FA5000-14-R-0022 Attachment 11 Construction Task Catalog - Labor Rates
View the file
Other files for this federal contract opportunity
Show all 27
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
01 General Requirements
01 20 Price And Payment Procedures 01 22 Unit Prices
MINOR TOTAL DIRECT DEMOLITION
CSI UOM DESCRIPTION LABOR EQUIP MATERIAL UNIT COST UNIT COST
March 2014 copyright © 2014 The Gordian Group, Inc.
Joint Base Elmendorf Richardson (JBER) SABER Page 01 - 1
01 22 Unit Prices
01 22 20 Wage Rates For tasks not included in the Construction Task Catalog® and as directed by owner only. Wage rates include base rate, fringe and an allowance for payroll taxes, worker's compensation, unemployment insurance, etc.
01 22 20 00-0001 Local Labor/Wage Rates Welders receive the rate prescribed for the craft performing the operation to which the welding is incidental.
01 22 20 00-0002 HR Asbestos Removal Worker .................................................................................................................................................................................................................................. 77.90 0.00 0.00 77.90 0.00 Tasks in the CTC include appropriate costs to cover labor. These tasks will be requested specifically by the owner for miscellaneous work not covered in the CTC.
0084 For Foreman, Add 3.90 0085 For Apprentice, Deduct -15.58 01 22 20 00-0003 HR Insulator ................................................................................................................................................................................................................................................................ 66.03 0.00 0.00 66.03 0.00
Tasks in the CTC include appropriate costs to cover labor. These tasks will be requested specifically by the owner for miscellaneous work not covered in the CTC.
0084 For Foreman, Add 3.30 0085 For Apprentice, Deduct -13.21
01 22 20 00-0004 HR Boilermaker........................................................................................................................................................................................................................................................... 84.62 0.00 0.00 84.62 0.00 Tasks in the CTC include appropriate costs to cover labor. These tasks will be requested specifically by the owner for miscellaneous work not covered in the CTC.
0084 For Foreman, Add 4.23 0085 For Apprentice, Deduct -16.92 01 22 20 00-0005 HR Brick Layer ............................................................................................................................................................................................................................................................ 71.70 0.00 0.00 71.70 0.00
Tasks in the CTC include appropriate costs to cover labor. These tasks will be requested specifically by the owner for miscellaneous work not covered in the CTC.
0084 For Foreman, Add 3.59 0085 For Apprentice, Deduct -14.34 01 22 20 00-0006 HR Carpenter .............................................................................................................................................................................................................................................................. 73.19 0.00 0.00 73.19 0.00
Tasks in the CTC include appropriate costs to cover labor. These tasks will be requested specifically by the owner for miscellaneous work not covered in the CTC.
0084 For Foreman, Add 3.66 0085 For Apprentice, Deduct -14.64
01 22 20 00-0007 HR Carpet, Linoleum .................................................................................................................................................................................................................................................. 54.63 0.00 0.00 54.63 0.00 Tasks in the CTC include appropriate costs to cover labor. These tasks will be requested specifically by the owner for miscellaneous work not covered in the CTC.
0084 For Foreman, Add 2.73 0085 For Apprentice, Deduct -10.93 01 22 20 00-0008 HR Cement Mason ..................................................................................................................................................................................................................................................... 68.03 0.00 0.00 68.03 0.00
Tasks in the CTC include appropriate costs to cover labor. These tasks will be requested specifically by the owner for miscellaneous work not covered in the CTC.
0084 For Foreman, Add 3.40 0085 For Apprentice, Deduct -13.61 01 22 20 00-0009 HR Drywall Finisher .................................................................................................................................................................................................................................................... 60.79 0.00 0.00 60.79 0.00
Tasks in the CTC include appropriate costs to cover labor. These tasks will be requested specifically by the owner for miscellaneous work not covered in the CTC.
0084 For Foreman, Add 3.04 0085 For Apprentice, Deduct -12.16
01 22 20 00-0010 HR Electrician ............................................................................................................................................................................................................................................................. 72.76 0.00 0.00 72.76 0.00 Tasks in the CTC include appropriate costs to cover labor. These tasks will be requested specifically by the owner for miscellaneous work not covered in the CTC.
0084 For Foreman, Add 3.64 0085 For Apprentice, Deduct -14.55 01 22 20 00-0011 HR Equipment Operator, Heavy (Crane) .................................................................................................................................................................................................................. 73.37 0.00 0.00 73.37 0.00
Tasks in the CTC include appropriate costs to cover labor. These tasks will be requested specifically by the owner for miscellaneous work not covered in the CTC.
0084 For Foreman, Add 3.67 0085 For Apprentice, Deduct -14.67 01 22 20 00-0012 HR Equipment Operator, Medium (Bulldozer) .......................................................................................................................................................................................................... 71.10 0.00 0.00 71.10 0.00
Tasks in the CTC include appropriate costs to cover labor. These tasks will be requested specifically by the owner for miscellaneous work not covered in the CTC.
0084 For Foreman, Add 3.56 0085 For Apprentice, Deduct -14.22 01 22 20 00-0013 HR Equipment Operator, Light (Backhoe, Bobcat) ................................................................................................................................................................................................... 70.10 0.00 0.00 70.10 0.00
Tasks in the CTC include appropriate costs to cover labor. These tasks will be requested specifically by the owner for miscellaneous work not covered in the CTC.
0084 For Foreman, Add 3.51 0085 For Apprentice, Deduct -14.02
March 2014 copyright © 2014 The Gordian Group, Inc.
Joint Base Elmendorf Richardson (JBER) SABER Page 01 - 2
01 22 20 00-0014 HR Glazier ................................................................................................................................................................................................................................................................... 67.22 0.00 0.00 67.22 0.00 Tasks in the CTC include appropriate costs to cover labor. These tasks will be requested specifically by the owner for miscellaneous work not covered in the CTC.
0084 For Foreman, Add 3.36 0085 For Apprentice, Deduct -13.44 01 22 20 00-0015 HR Laborer .................................................................................................................................................................................................................................................................. 72.32 0.00 0.00 72.32 0.00
Tasks in the CTC include appropriate costs to cover labor. These tasks will be requested specifically by the owner for miscellaneous work not covered in the CTC.
01 22 20 00-0016 HR Lather .................................................................................................................................................................................................................................................................... 70.16 0.00 0.00 70.16 0.00
Tasks in the CTC include appropriate costs to cover labor. These tasks will be requested specifically by the owner for miscellaneous work not covered in the CTC.
0084 For Foreman, Add 3.51 0085 For Apprentice, Deduct -14.03 01 22 20 00-0017 HR Marble Setter ........................................................................................................................................................................................................................................................ 71.71 0.00 0.00 71.71 0.00
Tasks in the CTC include appropriate costs to cover labor. These tasks will be requested specifically by the owner for miscellaneous work not covered in the CTC.
0084 For Foreman, Add 3.59 0085 For Apprentice, Deduct -14.34 01 22 20 00-0018 HR Millwright ............................................................................................................................................................................................................................................................... 65.87 0.00 0.00 65.87 0.00
Tasks in the CTC include appropriate costs to cover labor. These tasks will be requested specifically by the owner for miscellaneous work not covered in the CTC.
0084 For Foreman, Add 3.29 0085 For Apprentice, Deduct -13.17 01 22 20 00-0019 HR Painter, Ordinary .................................................................................................................................................................................................................................................. 59.08 0.00 0.00 59.08 0.00
Tasks in the CTC include appropriate costs to cover labor. These tasks will be requested specifically by the owner for miscellaneous work not covered in the CTC.
0084 For Foreman, Add 2.95 0085 For Apprentice, Deduct -11.82
01 22 20 00-0020 HR Painter, Structural Steel ....................................................................................................................................................................................................................................... 71.89 0.00 0.00 71.89 0.00 Tasks in the CTC include appropriate costs to cover labor. These tasks will be requested specifically by the owner for miscellaneous work not covered in the CTC.
0084 For Foreman, Add 3.59 0085 For Apprentice, Deduct -14.38 01 22 20 00-0021 HR Paperhanger ......................................................................................................................................................................................................................................................... 59.08 0.00 0.00 59.08 0.00
Tasks in the CTC include appropriate costs to cover labor. These tasks will be requested specifically by the owner for miscellaneous work not covered in the CTC.
0084 For Foreman, Add 2.95 0085 For Apprentice, Deduct -11.82 01 22 20 00-0022 HR Pile Drivers ........................................................................................................................................................................................................................................................... 75.83 0.00 0.00 75.83 0.00
Tasks in the CTC include appropriate costs to cover labor. These tasks will be requested specifically by the owner for miscellaneous work not covered in the CTC.
0084 For Foreman, Add 3.79 0085 For Apprentice, Deduct -15.17 01 22 20 00-0023 HR Plasterer................................................................................................................................................................................................................................................................ 69.59 0.00 0.00 69.59 0.00
Tasks in the CTC include appropriate costs to cover labor. These tasks will be requested specifically by the owner for miscellaneous work not covered in the CTC.
0084 For Foreman, Add 3.48 0085 For Apprentice, Deduct -13.92 01 22 20 00-0024 HR Plumber ................................................................................................................................................................................................................................................................. 71.27 0.00 0.00 71.27 0.00
Tasks in the CTC include appropriate costs to cover labor. These tasks will be requested specifically by the owner for miscellaneous work not covered in the CTC.
0084 For Foreman, Add 3.56 0085 For Apprentice, Deduct -14.25 01 22 20 00-0025 HR Powderman........................................................................................................................................................................................................................................................... 74.68 0.00 0.00 74.68 0.00
Tasks in the CTC include appropriate costs to cover labor. These tasks will be requested specifically by the owner for miscellaneous work not covered in the CTC.
0084 For Foreman, Add 3.73 0085 For Apprentice, Deduct -14.94 01 22 20 00-0026 HR Rodman (Reinforcing)/Ornamental Steel Worker............................................................................................................................................................................................... 76.12 0.00 0.00 76.12 0.00
Tasks in the CTC include appropriate costs to cover labor. These tasks will be requested specifically by the owner for miscellaneous work not covered in the CTC.
0084 For Foreman, Add 3.81 0085 For Apprentice, Deduct -15.22 01 22 20 00-0027 HR Roofer, Composite ............................................................................................................................................................................................................................................... 79.37 0.00 0.00 79.37 0.00
Tasks in the CTC include appropriate costs to cover labor. These tasks will be requested specifically by the owner for miscellaneous work not covered in the CTC.
0084 For Foreman, Add 3.97 0085 For Apprentice, Deduct -15.87 01 22 20 00-0028 HR Roofer, Tile/Slate .................................................................................................................................................................................................................................................. 79.37 0.00 0.00 79.37 0.00
Tasks in the CTC include appropriate costs to cover labor. These tasks will be requested specifically by the owner for miscellaneous work not covered in the CTC.
0084 For Foreman, Add 3.97 0085 For Apprentice, Deduct -15.87 01 22 20 00-0029 HR Sheet Metal Worker ............................................................................................................................................................................................................................................. 77.07 0.00 0.00 77.07 0.00
Tasks in the CTC include appropriate costs to cover labor. These tasks will be requested specifically by the owner for miscellaneous work not covered in the CTC.
0084 For Foreman, Add 3.85
March 2014 copyright © 2014 The Gordian Group, Inc.
Joint Base Elmendorf Richardson (JBER) SABER Page 01 - 3
0085 For Apprentice, Deduct -15.41 01 22 20 00-0030 HR Sprinkler Installer .................................................................................................................................................................................................................................................. 75.16 0.00 0.00 75.16 0.00
Tasks in the CTC include appropriate costs to cover labor. These tasks will be requested specifically by the owner for miscellaneous work not covered in the CTC.
0084 For Foreman, Add 3.76 0085 For Apprentice, Deduct -15.03 01 22 20 00-0031 HR Steam / Pipe Fitter................................................................................................................................................................................................................................................ 71.27 0.00 0.00 71.27 0.00
Tasks in the CTC include appropriate costs to cover labor. These tasks will be requested specifically by the owner for miscellaneous work not covered in the CTC.
0084 For Foreman, Add 3.56 0085 For Apprentice, Deduct -14.25 01 22 20 00-0032 HR Stone Mason......................................................................................................................................................................................................................................................... 71.70 0.00 0.00 71.70 0.00
Tasks in the CTC include appropriate costs to cover labor. These tasks will be requested specifically by the owner for miscellaneous work not covered in the CTC.
0084 For Foreman, Add 3.59 0085 For Apprentice, Deduct -14.34 01 22 20 00-0033 HR Structural Steel Worker ........................................................................................................................................................................................................................................ 80.68 0.00 0.00 80.68 0.00
Tasks in the CTC include appropriate costs to cover labor. These tasks will be requested specifically by the owner for miscellaneous work not covered in the CTC.
0084 For Foreman, Add 4.03 0085 For Apprentice, Deduct -16.14 01 22 20 00-0034 HR Tile Layer .............................................................................................................................................................................................................................................................. 68.78 0.00 0.00 68.78 0.00
Tasks in the CTC include appropriate costs to cover labor. These tasks will be requested specifically by the owner for miscellaneous work not covered in the CTC.
0084 For Foreman, Add 3.44 0085 For Apprentice, Deduct -13.76 01 22 20 00-0035 HR Terrazzo Finisher ................................................................................................................................................................................................................................................. 68.86 0.00 0.00 68.86 0.00
Tasks in the CTC include appropriate costs to cover labor. These tasks will be requested specifically by the owner for miscellaneous work not covered in the CTC.
0084 For Foreman, Add 3.44 0085 For Apprentice, Deduct -13.77 01 22 20 00-0036 HR Truck Driver, Light ................................................................................................................................................................................................................................................ 68.01 0.00 0.00 68.01 0.00
Tasks in the CTC include appropriate costs to cover labor. These tasks will be requested specifically by the owner for miscellaneous work not covered in the CTC.
0084 For Foreman, Add 3.40 0085 For Apprentice, Deduct -13.60 01 22 20 00-0037 HR Truck Driver, Heavy ............................................................................................................................................................................................................................................. 70.81 0.00 0.00 70.81 0.00
Tasks in the CTC include appropriate costs to cover labor. These tasks will be requested specifically by the owner for miscellaneous work not covered in the CTC.
0084 For Foreman, Add 3.54 0085 For Apprentice, Deduct -14.16
XXXXXXX
01 22 20 00-0038 Rates For Services
01 22 20 00-0039 HR Watchman/Guard, Unarmed ................................................................................................................................................................................................................................ 28.36 0.00 0.00 28.36 0.00 01 22 20 00-0040 HR Watchman/Guard, Armed .................................................................................................................................................................................................................................... 38.51 0.00 0.00 38.51 0.00 01 22 20 00-0041 HR OSHA Testing ....................................................................................................................................................................................................................................................... 71.25 0.00 0.00 71.25 0.00 01 22 20 00-0042 HR Investigating Engineer Or Specialty Consultant ................................................................................................................................................................................................. 80.00 0.00 0.00 80.00 0.00
For special investigating requirements or services outside required architectural and engineering services.
01 22 20 00-0043 HR Investigating Senior Engineer Or Specialty Consultant ................................................................................................................................................................................... 125.00 0.00 0.00 125.00 0.00
For special investigating requirements or services outside required architectural and engineering services.
01 22 20 00-0044 HR Industrial Hygienist ............................................................................................................................................................................................................................................... 34.69 0.00 0.00 34.69 0.00 01 22 20 00-0045 HR On Site Material Testing Technician ................................................................................................................................................................................................................... 57.00 0.00 0.00 57.00 0.00 01 22 20 00-0046 MI Mileage For Professional Services (Engineering, Surveying, Etcetera)............................................................................................................................................................... 0.00 0.00 0.56 0.56 0.00
For use only when the Owner directs the contractor to use personnel whose base of operations is more than 100 miles from the site. Quantity shall be miles that exceed 100.
XXXXXXX
01 22 20 00-0047 Rates For Traffic Control
01 22 20 00-0048 HR Flagperson For Traffic Control............................................................................................................................................................................................................................. 72.32 0.00 0.00 72.32 0.00
END OF SECTION 01
March 2014 copyright © 2014 The Gordian Group, Inc.
Joint Base Elmendorf Richardson (JBER) SABER Page 01 - 4
THIS PAGE INTENTIONALLY LEFT BLANK