This document is a minutes of site visit memorandum for a solicitation by the 374th Airlift Wing at Yokota Air Base, Japan, detailing a site visit for an Avigilon Surveillance System procurement. The site visit occurred on 27 Aug 2025, with government representatives from the 374th Security Forces Squadron and Contacting Squadron inspecting multiple base locations including West Gate, Terminal Gate, Fussa Gate, East Gate, South Railroad Gate, and Supply Gate. Key requirements include cameras that can cover inbound and outbound traffic lanes, read vehicle license plates, and capture pedestrian activities near railroad crossings, with the specific stipulation that this will be a new, stand-alone surveillance system not connected to the Air Force network.
The solicitation (No. FA520925Q0056) has a proposal due date of 08 Sep 2025 at 02:00 PM Japan Standard Time. Vendors are advised to prepare quotation packages according to specified submission instructions in Standard Form 1449, following evaluation criteria outlined in FAR 52.212-2. Additional questions about the requirement must be submitted in writing to 374 CONS/PKBB by 29 Aug 2025, with answers to be provided to all prospective offerors. The site visit concluded at 11:50 AM, with participants given two working days to provide any corrections or additional information to the documented minutes.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Controlled Unclassified Information
DEPARTMENT OF THE AIR FORCE
374th Airlift wing
28 Aug 2025
MEMORANDUM FOR PROSPECTIVE OFFEROR
FROM: 374th Contracting Squadron
Airlift Wing Acquisition Flight Other Orgs & CE Commodities Contracting Team (374 CONS/PKBB) Unit 5228, Bldg. 620, Yokota Air Base Fussa-shi, Tokyo 197-0001
SUBJECT: Minutes of Site Visit, Solicitation No. FA520925Q0056, Avigilon Surveillance System, Yokota Air Base, Japan
1. An escorted site visit for the subject requirement was conducted on 27 Aug 2025 at Bldg. 210 and various locations/gates at Yokota Air Base, Japan. The following individuals participated in the site visit:
Government 374 SFS SrA Taylor K. Arias Government Representative (GR) 374 SFS SrA Khales E. Davis GR 374 SFS TSgt Darrien L. Gadson GR 374 CONS/PKBB Mr. Benjamin D. Warren Contracting Officer 374 CONS/PKBB Mr. Yuma Kato Contract Specialist
Prospective Offerors This is only filed internally for the Government.
2. The participants met at 09:30 AM at Bldg. 210 at Yokota Air Base, Japan. SrA Arias ensured all participants checked in at 09:45 AM. The participants entered the Base Defense Operations Center (BDOC) Server Room and confirmed the current conditions of the server room. It was emphasized by the Government that the Avigilon surveillance system would be a new, stand-alone surveillance system; therefore, it would not be connected to the Air Force network.
3. The participants moved to Bldg. 1200 (West Gate) at 10:10 AM, followed by the railroad crossing by Bldg. 1296 (Wing Operations Center (WOC)) at 10:20 AM, Bldg. 82 (Terminal Gate) at 10:30 AM, Bldg. 448 (Fussa Gate) at 10:40 AM, Bldg. 4482 (East Gate) at 11:05 AM, the South Railroad Gate at 11:20 AM, and Bldg. 984 (Supply Gate) at 11:35 AM in order to survey the location and the conditions of each gate/location.
a. Bldg. 1200 (West Gate): It was confirmed that the cameras should cover the inbound and outbound lanes of traffic and read the license plate of each vehicle.
b. Railroad Crossing by Bldg. 1296 (WOC): It was confirmed that the cameras should capture any walk-on activities via the railroads (JR Hachiko Line), e.g., pedestrians who try to enter the base by trespassing the railroads.
c. Bldg. 82 (Terminal Gate): Same as Bldg. 1200.
Controlled Unclassified Information
d. Bldg. 448 (Fussa Gate): Same as Bldg. 1200.
e. Bldg. 4482 (East Gate): Same as Bldg. 1200.
f. South Railroad Gate: It was confirmed that the cameras should capture any walk activities via the railroads.
g. Bldg. 984 (Supply Gate): Same as Bldg. 1200. It was also confirmed that this requirement would not cover the activities for the vehicle inspection lane or the activities inside the parking lot in front of Bldg. 993 (Pass and Registration Office). However, the camera for the outbound lane should capture the movements of the vehicles leaving the parking lot and merging into the outbound lane at the point right after the outbound gate.
4. It was advised that the vendors prepare a quotation package in accordance with the submission instructions specified in Standard Form (SF) 1449, page 37 of 40, Addenda to Federal Acquisition Regulation (FAR) 52.212-1, paragraph 2(m)(2), and the evaluation criteria specified in SF 1449, page 40 of 40, FAR 52.212-2.
5. Any additional questions regarding the requirement shall be submitted to 374 CONS/PKBB in writing by Friday, 29 Aug 2025. The answers will be provided to all prospective offerors.
6. Offer Due Date: 08 Sep 2025, 02:00 PM, Japan Standard Time (JST)
7. The site visit was concluded at 11:50 AM.
8. The foregoing is a brief summary of the discussions held during the meeting. Those present should advise the undersigned of any additional information, clarifications, or corrections that they feel should be made to the minutes within two (2) working days from distribution date. Failing notification to the contrary, these minutes will stand for the record.
YUMA KATO BENJAMIN D. WARREN
Contract Specialist Contracting Officer
Distribution:
All attendees
| 28 Aug 2025 |
| MEMORANDUM FOR PROSPECTIVE OFFEROR |
| FROM: 374th Contracting Squadron |
| Airlift Wing Acquisition Flight |
| Other Orgs & CE Commodities Contracting Team (374 CONS/PKBB) |
| Unit 5228, Bldg. 620, Yokota Air Base |
| Fussa-shi, Tokyo 197-0001 |
| 2025-08-28T09:26:52+0900 | |
| KATO.YUMA.1502589470 |
| 2025-08-28T10:13:27+0900 | |
| WARREN.BENJAMIN.D.1065670719 |
File details come from the government source that posted it. Updated .