6 RFP AtcJ3b(SOW Addendum).pdf
PDF 135 KB Posted
- Solicitation number
- FA5209-19-R-A006
About this file
This solicitation package is for an Indefinite-Delivery/Indefinite-Quantity (IDIQ) Multiple Award Construction Contract (MACC) to provide general construction services for U.S. Army and Air Force installations in Honshu, Japan and Yokota Air Base. The government intends to award up to ten IDIQ contracts for a one-year basic period plus nine one-year options, with a guaranteed minimum of $2,000 per contract and a maximum total value of $990 million. A pre-proposal conference will be held on June 13, 2019 to discuss the mock project at Building 907 and address any questions. Offerors must submit past performance questionnaires by June 28, 2019 and final proposals by July 10, 2019. Construction services will cover multiple disciplines including a mock project to repair Building 907 at Yokota Air Base. Offerors must register in the System for Award Management and represent authorization to do business in Japan.
View the file
Other files
Show 40 more
Latest 50 of 66 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA5209-19-R-A006
Attachment J-3.b
Addendum to Statement of Work for Mock Project
Project Number: ZNRE 19-1069
Project Title: Repair B907 Annex at Yokota, Air Base, Japan
1. Magnitude of Construction: Pursuant to FAR 36.204(f) the following is provided: The estimated amount of the project: Between ¥111,593,800 and ¥557,969,000 ($1.00 = ¥111.5938).
2. This project is Design-Build
3. The performance period will be 570 calendar days (210 calendar days for Design and 360 calendar days for construction) after Notice to Proceed is issued under the clause at 52.211-10 in Section I of the contract. The time stated for completion shall include final cleanup of the premises.
4. Applicable Clauses:
(1) FAR 52.211-12 -- Liquidated Damages -- Construction (Sep 2000)
(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of ¥88,966 for the first day, and
¥70,888 for each additional day of delay until the work is completed and accepted. If the Government terminates the Contractor’s right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the
Termination clause.
(2) FAR 52.246-21 -- Warranty Of Construction (Mar 1994)
The words “One (1) year” in para (b) & (d) are modified to read 10 years for Metal roofing and 3 years for HVAC, and one (1) year for all other items.
(3) Identification of Contractor-Furnished U.S. Materials
(a) The Contractor shall purchase and deliver for use under this contract the following United States
Materials (CFUSM) (See Statement of Work, Paragraph VII.N.):
Item Item Description
1 Ground-Fault Circuit Interrupter (GFCI) receptacle
2 Advanced Meter Reading System (AMRS).
3 Fire Alarm and Mass Notification systems.
4 Fire Alarm Reporting system.
(b) Ocean transportation of the above items shall be in accordance with the clause at DFARS 252.247-
7023 in Section I. The Contractor shall notify the Contracting Officer in writing, within 30 calendar days after the receipt of the Notice to Proceed, of the name of importer and estimated date of arrival at the construction jobsite.
(c) In the event the Government and Contractor agree that the title to any surplus CFUSM, exempted from Japanese customs duty and taxes under the Status of Forces Agreement, will remain with the
FA5209-19-R-A006
Attachment J-3.b
Contractor, the disposition of such property accruing from the performance of this contract shall be the responsibility of the Contractor. The Contractor further agrees to make a full disclosure of such settlement to the Japanese Customs authorities for the payment of applicable duties and taxes.
5. Type of Task Order: Firm Fixed Price
6. Reference Documents
ATTACHMENT
NO.
TITLE DATE PAGE(S)
J-3.d.1 Specification Section 15011, Mechanical General
Requirements
N/A 10
J-3.d.2 Specification Section 01410, Environmental
Protection
N/A 12
J-3.d.3 Disposal and Recycling Data Sheet N/A 1
J-3.d.4 B907 Annex As-Built Drawings 12 Mar 1962 8
J-3.d.5 B907 Annex As-Built Drawing, Electrical 19 Dec 2014 1
J-3.d.6 B907 Annex As-Built Drawings, Architectural 2 Mar 1986 29
J-3.d.7 B906 As-Built Drawings 6 Apr 1994 20
J-3.d.8 B907 As-Built Drawings (Sprinkler) 16 Dec 1996 32
J-3.d.9 B907 Annex Demolition Plan N/A 1
J-3.d.10 B907 Annex Concept Plan N/A 1
J-3.d.11 B907 Annex Concept Plan (Communication) N/A 1
J-3.d.12 B907 Water Flow Test Report N/A 5
J-3.d.13 B907 Lead-based Paint Report 7 Jan 2019 1
J-3.d.14 Report Limited Asbestos Survey, Building 907 4 Apr 2019 58