B2035 225 1950 03 B2035 225 1950 06
Roof, Low Sloped, Large (up to 15k sf, min 2 person task) Roof, Steep Slope, Lg (up to 15k sf, min 2 person task)
Labor-hrs A Labor-hrs A
1 0.044 x 1 0.044 x
2 0.000 x
2 0.000 x
3 0.000 x 3 0.000 x
4 0.000 x 4 0.000 x
5 0.000 x
5 0.000 x
6 0.000 x
6 0.000 x
7 0.000 x 7 0.000 x
8 0.000 x
8 0.000 x
9 0.000 x 9 0.000 x
10 0.000 x Total Annual Hours 0.044
11 0.000 x
12 0.000 x D4015 150 1950 01
13 0.000 x Standpipe Fire System
14 0.000 x Labor-hrs S 2 Yr 5 Yr
15 0.000 x 1 0.044 x x x
16 0.000 x 2 0.044 x x x
17 0.000 x 3 0.041 x x x
18 0.000 x 4 0.167 x
19 0.000 x 5 0.092 x
0.044 6 0.084 x
7 0.167 x
Equipment Type: 8 0.900 x
Component: 9 3.500 x
Labor-hrs 3 Yrs 6 Yrs 10 0.167 x x x
0.463
1 0.044 x x 0.639
2 0.083 x x 4.696
3 0.416 x x
4 0.165 x x D5095 250 3950 04
5 0.083 x x Perform Grounding Checks Comm Facility -Per Facility
6 0.165 x x Labor-hrs
7 0.25 x x 1 0.044
8 0.416 x x 2 0.017
9 0.583 x 3 0.044
10 0.333 x 4 0.044
11 0.083 x 5 0.044
12 0.5 x 6 0.083
13 0.083 x x 7 0.083
14 0.124 x x 8 0.083
15 0.16 x x 9 0.083
16 0.044 x x 10 0.016
17 0.167 x x 11 0.083
2.250 12 0.050
Total Six Year Hours 3.750 13 0.033
14 0.033
Equipment Type: D5015 260 1950 02 15 0.167
Component: Electrical Subpanel 226 Amps and Larger 1.000
Labor-hrs 3 Yrs 6 Yrs
This PMTL does not satisfy the testing requirements of NFPA-70B
1 Check 0.044 x x
2 Conduct 0.083 x x
3 Establish 0.416 x x
4 Don 0.165 x x
5 Remove panel cover 0.416 x x
6 Visually 0.583 x x
7 Conduct complete infrared scan for hot spots 0.291 x x
8 Check all 0.583 x x
9 With the 0.666 x
10 De- 0.333 x
11 Operate 0.16 x
12 Tighten all lugs, screws and loose connections 0.75 x
13 Vacuum and clean inside of panel 0.201 x x
14 Reinstall panel cover 0.583 x x
15 Remove lockout tagout and Re-energize 0.16 x x
16 Notify facility manger of completion 0.044 x x
17 Compile 0.167 x x
Total Three Year Hours 3.736
Total 2 Year Hours
Check ground reading x
Record results x
Compile list of discrepancies and open corrective maintenance job x
Inspect/tighten ground connections as required x
Locate test point x
Drive reference pins and attach cables x
Check to see if grounding system within the facility are bonded together x
Check to see if flashover protection is installed on insulated fittings on x
Inspect cable and ground rods for corrosion x
Obtain approval to enter secured area from guard if required x
Don safety equipment x
Check system neutral to ensure system is grounded at transformer x
Collect maps, communication equipment, tools, safety equipment x
Check for current meter calibration date if required x
Coordinate inspection with facility manager x
Equipment Type:
Component:
PM Components (Task Description) 21 Mo
PM Components (Task Description)
Check with Facility Manager
Conduct tailgate style safety briefing
D5015 260 1950 01
Electrical Subpanel 225 Amps and Smaller
PM Components (Task Description)
This PMTL does not satisfy the testing requirements of NFPA-70B
Remove lockout tagout and Re-energize
Notify facility manger of completion
Compile list of discrepancies and open corrective maintenance job order(s)
Total Three Year Hours
With the facility managers assistance turn off one breaker at a time
De-energize panel and apply lockout/tagout and test to ensure deenergized
Operate all breakers several times checking for proper operation
Tighten all lugs, screws and loose connections
Vacuum and clean inside of panel
Reinstall panel cover
Establish safe clearance work area
Don personal protective equipment
Remove panel cover
Visually check for discolorations or charred insulation, immediately smell for
Conduct complete infrared scan for hot spots
Check all phases, neutral and ground for load balance and presence of
2-yr Tasks only
5-yr Tasks only
Lubricate valve stem
Inspect piping and piping supports for damage
Conduct flow test to verify flow capacity and minimum discharge
Hydrostatic test to ensure integrity (dry standpipe systems only)
Fill out maintenance checklist, compile list of discrepancies and open
Semi-Annual Hours
PM Components (Task Description)
Collect maps, communication equipment, tools, safety equipment
Notify Facility Manager/facility occupants
Notify fire department
Inspect for damage, leaking, missing, caps, and obstruction
Operate valve through entire travel to verify function
Inspect roof membrane for damage, debris, vegetation growth, As encountered - remove debris, tighten/replace loose/missing fasteners, clear clogged drainage and re-secure gutters or drain screens.
Fill out maintenance checklist and report deficiencies
Equipment Type:
Component:
Component:
PM Components (Task Description)
Collect maps, roof plans, communications equipment, tools, safety
Interview facility manager and walk through building checking interior walls, ceiling and insulation looking for Insect damage signs of water damage and staining
Pitch Pan: Inspect for flashing around pitch pan; Inspect pitch pan edges for
Coping Cap: Inspect base flashing; Inspect metal cap end/lap joints; Inspect
Gutters/Downspouts: Inspect. Clear debris
Fill out maintenance checklist and report defeficiencies
Total Annual Hours
Equipment Type:
Walk around exterior of building checking exterior walls and overhangs
Prepare safety equipment
Inspect gutters and downspouts checking for debris and vegetation growth, loose/missing fasteners, displaced or loose joints, corrosion, Inspect edge/rake, hips, valleys, ridges, flashings and penetrations for loose/missing fasteners, open end or lap joints and covers, loose or displaced closures and baffles, damage from foot traffic or
Roof Hatch: Inspect base flashing; Inspect metal counterflashing; Inspect
Mech Equip/Exhaust Fan/Vent: Inspect exhaust vent equipment for
Other Equip (Satelite Dish, etc): Inspect for damage; Inspect for proper
Field Drain: Inspect flashing around drain; Inspect clamping ring for
Overflow Scupper: Inspect flashing around drain; Inspect strainer for
Drains/Scuppers: Tighten/install bolts. Clear debris
Parapet Membrane Flashing: Inspect for damage/holes/deterioration;
Parapet Counter Flashing: Inspect metal counterflashing; Inspect fasteners;
Inspect end/lap joints in metal
Wall Membrane Flashing: Inspect membrane flashing for holes or damage;
Inspect the flashing seams; Inspect the metal counterflashings for damage/holes and proper attachment
Wall Counter Flashing: Inspect membrane flashing for holes or damage;
Surface, Membrane, Flashing: Apply mastic and fabric. Tighten/install fasteners. Apply caulk/sealant to open metal joints to prevent moisture
Pipe vent: Inspect for corrosion; Inspect pipe flashing for damage/leaks;
Equipment Type:
Component:
PM Components (Task Description)
Check with Facility Manager for deficiencies. Ensure All Safety Equipment Is
Inspect surface for wear and UV protection deterioration
Inspect membrane for holes or damage
D4015 310 1950 01
Dry Pipe Automatic Sprinkler System
B2035 225 1950 07 Labor Hrs M A 2 YR 5 YR 10 YR 20 YR 50 YR
Ladders, Fixed 1 0.0875 X X
Labor-hrs A 2 0.044 X X
1 0.044 x 3 0.044 X X
2 0.167 x 4 0.041 X X
3 Inspect for damaged or corroded handrails/brackets on platforms 0.167 x 5 0.0833 X X
4 Inspect for deteriorating masonry or siding where fixed ladder anchorages are secured to the structure0.167 x 6 0.167 X
5 Inspect for lose or damaged carrier rails or cables 0.167 x 7 0.167 X
6 Inspect for cracked, rusted, or damaged welds 0.500 x 8 0.0833 X
7 Inspect for any surface rust 0.291 x 9 0.0333 X
8 Tighten or replace loose, damaged, or missing bolts, rivet heads, hardware 0.330 x 10 0.167 X
9 Fill out maintenance checklist and report deficiencies 0.167 x 11 0.0833 X
2.000 12 0.0833 X
13 0.0833 X
D4095 100 1950 02 14 0.0833 X
Clean Agent Systems 15 0.0833 X
Labor Hrs A 2 YR 5 YR 16 0.1667 X
1 0.088 X 17 0.0833 X
2 0.044 X 18 0.3333 X
3 0.044 X 19 Operate 0.167 X
4 0.041 X 20 Lubricate 0.167 X
5 0.167 X 21 1 X
6 0.167 X 22 0.25 X
7 0.167 X 23 0.25 X
8 0.083 X 24 0.0833 X
9 0.25 X 25 0.667 X
10 0.25 X 26 1 X
11 0.083 X 27 0.167 X
12 0.5 X 28 2.000 X
13 0.5 X 29 2.000 X
14 1.5 X 30 0.167 X X
15 0.167 X 31 0.167 X X
16 0.167 X Monthly 0.634
Total Annually 1.718 5.0704
0.500 3.585
2.000 0.5833
2.368 0.667
Annualized #REF!
D3035 160 2950 05
Chiller, Scroll, Air Cooled 30 to 130 Ton
Labor-hrs M Q S A
1 0.044 x x x x
2 0.033 x x x x EQUIPMENT TYPE: D4095 400 1950 01
3 0.325 x x x x COMPONENT: Dry & Wet Chemical SystemsFrequency
4 0.036 x x x x PM Components (Task Description) Labor Hrs SA A 5 YR
5 Check superheat and subcooling temperatures 0.325 x x x x
Review facility information sheet, as-built drawings and work order history
0.088 X X
6 0.237 x x x x
Collect maps, communication equipment, tools, safety equipment
0.044 X X
7 0.042 x 3 Notify facility manager/facility occupants 0.044 X X
8 0.117 x 4 Notify fire department/coordinate testing with alarm shop 0.041 X X
9 Inspect condenser coils for dirt and debris, clean as necessary 1.282 x x x x 5 Inspect piping for obstructions and proper support. 0.083 X X
10 Check contactors, sensors and unit safeties 0.094 x
Insepct agent container for condition; verify storage pressure of the propellant 0.167 X
X
11 0.120 x
Inspect and clean piping and nozzles for condition and orientation 0.25 X X
12 Check evaporator and condenser for corrosion 0.052 x x x x 8 Verify quantity and quality of agent 0.5 X X
13 Clean chiller and surrounding area 0.117 x x x x 9 Inspect manual actuator for accessibility 0.167 X X
14 0.167 x x x x 10 Inspect detection devices (fusible links or heat detectors) for 0.25 X X
2.618 11 Test actuation system without agent release (coordinate with annual replacement of fixed temperature sensing elements) 0.25
X
X
Total Monthly 20.944 12 Verify that interfaces (gas shutoff, power shutoff) operate properly 0.167 X
X
2.618 13 Replace fixed temperature sensing elements (fusible 0.25 X
Total Quarterly 5.236 14 Conduct hydrostatic test for pressure cylinders in accordance 4 X
2.618 15 Fill out maintenance checklist, compile list of discrepancies 0.167 X X
2.991 16 Update facility information sheets as required 0.167 X X
31.789 Total Annually 2.635
Total 2 Year
Total 5 Year
Test Quick-Opening device to verify operability
Test "Low Pressure" alarm to verify initiation and receipt of alarm
Inspect Automatic Air Pressure Maintenance Devices to verify proper
Strainers; perform internal inspection and clean to verify condition
Total Monthly
Total Annually
Annualized
Check electrical wiring and connections; tighten loose connections
Compile list of discrepancies and open corrective maintenance job order(s)
Monthly
Quarterly
Semi-Annually
Annually
Check unit for proper operation, excessive noise or vibration
Run system for diagnostics test
Check the electronic expansion valve sight glasses, operating pressures and
Inspect fan(s) or blower(s) for bent blades, clearances, and operation
Check oil level and refrigerant charge, perform a compressor oil analysis
Inspect all piping components for leaks and damage, clean water strainer
Equipment Type:
Component:
PM Components (Task Description)
Collect maps, communication equipment, tools, and safety equipment
Fill out maintenance checklist, compile list of discrepancies and open
Update facility information sheets as required. Note: NFPA 2001 7.2.2
Total 2 Year
Total 5 Year
Annualized
Review facility information sheet, as-built drawings and work order history
Inspect manual actuators for accessibility; test acutation without agent
Test to verify that interfaces (equipment shutdown, dampers, and door
Verify that valves are in proper alignment
Inspect enclosure to verify integrity and ability to maintain agent
Perform complete external inspection of non-discharged cylinders to ensure
Pressure test hoses to ensure suitability for use
PM Components (Task Description)
EQUIPMENT TYPE:
COMPONENT: Frequency
PM Components (Task Description)
Fill out maintenance checklist, compile list of discrepancies and open
Update facility information sheets as required
Test/Replace/Recalibrate all gauges
Label gauges as: "Installed" or "Tested" and Date
Test sample of Fast Response/Extra High Temp sprinklers to verify
Test sample of Standard Sprinklers to verify response characteristics or
Collect maps, communication equipment, tools, safety equipment
Notify fire department/coordinate testing with alarm shop
Inspect and clean piping and nozzles for condition and orientation
Inspect flexible hoses for damage
Notify facility manager/facility occupants
Inspect exterior of storage containers (tanks, spheres, cylinders)
Verify adequate quantity of agent, verify adequate pressure of
Total Annual Hours
Trip valve to verify operability, inspect internal condition before
Equipment Type:
Component:
Check with Facility Manager for deficiencies
Inspect for loose, worn, or damaged rungs/side rails
Test "Low Temperature" alarm initiation and receipt at beginning of
Drain all low points to remove condensation prior to cold season
Verify that results are within acceptable limits. If not, investigate; may
Verify Fire Department Connection (FDC) is accessible and in good
Remove caps/covers from FDC and check for obstructions
Verify heating system operability at beginning of the heating season
Test Water flow Devices (Pressure Switch) to verify that "Alarm" signal is
Visually check the exterior of valves, gauges and trim alignment
Verify valve pressure and legibility of hydraulic nameplate
Conduct main drain test to verify supply
Document Static and Residual pressure readings on a 3X5 tag and secure
Compare results with Acceptance/Previous Main Drain tests
Review facility information sheet, as-built drawings and work order
Collect maps, communication equipment, tools, safety equipment
Notify facility manager/facility occupants
Notify fire department/coordinate testing with alarm shop
Verify position of Main Control, Alarm Test, Alarm Shut-Off valves (If not
If electronic tampers are installed; Operate valve to activate tamper
EQUIPMENT TYPE:
COMPONENT: Frequency
PM Components (Task Description)
D5095 250 3950 03
Perform Grounding Checks Ammo Facility - Per Facility Equipment Type: G3025 536 1950 01
Labor-hrs 2 yrs Component: Grease Trap Inspection Capacity 750 - 1250 Gals
1 0.044 x Labor-hrs M Q S A
2 0.017 x 1 Collect maps, communication equipment, tools, safety equipment 0.044 x x x x
3 0.044 x 2 Remove lids, grates, and covers as required 0.200 x x x x
4 Obtain approval to enter secured area from guard if required 0.044 x 3 Inspect for cracks or leaks 0.150 x x x x
5 Don 0.044 x 4 Check depth of grease and solid waste 0.100 x x x x
6 Check 0.083 x 5 Check trap to insure grease is not passing through with water 0.150 x x x x
7 If possible 0.083 x 6 Check drain lines for damage or stoppage 0.150 x x x x
8 Check to 0.083 x 7 Check cleanout on the drain 0.150 x x x x
9 Inspect cable and ground rods for corrosion 0.083 x 8 Pump/remove grease and solid waste (as required) 0.500 x x x x
10 Inspect/tighten ground connections as required 0.016 x 9 Fill out 0.167 x x x x
11 Locate test point 0.083 x 1.611
12 Drive reference pins and attach cables 0.050 12.888
13 Check ground reading 0.033 x 3.222
14 Record results 0.033 x 1.611
15 0.167 x 1.611
1.000 19.500
Equipment Type: D5095 250 3950 02 EQUIPMENT TYPE: D4095 100 1950 01
Component: Perform Grounding Checks AF System Facility -Per Facility COMPONENT: Carbon Dioxide Systems Frequency
PM Components (Task Description) Labor-hrs 5 Year PM Components (Task Description) Labor Hrs SA A 2 YR 5 YR
1 Collect maps, communication equipment, tools, safety equipment 0.044 x
Review facility information sheet, as-built drawings and work order history
0.088 X X
2 Check for current meter calibration date if required 0.017 x
Collect maps, communication equipment, tools, safety equipment
0.044 X X
3 Coordinate inspection with facility manager 0.044 x 3 Notify facility manager/facility occupants 0.044 X X
4 Obtain approval to enter secured area from guard if required 0.044 x
Notify fire department/coordinate testing with alarm shop 0.041 X X
5 0.044 x 5 Verify adequate liquid level with tank level gauge 0.083 X X
6 0.050 x
Inspect piping and flexible hoses for condition and proper support 0.5 X
7 0.085 x 7 Check nozzles for obstruction and alignment 0.167 X
8 0.050 x
Check level and pressure gauges on low pressure tanks, verify valve alignment 0.167 X X
9 0.033 x
Inspect high pressure cylinders for condition and securing 0.083 X
10 0.050 x
Exercise control panel function, including zone valve operation. Inspect manual actuators for accessibility. Check times and time delay (pre-discharge) 1
X
11 0.083 x
Test Auxiliary Equipment to verify that interfaces (shutdown, door closers, and dampers) operate properly and are activated by the control panel 0.25
X
12 0.050 x 12 Verify CO2 quantity by weighing cylinders 1.5 X X
13 0.033 x
Perform complete external visual inspection of non-discharged cylinders to ensure suitability for use 0.5 X
14 0.033 x
Fill out maintenance checklist, compile list of discrepancies and open corrective maintenance job order(s) to make the repair(s)
0.167 X X
15 0.167 x
Update facility information sheets as required. Note: NFPA
2001 7.2.2 dictates any 5 year inspection requirements, if any apply, and will be completed by Work Task
0.167 X X
1.000 Total Semi-Annually 2.301
Total Annually 4.301
Total 5 Year 0.500
Annualized 6.7015
Locate test point
Drive reference pins and attach cables
Check ground reading
Record results
Compile list of discrepancies and open corrective maintenance job order(s) to make the repair(s)
Five Year Total
PM Components (Task Description)
Total Semi-Annual Hours
Total Annual Hours
Total Monthly Hours
Total Quarterly Hours
Inspect cable and ground rods for corrosion
Inspect/tighten ground connections as required
Check system neutral to ensure system is grounded at transformer
If possible verify the grounding systems within the facility are bonded
Check to see if flashover protection is installed on insulated fittings on underground metallic pipeline entering the facility (if accessable)
Don safety equipment
Compile list of discrepancies and open corrective maintenance job order(s)
Total Annual Hours
Collect maps, communication equipment, tools, safety equipment
Check for current meter calibration date if required
Coordinate inspection with facility manager and ensure no munitions are
Equipment Type:
Component:
PM Components (Task Description)
Monthly Hours
Total Annualized Hours
File details come from the government source that posted it. Updated .