This statement of work outlines requirements for a roof repair project at an Air Force facility. The Department of the Air Force Air Combat Command is seeking to replace metal roof panels. Interested contractors must register for an optional site visit by March 5th and submit any questions by March 12th. Proposals are due March 21st. The project involves replacing existing metal roof panels with new panels of similar or higher quality. Contractors should describe their experience with comparable military construction projects and metal roof installations. This statement of work provides contractors with the necessary details to understand the scope of work and respond with a proposal by the specified deadline.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
7 December 2023 Project: WT# 13585616 Title: Repair Metal Roof Section J, Facility 2371 Project Manager: Charles Shoemaker Facility: Base Gymnasium 2371 Period of Performance: 30 days Liquidated Damages: Does not apply to this project Submittals: None Government Furnished Material: None
Work requirements:
Contractor shall procure and install metal roof panels on Gymnasium 2371 to match the existing panels and as shown on attached drawing, approximately 1,000 square feet (approximate area of work highlighted). The Standing Seam Metal Roof Panels are approximately 16” wide X 90’ long.
No asbestos or lead based materials are expected to be encountered during construction.
Repair the roof at Gymnasium 2371 by removing and replacing roof panels (see attached drawing).
Metal roofing materials removed may be disposed of at base recycle center. Re-install all trim metal that had to be removed to enable installation of the new panels. In addition, install approximately 490 panel clips 16 inches on center over each metal roof panel (approximate area of work identified in attached drawing).
The following requirements are part of this project:
1. All materials shall be installed in accordance with manufacturer’s recommendations and installations instructions.
2. Environmental: All work shall be in accordance with latest Mountain Home AFB Environmental Specifications.
3. Safety: All work shall be in accordance with OSHA regulations.
4. During construction the building will remain occupied. Contractor shall provide protection for building occupants entering or leaving the building as necessary. Contractor shall also protect and ensure water does not enter the building and shall be responsible for any damages caused by construction.
5. Clean up project area after repair work complete.