Attachment6.Construction_Narrative_Guidelines.pdf
PDF 223 KB Posted
- Attached to
- Mini-Multiple Award Construction Contract, Kadena AB, Okinawa, Japan Federal contract opportunity
- Solicitation number
- FA5270-14-R-0019
About this file
Attachment 6 for Draft RFP Construction Narrative Guidlines
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Synopsis.pdf | ||
| Revised_Question_and_Answer_Draft_RFP.pdf | ||
| Question_and_Answer_Draft_RFP.pdf | ||
| Mini-MACC_Information_for_calling_DSN_from_Japanese_Commercial_Telephone_Number.14Apr14.pdf | ||
| Attachment8.Past_Pefrormance_Questionnaire.pdf | ||
| Attachment3.Mini-MACC_Price_Proposal_for_Sample_Project.pdf | ||
| Attachment7.Past Current_Projects'_List.pdf | ||
| Attachment1.Mini-MACC_Specifications.pdf | ||
| Attachment4.Instruction_for_Prime_Contractor_Statement_of_Capabilities_and_Subcontractor_integration_Plan.pdf | ||
| Attachment2.Mini-MACC_Sample_Project.pdf | ||
| Attachment5.Instruction_for_10__Design.pdf | ||
| Draft_RFP_for_Market_Research.Mini-MACC.21Mar14.doc.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA5270-14-R-0019
Attachment 6 14 Jan 2014
CONSTRUCTION NARRATIVE GUIDELINES
The Construction Narrative is an important part of an Offeror’s Proposal Package. The Construction Narrative indicates to the Government that the Offeror has a well structured plan for completing the proposed project. The Narrative must be written in English and should (at a minimum) include the following information:
Included (Check)
Basic description of the project o Project Number and Name o Project Location o Project Summary
Description of existing conditions o Topography o Vegetation and landscaping retention plan o Environmental concerns o Critical or sensitive areas like wetlands and geologic hazards
Include a plan for regulating and/or treating storm-water runoff o Description of existing improvements or structures on the site and their condition
Infrastructure o Describe any infrastructure improvements, including o Street and frontage improvements o Water, sewer, and power improvements o Other utility impacts / improvements
Construction Methods and Procedures o Describe construction process from concept to completion identifying key trades and tasks required to complete the project (i.e., surveying, excavation, grading, forming, masonry, etc.)
o Include safety requirements and Personal Protective Equipment PPE use
Quality Controls o Identify process of ensuring only high-quality materials and workmanship is provided to the Government o Describe inspection and surveillance of work procedures o Identify acceptance, rejection, documentation, and resolution of deficiencies processes and procedures
File details come from the government source that posted it. Updated .