About this file

This is an architectural floor plan drawing from the US Army Corps of Engineers for a renovation project covering 3,051.2 square meters on Level 1 of a building. Key renovation details include replacing acoustical ceiling tiles (except in specific rooms 170, 171, 172, and 173), installing new 610mm x 610mm carpet tiles (with exceptions), and repainting existing interior surfaces. The project will be conducted while the building remains occupied, requiring careful sequencing and coordination to prevent disruption of ongoing operations. The drawing includes general sheet notes specifying existing condition verification, construction constraints, and specific requirements for ductwork penetrations, wall treatments, and preservation of certain areas like the historic hangar.

View the file

Other files for this federal contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

G

F

E

D

N

B

A

1 2 3

(,) G) G)

0-- I I I

0-- - - --r::, •-•I=[==]==="-=

0-- --e

2 3

FLOOR PLAN - LEVEL 1 - OVERALL

1:150

4 5 6

G) 5 G)

II

I

11======�

___ e

� _J]

---'--I 11--f-+-t-H--++-H+

_Jlrl _n

3.4 4 2

G)

I

1, 1, """"fi'==..;;a;a;a;;;;;;;aaa-a="" f

G),++++1-ir..,_

G)

_J

&A 'B' IREJi'D'

---G

- --0

- ----0

-(D .L:::,,.

A1 A-30

- --0

--0

- ---G

9 10

GENERAL SHEET NOTES

A. EXISTING CONDITIONS ARE SHOWN BASED ON AS-BUILT DRAWINGS AND BEST

AVAILABLE INFORMATION PROVIDED BY OTHERS.

B. FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO COMMENCEMENT OF WORK.

C. ALL ACOUSTICAL CEILING TILES SHALL BE REPLACED EXCEPT IN ROOMS 170, 171,

172 AND 173. CEILING GRIDS SHALL BE REPLACED WHERE INDICATED. REPLACE

CEILING GRIDS IN ANY AREA DAMAGED BY THE WORK AT NO ADDITIONAL COST TO

THE GOVERNMENT. REFER TO ROOM FINISH SCHEDULE.

D. ALL CARPET SHALL BE REPLACED WITH NEW 610mm x 610mm CARPET TILE EXCEPT

IN ROOMS 170,171,172,173 AND 120.

E. ALL EXISTING PAINTED SURFACES OF THE BUILDINGS INSIDE THE HANGAR SHALL

BE REPAINTED UNO. THE HISTORIC HANGAR SHALL NOT BE PAINTED OR

OTHERWISE AFFECTED BY THE WORK UNO

F. THE BUILDING WILL REMAIN OCCUPIED DURING CONSTRUCTION. SEE DRAWINGS

G-101 AND G-102 AND SPECIFICATIONS FOR SEQUENCING OF THE WORK AND

COORDINATION WITH USERS TO PREVENT DISRUPTION OF ONGOING OPERATIONS.

G. FOR WALL TYPES, SEE A-500

H. FOR WALLS WITH ART WORK AND WHITEBOARDS TO REMAIN, SEE INTERIOR FINISH

DRAWINGS.

I. NOT ALL KEYNOTES APPLY TO ALL SHEETS (TYP. ALL SHEETS).

J. WHERE NEW DUCTWORK PENETRATES EXISTING CONSTRUCTION, OPENINGS

SHALL BE ENCLOSED TO MATCH SURROUNDING ASSEMBLY AND TO WITHIN ONE

INCH OF DUCTS UNO. AREA BETWEEN DUCTWORK AND OPENING EDGES SHALL BE

SEALED WITH COMPRESSIBLE MATERIAL OF SAME FIRE OR STC RATING AS

SURROUNDING ASSEMBLY. REFER TO MECHANICAL DRAWINGS FOR LOCATIONS

WHERE NEW DUCTWORK ARE TO BE INSTALLED THROUGH WALLS.

3051.2 Square Meter

GRAPHIC SCALE

0 150

KEY PLAN

PLAN

NORTH

300 450

1:150

Hargreaves

US Army Corps of Engineers•

SHEET ID

e j Oz0

0"' - 0 !;-

u. -w "' :, 0"' "' <!l I':/ if:

o f

A-110� @ mL._ _________________________________________________________________________________ .L::::::::.... _____ ...,'.. ____ _JL_::::::::::__1..::::====:J

RTA

File details come from the government source that posted it. Updated .