FA5215-18-R-9004_01_-_Rubber_Removal_Amendment.pdf

PDF 410 KB Posted

Attached to
AFICA Runway Rubber Removal and Airfield Painting at Wake Island
Solicitation number
FA5215-18-R-9004
Issued by

About this file

Amended Solicitation

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

F1W6CC8116AW01

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

Corrections to Sections L and M - remove extension of services language as this is a single effort contract, and J - to add the attachments list. This amendment also changes the CLIN structure for pricing. Corrections to Statement of Work and guidance changed to UFC 3-260-04.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 15

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 26-Jul-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA521518R9004

X 9B. DATED (SEE ITEM 11)

27-Jun-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

26-Jul-2018

CODE

FA5215 - 766TH SCONS

10480 SIJAN AVE

STE 247

JB ELMENDORF/RICHARDSON AK 99506

FA5215 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

FA521518R9004

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION A - SOLICITATION/CONTRACT FORM

The required response date/time has changed from 27-Jul-2018 02:00 PM to 07-Aug-

2018 01:00 PM.

The required performance has changed from Paint the Airfield and remove rubber deposit buildup from the Runway at Wake Island IAW SOW. Painting needs to include the

Runway to meet Non-Precision Instrument Approach standards IAW ETL 04-2, Para 6. The taxiway and Aprons also need to be repainted to meet ETL 04-2, Para 7. to include taxiway directional markings IAW ETL 04-2, Para 7.4.Total Small Business set-aside IAW DFARS

219.502-2(i).In accordance with FAR 36.204(e) Magnitude of Construction Projects, the price range of this project is anticipated to be between $500,000 and $1,000,000. Notice to Offerors:

The Government reserves the right to cancel this slicitation, either before or after the closing date. In the event the Government cancels this solicitation, the Government has no obligation to reimburse an offeror for any costs. to Paint the Airfield and remove rubber deposit buildup from the Runway at Wake Island IAW Statement of Work (SOW) dated 26 July 2018. Painting needs to include the Runway to meet Non-Precision Instrument Approach standards IAW UFC 3-260-

04 The taxiway and Aprons also need to be repainted to meet UFC 3-260-04 to include taxiway directional markings IAW UFC 3-260-04.Total Small Business set-aside IAW DFARS 219.502-

2(i).In accordance with FAR 36.204(e) Magnitude of Construction Projects, the price range of this project is anticipated to be between $500,000 and $1,000,000. Notice to Offerors: The

Government reserves the right to cancel this solicitation, either before or after the closing date. In the event the Government cancels this solicitation, the Government has no obligation to reimburse an offeror for any costs..

SECTION B - SUPPLIES OR SERVICES AND PRICES

CLIN 0001

The CLIN description has changed from WI Airfield Painting and rubber removal to Mobilization.

The CLIN extended description has changed from:

WAKE ISLAND AIRFIELD PAINTING AND RUBBER REMOVAL IAW SOW

To:

All Mobilization costs. The contractor shall provide all labor, materials, equipment, supervision, and transportation necessary to accomplish project Airfield Paint and Rubber Removal at Wake Island, in accordance with the attached

Statement of Work dated 26 July 2018.

The unit of issue has changed from Each to Job.

CLIN 0002 is added as follows:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0002 1 Job Paint Removal

FFP

The contractor shall provide all labor, materials, equipment, supervision, and transportation necessary to accomplish project Airfield Paint and Rubber Removal at Wake Island, in accordance with the attached Statement of Work dated 26 July

2018..

FOB: Destination

SIGNAL CODE: a

NET AMT

CLIN 0003 is added as follows:

0003 1 Job Rubber removal

FFP

The contractor shall provide all labor, materials, equipment, supervision, and transportation necessary to accomplish project Airfield Paint and Rubber Removal at Wake Island, in accordance with the attached Statement of Work dated 26 July

2018.

CLIN 0004 is added as follows:

0004 1 Job Painting, Reflective - Type I

FFP

Painting, Reflective - Line item includes costs and work associated with reflective painting, to include but not limited to surface preparation, painting, masking and layout using Type I Glass Beads. The contractor shall provide all labor, materials, equipment, supervision, and transportation necessary to accomplish project

Airfield Paint and Rubber Removal at Wake Island, in accordance with the attached Statement of Work dated 26 July 2018.

CLIN 0005 is added as follows:

0005 1 Job Painting, Reflective - Type III

FFP

Painting, Reflective - Line item includes costs and work associated with reflective painting, to include but not limited to surface preparation, painting, masking and layout using Type III Glass Beads. The contractor shall provide all labor, materials, equipment, supervision, and transportation necessary to accomplish project

Airfield Paint and Rubber Removal at Wake Island, in accordance with the attached Statement of Work dated 26 July 2018.

CLIN 0006 is added as follows:

0006 1 Job Travel

FFP

Travel. The contractor shall provide all labor, materials, equipment, supervision, and transportation necessary to accomplish project Airfield Paint and Rubber

Removal at Wake Island, in accordance with the attached Statement of Work dated

26 July 2018.

CLIN 0007 is added as follows:

0007 1 Job Demobilization

FFP

Removal of all equipment and supplies; waste disposal costs. The contractor shall provide all labor, materials, equipment, supervision, and transportation necessary to accomplish project Airfield Paint and Rubber Removal at Wake Island, in accordance with the attached Statement of Work dated 26 July 2018.

SECTION E - INSPECTION AND ACCEPTANCE

The following Acceptance/Inspection Schedule was added for CLIN 0002:

INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

Destination Government Destination Government

The following Acceptance/Inspection Schedule was added for CLIN 0003:

The following Acceptance/Inspection Schedule was added for CLIN 0004:

The following Acceptance/Inspection Schedule was added for CLIN 0005:

The following Acceptance/Inspection Schedule was added for CLIN 0006:

The following Acceptance/Inspection Schedule was added for CLIN 0007:

SECTION F - DELIVERIES OR PERFORMANCE

The following Delivery Schedule for CLIN 0002 has been added:

DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

90 dys. ANP 1 F1W6CC - 611TH CIVIL ENGINEER

SQUADRON

10471 20TH STREET

SUITE 302

ELMENDORF AFB AK 99506

F1W6CC

The following Delivery Schedule for CLIN 0003 has been added:

10471 20TH STREET

SUITE 302

ELMENDORF AFB AK 99506

The following Delivery Schedule for CLIN 0004 has been added:

10471 20TH STREET

SUITE 302

ELMENDORF AFB AK 99506

The following Delivery Schedule for CLIN 0005 has been added:

10471 20TH STREET

SUITE 302

ELMENDORF AFB AK 99506

The following Delivery Schedule for CLIN 0006 has been added:

10471 20TH STREET

SUITE 302

ELMENDORF AFB AK 99506

The following Delivery Schedule for CLIN 0007 has been added:

10471 20TH STREET

SUITE 302

ELMENDORF AFB AK 99506

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

Table of Contents has been deleted

SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS

The following have been added by reference:

52.204-23

The following have been modified:

INSTRUCTIONS TO OFFERORS

Section L - Instructions, Conditions, and Notices to Offerors

(Non-commercial)

L PROPOSAL PREPARATION INSTRUCTIONS

A. To assure timely and equitable evaluation of proposals, offerors must follow the instructions contained herein.

Offerors are required to meet all solicitation requirements, including terms and conditions, representations and certifications, and technical requirements, in addition to those identified as evaluation factors or subfactors.

Offerors must clearly identify any exception to the solicitation terms and conditions and provide complete accompanying rationale. The response shall consist of three (3) separate parts; Part I - Price Proposal, PART II –

Technical Proposal, and PART III –Past Performance Proposal.

B. Specific Instructions:

1. PART I – PRICE PROPOSAL - Submit 1 electronic copy. No page limit.

(a) Complete blocks 14, 15, 17, 18, 20, and 30 of RFP Section A, SF1442. In doing so, the offeror agrees to the contract terms and conditions as written in the RFP Sections

A through K, with amendments. These sections constitute the model contract. Block

22 should not be filled in since two types of beads are being evaluated and only one will be included in any contract award.

(b) Insert proposed unit prices in RFP Section B for each Contract Line Item Numbers

(CLINs). The extended amount must equal the whole dollar unit multiplied by the number of units. The contract award is expected to be awarded using a single CLIN that encompasses the entire scope of work using a single type of bead.

(c) Contractor shall provide a detailed breakout of all direct and indirect cost elements showing how the total contract price was developed. This includes but not limited to:

Mobilization/Demobilization, equipment rentals, labor cost identified by SCA or

CBA work classification, material, bonds, permits, insurance, travel cost and per-diem, overhead and profit factors. Labor exempt from SCA shall be labeled as such.

If available, a copy of any DCAA audit reports supporting overhead rates shall be included. Cost breakout shall be structured to match solicitation CLIN structure.

(d) This solicitation requires the contractor to propose the total effort using Type I beads or Type III beads. The contractor shall submit a price proposal that shows a total cost using Type I beads (CLIN 0004) and a price proposal using Type III beads (CLIN

0005). The Government will conduct a price analysis comparing the cost difference between the two types of beads and will make award using only a single type of bead.

Contract award will only include CLIN 0004 or CLIN 0005, not both. The price proposals for each type of bead may be included in the single Part I Price Proposal.

(e) In accordance with 52.204-7, System for Award Management, Registration online representation and certification is required. SAM must be completed as of the date of the offer. SAM can be accessed through https://www.sam.gov.

2. PART II – TECHNICAL PROPOSAL – Submit 1 electronic copy. Limit 30 pages.

1. Technical Proposal:

(a) The offeror's proposal shall include their execution plan from start to finish of the project. It needs to include their transportation plan of equipment and supplies, both to island and return from island upon completion of the work. It shall also include the exit plan, addressing the steps they are proposing for handling and disposal of waste from the island.

(b) The offeror shall provide a schedule including the lead time for equipment and materials from the date of notice of award to delivery to Wake Island and completion of the project. Contractor must provide their own equipment for loading/unloading equipment or sub-contract with the Wake Island ISS contractor and include that price in their proposal.

2. Technical Acceptability:

(a) The Government will evaluate the technical proposal for conformance to the specification and IAW the

Statement of Work.

1. PART III – PAST PERFORMANCE PROPOSAL - Submit 1 electronic copy. Limit

10 pages.

Submit a maximum of three (3) references for recent and relevant past efforts/contracts.

The government will evaluate the quality and extent of offeror’s performance deemed recent and relevant to the requirements of this RFP. Recent performance is performance conducted with in the last three (3) years. Relevant performance includes performance of efforts involving supervision, quality control, labor, tools, equipment, materials, and performance of all work necessary for Rubber Removal and Line Striping projects that are similar or greater in scope, magnitude and complexity to the effort described in this solicitation. The government will use information submitted by the offeror and other sources such as other Federal government offices and commercial sources, to assess performance.

(a) Quality and Satisfaction Rating of Contracts Performed in the Past Three (3) Years: Provide any information currently available (letters, metrics, customer surveys, independent surveys, etc.) that demonstrates customer satisfaction with overall job performance and/or quality of completed and/or ongoing contracts. In addition, explain corrective actions taken in the past, if any, for substandard performance and any current performance problems, such as cost overruns, extended performance periods, numerous warranty calls, etc. (See Sec

M, paragraph C.)

(b) Performance Surveys/Questionnaires: Past Performance Questionnaires (PPQs) may be used by the offeror in obtaining and providing past performance information. The government requires the offeror send out a

PPQ to each of the Points-of-Contact (POCs) identified in the Past Performance Proposal (paragraph (c) below).

The offeror shall send out the PPQ (Attachment J-5) to each of its references.

THE RESPONSIBILITY TO SEND OUT THE PAST PERFORMANCE QUESTIONNAIRE

RESTS SOLELY WITH THE OFFEROR.

Once the questionnaires are completed by the POCs, the information contained therein will be considered source selection sensitive and will not be released outside the Government. The

POCs shall forward their completed questionnaires directly to the government – NOT BACK TO

THE OFFEROR.

PPQs shall be sent directly from your reference to this office marked to the attention of Jeannette

Morphew, via e-mail to jeannette.morphew@us.af.mil or MSgt Robert Bleichner, robert.bleichner@us.af.mil

(c) Past Performance Information: Provide a list of no more than three (3) of the most relevant contracts performed for any customer.

Furnish the following information for each contract listed:

(1) Company/Division name

(2) Product/Service

(3) Contracting Agency/Customer

(4) Contract Number

(5) Contract Dollar Value

(6) Period of Performance

(7) Verified, up-to-date name, mailing and e-mail addresses, and telephone number of the contracting officer

(Point-of-Contact)

(8) Comments regarding compliance with contract terms and conditions

(9) Comments regarding any known performance deemed unacceptable to the customer, or not in accordance with the contract terms and conditions.

(10) Include rationale supporting your assertion of relevance and identify aspects (scope, magnitude of effort, and complexity) of the contracts deemed relevant and how they relate to the proposed effort.

If an offeror has no past performance history of relevance, the offeror must state affirmatively it possesses no past performance history of relevance.

(d) If a teaming arrangement is contemplated, provide complete information as to the arrangement, including any relevant and recent past performance information on previous teaming arrangements with same partner. If this is a first time joint effort, each party to the arrangement must provide a list of past contracts of relevance.

(e) Subcontractor Consent: Past performance information pertaining to a subcontractor cannot be disclosed to the prime offeror without the subcontractor’s consent. Provide with the proposal a letter from each mailto:jeannette.morphew@us.af.mil mailto:robert.bleichner@us.af.mil subcontractor that will perform major or critical aspects of the requirement, consenting to the release of its past performance information to the prime contractor.

C. Documents submitted in response to this RFP must be consistent with the following:

1. Requirements of the solicitation (CLINs and PWS) and government standards and regulations pertaining to the PWS.

2. Evaluation Factors for Award in Section M of this solicitation.

3. If a Part in a proposal exceeds the specified page limit cited in the Part Content, the excessive pages will not be evaluated.

4. Format for proposal Parts I, II, and III shall be as follows:

(a) Each Part of the proposal shall contain a Table of Contents, Cross References, and the List of Tables and Drawings (if applicable). Cover pages, Table of Contents, and Tabs will not be counted against the page limits. However, pages depicting tables, charts, graphs and figures will count toward the page limit. The number of copies of each part is specified in paragraph B, Specific Instructions, above.

(b) The proposals will be 8 1/2” x 11” format size, except for fold-outs used for charts, tables, or diagrams, which may not exceed 11” x 17”.

(c) Written entries shall not be less than 11 font size. Size of print is applicable to charts and graphs.

(d) Page margins shall be a minimum of 1 inch top, bottom, and each side.

(e) One electronic copy of each Part of the entire offer must be submitted. The electronic version of the proposal shall be submitted in a format readable by Microsoft Office

2013 which includes software programs such as Word, Excel, or PowerPoint. For those pages of the proposal that cannot be submitted using Microsoft Office, such as the Standard Form 1442, offerors shall include those pages electronically using Adobe Acrobat portable document files

(.pdf) format. The Price Part shall be submitted in Excel spreadsheet format and MS Word for price narrative. Email the file(s) by the solicitation closing date and time to the following email address: jeannette.morphew@us.af.mil and robert.bleichner@us.af.mil. Offerors may also transfer proposals through the AMRDEC SAFE file exchange at https://safe.amrdec.army.mil/safe/. Offerors should verify proposal receipt before the closing date of the solicitation.

(f) Each Part shall be complete in itself and shall not reference information contained in other Parts. Page 1 of a Part is defined as the first page after the Table of Contents. All pages shall be numbered.

(g) Price data of any kind shall be presented only in the Price Proposal Part.

(h) Elaborate formats, bindings, and color presentations are not desired or required.

(i) Documents submitted in response to this RFP must be fully responsive to and consistent with the following:

mailto:jeannette.morphew@us.af.mil mailto:robert.bleichner@us.af.mil https://safe.amrdec.army.mil/safe/

(1) Requirements of the RFP (CLINs & PWS) and Government standards and regulations pertaining to the PWS.

(2) Evaluation Factors for Award in Section M of this solicitation.

(3) Any limitation on the number of proposal pages. Pages exceeding the page limitations set forth in this Section L will not be read or evaluated, and will be removed from the proposal.

The following table summarizes the proposal submission:

52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)

This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):

http://farsite.hill.af.mil

(End of provision)

52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS (APR 1984)

(a) The use in this solicitation of any Federal Acquisition Regulation (48 CFR Chapter 1) provision with an authorized deviation is indicated by the addition of"(DEVIATION)" after the date of the provision.

(b) The use in this solicitation of any Defense Federal Acquisition Regulation (48 CFR Chapter 2) provision with an authorized deviation is indicated by the addition of "(DEVIATION)" after the name of the regulation.

(End of provision)

SECTION M - EVALUATION FACTORS FOR AWARD

The following have been modified:

PART TITLE

ELECTRONIC

COPY

PAPER

COPY

PAGE LIMIT DUE DATE

I

Price

(File Name: Part I)

X jeannette.morphew@us.af

.mil No Limit

1:00PM AK

time, 7 Aug

II

Technical

(File Name: Part II)

X jeannette.morphew@us.af

.mil 30

1:00PM AK

time, 7 Aug

III

Past Performance

(File Name: Part III)

X jeannette.morphew@us.af

.mil 10

1:00PM AK

time, 7 Aug http://farsite.hill.af.mil/ mailto:jeannette.morphew@us.af.mil mailto:jeannette.morphew@us.af.mil mailto:jeannette.morphew@us.af.mil mailto:jeannette.morphew@us.af.mil

EVALUATION FACTORS

Section M – Lowest Price Technically Acceptable (LPTA)

(Non-commercial)

M BASIS FOR CONTRACT AWARD: This is a competitive Lowest Price Technically Acceptable (LPTA) source selection conducted in accordance with Federal Acquisition Regulation (FAR) Part 15, Department of

Defense (DoD) FAR Supplement Procedures, Guidance and Information Subpart 215.3, and Air Force FAR

Supplement (AFFARS) Mandatory Procedure (MP) 5315.3. By submission of its offer in accordance with the instructions provided in provision FAR 52.215-1, Instructions to Offerors – Competitive Acquisition, the offeror accedes to the terms of this model contract. Failure to meet a requirement may result in an offer being determined unacceptable. Award will be made to the lowest Total Evaluated Price (TEP) offer that meets the acceptability standards for non-price factors. The evaluation process will include the following:

A. Technical Acceptability Factor. The government will evaluate proposals on a pass/fail basis and assign an

Acceptable or Unacceptable rating as described in Table 1 below.

Table 1. Technical Ratings

Rating Description

Acceptable Proposal meets the requirements of the solicitation.

Unacceptable Proposal does not meet the requirements of the solicitation.

B. Price Evaluation Factor. The government will rank all offers by TEP. The price evaluation will document the fairness and reasonableness of the TEP. The government reserves the right to perform price realism analysis. If the

Government elects to perform a price realism analysis, the Government reserves discretion over the method within which it performs its price realism analysis. If the Government elects to perform a price realism analysis and finds a proposal unrealistic or unbalanced, the Government may withhold award to that offeror.

Total Evaluated Price: A TEP will be computed for each offer in order to meet the requirements of FAR Parts 6.

The TEP is a two-part computation. First, the offeror’s total proposed price will be determined by multiplying the quantities identified in Section B by the unit price, limited to two decimal places, for each Contract Line Item

Number (CLIN) to confirm the extended total amount for each CLIN. Next, a TEP will be calculated for the use of

Type I beads (CLIN 0004) and a TEP will be calculated for the use of Type III beads. The TEP calculations are:

TEP USING TYPE I BEADS = SUM of CLIN 0001, 0002, 0003, 0004, 0006, 0007

TEP USING TYPE III BEADS = SUM of CLIN 0001, 0002, 0003, 0005, 0006, 0007

The Government will make a determination on which type of bead is most advantageous to the Government.

The Government will then select the LPTA proposal for award if funding is available.

The contract award is expected to be awarded using a single CLIN that encompasses the entire scope of work.

C. Past Performance Factor. The government will evaluate recent and relevant performance information on all offerors based on (i) the references provided by the offeror, and (ii) any past performance information obtained from survey/questionnaires (Attachment J-5), and (iii) any data independently obtained by the government. If a reference identified by the offeror in accordance with Sec L, paragraph B.4(c), does not submit a survey/questionnaire, the government will follow up with the reference POC, but it is not responsible for the failure of a reference POC to provide a survey/questionnaire.

(1) Recent past performance information includes contracts performed and/or being performed for any customer within the last three (3) years prior to the issuance date of the solicitation.

file://///Periwinkle/SAF_AQC_ORG/AQCP/5640%20-%20AFFARS/AFAC%20Working%20Folders%20--%20PM/far/FAR31.doc%23b522121

(2) The government will assess relevancy for each contract and assign a rating as described in Table 2 below:

Table 2. Past Performance Relevancy Ratings

Rating Rating Definition

Relevant

Present/past performance involved similar scope, magnitude of effort, and complexity that this solicitation requires.

Not Relevant

Present/past performance effort involved little or none of the scope and magnitude of effort and complexities this solicitation requires.

(3) Performance Quality Assessment: For each of the recent and relevant past performance information reviewed, the performance quality of work will be assessed based on the (i) Quality Assessment Criteria evaluated under Past Performance Survey/Questionnaire and (ii) the evaluation ratings in the Federal Past Performance

Information Retrieval System (PPIRS), if available. Each recent and relevant past performance information reviewed will be assigned a rating as described in Table 3 below:

Table 3. Quality Assessment Ratings

Rating Rating Definition

Satisfactory (S)

During the contract period, contractor performance is meeting (or met) contract requirements. For any problems encountered, contractor took effective corrective action.

Unsatisfactory (U)

During the contract period, contractor performance is not meeting (or did not meet) contract requirements. For any problems encountered, corrective action appeared only marginally effective, not effective, or not fully implemented. Customer involvement was required.

The past performance evaluation is an assessment of the offeror’s probability of meeting the solicitation requirements. Offerors must receive a past performance rating of “Acceptable” to be eligible for award. For offerors in a teaming arrangement where two or more companies form a partnership or joint venture (JV), the following will apply: (i) for a JV at least one partner must be rated “Acceptable;” and (ii) for prime-subcontractor(s) partnerships, the prime must be rated “Acceptable” in order for the partnership to be rated “Acceptable” as a whole.

As a result of the recency, relevancy, and performance quality assessments, offerors will receive an integrated past performance rating as described in Table 4 below:

Table 4, Past Performance Evaluation Ratings

Rating Description

Acceptable Based on the offeror’s performance record, the government has a reasonable expectation that the offeror will successfully perform the required effort, or the offeror’s performance record is unknown.

Unacceptable Based on the offeror’s performance record, the government has no reasonable expectation that the offeror will be able to successfully perform the required effort.

Note: In the case of an offeror without a record of relevant past performance or for whom information on past performance is not available or so sparse that no meaningful past performance rating cannot be reasonably assigned, the offeror may not be evaluated favorably or unfavorably on past performance (see FAR

15.305(a)(2)(iv)). Therefore, the offeror shall be determined to have an unknown (or “neutral”) past performance. In the context of acceptability/unacceptability, a neutral shall be considered “acceptable.”

D. Offerors are cautioned to submit sufficient information and in the format specified in Section L of this solicitation. Offerors may be asked to clarify certain aspects of their proposals. Exchanges conducted to resolve minor or clerical errors will not constitute discussions and the contracting officer reserves the right to award a contract without the opportunity for proposal revision. The government intends to award a contract without discussions with respective offerors. The government, however, reserves the right to conduct discussions if deemed in its best interest.

E. Award will be made to the lowest priced offer, based on TEP, which meets the acceptability standards for non-price factors.

(End of Summary of Changes)

File details come from the government source that posted it.