Attachment 2 - DRAFT Request For Proposal (RFP) dated 30 January 2014

View the file

Other files for this federal contract opportunity

Other files attached to JOINT BASE ELMENDORF-RICHARDSON SABER IDIQ, newest first.
File Type Posted
FA5000-14-R-0022 _Amend_0001.pdf PDF
Att_11_CTC__Labor_Rates.pdf PDF
_02_Q A.pdf PDF
SABER_Site_Visit_Powerpoint.pdf PDF
SABER_Site_Visit_Minutes.pdf PDF
SABER_Site_Visit_Record_of_Attendance.pdf PDF
_01_Q A.pdf PDF
Att_6_CTC_March2014.pdf PDF
Att_7_Price_Evaluation_Worksheet_31July2014.xlsx XLSX spreadsheet
Att_9_PPQ.docx DOCX document
SOW_Att_2_Elmendorf_Architectural_Standards.pdf PDF
Att_1_AK140001_Building Heavy.pdf PDF
SOW_Att_3_Richardson_Installation_Design_Guide.pdf PDF
SOW_Att_1_JBER_OPLAN_19-3.pdf PDF
Att_5_Technical_Specifications_March2014.pdf PDF
SOW_Att_4_JBER_Telecommunications_Installation_Standards.pdf PDF
Att_10_SABER_Historical_Data.pdf PDF
Att_2_AK140004_Residential.pdf PDF
FA5000-14-R-0022_Solicitation.pdf PDF
Att_8_-_Past_Performance_Project_Listing.docx DOCX document
Att_4_SABER__SOW_(21Jul2014).pdf PDF
Att_3_AK140007_Highway.pdf PDF
SABER_Draft_SOW_(30_Jan_2014).pdf PDF
Draft_RFP_Verbiage.pdf PDF
SABER_Draft_Inst_to_Offerors(17Jan2014).pdf PDF
Questions_Comments_Matrix.xlsx XLSX spreadsheet
SABER_Draft_Coefficient_Structure(17January2014).pdf PDF
Show all 27

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

This is a Competitive HUBZone Procurement for an Indefinite Delivery, Indefinite Quantity (IDIQ) Simplif ied Acquisition of Base Engineer Requirements (SABER), JBER, Alaska. Contractor shall provide all plant, material, and equipment and w ork necessary to complete each delivery order (not to exceed $2,000,000.00). Work consists of, but is not limited to: a broad range of maintenance, repair, and minor construction w ork. This project is open to HUBZone firms certif ied by the SBA. All responsible sources w hich have a NAICS (North American Industry Classif ication System) 236220 among their approved codes may submit a proposal w hich shall be considered by the agency. The size standard is $33.5 Million. All other f irms are deemed ineligible to submit offers.

THIS PROJECT IS A HUBZONE SET-ASIDE PROJECT.

MAGNITUDE OF PROJECT IS BETWEEN $20,000,000.00 - $100,000,000.00

SUSAN R. REINHART 907-552-5337

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

30-Jan-2014

(RFP)

(IFB)

X

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

X

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________365 calendar days after receiving aw ard, notice to proceed. This performance period is X mandatory, negotiable. (See _________________________

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________3 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee X is, is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______120 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

FA5000 - 673D CONTRACTING SQUADRON

10480 SIJAN AVE

JBER AK 99506-2501

FA5000

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

(hour) Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

907 552 7497FAX:TEL: 907 552 5351 TEL: FAX:

FA5000-14-R-0022 67

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

FA5000-14-R-0022

Section B - Supplies or Services and Prices

ITEM NO SUPPLIES/SERVICES MAX

QUANTITY

UNIT UNIT PRICE MAX AMOUNT

0001 20,000,000 Each SABER IDIQ: Base Year

FFP

This acquisition shall provide Simplified Acquisition of Base Engineering Requirements (SABER) services. The Contractor shall perform any and all functions called out in the contract per scope specified in individual task orders issued against this contract.

FOB: Destination

SIGNAL CODE: A

MAX

NET AMT

UNIT UNIT PRICE MAX AMOUNT

0002 20,000,000 Each OPTION SABER IDIQ: Option Year One

FFP

This acquisition shall provide Simplified Acquisition of Base Engineering Requirements (SABER) services. The Contractor shall perform any and all functions called out in the contract per scope specified in individual task orders issued against this contract.

UNIT UNIT PRICE MAX AMOUNT

0003 20,000,000 Each OPTION SABER IDIQ: Option Year Two

FFP

This acquisition shall provide Simplified Acquisition of Base Engineering Requirements (SABER) services. The Contractor shall perform any and all functions called out in the contract per scope specified in individual task orders issued against this contract.

UNIT UNIT PRICE MAX AMOUNT

0004 20,000,000 Each OPTION SABER IDIQ: Option Year Three

FFP

This acquisition shall provide Simplified Acquisition of Base Engineering Requirements (SABER) services. The Contractor shall perform any and all functions called out in the contract per scope specified in individual task orders issued against this contract.

UNIT UNIT PRICE MAX AMOUNT

0005 20,000,000 Each OPTION SABER IDIQ: Option Year Four

FFP

This acquisition shall provide Simplified Acquisition of Base Engineering Requirements (SABER) services. The Contractor shall perform any and all functions called out in the contract per scope specified in individual task orders issued against this contract.

CONTRACT MINIMUM/MAXIMUM QUANTITY AND CONTRACT VALUE

The minimum quantity and contract value for all orders issued against this contract shall not be less than the minimum quantity and contract value stated in the following table. The maximum quantity and contract value for all orders issued against this contract shall not exceed the maximum quantity and contract value stated in the following table.

MINIMUM

QUANTITY

MINIMUM

AMOUNT

MAXIMUM

QUANTITY

MAXIMUM

AMOUNT

1.00 $20,000.00 999,999.00 $100,000,000.00

DELIVERY/TASK ORDER MINIMUM/MAXIMUM QUANTITY AND ORDER VALUE

The minimum quantity and order value for each Delivery/Task Order issued shall not be less than the minimum quantity and order value stated in the following table. The maximum quantity and order value for each Delivery/Task Order issued shall not exceed the maximum quantity and order value stated in the following table.

MINIMUM

QUANTITY

MINIMUM

AMOUNT

MAXIMUM

QUANTITY

MAXIMUM

1.00 $2,000.00 999,999.00 $2,000,000.00

CLIN DELIVERY/TASK ORDER MINIMUM/MAXIMUM QUANTITY AND CLIN ORDER VALUE

The minimum quantity and order value for the given Delivery/Task Order issued for this CLIN shall not be less than the minimum quantity and order value stated in the following table. The maximum quantity and order value for the given Delivery/Task Order issued for this CLIN shall not exceed the maximum quantity and order value stated in the following table.

CLIN

MINIMUM

QUANTITY

MINIMUM

AMOUNT

MAXIMUM

QUANTITY

MAXIMUM

Section E - Inspection and Acceptance

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

0001 Destination Government Destination Government 0002 Destination Government Destination Government 0003 Destination Government Destination Government 0004 Destination Government Destination Government 0005 Destination Government Destination Government

ADDITIONAL

ADDITIONAL

E. 1. INSPECTION AND ACCEPTANCE: The Base Civil Engineer, or his authorized representative, is designated as the representative of the Contracting Officer for the purpose of technical surveillance of the workmanship and inspection of materials for work being performed under this contract. This designation in no way authorizes anyone other than the Contracting Officer to commit the Government to changes in the terms of the contract or Delivery Orders thereto.

(Inspection and acceptance will be at JBER Alaska as indicated in individual delivery orders)

Section F - Deliveries or Performance

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC

0001 365 dys. ADC 20,000,000 F1W3EA - 673D CES - CEP/CER/CEA

ROBERT MCELROY

6326 ARCTIC WARRIOR

JBER AK 99506-3221

552-1601

F1W3EA

0002 365 dys. ADC 20,000,000 (SAME AS PREVIOUS LOCATION)

0003 365 dys. ADC 20,000,000 (SAME AS PREVIOUS LOCATION)

0004 365 dys. ADC 20,000,000 (SAME AS PREVIOUS LOCATION)

0005 365 dys. ADC 20,000,000 (SAME AS PREVIOUS LOCATION)

Section H - Special Contract Requirements

INSURANCE

REQUIRED INSURANCE

REQUIRED INSURANCE

(IAW FAR 28.306(b))

Reference FAR clause 52.228-5 entitled "Insurance..." the contractor shall, at its own expense, procure and thereafter maintain the following kinds of insurance with respect to performance under the contract.

(a) Workers’ compensation and employer’s liability. Contractors are required to comply with applicable Federal and State workers’ compensation and occupational disease statutes. If occupational diseases are not compensable under those statutes, they shall be covered under the employer’s liability section of the insurance policy, except when contract operations are so commingled with a contractor’s commercial operations that it would not be practical to require this coverage. Employer’s liability coverage of at least $100,000 shall be required, except in States with exclusive or monopolistic funds that do not permit workers’ compensation to be written by private carriers. (See 28.305(c) for treatment of contracts subject to the Defense Base Act.)

(b) General liability.

(1) The contracting officer shall require bodily injury liability insurance coverage written on the comprehensive form of policy of at least $500,000 per occurrence.

(2) Property damage liability insurance shall be required only in special circumstances as determined by the agency.

(c) Automobile liability. The contracting officer shall require automobile liability insurance written on the comprehensive form of policy. The policy shall provide for bodily injury and property damage liability covering the operation of all automobiles used in connection with performing the contract. Policies covering automobiles operated in the United States shall provide coverage of at least $200,000 per person and $500,000 per occurrence for bodily injury and $20,000 per occurrence for property damage. The amount of liability coverage on other policies shall be commensurate with any legal requirements of the locality and sufficient to meet normal and customary claims.

http://farsite.hill.af.mil/reghtml/regs/far2afmcfars/fardfars/far/28.htm%23P360_59325%23P360_59325

Section I - Contract Clauses

NAFI

NAFI The clauses below are applicable to Non-Appropriated funds task orders. NAF Clauses

GENERAL PROVISIONS

l. DEFINITIONS (JAN 2005) - As used throughout this contract, the following terms and abbreviations have the meanings set forth below:

The term "contract" means this agreement or order and any modifications hereto.

The abbreviation "NAFI" means Nonappropriated Fund Instrumentality of the United States Government.

c. The term "Contracting Officer" means the person executing or responsible for administering this contract on behalf of the NAFI, which is a party hereto, or their successor or successors.

d. The term "Contractor" means the party responsible for providing supplies and/or services at a certain price or rate to the NAFI under this contract.

e. The abbreviation “FAR” means Federal Acquisition Regulation.

2. DISPUTES (NOV 2005)

Except as otherwise provided in this contract, any dispute or claim concerning this contract which is not disposed of by agreement shall be decided by the Contracting Officer, who shall state his decision in writing and mail or otherwise furnish a copy of it to the Contractor. Within 30 days from the date of receipt of such copy, the Contractor may appeal by mailing or otherwise furnishing to the Contracting Officer a written appeal addressed to the Armed Services Board of Contract Appeals, and the decision of the Board shall be final and conclusive; provided that if no such appeal is filed, the decision of the Contracting Officer shall be final and conclusive. The Contractor shall be afforded an opportunity to be heard and to offer evidence in support of any appeal under this clause. Pending final decision on such a dispute, however, the Contractor shall proceed diligently with the performance of the contract and in accordance with the decision of the Contracting Officer unless directed to do otherwise by the Contracting Officer.

A claim by the Contractor shall be made in writing and submitted to the Contracting Officer for a written decision. Contractors shall provide the certification specified below when submitting any claim. Any person duly authorized to bind the Contractor with respect to the claim may execute the certification. “I certify that the claim is made in good faith; that the supporting data is accurate and complete to the best of my knowledge and belief; that the amount requested accurately reflects the contract adjustment for which the Contractor believes the Government is liable; and that I am duly authorized to certify on behalf of the Contractor.”

This "Disputes" clause does not preclude consideration of law questions in connection with decisions provided for in paragraph "a" above, provided, that nothing in this contract shall be construed as making final the decision of any administrative official, representative, or board on a question of law.

1. LAW GOVERNING CONTRACTS (JAN 2005) - In any dispute arising out of this contract, the decision of which requires consideration of law questions, the rights and obligations of the parties shall be interpreted and determined in accordance with the substantive laws of the United States of America.

2. LEGAL STATUS (JAN 2005) - The NAFI is an integral part of the Department of Defense and is an instrumentality of the United States Government. Therefore, NAFI contracts are United States Government contracts; however, they do not obligate appropriated funds of the United States.

1. EXAMINATION OF RECORDS (JAN 2005) - This clause is applicable under contracts that are entered into by means of negotiation and where price and costing data are required to support a determination of price reasonableness. This clause does not apply to commercial items or when the Contracting Officer determines that prices agreed upon are based on adequate price competition. The Contractor agrees that the Contracting Officer or his duly authorized representative shall have the right to examine and audit the books and records of the Contractor directly pertaining to the contract during the period of the contract and until the expiration of three years after the final payment.

2. ASSIGNMENT (JAN 2005) - The Contractor or its assignee’s rights to be paid amounts due as a result of performance of this contract, may be assigned. No assignment by the Contractor, assigning its rights or delegating its obligations under this contract will be effective and binding on the NAFI until the written terms of the assignment have been approved in writing by the Contracting Officer.

3. GRATUITIES (JAN 2005)

a. The NAFI may, by written notice to the Contractor, terminate the right of the Contractor to proceed under this contract if it is found, after notice and hearing, by the Secretary of the Air Force or their duly authorized representative, that gratuities (in the form of entertainment, gifts, or otherwise) were offered or given by the Contractor, or any agent, or representative of the Contractor, to any officer or employees of the Government or the NAFI with a view toward securing favorable treatment with respect to the awarding or amending, or the making of any determinations with respect to the performing of such contract.

b. In the event this contract is terminated as provided in paragraph "a" hereof, the NAFI shall be entitled

(i) to pursue the same remedies against the Contractor as it could pursue in the event of a breach of contract by the Contractor, and

(ii) as a penalty in addition to any other damages to which it may be entitled by law, to exemplary damages in an amount (as determined by the Secretary of the Air Force or their duly authorized representative) which shall be not less than three nor more than ten times the cost incurred by the Contractor in providing any such gratuities to any such officer or employee.

c. The rights and remedies of the NAFI provided in this clause shall not be exclusive and are in addition to any other rights and remedies provided by law or under this contract.

1. TERMINATION FOR CONVENIENCE (JAN 2005) - The Contracting Officer, by written notice, may terminate this contract, in whole or in part, when it is in the best interest of the NAFI. If this contract is for supplies and is so terminated, the Contractor shall be compensated in accordance with FAR, Sub Parts 49.1 and

49.2 in effect on this contract's date. To the extent that this contract is for services and is so terminated, the NAFI shall be liable only for payment in accordance with the payment provisions of this contract for services rendered prior to the effective date of termination, providing there are no Contractor claims covering nonrecurring costs for capital investment. If there are any such Contractor claims, they shall be settled in accordance with FAR, Sub Parts 49.1 and 49.2.

2. CANCELLATION BY MUTUAL AGREEMENT (JAN 2005) - Should the situation warrant, the parties upon mutual agreement and no costs, may cancel this contract.

3. TERMINATION FOR CAUSE (JAN 2005)

a. (1) The NAFI may, subject to paragraphs (c) and (d) below, by written notice of cause to the Contractor, terminate this contract in whole or in part if the Contractor fails to-

(i) Deliver the supplies or perform the service within the time specified within this contract or any Extension;

(ii) Make progress, so as to endanger performance of this contract (but see subparagraph (a)(2) below);or

(iii) Perform any of the other provisions of this contract (but see subparagraph (a)(2) below).

(2) The NAFI's right to terminate this contract under subdivisions (1)(ii) and (1)(iii) above, may be exercised if the Contractor does not cure such failure within 10 days (or more if authorized in writing by the Contracting Officer) after receipt of notice from the Contracting Officer specifying the failure.

b. If the NAFI terminates this contract in whole or in part, it may acquire, under the terms and in the manner the Contracting Officer considers appropriate, supplies or services similar to those terminated, and the Contractor will remain liable to the NAFI for any excess costs for those supplies or services. However the Contractor must continue the work not terminated.

c. The Contractor shall not be liable for any excess costs if the failure to perform the contract arises from causes beyond the control and without the fault or negligence of the Contractor. Examples of such causes include

(1) acts of God or of the public enemy,

(2) act of the NAFI in either its sovereign or contractual capacity,

(3) fires,

(4) floods,

(5) epidemics,

(6) quarantine restrictions,

(7) strikes,

(8) freight embargoes, and;

(9) unusually severe weather. Defaults by subcontractors at any tier for any reason do not constitute causes beyond the control and without the fault or negligence of the Contractor.

d. If this contract is terminated for cause, the NAFI may require the Contractor to transfer title and deliver to the NAFI as directed by the Contracting Officer, any

(1) completed supplies, and

(2) partially completed supplies and materials, parts, tool dies, jigs, fixtures, plans, drawings, information, and contract rights (collectively referred to as manufacturing materials in the clause) that the Contractor has specifically produced or acquired for the terminated portion of this contract. Upon direction of the Contracting Officer, the Contractor shall also protect and preserve property in its possession in which the NAFI has an interest.

e. The NAFI shall pay the contract price for completed supplies delivered and accepted. The Contractor and Contracting Officer shall agree on the amount of payment for manufacturing materials delivered and accepted and for the protection and preservation of the property. Failure to agree will be a dispute under the Disputes Clause. The NAFI may withhold from these amounts any sum the Contracting Officer determines to be necessary to protect the NAFI against loss because of outstanding liens or claims of former lien holders.

f. If, after termination, it is determined that the cause by the Contractor was excusable, the rights and obligations of the parties shall be the same as if the termination had been issued for convenience of the NAFI.

g. The rights and remedies of the NAFI in this clause are in addition to any other rights and remedies provided by law or under this contract.

11. INSPECTION AND ACCEPTANCE (JAN 2005) - Inspection and acceptance will be at destination, unless otherwise provided in this contract. Not withstanding the requirements for any NAFI inspection and test contained in specifications applicable to this contract, except where specialized inspections or tests are specified for performance solely by the NAFI, the Contractor, shall perform or have performed the inspections and tests required to substantiate that the supplies provided under the contract conform to the drawings, specifications, and contract requirements listed herein, including if applicable the technical requirements for the manufacturers' part numbers specified herein.

The Contractor shall only tender for acceptance those items that conform to the requirements of this contract. The Government reserves the right to inspect or test any supplies or services that have been tendered for acceptance. The Government may require repair or replacement of nonconforming supplies or reperformance of nonconforming services at no increase in contract price. Acceptance of the supplies or services or a written notice of rejections must be accomplished on or before the fifth working day following delivery of the supplies or services, unless otherwise specified in this contract.

1. VARIATION IN QUANTITY (JAN 2005) - No variation in quantity of any item called for by this contract will be accepted unless authorized by the Contracting Officer.

2. PARTIAL DELIVERIES (JAN 2005) - Partial deliveries are not permitted unless authorized by the terms of the contract or approved by the Contracting Officer.

3. PAYMENTS (JAN 2005) - Partial payments will be made when deliveries are authorized or as approved by the Contracting Officer. Payments and penalties for late payments are subject to the requirements established by the Prompt Payment Act, as amended, and as implemented for NAFI's. If the NAFI makes payment but such payment fails to include a prompt payment penalty due to the Contractor within 10 days from when the contract payment is made, penalty amounts will not be paid unless the Contractor makes a written request within forty days after the date of payment.

4. HOLD AND SAVE HARMLESS (JAN 2005) - The Contractor shall indemnify, hold and save harmless, and defend the NAFI, its outlets and customers from any liability, claimed or established for violation or infringement of any patent, copyright, or trademark right asserted by any third party with respect to goods hereby ordered or any part thereof. Contractor further agrees to hold the NAFI harmless from all claims or judgments for damages resulting from the use of products or services listed in this contract, except for such claims or damages caused by, or resulting from negligence of NAFI customers, employees, agents, or representatives. Also, Contractor shall at all times hold and save harmless the NAFI, its agents, representatives, and employees from any and all suits, claims, charges, and expenses which arise out of acts or omissions of Contractor, its agents, representatives, or employees.

5. MODIFICATIONS (JAN 2005) - No agreement or understanding to modify this contract will be binding upon the NAFI unless made in writing and signed by a Contracting Officer from the office that issued the contract or its successor.

6. TAXES (JAN 2005)

a. Except as may be otherwise provided in this contract, the contract price includes all taxes, duties or other public charges in effect and applicable to this contract on the contract date, except any tax, duty, or other public charge, which by law, regulation or governmental agreement, is not applicable to expenditures made by the NAFI or on its behalf; or any tax, duty, or other public charge from which the Contractor, or any subcontractor hereunder, is exempt by law, regulation or otherwise. If any such tax, duty, or other public charge has been included in the contract price, through error or otherwise, the contract price shall be correspondingly reduced.

b. If for any reason, after the contract date of execution, the Contractor or subcontractor is relieved in whole or in part from the payment or the burden of any tax, duty, or other public charge included in the contract price, the contract price shall be correspondingly reduced; or if the Contractor or subcontractor is required to pay in whole or in part any tax, duty, of other public charge which was not applicable at the contract date of execution the contract price shall be correspondingly increased.

18. PROOF OF SHIPMENT (JAN 2005) - (Applicable to shipments outside the United States through the Surface Deployment and Distribution Command (SDDC) and Parcel Post shipments to overseas destinations.)

a. Notwithstanding any clause of this contract to the contrary, payment will be made for items not yet received, upon receipt of an invoice accompanied by an appropriate proof of shipment. If shipment is made by insured parcel post, the contractor must furnish a copy of the Insured Mail Receipt issued by the US Postal Service. Otherwise, a stamped copy of a Certificate of Mailing issued by the US Postal Service must be furnished. If shipment is made by a common carrier (rail, air or motor freight), the Contractor must furnish a signed copy of the shipping document on which items are receipted for by the common carrier. A signed receipt by a NAFI representative at the delivery point (CCP or POE) is also acceptable evidence of proof of shipment.

b. Forwarding a proof of shipment and an invoice for payment by the Contractor shall be construed as a certification by the contractor that the items shipped conform to the specifications.

c. Notwithstanding any provisions of this clause or any payment made pursuant to the terms of this clause prior to receipt of the items contracted for, the NAFI retains the right to inspect upon receipt and the right to reject nonconforming items. The liability of the Contractor with respect to items for which payments have been made will, after inspection by the NAFI or after the expiration of a reasonable time following delivery to the NAFI within which inspection may be made, whichever occurs first, be limited to

(i) exceptions taken at the time of inspection, and

(ii) latent defects, fraud, or such gross mistakes as amount to fraud.

1. COMMERCIAL WARRANTY (JAN 2005) - The Contractor agrees that the supplies or services furnished under this contract shall be covered by the most favorable commercial warranties the Contractor gives to any customer for such supplies or services and that the rights and remedies provided herein are in addition to and do not limit any rights afforded to the NAFI by any other clause of this contract. The printed terms and conditions of such warranty will be provided to the NAFI with the delivery of any supplies covered.

2. ADVERTISEMENTS (JAN 2005) - Contractor agrees that none of its nor its agent's advertisements, to include publications, merchandise, promotions, coupons, sweepstakes, contest, sales brochures, etc, shall state, infer or imply that the Contractor's products or services are approved, promoted, or endorsed by the NAFI. Any advertisement, including cents-off coupons, which refers to a NAFI will contain a statement that the advertisement is neither paid for, nor sponsored in whole or in part by, the particular activity.

3. DISCOUNTS FOR PROMPT PAYMENT (JAN 2005)

a. Discounts for prompt payment will not be considered in the evaluation of offers. However, any offered discount will form a part of the award, and will be taken if payment is made within the discount period indicated in the offer by the offeror. As an alternative to offering a prompt payment discount in conjunction with the offer, offerors awarded contracts may include prompt payment discounts on individual invoices.

b. In connection with any discount offered for prompt payment, time shall be computed from the date of the invoice.

If the Contractor has not placed a date on the invoice, the due date shall be calculated from the date the designated billing office receives a proper invoice, provided the agency annotates such invoice with the date of receipt at the time of receipt. For the purpose of computing the discount earned, payment shall be considered to have been made on the date that appears on the payment check or, for an electronic funds transfer, the specified payment date. When the discount date falls on a Saturday, Sunday, or legal holiday when Federal Government offices are closed and Government business is not expected to be conducted, payment may be made on the following business day.

22. INVOICES (JAN 2005):

a. An invoice is a written request for payment under the contract for supplies delivered or for services rendered.

In order to be proper, an invoice should include (and in order to support the payment of interest penalties, must include) the following:

(i) Invoice date;

(ii) Name of Contractor;

(iii) Contract number (including order number, if any), contract line item number, contract description of supplies or services, quantity, contract unit of measure and unit price, and extended total;

(iv) Shipment number and date of shipment (Bill of Lading number and weight of shipment will be shown for shipments on Government Bills of Lading);

(v) Name and address to which payment is to be sent (which must be the same as that in the contract or on a proper notice of assignment);

(vi) Name (where practicable), title, phone number and mailing address of person to be notified in event of a defective invoice; and

(vii) Any other information or documentation required by other provisions of the contract (such as evidence of shipment). Invoices shall be prepared and submitted in duplicate (one copy shall be marked “Original") unless otherwise specified.

b. For purposes of determining if interest begins to accrue under the PROMPT PAYMENT ACT (PUBLIC LAW 97-177):

(i) A proper invoice will be deemed to have been received when it is received by the office designated in the contract for receipt of invoices and acceptance of the supplies delivered or services rendered has occurred.

(ii) Payment shall be considered made on the date on which a check for such payment is dated.

(iii) Payment terms (e.g., "Net 20") offered by the contractor will not be deemed Required payment dates.

(iv) The following periods of time will not be included:

(A) After receipt of improper invoice and prior to notice of any defect or impropriety, but not to exceed three days for meat and meat food products, five days for perishable agricultural commodities, and 15 days in all other cases, and

(B) Between the date of a notice of any defect or impropriety and the date a proper invoice is received. When the notice is in writing, it shall be considered made on the date shown on the notice.

1. ELECTRONIC FUND TRANSFER PAYMENTS (AUG 2007) - Federal law 31 USC requires Federal payments to be made by electronic fund transfer. Any payment made on this contract will be made by EFT (unless otherwise specified within the contract or exempted by law). After award of the contract the EFT Partner Enrollment Form will be provided and must be completed to accomplish EFT payments.

2. NOTIFICATION OF DEBARMENT/SUSPENSION STATUS (JAN 2005) - The Contractor shall provide immediate notice to the Contracting Officer in the event of being suspended, debarred or declared ineligible by any other Federal Department or agency, or upon receipt of a notice of proposed debarment from another DOD Agency, during the performance of this contract.

3. NON WAIVER OF DEFAULTS (JAN 2005) - Any failure by the NAFI at any time, or from time to time, to enforce or require strict performance of any terms or conditions of this contract will not constitute waiver thereof and will not affect or impair such terms or conditions in any way or the NAFI’s right at any time to avail itself of such remedies as it may have for any breach or breaches of such terms and conditions.

CLAUSES INCORPORATED BY REFERENCE

52.202-1 Definitions NOV 2013 52.203-3 Gratuities APR 1984 52.203-5 Covenant Against Contingent Fees APR 1984 52.203-6 Restrictions On Subcontractor Sales To The Government SEP 2006 52.203-7 Anti-Kickback Procedures OCT 2010 52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or

Improper Activity

JAN 1997

52.203-10 Price Or Fee Adjustment For Illegal Or Improper Activity JAN 1997 52.203-12 Limitation On Payments To Influence Certain Federal

Transactions

OCT 2010

52.203-13 Contractor Code of Business Ethics and Conduct APR 2010 52.203-17 Contractor Employee Whistleblower Rights and Requirement

To Inform Employees of Whistleblower Rights

SEP 2013

52.204-2 Alt I Security Requirements (Aug 1996) - Alternate I APR 1984 52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber

Content Paper

MAY 2011

52.204-7 System for Award Management JUL 2013 52.204-9 Personal Identity Verification of Contractor Personnel JAN 2011 52.209-6 Protecting the Government's Interest When Subcontracting

With Contractors Debarred, Suspended, or Proposed for Debarment

AUG 2013

52.209-9 Updates of Publicly Available Information Regarding Responsibility Matters

JUL 2013

52.211-13 Time Extensions SEP 2000 52.211-15 Defense Priority And Allocation Requirements APR 2008 52.211-18 Variation in Estimated Quantity APR 1984 52.215-2 Audit and Records--Negotiation OCT 2010 52.215-8 Order of Precedence--Uniform Contract Format OCT 1997 52.215-21 Requirements for Certified Cost or Pricing Data or

Information Other Than Certified Cost or Pricing Data-- Modifications

OCT 2010

52.216-19 Order Limitations OCT 1995 52.219-3 Notice of HUBZone Set-Aside or Sole Source Award NOV 2011 52.219-8 Utilization of Small Business Concerns JUL 2013 52.219-14 Limitations On Subcontracting NOV 2011 52.222-1 Notice To The Government Of Labor Disputes FEB 1997 52.222-3 Convict Labor JUN 2003 52.222-4 Contract Work Hours and Safety Standards Act - Overtime

Compensation

JUL 2005

52.222-6 Davis Bacon Act JUL 2005 52.222-7 Withholding of Funds FEB 1988 52.222-9 Apprentices and Trainees JUL 2005 52.222-10 Compliance with Copeland Act Requirements FEB 1988 52.222-11 Subcontracts (Labor Standards) JUL 2005 52.222-12 Contract Termination-Debarment FEB 1988 52.222-13 Compliance with Davis-Bacon and Related Act Regulations. FEB 1988 52.222-14 Disputes Concerning Labor Standards FEB 1988 52.222-15 Certification of Eligibility FEB 1988 52.222-21 Prohibition Of Segregated Facilities FEB 1999 52.222-26 Equal Opportunity MAR 2007 52.222-27 Affirmative Action Compliance Requirements for

Construction

FEB 1999

52.222-30 Davis-Bacon Act--Price Adjustment (None or Separately Specified Method)

DEC 2001

52.222-35 Equal Opportunity for Veterans SEP 2010 52.222-36 Affirmative Action For Workers With Disabilities OCT 2010 52.222-37 Employment Reports on Veterans SEP 2010 52.222-40 Notification of Employee Rights Under the National Labor

Relations Act

DEC 2010

52.222-50 Combating Trafficking in Persons FEB 2009 52.222-54 Employment Eligibility Verification AUG 2013 52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction Contracts

SEP 2013

52.223-3 Hazardous Material Identification And Material Safety Data JAN 1997

52.223-5 Pollution Prevention and Right-to-Know Information MAY 2011 52.223-6 Drug-Free Workplace MAY 2001 52.223-11 Ozone-Depleting Substances MAY 2001 52.223-12 Refrigeration Equipment and Air Conditioners MAY 1995 52.223-17 Affirmative Procurement of EPA-Designated Items in Service and Construction Contracts

MAY 2008

52.223-18 Encouraging Contractor Policies To Ban Text Messaging While Driving

AUG 2011

52.225-13 Restrictions on Certain Foreign Purchases JUN 2008 52.227-1 Authorization and Consent DEC 2007 52.227-2 Notice And Assistance Regarding Patent And Copyright

Infringement

DEC 2007

52.228-2 Additional Bond Security OCT 1997 52.228-5 Insurance - Work On A Government Installation JAN 1997 52.228-11 Pledges Of Assets JAN 2012 52.228-12 Prospective Subcontractor Requests for Bonds OCT 1995 52.228-14 Irrevocable Letter of Credit DEC 1999 52.228-15 Performance and Payment Bonds--Construction OCT 2010 52.229-3 Federal, State And Local Taxes FEB 2013 52.232-5 Payments under Fixed-Price Construction Contracts SEP 2002 52.232-17 Interest OCT 2010 52.232-18 Availability Of Funds APR 1984 52.232-27 Prompt Payment for Construction Contracts JUL 2013 52.232-33 Payment by Electronic Funds Transfer--System for Award

Management

JUL 2013

52.233-3 Protest After Award AUG 1996 52.233-4 Applicable Law for Breach of Contract Claim OCT 2004 52.236-2 Differing Site Conditions APR 1984 52.236-3 Site Investigation and Conditions Affecting the Work APR 1984 52.236-5 Material and Workmanship APR 1984 52.236-6 Superintendence by the Contractor APR 1984 52.236-7 Permits and Responsibilities NOV 1991 52.236-8 Other Contracts APR 1984 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements

APR 1984

52.236-10 Operations and Storage Areas APR 1984 52.236-11 Use and Possession Prior to Completion APR 1984 52.236-12 Cleaning Up APR 1984 52.236-13 Accident Prevention NOV 1991 52.236-14 Availability and Use of Utility Services APR 1984 52.236-15 Schedules for Construction Contracts APR 1984 52.236-17 Layout of Work APR 1984 52.236-26 Preconstruction Conference FEB 1995 52.236-28 Preparation of Proposals--Construction OCT 1997 52.242-13 Bankruptcy JUL 1995 52.242-14 Suspension of Work APR 1984 52.244-5 Competition In Subcontracting DEC 1996 52.244-6 Subcontracts for Commercial Items JUL 2013 52.245-1 Government Property APR 2012 52.246-12 Inspection of Construction AUG 1996 52.246-13 Inspection--Dismantling, Demolition, or Removal of

Improvements

AUG 1996

52.246-21 Warranty of Construction MAR 1994 52.248-3 Value Engineering-Construction OCT 2010

52.249-2 Alt I Termination for Convenience of the Government (Fixed- Price) (Apr 2012) - Alternate I

SEP 1996

52.253-1 Computer Generated Forms JAN 1991 252.201-7000 Contracting Officer's Representative DEC 1991 252.203-7000 Requirements Relating to Compensation of Former DoD

Officials

SEP 2011

252.203-7001 Prohibition On Persons Convicted of Fraud or Other Defense- Contract-Related Felonies

DEC 2008

252.203-7002 Requirement to Inform Employees of Whistleblower Rights SEP 2013 252.203-7003 Agency Office of the Inspector General DEC 2012 252.204-7000 Disclosure Of Information AUG 2013 252.204-7003 Control Of Government Personnel Work Product APR 1992 252.204-7004 Alt A System for Award Management Alternate A MAY 2013 252.205-7000 Provision Of Information To Cooperative Agreement Holders DEC 1991 252.209-7004 Subcontracting With Firms That Are Owned or Controlled By

The Government of a Terrorist Country

DEC 2006

252.223-7004 Drug Free Work Force SEP 1988 252.225-7012 Preference For Certain Domestic Commodities FEB 2013 252.227-7023 Drawings and Other Data to become Property of Government MAR 1979 252.227-7033 Rights in Shop Drawings APR 1966 252.231-7000 Supplemental Cost Principles DEC 1991 252.232-7003 Electronic Submission of Payment Requests and Receiving

Reports

JUN 2012

252.232-7003 Electronic Submission of Payment Requests and Receiving Reports

JUN 2012

252.232-7006 Wide Area WorkFlow Payment Instructions MAY 2013 252.236-7000 Modification Proposals-Price Breakdown DEC 1991 252.236-7002 Obstruction of Navigable Waterways DEC 1991 252.236-7005 Airfield Safety Precautions DEC 1991 252.236-7008 Contract Prices-Bidding Schedules DEC 1991 252.243-7001 Pricing Of Contract Modifications DEC 1991 252.243-7002 Requests for Equitable Adjustment DEC 2012 252.246-7000 Material Inspection And Receiving Report MAR 2008 252.247-7024 Notification Of Transportation Of Supplies By Sea MAR 2000

CLAUSES INCORPORATED BY FULL TEXT

52.203-14 DISPLAY OF HOTLINE POSTER(S) (DEC 2007)

(a) Definition.

United States, as used in this clause, means the 50 States, the District of Columbia, and outlying areas.

(b) Display of fraud hotline poster(s). Except as provided in paragraph (c)--

(1) During contract performance in the United States, the Contractor shall prominently display in common work areas within business segments performing work under this contract and at contract work sites--

(i) Any agency fraud hotline poster or Department of Homeland Security (DHS) fraud hotline poster identified in paragraph (b)(3) of this clause; and

(ii) Any DHS fraud hotline poster subsequently identified by the Contracting Officer.

(2) Additionally, if the Contractor maintains a company website as a method of providing information to employees, the Contractor shall display an electronic version of the poster(s) at the website.

(3) Any required posters may be obtained as follows:

Poster(s) Obtain from http://www.oig.dhs.gov/assets/Hotline/DHS_OIG_Hotline-optimized.jpg

(c) If the Contractor has implemented a business ethics and conduct awareness program, including a reporting mechanism, such as a hotline poster, then the Contractor need not display any agency fraud hotline posters as required in paragraph (b) of this clause, other than any required DHS posters.

(d) Subcontracts. The Contractor shall include the substance of this clause, including this paragraph (d), in all subcontracts that exceed $5,000,000, except when the subcontract--

(1) Is for the acquisition of a commercial item; or

(2) Is performed entirely outside the United States.

(End of clause)

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than the date indicated per each task order. The time stated for completion shall include final cleanup of the premises.

52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEP 2000)

(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $629.09 for first and last day and $524.61 for each calendar day of delay until the work is completed or accepted.

(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination http://www.oig.dhs.gov/assets/Hotline/DHS_OIG_Hotline-optimized.jpg clause.

52.215-1 INSTRUCTIONS TO OFFERORS--COMPETITIVE ACQUISITION (JAN 2004)

(a) Definitions. As used in this provision--

“Discussions” are negotiations that occur after establishment of the competitive range that may, at the Contracting Officer's discretion, result in the offeror being allowed to revise its proposal.

“In writing or written” means any worded or numbered expression which can be read, reproduced, and later communicated, and includes electronically transmitted and stored information.

“Proposal modification” is a change made to a proposal before the solicitation's closing date and time, or made in response to an amendment, or made to correct a mistake at any time before award.

“Proposal revision” is a change to a proposal made after the solicitation closing date, at the request of or as allowed by a Contracting Officer as the result of negotiations.

“Time”, if stated as a number of days, is calculated using calendar days, unless otherwise specified, and will include Saturdays, Sundays, and legal holidays. However, if the last day falls on a Saturday, Sunday, or legal holiday, then the period shall include the next working day.

(b) Amendments to solicitations. If this solicitation is amended, all terms and conditions that are not amended remain unchanged. Offerors shall acknowledge receipt of any amendment to this solicitation by the date and time specified in the amendment(s).

(c) Submission, modification, revision, and withdrawal of proposals. (1) Unless other methods (e.g., electronic commerce or facsimile) are permitted in the solicitation, proposals and modifications to proposals shall be submitted in paper media in sealed envelopes or packages (i) addressed to the office specified in the solicitation, and (ii) showing the time and date specified for receipt, the solicitation number, and the name and address of the offeror.

Offerors using commercial carriers should ensure that the proposal is marked on the outermost wrapper with the information in paragraphs (c)(1)(i) and (c)(1)(ii) of this provision.

(2) The first page of the proposal must show--

(i) The solicitation number;

(ii) The name, address, and telephone and facsimile numbers of the offeror (and electronic address if available);

(iii) A statement specifying the extent of agreement with all terms, conditions, and provisions included in the solicitation and agreement to furnish any or all items upon which prices are offered at the price set opposite each item;

(iv) Names, titles, and telephone and facsimile numbers (and electronic addresses if available) of persons authorized to negotiate on the offeror's behalf with the Government in connection with this solicitation; and

(v) Name, title, and signature of person authorized to sign the proposal. Proposals signed by an agent shall be accompanied by evidence of that agent's authority, unless that evidence has been previously furnished to the issuing office.

(3) Submission, modification, or revision, of proposals.

(i) Offerors are responsible for submitting proposals, and any modifications, or revisions, so as to reach the Government office designated in the solicitation by the time specified in the solicitation. If no time is specified in the solicitation, the time for receipt is 4:30 p.m., local time, for the designated Government office on the date that proposal or revision is due.

(ii)(A) Any proposal, modification, or revision received at the Government office designated in the solicitation after the exact time specified for receipt of offers is “late” and will not be considered unless it is received before award is made, the Contracting Officer determines that accepting the late offer would not unduly delay the acquisition; and--

(1) If it was transmitted through an electronic commerce method authorized by the solicitation, it was received at the initial point of entry to the Government infrastructure not later than 5:00 p.m. one working day prior to the date specified for receipt of proposals; or

(2) There is acceptable evidence to establish that it was received at the Government installation designated for receipt of offers and was under the Government's control prior to the time set for receipt of offers; or

(3) It is the only proposal received.

(B) However, a late modification of an otherwise successful proposal that makes its terms more favorable to the Government, will be considered at any time it is received and may be accepted.

(iii) Acceptable evidence to establish the time of receipt at the Government installation includes the time/date stamp of that installation on the proposal wrapper, other documentary evidence of receipt maintained by the installation, or oral testimony or statements of Government personnel.

(iv) If an emergency or…