmental Manager Qualifications to the Contracting Officer.
] 1.7.5 Employee Training Records
Prepare and maintain Employee Training Records throughout the term of the Contract meeting applicable JEGS requirements. Provide Employee Training Records in the Environmental Records Binder. Ensure every employee completes a program of classroom instruction or on-the-job training that teaches them to perform their duties in a way that ensures compliance with JEGS and all applicable Federal, GOJ national or prefectural laws or regulations and installation requirements. Submit these Assembled Employee Training Records to the Contracting Officer at the conclusion of the project, unless otherwise directed.
Train personnel shall meet JEGS and all applicable Federal, GOJ national or prefectural laws or regulations, and Installation requirements.
Conduct environmental protection/pollution control meetings for personnel prior to commencing construction activities. Contact additional meetings for new personnel and when site conditions change. Include in the training and meeting agenda: methods of detecting and avoiding pollution;
familiarization with statutory and contractual pollution standards;
installation and care of devices, vegetative covers, and instruments required for monitoring purposes to ensure adequate and continuous environmental protection/pollution control; anticipated hazardous or toxic chemicals or wastes, and other regulated contaminants; recognition and protection of archaeological sites, artifacts, waters of Japan, and endangered species and their habitat that are known to be in the area.
1.7.5.1 Pest Control Training
Train personnel in pest control. Conduct a pest control meeting for personnel prior to commencing construction activities. Conduct additional meetings for new personnel and when site conditions change. Include in the training and meeting agenda: methods of detecting and pest infestation; familiarization with statutory and contractual pest control standards; installation and care of devices, and instruments, if required, for monitoring purposes to ensure adequate and continuous pest control;
anticipated hazardous or toxic chemicals or wastes, and other regulated contaminants; recognition and protection of waters of Japan, and endangered species and their habitat that are known to be in the area.
SECTION 01 57 19 Page 10
Provide a Certificate of Competency for the personnel who will be conducting the pesticide application and management of pest control.
1.7.6 Non-Compliance Notifications
The Contracting Officer shall notify the Contractor in writing of any observed noncompliance with the JEGS, applicable Federal, GOJ national or prefectural laws and regulations, and installation requirements, and other elements of the Contractor's EPP. After receipt of such notice, inform the Contracting Officer of the proposed corrective action and take such action when approved by the Contracting Officer. The Contracting Officer may issue an order stopping all or part of the work until satisfactory corrective action has been taken. No time extensions will be granted or equitable adjustments allowed for any such suspensions. This is in addition to any other actions the Contracting Officer may take under the Contract, or in accordance with the Federal Acquisition Regulation or Federal Law.
1.8 ENVIRONMENTAL PROTECTION PLAN
The purpose of the EPP is to present an overview of known or potential environmental issues that must be considered and addressed during construction. Incorporate construction related objectives and targets from the installation's EMS into the EPP. Include in the EPP measures for protecting natural and cultural resources, required reports, and other measures to be taken. Meet with the Contracting Officer or Contracting Officer Representative to discuss the EPP and develop a mutual understanding relative to the details for environmental protection including measures for protecting natural resources, required reports, and other measures to be taken. Submit the EPP within 15 days after Contract award and not less than 10 days before the preconstruction meeting.
Revise the EPP throughout the project to include any reporting requirements, changes in site conditions, or Contract modifications that change the project scope of work in a way that could have an environmental impact. No requirement in this section will relieve the Contractor of any JEGS, and applicable Federal, GOJ national or prefectural laws and regulations, and installation requirements. During Construction, identify, implement, and submit for approval any additional requirements to be included in the EPP. Maintain the current version onsite.
The EPP includes, but is not limited to, the following elements:
1.8.1 General Overview and Purpose
1.8.1.1 Descriptions
A brief description of each specific plan required by environmental permit or elsewhere in this Contract such as stormwater pollution prevention plan, spill control plan, solid waste management plan, wastewater management plan, air pollution control plan, contaminant prevention plan, a historical, archaeological, cultural resources, biological resources and wetlands plan, traffic control plan, Hazardous, Toxic and Radioactive Waste (HTRW) Plan, Non-Hazardous Solid Waste Disposal Plan, and borrowing material plan.
1.8.1.2 Duties
The duties and level of authority assigned to the person(s) on the job site who oversee environmental compliance, such as who is responsible for
SECTION 01 57 19 Page 11 adherence to the EPP, who is responsible for spill cleanup and training personnel on spill response procedures, who is responsible for manifesting hazardous waste to be removed from the site (if applicable), and who is responsible for training the Contractor's environmental protection personnel.
1.8.1.3 Procedures
A copy of any standard or project-specific operating procedures that will be used to effectively manage and protect the environment on the project site.
1.8.1.4 Communications
Communication and training procedures that will be used to convey environmental management requirements to Contractor employees and subcontractors.
1.8.1.5 Contact Information
Emergency contact information contact information (office phone number, cell phone number, and e-mail address).
1.8.2 General Site Information
1.8.2.1 Drawings
Drawings showing locations of proposed temporary excavations or embankments for haul roads, stream crossings, jurisdictional wetlands, material storage areas, structures, sanitary facilities, storm drains and conveyances, and stockpiles of excess soil.
1.8.2.2 Work Area
Work area plan showing the proposed activity in each portion of the area and identify the areas of limited use or nonuse. Include measures for marking the limits of use areas, including methods for protection of features to be preserved within authorized work areas and methods to control runoff and to contain materials on site, and a traffic control plan.
1.8.2.3 Documentation
A letter signed by an officer of the firm appointing the Environmental Manager and stating that person is responsible for managing and implementing the Environmental Program as described in this Contract.
Include in this letter the Environmental Manager's authority to direct the removal and replacement of non-conforming work.
1.8.3 Management of Natural Resources
a. Land resources
b. Tree protection
c. Replacement of damaged landscape features
d. Temporary construction
SECTION 01 57 19 Page 12
e. Stream crossings
f. Fish and wildlife resources
g. Wetland areas
1.8.4 Protection of Historical and Archaeological Resources
a. Objectives
b. Methods
1.8.5 Stormwater Management and Control
a. Ground cover
b. Erodible soils
c. Temporary measures
(1) Structural Practices
(2) Temporary and permanent stabilization
d. Effective selection, implementation and maintenance of Best Management Practices (BMPs).
1.8.6 Protection of the Environment from Waste Derived from Contractor Operations
Control and disposal of solid and sanitary waste. Control and disposal of hazardous waste.
This item consist of the management procedures for hazardous waste to be generated. The elements of those procedures will coincide with the Installation Hazardous Waste Management Plan. The Contracting Officer will provide a copy of the Installation Hazardous Waste Management Plan.
As a minimum, include the following:
a. List of the types of hazardous wastes expected to be generated.
b. Procedures to ensure a written waste determination is made for appropriate wastes that are to be generated.
c. Sampling/analysis plan, including laboratory method(s) that will be used for waste determinations and copies of relevant laboratory certifications.
d. Methods and proposed locations for hazardous waste accumulation/storage (that is, in tanks or containers).
e. Management procedures for storage, labeling, transportation, and disposal of waste (treatment of waste is not allowed unless specifically noted).
f. Management procedures and regulatory documentation ensuring disposal of hazardous waste complies with Land Disposal Restrictions.
g. Management procedures for recyclable hazardous materials such as
SECTION 01 57 19 Page 13 lead-acid batteries, used oil, and similar.
h. Used oil management procedures in accordance with the JEGS; Hazardous waste minimization procedures.
i. Plans for the disposal of hazardous waste by permitted facilities; and Procedures to be employed to ensure required employee training records are maintained.
1.8.7 Prevention of Releases to the Environment
a. Procedures to prevent releases to the environment.
b. Notifications in the event of a release to the environment.
1.8.8 Regulatory Notification and Permits
List the required notifications and permit applications. Some permits require up to 180 days to obtain. Demonstrate that permits have been obtained or applied for by including hard copies. The EPP shall not be approved until the permits have been obtained.
1.8.9 Air Quality Compliance
1.8.9.1 Haul Route
Submit truck and material haul routes along with a Dirt and Dust Control Plan for controlling dirt, debris, and dust on Installation roadways. As a minimum, identify in the plan the subcontractor and equipment for cleaning along the haul route and measures to reduce dirt, dust, and debris from roadways.
1.8.9.2 Pollution Generating Equipment
Identify air pollution generating equipment or processes that may require compliance with JEGS or GOJ national or prefectural laws-regulations.
Determine requirements based on any current JEGS and installation requirements and the impacts of the project. Provide a list of all fixed or mobile equipment, machinery or operations that could generate air emissions during the project to the Installation Environmental Office (Air Program Manager).
1.8.9.3 Stationary Internal Combustion Engines
Identify portable and stationary internal combustion engines that will be supplied, used or serviced. Comply with JEGS and all applicable Federal, GOJ national or prefectural laws and regulations, and installation requirements. At minimum, include the make, model, serial number, manufacture date, size (engine brake horsepower), and EPA emission certification status of each engine. Maintain applicable records and log hours of operation and fuel use. Logs must include reasons for operation and delineate between emergency and non-emergency operation.
1.8.9.4 Refrigerants
Identify management practices to ensure that heating, ventilation, and air conditioning (HVAC) work involving refrigerants complies with JEGS and installation requirements. Technicians shall be trained in proper recovery/recycling procedures, leak detection, safety, shipping, and
SECTION 01 57 19 Page 14 disposal in accordance with recognized industry standards or Japanese equivalent. Any refrigerant reclaimed is the property of the Government;
coordinate with the Installation Environmental Office to determine the appropriate turn in location.
1.8.9.5 Air Pollution-Engineering Processes
Identify planned air pollution-generating processes and management control measures (including, but not limited to, spray painting, abrasive blasting, demolition, material handling, fugitive dust, and fugitive emissions). Log hours of operations and track quantities of materials used.
1.9 LICENSES AND PERMITS
Obtain licenses and permits required for the construction of the project and in accordance with FAR 52.236-7. Notify the Government of all general use permitted equipment the Contractor plans to use on site. This paragraph supplements the Contractor's responsibility under FAR 52.236-7.
1.10 ENVIRONMENTAL RECORDS BINDER
Maintain on-site a separate three-ring Environmental Records Binder and submit at the completion of the project. Make separate parts within the binder that correspond to each submittal listed under paragraph CLOSEOUT SUBMITTALS in this section.
1.11 SOLID WASTE MANAGEMENT LICENSE
Provide the Contracting Officer with written notification of the quantity of anticipated solid waste or debris that is anticipated or estimated to be generated by construction. Include in the report the locations where various types of waste will be disposed or recycled. Include letters of acceptance from the receiving location or as applicable; submit one copy of the receiving location state and local Solid Waste Management Permit or license showing such agency's approval of the disposal plan before transporting wastes off Government property.
1.11.1 Solid Waste Management Report
Monthly, submit a solid waste disposal report to the Contracting Officer.
For each waste, the report will state the classification (using the definitions provided in this section), amount, location, and name of the business receiving the solid waste.
PART 2 PRODUCTS (NOT USED)
PART 3 EXECUTION
3.1 PROTECTION OF NATURAL RESOURCES
Minimize interference with, disturbance to, and damage to fish, wildlife, and plants, including their habitats. Prior to the commencement of activities, consult with the Installation Environmental Office, regarding rare species or sensitive habitats that need to be protected. The protection of rare, threatened, and endangered animal and plant species identified, including their habitats, is the Contractor's responsibility.
Preserve the natural resources within the project boundaries and outside
SECTION 01 57 19 Page 15 the limits of permanent work. Restore to an equivalent or improved condition upon completion of work that is consistent with the requirements of the Installation Environmental Office or as otherwise specified.
Confine construction activities to within the limits of the work indicated or specified.
3.1.1 Flow Ways
Do not alter water flows or otherwise significantly disturb the native habitat adjacent to the project and critical to the survival of fish and wildlife, except as specified and permitted.
3.1.2 Vegetation
Except in areas to be cleared, do not remove, cut, deface, injure, or destroy trees or shrubs without the Contracting Officer's permission. Do not fasten or attach ropes, cables, or guys to existing nearby trees for anchorages unless authorized by the Contracting Officer. Where such use of attached ropes, cables, or guys is authorized, the Contractor is responsible for any resultant damage.
Protect existing trees that are to remain to ensure they are not injured, bruised, defaced, or otherwise damaged by construction operations. Remove displaced rocks from uncleared areas. Coordinate with the Contracting Officer and Installation Environmental Office to determine appropriate action for trees and other landscape features scarred or damaged by equipment operations.
3.1.3 Streams
Stream crossings must allow movement of materials or equipment without violating water pollution control standards of the JEGS and applicable, Federal, and GOJ national and prefectural laws and regulations, and installation requirements. Construction of stream crossing structures must be in compliance with JEGS, applicable Federal and GOJ national and prefectural laws and regulations, and installation requirements.
The Contracting Officer's approval and applicable local permits are required before any equipment will be permitted to ford live streams. In areas where frequent crossings are required, install temporary culverts or bridges. Obtain Contracting Officer's approval prior to installation.
Remove temporary culverts or bridges upon completion of work, and repair the area to its original condition unless otherwise required by the Contracting Officer.
3.2 STORMWATER
Do not discharge stormwater from construction sites to the sanitary sewer. If the water is noted or suspected of being contaminated, it may only be released to the storm drain system if the discharge is specifically permitted. Obtain authorization in advance from the Installation Environmental Office for any release of contaminated water.
3.2.1 Stormwater Pollution Prevention Plan
Submit a project-specific Stormwater Pollution Prevention Plan (SWPPP) to the Contracting Officer for approval, prior to the commencement of work.
The SWPPP must meet the requirements of JEGS and installation's SWPPP plans.
SECTION 01 57 19 Page 16
Include the following:
a. Comply with terms of the installation SWPPP for stormwater discharges from construction activities. Prepare SWPPP in accordance with installation requirements.
b. Select applicable BMPs from JEGS and/or installation SWPPP.
3.2.2 Inspection Reports
Submit "Inspection Reports" to the Contracting Officer in accordance with JEGS and applicable GOJ or Local Laws and Regulations.
] 3.2.3 Erosion and Sediment Control Measures
Provide erosion and sediment control measures in accordance with GOJ, Federal, and Local prefecture laws and regulations, and JEGS. Preserve vegetation to the maximum extent practicable.
Erosion control inspection reports may be compiled as part of a stormwater pollution prevention plan inspection reports.
3.2.3.1 Erosion Control
Prevent erosion by mulching, compost blankets, geotextiles, or temporary slope drains. Stabilize slopes by sodding or seeding, or a combination of these methods necessary for effective erosion control. Provide seeding in accordance with Section 32 92 19 SEEDING. Use of hay bales is prohibited. Any disturbed area with exposed soil that is not being worked on must be seeded or sodded no later than two weeks from the last disturbance regardless of the installation of any other erosion control measures in place. Remove any temporary measures after the area has been stabilized. No "red soil" shall be allowed to leave the site through runoff.
3.2.3.2 Sediment Control Practices
Implement sediment control practices to divert flows from exposed soils, temporarily store flows, or otherwise limit runoff and the discharge of pollutants from exposed areas of the site. Implement sediment control practices prior to soil disturbance and prior to creating areas with concentrated flow, during the construction process to minimize erosion and sediment laden runoff. Best Management Practices (BMPs) may include, but not limited to, vegetation cover, stream bank stabilization, slope stabilization, silt fences, construction of terraces, interceptor channels, sediment traps, inlet and outfall protection, diversion channels, and sedimentation basins.
3.2.4 Work Area Limits
Mark the areas that need not be disturbed under this Contract prior to commencing construction activities. Mark or fence isolated areas within the general work area that are not to be disturbed. Protect monuments and markers before construction operations commence. Where construction operations are to be conducted during darkness, any markers must be visible in the dark. Personnel must be knowledgeable of the purpose for marking and protecting particular objects.
SECTION 01 57 19 Page 17
3.2.5 Contractor Facilities and Work Areas
Place field offices, staging areas, stockpile storage, and temporary buildings in areas designated on the drawings or as directed by the Contracting Officer. Move or relocate the Contractor facilities only when approved by the Government. Provide erosion and sediment controls for onsite borrow and spoil areas to prevent sediment from entering nearby waters. Control temporary excavation and embankments for plant or work areas to protect adjacent areas.
3.3 SURFACE AND GROUNDWATER
3.3.1 Cofferdams, Diversions, and Dewatering
Construction operations for dewatering, removal of cofferdams, tailrace excavation, and tunnel closure must be constantly controlled to maintain compliance with existing water quality standards and designated uses of the surface water body. Comply with water quality standards and anti-degradation provisions. Do not discharge excavation ground water to the sanitary sewer, storm drains, or to surface waters without prior specific authorization in writing from the Installation Environmental Office. Discharge of hazardous substances will not be permitted under any circumstances. Use sediment control BMPs to prevent construction site runoff from directly entering any storm drain or surface waters.
If the construction dewatering is noted or suspected of being contaminated, it may only be released to the storm drain system if the discharge is specifically permitted. Obtain authorization for any contaminated groundwater release in advance from the Installation Environmental Officer. Discharge of hazardous substances will not be permitted under any circumstances.
3.3.2 Waters of Japan
Do not enter, disturb, destroy, or allow discharge of contaminants into waters of Japan[.][, except as authorized herein. The protection of waters of Japan shown on the drawings in accordance with paragraph LICENSES AND PERMITS is the Contractor's responsibility. Authorization to enter specific waters of Japan identified does not relieve the Contractor from any obligation to protect other waters of Japan within, adjacent to, or in the vicinity of the construction site and associated boundaries.]
3.4 PROTECTION OF CULTURAL RESOURCES
3.4.1 Archaeological Resources
If, during excavation or other construction activities, any previously unidentified or unanticipated historical, archaeological, and cultural resources are discovered or found, activities that may damage or alter such resources will be suspended. Resources covered by this paragraph include, but are not limited to: any human skeletal remains or burials;
artifacts; shell, midden, bone, charcoal, or other deposits; rock or coral alignments, pavings, wall, or other constructed features; and any indication of agricultural or other human activities. Upon such discovery or find, immediately notify the Contracting Officer so that the appropriate authorities may be notified and a determination made as to their significance and what, if any, special disposition of the finds should be made. Cease all activities that may result in impact to or the destruction of these resources. Secure the area and prevent employees or
SECTION 01 57 19 Page 18 other persons from trespassing on, removing, or otherwise disturbing such resources. The Government retains ownership and control over archaeological resources.
3.5 AIR QUALITY
Equipment operation, activities, or processes will be in accordance with JEGS and all applicable Federal, GOJ national or prefectural air emission and performance laws and regulations.
3.5.1 Oil or Dual-fuel Boilers and Furnaces
Provide product data and details for new, replacement, or relocated fuel fired boilers, heaters, or furnaces to the Installation Environmental Office (Air Program Manager) through the Contracting Officer. Data to be reported include: equipment purpose (water heater, building heat, process), manufacturer, model number, serial number, fuel type (oil type, gas type) size (MMBTU heat input). Product data shall be provided prior to equipment installation.
3.5.2 Burning
Burning is prohibited on the Government premises.
3.5.3 Class I [and II ]ODS Prohibition
Class I [and II ]ODS are Government property and must be returned to the Government for appropriate management. Coordinate with the Installation Environmental Office to determine the appropriate location for turn in of all reclaimed refrigerant.
3.5.4 Accidental Venting of Refrigerant
Accidental venting of a refrigerant is a release and must be reported immediately to the Contracting Officer.
3.5.5 Training/Certification Requirements
Heating and air conditioning technicians must be trained to meet requirements in JEGS Chapter 2, C2.3.6.1. Maintain copies of certifications at the employees' places of business; technicians must carry certification wallet cards, as provided by GOJ national or prefectural laws and regulations.
3.5.6 Dust Control
Keep dust down at all times, including during nonworking periods. Dry power brooming will not be permitted. Instead, use vacuuming, wet mopping, wet sweeping, or wet power brooming. Air blowing will be permitted only for cleaning nonparticulate debris such as steel reinforcing bars. Only wet cutting will be permitted for cutting concrete blocks, concrete, and bituminous concrete. Do not unnecessarily shake bags of cement, concrete mortar, or plaster.
3.5.6.1 Particulates
Dust particles, aerosols and gaseous by-products from construction activities, and…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .