Att 2 - Statement of Work_Scoreboards for Football B10026A_Softball B21024_14JUL2025.pdf

PDF 276 KB Posted

Attached to
36 FSS Football Scoreboard & Softball Scoreboard
Solicitation number
FA524025QM133
Issued by

About this file

This Statement of Work details the replacement of scoreboards at two fields on Andersen Air Force Base in Guam. The contractor is required to remove and dispose of existing football and softball scoreboards and install new ones: a 24' x 8' football scoreboard at location B10026A and a 15' x 6'6" softball scoreboard at location B21024. Specific requirements include ensuring power connections, wireless controller compatibility, and troubleshooting wiring and connections. The work must be coordinated with FSS/CES representatives to minimize business disruption, with all damaged items repaired or replaced at no additional cost to the government.

Key operational details include normal work hours from 0730 to 1630, Monday through Friday, excluding federal holidays. The contractor must provide a point of contact who can respond on-site within 1 hour during duty hours and 2 hours during non-duty hours. Security requirements are stringent, including base traffic law compliance, prohibition of weapons, proper identification, and adherence to controlled/restricted area procedures. The point of contact for this project is MSgt Elizabeth Townsend, contactable at elizabeth.townsend_saeteros@us.af.mil or 671-366-6220.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

SCOREBOARDS FOR FOOTBALL B10026A AND SOFTBALL B21024

FIELDS

ON

ANDERSEN AFB, GUAM

Table of Contents

1. DESCRIPTION OF SERVICES

1.1 REQUIREMENTS:

1.2 LIABILITY:

1.3 GOVERNMENT FURNISHED SERVICES:

2. GENERAL INFORMATION

2.1 HOURS OF OPERATION:

2.2 CONTRACTOR PERSONNEL:

3. SECURITY

3.1 PASS AND IDENTIFICATION ITEMS:

3.2 RETRIEVING IDENTIFICATION MEDIA:

3.3 TRAFFIC LAWS:

3.4 WEAPONS, FIREARMS, AND AMMUNITION:

3.5 FOR OFFICIAL USE ONLY (FOUO):

3.6 REPORTING REQUIREMENTS:

3.7 PHYSICAL SECURITY:

3.8 CONTROLLED/RESTRICTED AREAS:

3.9 MILITARY EXERCISES:

1. DESCRIPTION OF SERVICES

1.1 REQUIREMENTS:

The contractor shall provide all labor, materials, equipment, permit and clearances, architectural and engineering services, transportation, supervision, and other incidental work required for the project. Other incidental work required includes all items and considerations necessary to ensure a complete and usable final product, including, but not limited to, the necessary design considerations not specifically stated elsewhere in this statement of work. Complete and usable final product means that the completed final product is finished throughout and can be used to fully satisfy the requirements and the intended purpose of the project.

The Contractor shall provide all resources (except as may be expressly stated in the contract as furnished by the Government) necessary to deliver and perform the work in accordance with the minimum requirements identified below. This includes but is not limited to financial resources, overall oversight and management or other resources including subcontractors that may affect performance of the instant acquisition.

Building 1621: Provide labor, tools, and temporary equipment to remove and dispose of scoreboards and install new scoreboards. Details of work as follows:

a. Remove and dispose of the old football and softball scoreboards

b. Provide a 24’ x 8’ football scoreboard and 20’ x 8’ softball scoreboard 15' x 6'6'' softball scoreboard

c. Install 24’ x 8’ football scoreboard at B10026A

d. Install 20’ x 8’ softball scoreboard at B21024 Install a 15' x 6'6'' softball scoreboard at B21024

e. Ensure power source is connected to each scoreboard

f. Ensure wireless controller and scoreboard are connected for each

g. Trouble shoot wiring/connections to ensure devices at each location work

h. Contractor shall coordinate closely with FSS/CES representatives to form a work schedule to minimize time business operations will be closed.

i. Contractor shall repair or replace items damaged to meet the standards outlined in this requirement.

All damaged work shall be replaced, repaired, and restored to its original conditions at no additional cost to the Government.

j. All debris shall be disposed of properly at an approved off base disposal site location at no additional cost to the government.

Point of Contact:

MSgt Elizabeth Townsend; elizabeth.townsend_saeteros@us.af.mil or 671-366-6220

1.2 LIABILITY:

The contractor shall be liable for any damages resulting from any carelessness or failure to follow proper safety, installation, engineering, or maintenance procedures and standards.

1.3 GOVERNMENT FURNISHED SERVICES:

1546225824C Cross-Out

1546225824C Cross-Out

1546225824C Cross-Out

The government will provide emergency medical transportation and treatment if required. The contractor shall reimburse the Government for the cost of these medical services at current rates.

2. GENERAL INFORMATION

2.1 HOURS OF OPERATION:

The normal hours of operation for the project are from 0730 to 1630, Monday through Friday, excluding federal holidays and PACAF Family days.

2.2 CONTRACTOR PERSONNEL:

The contractor shall provide point of contact (POC) for all contractual matters during all hours of operation. The POC shall respond on-site within 1 hour during normal duty hours of operation and within 2 hours during non-duty hours to discuss concerns with government personnel designated by the CO to discuss problem areas.

3. SECURITY

3.1 PASS AND IDENTIFICATION ITEMS:

The contractor shall ensure the pass and identification items required for contract performance are obtained for employees.

3.2 RETRIEVING IDENTIFICATION MEDIA:

The contractor shall return all identification media and/or visitor passes from employees who depart for any reason before the contract expires; i.e. terminated for cause, reassignment, retirement, etc.

3.3 TRAFFIC LAWS:

The contractor and its employees shall comply with base traffic regulations. Traffic regulations include, but are not limited to:

· Employees shall wear seatbelts when operating or riding in any vehicle (military, company or private owned) while on installation.

· Speed limits on Andersen AFB are 25 MPH unless otherwise posted. Be aware of reduced speed limits and exercise caution when driving in base housing and school zones.

· All vehicle operators on the installation shall not use cell phones unless the vehicle is safely parked or they are using a 100% hands free device. The wearing of any other portable headphones, earphones or other listening devices while operating a motor vehicle is prohibited.

3.4 WEAPONS, FIREARMS, AND AMMUNITION:

Employees are prohibited from possessing weapons, firearms, or ammunition on themselves or within vehicles (military, contractor-owned, or privately owned) while on Andersen AFB.

3.5 FOR OFFICIAL USE ONLY (FOUO):

The contractor shall comply with DoD 5400.7-R, Chapter 4, DoD Freedom of Information Act (FOIA) Program, requirements. This regulation sets policy and procedures for the disclosure of records to the public and for marking, handling, transmitting, and safeguarding FOUO material.

3.6 REPORTING REQUIREMENTS:

Contractor personnel shall report to an appropriate authority any information or circumstances of which they are aware may pose a threat to the security of DoD personnel, contractor personnel, resources, and classified/unclassified defense information. Employees shall be briefed by their immediate supervisor upon initial on-base assignment.

3.7 PHYSICAL SECURITY:

The contractor shall be responsible for safeguarding all Government property and controlled forms provided for contractor use. At the end of each work period, all Government facilities, equipment and materials shall be secured.

3.8 CONTROLLED/RESTRICTED AREAS:

The contractor shall implement local base procedures for entry to AF Controlled/Restricted areas where contractor personnel will work. An AF Form 2586, Unescorted Entry Authorization Certificate, must be completed and signed by 36 FSS security manager before restricted area badges (RAB) will be issued. Employees must have a completed and favorable NACI investigation before receiving a RAB. Interim access can be granted in accordance with AFI 31- 501, Personnel Security Program Management.

3.9 MILITARY EXERCISES:

No compensation will be claimed for any delays resulting from re-entry procedures due to exercises.

1. DESCRIPTION OF SERVICES
1.1 REQUIREMENTS:
1.2 LIABILITY:
1.3 GOVERNMENT FURNISHED SERVICES:
2. GENERAL INFORMATION
2.1 HOURS OF OPERATION:
2.2 CONTRACTOR PERSONNEL:
3. SECURITY
3.1 PASS AND IDENTIFICATION ITEMS:
3.2 RETRIEVING IDENTIFICATION MEDIA:
3.3 TRAFFIC LAWS:
3.4 WEAPONS, FIREARMS, AND AMMUNITION:
3.5 FOR OFFICIAL USE ONLY (FOUO):
3.6 REPORTING REQUIREMENTS:
3.7 PHYSICAL SECURITY:
3.8 CONTROLLED/RESTRICTED AREAS:
3.9 MILITARY EXERCISES:

File details come from the government source that posted it. Updated .