floor plan A.pdf

PDF 116 KB Posted

Attached to
Upgrade video wall for TEOCC in Bldg 714 Yokota AB, Japan
Solicitation number
FA520926Q037A
Issued by

About this file

This document is a facility layout and requirements briefing for an Operations Floor and Briefing Room at a Tactical Exploitation Operations Control Center (TEOCC). The facility consists of three main areas: a Server Room (110 sq ft), a C2 Ops Floor (876 sq ft), and an Ops Briefing Room (434 sq ft).

The C2 Ops Floor requires 16 operator workstations, 6 large operations display monitors (65" to 75"), and VTC repeater capabilities. The Ops Briefing Room must include a video wall display, an executive conference table seating 10-12 personnel with BYOD capability, a VTC operator console desk, VTC capes/data wall connectivity, and a room-based VTC system capable of extending video feeds to the C2 Ops floor displays. The facility is designed to support operational briefings and video teleconferences with senior leadership, with infrastructure to distribute video content from the briefing room to the main operations floor displays.

View the file

Other files

File Type Posted
B131 B132 Floorplan.png PNG image
Amendment3-5AFTEOCCStatementofObjectives.docx DOCX document
amendment 3COMBINEDSYNOPSISTEOCC.docx DOCX document
amendment 3SAM FA520926Q037A Yokota TEOCC upgrade RFIs 20260729.xlsx XLSX spreadsheet
Amendment 2 QA.pdf PDF
Amendment 1 - 5 AF - TEOCC Statement of Objectives (SOO).docx DOCX document
TEOCC Specifications.pdf PDF
COMBINED SYNOPSIS TEOCC.docx DOCX document
5 AF - TEOCC Statement of Objectives (SOO).docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

I n t e g r i t y - S e r v i c e - E x c e l l e n c e

Ops Floor / Briefing Rm (TEOCC)

Ops Briefing Room

UNCLASSIFIED

UNCLASSIFIED

Main Floor 875 Sq Ft

Briefing Rm 434 Sq Ft

B132 110 Sq Ft

C2 Ops Floor

Server Room

Legend

Furniture

Displays

Operator desks for ~16 personnel.

6 Operations Displays (65” to 75”) in the C2 Ops Floor Space.

1 Video Wall display in the Ops Briefing Room

1 Executive Conference Room table seating 10-12 personnel.

1 VTC operator console desk

Room base VTC system in the Ops Briefing Room with capability to extend video feeds to the C2 Ops floor displays. operations floor to brief or conduct VTCs with senior leaders.

Ops Floor 16 workstations 6 Display monitors VTC Repeater Capes

Briefing Room Conference table w/BYOD capability VTC Capes/Data Wall

File details come from the government source that posted it. Updated .