This statement of work and related federal contract opportunity outline requirements for a roof repair project at Mountain Home Air Force Base in Idaho. The statement of work requires repairing approximately 1,000 square feet of standing seam metal roofing on Gymnasium 2371 to match existing panels, which will involve reworking 630 linear feet of seam. No asbestos or lead is expected. The contractor must procure the proper metal roof seamer and install correct rollers to produce the required folded standing seam. The opportunity was posted through the Department of the Air Force Air Combat Command under solicitation number FA489724R0003. Key dates include a site visit on March 7th, questions due by March 12th, and proposals due by March 21st. The contractor will be responsible for safety, protecting building occupants, and cleaning up after completion of the roof repair work.

View the file

Other files

Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

13 March 2024 Project: WT# 13585616 Title: Repair Metal Roof Section J, Facility 2371 Project Manager: Charles Shoemaker Facility: Base Gymnasium 2371 Period of Performance: 30 days Liquidated Damages: Does not apply to this project Submittals: None Government Furnished Material: None

Work requirements:

Contractor shall procure the proper metal roof seamer. Contractor shall ensure that the correct rollers for the seamer are installed to produce the correct folded standing seam on Gymnasium 2371 to match the existing panels as shown on attached drawing. Approximately 1,000 square feet or 630 linear feet of standing seam need re-worked. (approximate area of work highlighted). The Standing Seam Metal Roof Panels are approximately 16” wide X 90’ long. No asbestos or lead based materials are expected to be encountered during construction.

Repair the roof at Gymnasium 2371 re-seaming 7 roof panels standing seams. The edge panel may have exposed fasteners (Screws with watertight washers) securely installed to purlins. Metal roofing materials removed may be disposed of at base recycle center. Re-install all trim metal if removed.

Gasketed fasteners matching the trim colors may be utilized to ensure security on the leading edge to prevent further wind damage.

The following requirements are part of this project:

1. All materials shall be installed in accordance with manufacturer’s recommendations and installations instructions.

2. Environmental: All work shall be in accordance with latest Mountain Home AFB Environmental Specifications.

3. Safety: All work shall be in accordance with OSHA regulations.

4. During construction the building will remain occupied. Contractor shall provide protection for building occupants entering or leaving the building as necessary. Contractor shall also protect and ensure water does not enter the building and shall be responsible for any damages caused by construction.

5. Clean up project area after repair work complete.