This submittal register provides a list of submittal requirements for the Project No. QKKA214009, Repair JNCO Homes, MFH, 123, 125, 127, 129, 291 at Misawa Air Base in Japan. The solicitation number is FA520523R0004 from the Department of the Air Force Pacific Air Forces.

The submittal register includes over 130 submittal items across 43 specification sections involving construction documents such as schedules, plans, shop drawings, product data, samples, design mixes, manuals, certificates, test reports, and closeout documents. Key submittals include construction schedules and quality control plans, as-built drawings and warranties, hazardous material management plans and safety data sheets, fire protection and alarm system designs and certifications, and telecommunications, mechanical, electrical and control system specifications, configurations, and test procedures. Compliance with environmental regulations on waste disposal, stormwater, and protected species is also required.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 43 PAGES

REPAIR MFH JNCO, 20 UNITS (123, 125, 127, 129, 291)

01 00 00 SD-01 Preconstruction Submittals

1.16Schedule of Material Submittal

SD-09 Manufacturer’s Field

Reports

1.19Daily Report

SD-10 Operation and Maintenance

Data

1.17Waste Disposal Manifest

SD-11 Closeout Submittals

1.18As-Built Drawings

01 32 16.00 20 SD-01 Preconstruction Submittals

1.2 GBaseline Construction Schedule

1.6 GMonthly Updates

01 33 00 SD-01 Preconstruction Submittals

1.8 GSubmittal Register

1.8.1 GSubmittal Register Monthly

Update

01 35 26 SD-01 Preconstruction Submittals

1.7.2.2 GStandard Lift Plan

1.7 GAccident Prevention Plan (APP)

1.7.2.3 GCritical Lift Plan

SD-06 Test Reports

1.4Monthly Exposure Reports

1.12Notifications and Reports

1.12.2 GAccident Reports

1.12.3LHE Inspection Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

Attachment 4 to FA520523R00040001 Date: 13 Jun 23

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 43 PAGES

01 35 26 SD-07 Certificates

1.6.1.3 GCrane Operators/Riggers

1.8 GActivity Hazard Analysis (AHA)

1.9.1Confined Space Entry Permit

1.9.1Hot Work Permit

1.12.4Certificate of Compliance

01 45 00.00 10 SD-01 Preconstruction Submittals

3.2 GContractor Quality Control (CQC)

Plan

SD-06 Test Reports

3.9.2Verification Statement

01 57 19.00 SD-01 Preconstruction Submittals

1.6.1Preconstruction Survey

1.6.2 G CEIEEnvironmental Protection Plan

1.7 G CEIEEnvironmental Protection Plan

1.7.3Natural/Cultural Resource

Management

1.7.3Air Quality Management

1.7.3Wind Erosion

1.7.3Water Quality Management

1.7.3Hazardous Materials

Management

1.7.3Petroleum, Oils, Lubricants (POL)

Management

3.11Waste Management Plan

1.7.3.1 GEmployee Training

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 43 PAGES

01 57 19.00 1.6.3 GEnvironmental Manager

Qualifications

3.9 GLaboratory Result Sheets

Inspection Reports

1.7.3.6 GSolid Waste Management

1.2.16 G CEIEWaste Determination

SD-07 Certificates

GEmployee Training Records

1.4.1.2 GEMS Training

Certificate of Competency

Erosion and Sediment Control

Inspector Qualifications

SD-11 Closeout Submittals

G CEIEErosion Control Plan Compliance

Notebook

1.7.3.3 GSite Specific Storm Water

Pollution Prevention Plan

(SWPPP)

3.3.2 GSite Specific Storm Water

Pollution Prevention Plan

(SWPPP)

G CEIEMonthly Hazardous Material

Usage Totals

GHazardous Waste/Debris

Management

1.7.3.6 G CEIESolid Waste Management

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 43 PAGES

01 57 19.00 1.2.16 G CEIEWaste Determination

3.5 GDemolition (C&D) Debris

Disposal, Diversion and

Recycling Worksheet

Weigh Tickets/Bills of Lading for

Disposal Activities

G CEIEDocumentation for Hazardous and Regulated Waste Disposal

3.11 G CEIEHazardous Waste Manifest

GSales Documentation

Contractor Certification

As-Built Topographic Survey

01 74 19 SD-01 Preconstruction Submittals

1.6 GWaste Management Plan

SD-11 Closeout Submittals

1.7Records

01 78 00.20 33 SD-03 Product Data

1.3.1Warranty Information

SD-11 Closeout Submittals

1.2.1 GAs Built Record Of Materials

01 78 23 SD-10 Operation and Maintenance

Data

1.4 GO&M Database

3.1.1 GTraining Plan

3.1.3 GTraining Outline

3.1.2 GTraining Content

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 43 PAGES

01 78 23 SD-11 Closeout Submittals

3.1.4 GTraining Video Recording

3.1.6 GValidation of Training Completion

02 41 00 SD-01 Preconstruction Submittals

1.2.2 GDemolition Plan

1.9Existing Conditions

SD-07 Certificates

1.6 GNotification

02 82 00 SD-03 Product Data

1.2.2Amended Water

1.3.9Safety Data Sheets (SDS) for All

Materials

2.1Encapsulants

3.1.2.1Respirators

3.1.7Local Exhaust Equipment

3.1.7Pressure Differential Automatic

Recording Instrument

3.1.8Vacuums

3.1.10 GGlovebags

SD-06 Test Reports

1.5.6Air Sampling Results

1.5.7Pressure Differential Recordings for Local Exhaust System

3.2.12.2Encapsulation Test Patches

3.2.13.5 GClearance Sampling

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 43 PAGES

02 82 00 3.3.3.2 GAsbestos Disposal Quantity

Report

SD-07 Certificates

1.3.4Employee Training

1.3.5 GNotifications

1.3.7Respiratory Protection Program

1.3.10Asbestos Hazard Abatement Plan

1.3.11Testing Laboratory

1.3.12Landfill Approval

1.3.12Delivery Tickets

1.3.12 GWaste Shipment Records

1.3.13Transporter Certification

1.3.14Medical Certification

1.5.2 GPrivate Qualified Person

Documentation

1.5.3 GCompetent Person

1.5.4Worker's License

1.5.5Contractor's License

1.5.10GOJ, Prefectural or Local

Citations on Previous Projects

2.1Encapsulants

3.1Equipment Used to Contain

Airborne Asbestos Fibers

3.1.3.3Water Filtration Equipment

3.1.8Vacuums

3.1.8Ventilation Systems

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 43 PAGES

02 82 00 SD-11 Closeout Submittals

1.3.5Permits and Licenses

1.3.5Notifications

1.3.7.1Respirator Program Records

1.5.9Protective Clothing

Decontamination Facility

Notification

1.7.1Rental Equipment

1.5.8Protective Clothing

Decontamination Quality Control

Records

02 84 16 SD-07 Certificates

1.8.1 GQualifications of IH/PQP

1.8.2 GPCB and Lamp Removal and

Disposal Work Plan

1.8.3 GPCB and Lamp Removal and

Disposal Work Plan

3.5.1 GJapan Specially Controlled

Hazardous Waste Disposal Permit

3.5.2 GJapan Industrial Waste Collection

and Transport Permit

SD-11 Closeout Submittals

3.5.5 GTransporter certification

3.2.4Certification of Decontamination

3.5.6.2Disposal Request Form

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 43 PAGES

02 84 16 3.5.3Copy E of the Japan Hazardous

Waste Manifest

3.3.1Signed Ballast Turn-in Sheet

03 30 00 SD-01 Preconstruction Submittals

1.6.3.1Concrete Curing Plan

1.6.5 GQuality Control Plan

1.6.8 GLaboratory Accreditation

SD-02 Shop Drawings

2.1Formwork

1.6.2.1 GReinforcing Steel

SD-03 Product Data

2.1Formwork Materials

2.6Reinforcement

2.4.2.1Liquid Chemical Floor Hardeners and Sealers

1.6.3.2Pumping Concrete

SD-05 Design Data

1.6.1.1 GConcrete Mix Design

SD-06 Test Reports

1.6.1.1 GConcrete Mix Design

1.6.4.1Fly Ash

1.6.4.1Pozzolan

1.6.4.2Slag Cement

1.6.4.3Aggregates

3.12.2.3 GCompressive Strength Tests

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 43 PAGES

03 30 00 3.12.2.5Unit Weight of Structural

Concrete

3.12.2.4Air Content

3.12.2.1Slump Tests

2.3.2Water

SD-07 Certificates

2.6.1Reinforcing Bars

1.8Welder Qualifications

1.6.3.3VOC Content for Form Release

Agents, Curing Compounds, and

Concrete Penetrating Sealers

1.6.3.4Safety Data Sheets

1.6.6.2Field Testing Technician and

Testing Agency

SD-08 Manufacturer’s Instructions

2.4.2.1Liquid Chemical Floor Hardeners and Sealers

2.4.3Joint Sealants

2.4.1Curing Compound

05 05 23.13 10 SD-01 Preconstruction Submittals

1.4.1 GPersonnel Qualification

2.1.1 GProcedure description

SD-03 Product Data

2.1.1Equipment and accessories

SD-06 Test Reports

1.4.5Equipment Qualifications

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 43 PAGES

05 05 23.13 10 3.4.1Inspection Test Reports

05 05 23.16 SD-01 Preconstruction Submittals

3.2 GWelding Quality Assurance Plan

SD-03 Product Data

1.3 GWelding Procedure Qualifications

1.3.4Welder, Welding Operator, and

Tacker Qualification

1.3.2Previous Qualifications

1.3.3 GPre-Qualified Procedures

2.2Welding Electrodes and Rods

SD-06 Test Reports

3.3Nondestructive Testing

3.2Weld Inspection Log

SD-07 Certificates

1.3.5Certified Welding Inspector

1.3.5Nondestructive Testing Personnel

05 12 00 SD-01 Preconstruction Submittals

1.5.1.1 GErection and Erection Bracing

Drawings

SD-02 Shop Drawings

1.5.2 GFabrication Drawings

SD-03 Product Data

2.6.2Shop Primer

2.4.1Welding Electrodes and Rods

2.4.2Non-Shrink Grout

2.3.3Tension Control Bolts

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 43 PAGES

05 12 00 SD-05 Design Data

1.5.2 GShoring and Temporary Bracing

SD-06 Test Reports

2.6.2Class B Coating

3.6.1.2Weld Inspection Reports

3.6.2.1Bolt Testing Reports

3.6.3Embrittlement Test Reports

SD-07 Certificates

1.3MLIT Structural Steel Fabricator

Quality Certification

1.3MLIT Structural Steel Erector

Quality Certification

3.3Welding Procedure Specifications

(WPS)

05 50 13 SD-02 Shop Drawings

1.5.2 GInstallation Drawings

2.3 GAngles and Plates

05 52 00 SD-02 Shop Drawings

1.2.1 GFabrication Drawings

3.2Stainless Steel Hardware

3.2Stainless Steel Shapes, Plates, Bars and Strips

SD-07 Certificates

1.4.1 GWelding Procedures

1.4.2 GWelder Qualification

SD-08 Manufacturer’s Instructions

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 43 PAGES

05 52 00 3.2Installation Instructions

06 10 00 SD-02 Shop Drawings

2.3.1.1 GNailing Strips

SD-06 Test Reports

1.4.2Preservative-treated

SD-07 Certificates

1.10.1Certificates of Grade

1.7Preservative Treatment

06 20 00 SD-02 Shop Drawings

1.3 GDetail Drawings Indicating All

Wood Assemblies

SD-03 Product Data

2.1 GWood Products

1.4 GTreated Wood Products

2.4 GHardware and Accessories

SD-04 Samples

1.5 GSamples

SD-07 Certificates

1.7.1.1 GCertificates of Grade

06 61 16 SD-02 Shop Drawings

1.4.2 GDetail Fabrication Drawings

3.1 GInstallation

SD-03 Product Data

2.1.1 GSolid Polymer

2.2.2Indoor air quality for solid surface seam and sealant products

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 43 PAGES

06 61 16 SD-04 Samples

2.1 GMaterial

2.3.4 GCounter and Vanity Tops

SD-06 Test Reports

2.1.1Test Report Results

SD-07 Certificates

1.4.1Qualifications

2.1.1Indoor Air Quality for solid surface fabrication products

SD-10 Operation and Maintenance

Data

2.1.1 GSolid Polymer

07 21 13 SD-03 Product Data

1.3 GManufacturer's Standard Details

2.1 GBlock or Board Insulation

2.2 GVapor Retarder

2.3 GPressure Sensitive Tape

2.5 GAccessories

SD-07 Certificates

2.1 GBlock or Board Insulation

2.2 GVapor Retarder

1.8 GSpecial Warranties

2.1.6Indoor Air Quality For Block Or

Board Insulation

SD-08 Manufacturer’s Instructions

2.1Block or Board Insulation

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 43 PAGES

07 21 13 2.5.1Adhesive

07 41 13 SD-02 Shop Drawings

1.4.5 GRoofing Panels

1.4.5 GFlashing and Accessories

1.4.5 GGutter/Downspout Assembly

SD-03 Product Data

2.1 GRoof Panels

1.4.5 GFactory-Applied Color Finish

2.4 GAccessories

1.4.5 GFasteners

2.6 GUnderlayments

2.7 GGaskets and Sealing/Insulating

Compounds

1.4.5 GAluminized Steel Repair Paint

SD-04 Samples

2.1 GRoof Panels

1.4.5 GFactory-applied Color Finish

2.4 GAccessories

1.4.5 GFasteners

1.4.5 GGaskets and Sealant/Insulating

Compounds

SD-05 Design Data

1.2.1.2 GWind Uplift Resistance

SD-06 Test Reports

1.2.1.1 GLeakage Test Report

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 43 PAGES

07 41 13 2.1 GRoof Panels

1.4.1 GQualification of Manufacturer

1.4.2 GQualification of Applicator

1.4.5 GInstallation Manual

SD-09 Manufacturer’s Field

Reports

3.9.1 GManufacturer's Field Inspection

Reports

SD-11 Closeout Submittals

1.8 GWarranties

3.10 GInformation Card

07 57 00 SD-03 Product Data

2.2 GSpray Urethane Coatings

2.4Sealants

SD-04 Samples

1.4.4 GRoof System Mock-Up

1.4.5 GSample Warranty

SD-06 Test Reports

2.2.1Performance Requirements

SD-07 Certificates

1.4.1 GQualification of Manufacturer

1.4.2 GQualification of Applicator

2.2.1Protective Coating

SD-08 Manufacturer’s Instructions

2.2 GSpray Urethane Coatings

3.7 GInstallation

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 43 PAGES

07 57 00 SD-11 Closeout Submittals

1.11 GWarranty

3.11 GInformation Card

07 60 00 SD-02 Shop Drawings

3.1.14 GDrip Edges

3.1.16 GOpen Valley Flashing

3.1.17 GEave Flashing

SD-08 Manufacturer’s Instructions

1.4.3 GInstructions for Installation

3.5 GQuality Control Plan

SD-10 Operation and Maintenance

Data

1.4.3 GCleaning and Maintenance

07 84 00 SD-02 Shop Drawings

2.1 GFirestopping System

SD-03 Product Data

2.2 GFirestopping Materials

SD-06 Test Reports

3.3 GInspection

SD-07 Certificates

1.5.2Inspector Qualifications

2.2Firestopping Materials

1.5.1 GInstaller Qualifications

08 11 13 SD-02 Shop Drawings

2.1 GDoors

2.1 GDoors

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 43 PAGES

08 11 13 2.6 GFrames

2.6 GFrames

08 11 16 SD-02 Shop Drawings

1.5.1 GDoor and Frame Assembly

SD-04 Samples

1.5.2 GFinish Samples

SD-05 Design Data

1.2.1 GCalculations

SD-06 Test Reports

1.2.3 GAir Infiltration

1.2.4 GWater Penetration

SD-10 Operation and Maintenance

Data

1.5.3 GAdjustments, Cleaning, and

Maintenance

08 14 00 SD-02 Shop Drawings

2.1 GDoors

SD-04 Samples

2.1Doors

2.3.5.3 GDoor Finish Colors

SD-11 Closeout Submittals

1.5Warranty

08 31 00 SD-03 Product Data

1.3 GAccess Doors And Panels

1.3.1 GHardware

2.1.7 GAccessories

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 43 PAGES

08 31 00 SD-04 Samples

2.4 GFinishes

SD-06 Test Reports

1.3.1 GFire-ratings of Assemblies

08 32 13 SD-02 Shop Drawings

2.1Aluminum sliding glass doors

SD-10 Operation and Maintenance

Data

2.1 GAluminum sliding glass doors

08 51 13 SD-02 Shop Drawings

2.1 GWindows

1.6Fabrication Drawings

SD-10 Operation and Maintenance

Data

2.1 GWindows

08 71 00 SD-02 Shop Drawings

1.3 GManufacturer's Detail Drawings

1.3 GVerification of Existing Conditions

1.5 GHardware Schedule

2.3.5 GKeying System

SD-08 Manufacturer’s Instructions

3.1Installation

SD-10 Operation and Maintenance

Data

1.5 GHardware Schedule

SD-11 Closeout Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 43 PAGES

08 71 00 1.6.1Key Bitting

08 81 00 SD-03 Product Data

1.7.1Insulating Glass

2.3.1.1Sealants

2.3.2Joint Backer

SD-08 Manufacturer’s Instructions

2.3Setting and Sealing Materials

3.2Glass Setting

SD-11 Closeout Submittals

1.7.1Insulated Glass Units

09 22 00 SD-02 Shop Drawings

2.1 GMetal Support Systems

SD-03 Product Data

2.1Metal Support Systems

09 29 00 SD-08 Manufacturer’s Instructions

2.1Safety Data Sheets

SD-10 Operation and Maintenance

Data

2.1Manufacturer Maintenance

Instructions

09 30 10 SD-02 Shop Drawings

3.2 GDetail Drawings

SD-10 Operation and Maintenance

Data

3.2 GInstallation

09 65 00 SD-02 Shop Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 43 PAGES

09 65 00 2.10 GResilient Flooring and

Accessories

SD-10 Operation and Maintenance

Data

2.10 GResilient Flooring and

Accessories

09 90 00 SD-02 Shop Drawings

3.11Piping Identification

SD-08 Manufacturer’s Instructions

3.3.1Application Instructions

3.7.2Mixing

SD-10 Operation and Maintenance

Data

1.3.1.1Coatings

10 28 13 SD-04 Samples

2.1.2 GFinishes

2.2Accessory Items

11 13 13 SD-03 Product Data

2.1Kitchen Equipment

SD-08 Manufacturer’s Instructions

2.1Kitchen Equipment

SD-10 Operation and Maintenance

Data

2.1Kitchen Equipment

SD-11 Closeout Submittals

3.3Manufacturer's Warranty

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 43 PAGES

12 32 00 SD-02 Shop Drawings

2.2 GFabrication

3.1.2 GInstallation Drawings

SD-03 Product Data

2.3.1 GCabinets

2.4 GHardwood

2.4 GHardwood Plywood

2.4 GFiller Material

2.4 GVarnish

2.4 GFasteners

2.5 GAccessories and Hardware

SD-04 Samples

2.5 GAccessories and Hardware

1.3 GManufacturer's Standard Color

Charts

SD-07 Certificates

2.4Hardwood

2.4Filler Material

2.4Varnish

2.4Fasteners

2.5Accessories and Hardware

SD-08 Manufacturer’s Instructions

Part 3Manufacturer's Instructions

21 21 00 SD-02 Shop Drawings

1.3 GSprinkler Heads and Piping

System Layout

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 43 PAGES

21 21 00 1.3.7 GSprinkler Heads and Piping

System Layout

1.3.7 GElectrical Wiring Diagrams

SD-03 Product Data

2.1 GPiping

2.1.6 GValves

2.1.2 GSprinkler Heads

2.1.5 GPipe Hangers and Supports

2.1.4 GFlow Switch

2.1.11 GFire Department Connections

2.1.1 GMechanical Couplings

2.1.8 GBackflow Prevention Assemblies

SD-05 Design Data

1.3 GSprinkler System Design

SD-06 Test Reports

3.3.1 GPreliminary tests

SD-07 Certificates

1.5.1 GQualifications of Installer

SD-11 Closeout Submittals

1.3.8 GAs-built Drawings of Each System

22 00 00 SD-02 Shop Drawings

3.7.1 GPlumbing System

SD-03 Product Data

3.7.1Plumbing System

SD-06 Test Reports

3.7Tests, Flushing and Disinfection

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 43 PAGES

22 00 00 SD-10 Operation and Maintenance

Data

3.7.1Plumbing System

23 05 15 SD-01 Preconstruction Submittals

1.2 GMaterial, Equipment, and Fixture

Lists

SD-02 Shop Drawings

1.2 GRecord Drawings

1.2 GCoordination Drawings

SD-10 Operation and Maintenance

Data

3.8Operation and Maintenance

Manuals

23 05 48.00 40 SD-02 Shop Drawings

1.2 GInstallation Drawings

SD-03 Product Data

1.2 GEquipment and Performance

Data

2.2.2 GIsolators

SD-06 Test Reports

2.4 GType of Isolator

2.4 GAllowable Deflection

2.4 GMeasured Deflection

23 05 93 SD-01 Preconstruction Submittals

1.3 GRecords of Existing Conditions

1.5.1.2 GTAB Firm

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 43 PAGES

23 05 93 1.2 GTAB Team Assistants

1.2 GTAB Team Engineer

1.5.1.1 GTAB Specialist

1.5.2.1 GTAB Team Field Leader

SD-02 Shop Drawings

1.5.2.3 GTAB Report

SD-03 Product Data

1.3 GEquipment and Performance

Data

3.3 GTab Procedures

1.5.1.1 GCalibration

1.5.2 GTab Execution

SD-06 Test Reports

3.5TAB Work Execution Schedule

3.5TAB Procedures Summary

1.5.4.2 GTab Design Review Report

1.5.5.1 GTab Report For Season 1

3.5 GTab Report For Season 1

1.5.5.1 GTab Report For Season 2

3.5 GTab Report For Season 2

SD-07 Certificates

1.5.1 GIndependent TAB Agency and

Personnel Qualifications

1.5.4.3 GTAB Pre-Field Engineering

Report

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 43 PAGES

23 05 93 3.5 GAdvance Notice of TAB Field

Work

3.5COMPLETED SEASON 1

Pre-TAB Work Checklist

1.5.4.2 GTAB Submittal and Work

Schedule

3.5 GTAB Submittal and Work

Schedule

3.5 GDesign Review Report

3.5 GPre-field TAB engineering report

23 07 00 SD-02 Shop Drawings

2.3Pipe Insulation Systems

23 08 00.00 20 SD-03 Product Data

2.1 GTest Equipment

SD-06 Test Reports

1.6 GPipe Flushing, Testing, And

Water Treatment Reports

3.7 GSeasonal Test Report

23 09 00 SD-02 Shop Drawings

3.3 GDDC Contractor Design Drawings

3.3 GDraft As-Built Drawings

3.3 GFinal As-Built Drawings

SD-03 Product Data

1.8.3 GProgramming Software

1.8.4 GController Application Programs

1.8.1 GConfiguration Software

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 43 PAGES

23 09 00 1.8.2 GController Configuration Settings

1.1.1.3 GProprietary Multi-Split

Engineering Tool Software

2.2 GManufacturer's Product Data

SD-06 Test Reports

3.1.1Existing Conditions Report

1.9.1 GPre-Construction Quality Control

(QC) Checklist

1.9.2 GPost-Construction Quality Control

(QC) Checklist

3.5.2 GStart-Up Testing Report

3.6.1 GPVT Procedures

3.6.3 GPVT Report

SD-10 Operation and Maintenance

Data

3.7 GOperation and Maintenance

(O&M) Instructions

3.9.1 GTraining Documentation

SD-11 Closeout Submittals

2.5 GEnclosure Keys

3.2.6.1 GPassword Summary Report

1.9.3 GCloseout Quality Control (QC)

Checklist

23 23 00 SD-02 Shop Drawings

2.3 GRefrigerant Piping System

SD-06 Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 43 PAGES

23 23 00 3.5Refrigerant Piping Tests

SD-10 Operation and Maintenance

Data

1.5Maintenance

3.4Operation and Maintenance

Manuals

3.4Demonstrations

23 30 00 SD-02 Shop Drawings

1.4.4 GDetail Drawings

SD-03 Product Data

2.10.1.1 GCeiling Exhaust Fans

2.9.2Backdraft Dampers

2.9.1.1Duct Connectors

2.9.5 GAir Vents

2.9.7 GSecondary Lint Filter Box

SD-06 Test Reports

3.9Performance Tests

SD-10 Operation and Maintenance

Data

3.11.1Operation and Maintenance

Manuals

2.9.2Backdraft Dampers

2.10.1.1Ceiling Exhaust Fans

23 81 29 SD-01 Preconstruction Submittals

1.5.1.1 GQualification Of Installer

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 43 PAGES

23 81 29 3.1 GVerification Of Existing

Conditions

SD-02 Shop Drawings

1.4.1 GVRF System Contractor Design

Drawings

SD-03 Product Data

3.7.1 GSpare Parts Data

2.6.1 GCoil Corrosion Protection

2.1 GManufacturer's Standard Catalog

Data

1.8 GSample Warranty

1.5.1.2 GRefrigerant SDS Sheets

SD-05 Design Data

1.5.3 GManufacturer's Engineering Data

SD-06 Test Reports

3.5 GSystem Performance Tests

SD-07 Certificates

3.7.2 GService Organizations

3.7.3 GWarranty

3.3 GElectronic Refrigerant Leak

Detector Calibration

1.5.1.2 GOzone Depleting Substances

Technician Certification

SD-08 Manufacturer’s Instructions

1.5.4 GManufacturer's Instructions

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 43 PAGES

23 81 29 SD-09 Manufacturer’s Field

Reports

3.4 GRefrigerant Charging

SD-11 Closeout Submittals

3.7.5 GPosted Instructions

1.7 GInventory

23 82 46.00 40 SD-02 Shop Drawings

1.2.1Fabrication Drawings

SD-03 Product Data

2.1 GPerformance Data

2.1 GElectric Unit Heaters

2.2.1 GHeating Element

2.2.2 GControls

3.1.1 GCasings

2.2.3 GPropellers and Motors

SD-08 Manufacturer’s Instructions

1.2.1Manufacturer's Instructions

25 05 11 SD-01 Preconstruction Submittals

3.3.2 GDevice Account Lock Exception

Request

3.2.4.4 GMultiple Ethernet Connection

Device Request

1.10.1.6 GContractor Computer

Cybersecurity Compliance

Statements

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 43 PAGES

25 05 11 1.10.6 GContractor Temporary Network

Cybersecurity Compliance

Statements

1.8.1 GProposed STIG and SRG

Applicability Report

1.7.1 GQualifications

SD-02 Shop Drawings

1.8.2 GNetwork Communication Report

1.8.5 GCybersecurity Riser Diagram

SD-03 Product Data

1.8.7 GControl System Cybersecurity

Documentation

SD-06 Test Reports

3.13.1 GControl System Cybersecurity

Testing Procedures

3.13.3 GControl System Cybersecurity

Testing Report

SD-07 Certificates

1.9 GSoftware Licenses

SD-11 Closeout Submittals

3.4.5.4 GConfidential Password Report

3.3.5 GEnclosure Keys

1.8.4 GSoftware and Configuration

Backups

3.9 GSystem Maintenance Tool

Software

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 43 PAGES

25 05 11 3.11.1 GControl System Scanning Tools

1.8.6 GSTIG, SRG and Vendor Guide

Compliance Result Report

1.8.3 GControl System Inventory Report

25 10 10 SD-02 Shop Drawings

3.2.2 GEMCS Contractor Design

Drawings

3.2.3 GDraft As-Built Drawings

3.2.3 GFinal As-Built Drawings

SD-05 Design Data

3.2.1 GEMCS IP Network Bandwidth

Usage Estimate

SD-06 Test Reports

1.7 GPre-Construction QC Checklist

1.7 GPost-Construction QC Checklist

3.1 GExisting Conditions Report

3.6 GStart-Up and Start-Up Testing

Report

3.7.1 GPVT Phase I Procedures

3.7.2 GPVT Phase I Report

3.7.3 GPVT Phase II Report

SD-10 Operation and Maintenance

Data

1.8 GOperation and Maintenance

(O&M) Instructions

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 43 PAGES

25 10 10 3.8.1 GRefresher Training

Documentation

SD-11 Closeout Submittals

1.7 GCloseout QC Checklist

25 10 10.01 SD-02 Shop Drawings

1.10.2 GWiring Diagrams

1.10.1 GDetail Drawings

3.5 GAs-Built Drawings

SD-03 Product Data

2.5.2 GPulse Flowmeters

2.5.3 GTemperature Sensors

SD-07 Certificates

1.11.2 GManufacturer Qualifications

1.11.2 GInstaller Qualifications

3.2 GBicsi Certification

SD-10 Operation and Maintenance

Data

3.3 GSoftware

1.11.1.2 GOperation And Maintenance Data

SD-11 Closeout Submittals

1.11.1.2 GPreventive Maintenance Work

Plan

26 20 00 SD-02 Shop Drawings

2.11 GPanelboards

2.12 GTransformers

3.1.9.1 GMarking strips

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 33 OF 43 PAGES

26 20 00 SD-03 Product Data

2.10Receptacles

2.11.3 GCircuit breakers

2.9 GSwitches

2.12 GTransformers

2.13 GManual motor starters

2.16.1 GCATV outlets

2.21 GSurge protective devices

SD-06 Test Reports

3.5.2600-volt wiring test

3.5.5Grounding system test

3.5.3Transformer tests

3.5.4Ground-fault receptacle test

26 51 00 SD-02 Shop Drawings

1.5.1 GLuminaire Drawings

SD-03 Product Data

2.2 GLuminaires

2.3 GLight Sources

2.4 GLED Drivers

1.6.1 GLuminaire Warranty

2.5.1.1 GSwitches

2.5.1.2 GPhotosensors

SD-05 Design Data

1.5.2 GLuminaire Design Data

1.5.8 GPhotometric Plan

SD-06 Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 34 OF 43 PAGES

26 51 00 1.5.3 GANSI/IES LM-79 Test Report

1.5.4 GANSI/IES LM-80 Test Report

1.5.5 GANSI/IES TM-21 Test Report

1.5.6 GANSI/IES TM-30 Test Report

3.2.1.1 GPhotosensor Verification Test

SD-07 Certificates

1.5.7 GLED Driver and Dimming Switch

Compatibility Certificate

27 10 00 SD-02 Shop Drawings

1.6.1.1 GTelecommunications drawings

1.6.1.2 GTelecommunications Space

Drawings

SD-03 Product Data

2.3 GTelecommunications cabling

2.4.3 GPatch panels

2.5 GTelecommunications

outlet/connector assemblies

2.4.1 GEquipment support frame

2.4.2 GConnector blocks

SD-06 Test Reports

3.5.1Telecommunications cabling testing

SD-10 Operation and Maintenance

Data

1.10.1Telecommunications cabling and pathway system

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 35 OF 43 PAGES

27 10 00 SD-11 Closeout Submittals

1.10.2Record Documentation

28 31 60 SD-01 Preconstruction Submittals

1.3.2 GQualified Fire Protection Engineer

(QFPE)

1.7.2.1 GFire alarm system designer

1.7.2.2 GSupervisor

1.7.2.3 GTechnician

1.7.2.4 GInstaller

1.7.2.5 GTest Technician

SD-02 Shop Drawings

1.7.1.3 GWiring Diagrams

1.7.1.4 GSystem Layout

1.7.1.5 GBattery Power

1.7.1.6 GVoltage Drop Calculations

SD-03 Product Data

2.3 GSmoke Alarms

3.3.2 GAlarm Wiring

3.2.2 GCeiling Bridges

SD-06 Test Reports

3.5.1 GTest Procedures

SD-07 Certificates

3.5.2.1 GVerification of Compliant

Installation

3.5.2.2 GRequest for Government Final

Test

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 36 OF 43 PAGES

28 31 60 SD-10 Operation and Maintenance

Data

3.7 GOperation and Maintenance

(O&M) Instructions

3.8 GInstruction of Government

Employees

SD-11 Closeout Submittals

1.7.1.9As-Built Drawings

1.9.1Spare Parts

28 31 70 SD-01 Preconstruction Submittals

1.3.2 GQualified Fire Protection Engineer

(QFPE)

1.8.2.1 GFire alarm system designer

1.8.2.2 GSupervisor

1.8.2.3 GTechnician

1.8.2.4 GInstaller

1.8.2.5 GTest Technician

1.7 GFire Alarm System Site-Specific

Software Acknowledgement

SD-02 Shop Drawings

1.8.1.3Nameplates

2.2.4 GInstructions

1.8.1.4 GWiring Diagrams

1.8.1.5 GSystem Layout

1.8.1.7 GInitiating devices

1.8.1.8 GBattery Power

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 37 OF 43 PAGES

28 31 70 1.8.1.9 GVoltage Drop Calculations

SD-03 Product Data

2.3 GFire Alarm Control Unit (FACU)

2.4 GManual Stations

2.5 GSmoke Detectors

2.6 GAddressable Interface Devices

2.7 GAddressable Control Modules

1.8.1.6 GNotification Appliances

2.10.1 GBatteries

2.10.2 GBattery Chargers

2.11 GSurge Protective Devices

2.11 GAlarm Wiring

3.3.4 GBack Boxes and Conduit

3.2.6 GCeiling Bridges

3.3.2 GTerminal Cabinets

2.13 GAutomatic Fire Alarm

Transmitters

2.13.1 GRadio Transmitter and Interface

Panels

2.15 GEnvironmental Enclosures or

Guards

3.10.3 GDocument Storage Cabinet

SD-06 Test Reports

3.6.1 GTest Procedures

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 38 OF 43 PAGES

28 31 70 3.6.2.1 GVerification of Compliant

Installation

3.6.2.2 GRequest for Government Final

Test

SD-10 Operation and Maintenance

Data

3.8 GOperation and Maintenance

(O&M) Instructions

3.9 GInstruction of Government

Employees

SD-11 Closeout Submittals

1.8.1.12As-Built Drawings

1.10.1Spare Parts

31 00 00 SD-01 Preconstruction Submittals

3.4 GShoring

1.4.2 GDewatering Work Plan

SD-06 Test Reports

3.15Testing

2.1Borrow Site Testing

32 05 33 SD-03 Product Data

2.1 GFertilizer

2.3Mulches Topdressing

2.3.1Organic Mulch Materials

SD-07 Certificates

3.4.1Maintenance Inspection Report

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 39 OF 43 PAGES

32 05 33 SD-10 Operation and Maintenance

Data

1.6Maintenance

32 11 20 SD-03 Product Data

1.4Plant, Equipment, and Tools

SD-06 Test Reports

2.2.1 GInitial Tests

3.10.1 GIn-Place Tests

32 11 23 SD-03 Product Data

1.4Plant, Equipment, and Tools

SD-06 Test Reports

2.3.1 GInitial Tests

3.11.1 GIn-Place Tests

32 12 13 SD-06 Test Reports

3.7 GSampling and Testing

32 12 16.16 SD-03 Product Data

2.4 GMix Design

3.11 GQuality Control

3.12 GMaterial Acceptance

SD-06 Test Reports

2.2 GAggregates

3.11.3.2QC Monitoring

32 16 19 SD-03 Product Data

2.1 GConcrete

SD-06 Test Reports

3.8Field Quality Control

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 40 OF 43 PAGES

32 17 23 SD-03 Product Data

2.1.1.1Surface Preparation Equipment

List

2.1.2Application Equipment List

3.2Exterior Surface Preparation

1.3.1Safety Data Sheets

2.2.4.1Reflective media for roads

2.2.1Waterborne Paint

2.2.2Thermoplastic compound

3.3.2Thermoplastic compound

2.2.3Raised Pavement Markers

Primers and Adhesives

SD-06 Test Reports

2.2.4.1Reflective Media for Roads

2.2.1Waterborne Paint

2.2.2Thermoplastic Compound

3.3.2Thermoplastic Compound

2.2.3Raised Pavement Markers

Primers and Adhesives

SD-07 Certificates

1.3.2Qualifications

2.2.4.1Reflective Media for Roads

2.2.1Waterborne Paint

1.3.1Volatile Organic Compound

2.2.2Thermoplastic Compound

3.3.2Thermoplastic Compound

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 41 OF 43 PAGES

32 17 23 SD-08 Manufacturer’s Instructions

2.2.1Waterborne Paint

2.2.2Thermoplastic Compound

3.3.2Thermoplastic Compound

32 92 23 SD-03 Product Data

2.1Sod

33 11 00 SD-03 Product Data

3.2.2 GDisinfection Procedures

SD-06 Test Reports

3.3.1.4 GBacteriological Samples

3.2.1.1.6 GHydrostatic Sewer Test

3.3.1.3 GLeakage Test

3.3.1.1 GHydrostatic Test

SD-08 Manufacturer’s Instructions

2.1.1.1Ductile Iron Piping

2.1.1.2.1Polyethylene (PE) Pipe

33 30 00 SD-02 Shop Drawings

3.1.1 GInstallation Drawings

SD-03 Product Data

2.2.1Gravity Pipe

SD-06 Test Reports

3.3.1.1Hydrostatic Sewer Test

3.3.1.2Infiltration Tests or Exfiltration

Tests

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 42 OF 43 PAGES

33 30 00 3.3.3.1 GPre-Installation Inspection

Request

3.3.3.2 GPost-Installation Inspection

33 71 02 SD-02 Shop Drawings

1.4.1 GPrecast underground structures

SD-03 Product Data

2.10.2.1 GPrecast concrete structures

2.10.2.4Sealing Material

3.4.3Pulling-In Irons

2.10.3 GManhole frames and covers

2.10.4 GHandhole frames and covers

2.11 GCable supports

SD-06 Test Reports

3.15.1Field Acceptance Checks and

Tests

33 82 00 SD-02 Shop Drawings

1.6.1.1 GTelecommunications Outside

Plant

1.6.1.2 GTelecommunications Entrance

Facility Drawings

SD-03 Product Data

2.7 GWire and cable

2.4 GCable splices, and connectors

2.3 GClosures

SD-06 Test Reports

3.5.1Pre-installation tests

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 43 OF 43 PAGES

33 82 00 3.5.2Acceptance tests

SD-10 Operation and Maintenance

Data

1.6.1.1Telecommunications outside plant (OSP)

SD-11 Closeout Submittals

1.8.1Record Documentation

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

File details come from the government source that posted it. Updated .