BOMS PPQ 20200611.pdf

PDF 205 KB Posted

Attached to
Base Operations Maintenance Service at Joint Base Elmendorf-Richardson
Solicitation number
FA5000-20-R-0019
Issued by

View the file

Other files

File Type Posted
JBER BOMS Industry Questions Draft RFP 2.pdf PDF
Appendix 10 Facilities.pdf PDF
A9.4. Storm Drain Map.pdf PDF
Appendix 7 PM List.pdf PDF
Attachment 6 - PPQ 20200721.pdf PDF
Solicitation - FA500020R0019 12 Aug DRAFT.pdf PDF
Questions from Industry_Answers 12 Aug 2020.pdf PDF
Appendix 17 PMTL.pdf PDF
A9.7 Pit Toilet Map.pdf PDF
A9.5. Sign Map.pdf PDF
TAB2 BOMS PWS_20200807 Draft.pdf PDF
A9.8. Bike Path Map.pdf PDF
A9.6. Railroad Map.pdf PDF
A9.3. Fence-Gate Map.pdf PDF
A9.2. Pavement Marking Map.pdf PDF
A9.1. Grading Map.pdf PDF
Appendix 15 JBER-R Signs.pdf PDF
BOMS Complete PWS 1 May 2020.pdf PDF
DRAFT Solicitation - FA500020R0019 19 Jun 2020.pdf PDF
DBA AK20200007.pdf PDF
SCA 2015_5682 Rev 10.pdf PDF
SCA 2015_5681 Rev 9.pdf PDF
DBA AK20200001.pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

YES NO N/A

Mechanical

(HVAC,

Controls, Plumbing)

Oil Water Separators

Horizontal Maintenance

Roads & Airfields

Industrial Electrical (Lightning Protection/

Grounding, etc)

Fire Suppression

Hazmat/ Asbestos/ Mold/

Abatement Removal

Roofing/ Insulation/ Thermal & Moisture Control

>300 >150 <150

Multiple Single

CDCs Gyms Dining Facilities Dormitories Office Buildings Motorpools Other

>50 Years old >40 Years old >30 Years old >20 Years old >10 Years old <10 Years old

Exceptional Satisfactory Marginal Unsatisfactory

Exceptional Satisfactory Marginal Unsatisfactory

Exceptional Satisfactory Marginal Unsatisfactory

Remarks (if necessary)

SECTION F - ASSESSED EVALUATION RATINGS:

To be completed by each reference using the rating scale in Section E. Please provide a check mark to indicate assessed rating for each question. An overall rating is requested for each of the major rated area (i.e Quality, Schedule, Management, Regulatory). Please describe in the remarks, any issues that may have influenced overall ratings which are not represented in the questions.

2. SCHEDULE

c. How would you rate the contractor's ability to provide services in compliance with contract requirements?

b. How would rate the contractor's ability to adhere to their Quality Control Plan, and/or inspection procedures?

b. How would you rate the Contractor's ability to provide CDRLS, reports, submittals, or other deliverables in a timely manner?

Overall Rating for "Schedule"

Remarks (if necessary)

Remarks (if necessary)

RATED AREAS

SECTION E - EVALUATION RATING DEFINITIONS:

RATING DEFINITIONS

Exceptional Performance meets contractual requirements and exceeds many to the Government’s benefit. The contractual performance of the element or sub-element being evaluated was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.

Satisfactory Performance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.

Marginal Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being evaluated reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented.

Unsatisfactory Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains a serious problem(s) for which the contractor’s corrective actions appear or were ineffective.

RATINGS

Overall Rating for "Quality of Services"

REMARKS

4. Please select what maintenance services were included under this contract? (Select all that apply)

QUESTIONS

2. Did this contract include inspection, certifying, maintaining, and cleaning of oil water separators?

3. Did your service contract include any temporary or portable heating capabilities in case of an unexpected outage?

1. Did this contract contain industrial application boiler maintenance and operations?

5. Please select how many facilities were maintained under this contract? (Select all that apply)

7. Please select what types of facilities were maintained under this contract? (Select all that apply)

8. Please select the ages of facilities maintained under this contract? (Select all that apply)

SECTION D: QUESTIONS REGARDING THE SCOPE OF CONTRACT

To be completed by each reference using checkmarks to indicate selection.

6. Were there multiple facility types maintained under this contract, or were they of a uniform/single type?

1. QUALITY OF SERVICES

a. How would you rate the Contractor's ability to maintain a schedule, meet specific response times, and adjust to varying work load?

3. MANAGEMENT

a. How would you rate the contractor's response to deficiencies, customer complaints, and re-performance if necessary?

Exceptional Satisfactory Marginal Unsatisfactory4. REGULATORY Remarks (if necessary)

a. How well would you rate the contractor's responsiveness of communication ?

b. How would you rate the Contractor's ability to adapt to varying work situations?

c. How would you rate the Contractor's ability to identify problems, displayed initiative to provide solutions to those problems, and performed as a Team Member?

d. How well would you rate the contractor's ability to hire quality subcontractor's and successfully manage their work?

Overall Rating for "Management"

Please provide any additional remarks they may have influenced the ratings above:

a. How would you rate the contractor's ability to adhere to OSHA guidelines for safety?

b. How would you rate the contractor's ability to adhere to environmental regulatory guidance?

Overall Rating for "Regulatory"

c. How would you rate the contractor's ability to meet the requirements of FAR 52.219-14 Limitations on Subcontracting? (if applicable)

Check Box1: Off
Check Box2: Off
Check Box3: Off
Text4:
Check Box5: Off
Check Box6: Off
Check Box7: Off
Check Box8: Off
Check Box9: Off
Check Box10: Off
Text11:
Text12:
Check Box13: Off
Check Box14: Off
Check Box15: Off
Check Box16: Off
Check Box17: Off
Check Box18: Off
Check Box19: Off
Check Box20: Off
Check Box21: Off
Check Box22: Off
Check Box23: Off
Check Box24: Off
Check Box25: Off
Check Box26: Off
Check Box27: Off
Check Box28: Off
Check Box29: Off
Check Box30: Off
Check Box31: Off
Check Box32: Off
Check Box33: Off
Check Box34: Off
Check Box35: Off
Check Box36: Off
Check Box37: Off
Check Box38: Off
Check Box39: Off
Check Box40: Off
Check Box41: Off
Check Box42: Off
Check Box43: Off
Check Box44: Off
Check Box45: Off
Check Box46: Off
Check Box47: Off
Check Box48: Off
Check Box49: Off
Check Box50: Off
Check Box51: Off
Check Box52: Off
Check Box53: Off
Check Box54: Off
Check Box55: Off
Check Box56: Off
Check Box57: Off
Check Box58: Off
Check Box59: Off
Check Box60: Off
Check Box61: Off
Check Box62: Off
Check Box63: Off
Check Box64: Off
Check Box65: Off
Check Box66: Off
Check Box67: Off
Check Box68: Off
Check Box69: Off
Check Box70: Off
Check Box71: Off
Check Box72: Off
Check Box73: Off
Check Box74: Off
Check Box75: Off
Check Box76: Off
Check Box77: Off
Check Box78: Off
Check Box79: Off
Check Box80: Off
Check Box81: Off
Check Box82: Off
Check Box83: Off
Check Box84: Off
Check Box85: Off
Check Box86: Off
Check Box87: Off
Check Box88: Off
Check Box89: Off
Check Box90: Off
Check Box91: Off
Check Box92: Off
Check Box93: Off
Check Box94: Off
Check Box95: Off
Check Box96: Off
Check Box97: Off
Check Box98: Off
Check Box99: Off
Check Box100: Off
Check Box101: Off
Text102:
Text103:
Text104:
Text105:
Text106:
Text107:
Text108:
Text109:
Text110:
Text111:
Text112:
Text113:
Text114:
Text115:
Text116:
Text117:
Text118:
Text119:
Text120:

File details come from the government source that posted it. Updated .