This document provides details for a federal contract opportunity to repair metal roof panels at an Air Force facility. The solicitation number is FA489724R0003 and interested vendors must register for a site visit by March 5, 2024 at 3:00PM MST in order to attend the in-person site visit scheduled for March 7, 2024 at 1:00PM MST. Questions regarding the opportunity are due by March 12, 2024 at 1:00PM MST and proposals must be submitted by March 21, 2024 at 3:30PM MST to the Department of the Air Force Air Combat Command. The attached roof report PDF provides additional technical specifications for the metal roof panel repair work required at the Air Force facility.

View the file

Other files

Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Proposal

02370/02371-FITNESS CENTER

365 Aardvark Ave 385 Aardvark Ave

Mountain Home AFB, ID 83648

Inspection Date: Friday, June 8, 2012

02370/02371-FITNESS CENTER Proposal

Mountain Home AFB Page 2

Building & Job Summary

Building Name 02370/02371-FITNESS CENTER

Building Address 365 Aardvark Ave 385 Aardvark Ave Mountain Home AFB, ID 83648

Year Built 1958

Roof Area (total) 82,810 SF

Building Description

Inspection Date Friday, June 8, 2012

Inspector Inspector 2399 not found

Inspection Notes

Building Contact

Client Contact

Mountain Home AFB Page 3

Section Key Plan

Mountain Home AFB Page 4

Section Information Section ID: J - northeast

Area: 8,879 SF

Roof Type: Metal Layers:

● Metal surface:

○ Material: Steel

○ Type: Architectural panel

○ Profile: Standing seam

○ Color: Beige

○ Coating: Kynar

Roof Condition Score: 90 (Adequate)

Section ID: J - northeast (Photo #2)

Area: 8,879 SF

Section ID: J - northeast (Photo #3)

Section ID: J - northeast (Photo #4)

Mountain Home AFB Page 5

Section ID: J - northeast (Photo #5)

Section ID: J - northeast (Photo #6)

Section ID: J - northeast (Photo #7)

Section ID: J - northeast (Photo #8)

Section J

Mountain Home AFB Page 6

Mountain Home AFB Page 7

Section Summary – J

Section ID: J - northeast

Year Installed: 2002 (approximate)

Height: 20 FT

Floors: 0

Sensitivity: Low

Roof Condition Score: 90 (Adequate)

Roof Type: Metal

Layers:

● Metal surface:

○ Material: Steel

○ Type: Architectural panel

○ Profile: Standing seam

○ Color: Beige

○ Coating: Kynar

Notes: None

Mountain Home AFB Page 8

Inventory Detail – Section J Segment

Raised edge

Segment

Drip edge

Segment

Cladding

Segment

Drip edge

Segment

Wall counter flashing

Segment

Cladding

Pipe vent

● Size: 2"

● Material: PVC

● Flashing: Rubber boot

Mountain Home AFB Page 9

Pipe vent

● Size: 2"

Pipe vent

● Size: 2"

Pipe vent

● Size: 4"

Mountain Home AFB Page 10

Roof Condition Score – Section J # Question (Max Value) / Notes Score 1 Roof is less than 5 years old and in excellent condition - no observed deficiencies (0) 2 Are there roof leaks? (5) 3 Have the past roof leaks caused significant interior damage? (10) 4 Have roof leaks caused significant damage to building's structural integrity? (10) 5 Has the roof been leaking for over 1 year? (7) 6 Does the roof leak every time it rains in 3 or fewer places? (5) 7 Does the roof leak every time it rains in 4 or more places? (10) 8 Is the surface of the roofing deteriorated excessively? (4) 9 Is there excessive patching on the roof? (8)

10 Is roof-top equipment mounted improperly? (5) 11 Is roof installation workmanship of medium quality? (3) 12 Is roof installation workmanship of poor quality? (5) 13 Remaining roof life > 75% (5) 14 Remaining roof life 50% - 74% (10) 10 15 Remaining roof life 25% - 49% (20) 16 Remaining roof life <25% (30) 17 Does the flashing look deteriorated and appear to be letting the water enter the building in a few places? (6)

18 Does the flashing look deteriorated and appear to be letting the water enter the building in an excessive number of places? (10)

19 Is exposed sealant showing signs of moderate deterioration? (3) 20 Is exposed sealant showing signs of excessive deterioration? (5) 21 Is there a moderate number of metal coating defects? (3) 22 Is there an excessive number of metal coating defects? (5) 23 Is there a moderate number of loose or missing fasteners? (3) 24 Is there an excessive number of loose or missing fasteners? (5) 25 Is there a moderate number of end lap defects (eave termination/transverse joints)? (3) 26 Is there an excessive number of end lap defects (eave termination/transverse joints)? (5) 27 Are the joints in the metal open to let water enter? (2) 28 Is sheet metal loose and or missing? (3) 29 Is the roof slope less than 3 in 12? (2) 30 Miscellaneous and other conditions - Low (5) 31 Miscellaneous and other conditions - Medium (10) 32 Miscellaneous and other conditions - High (15) 33 Roof is at the end of its life - Immediate Action Required! (0)

Total 10 FINAL SCORE (100 – Total) 90 ROOF CONDITION SCORE: Adequate

Mountain Home AFB Page 11

Photo Album

Building Photo

Mountain Home AFB Page 12

Mountain Home AFB Page 13

Section J: northeast

Mountain Home AFB Page 14

Mountain Home AFB Page 15

Mountain Home AFB Page 16

Proposal
Inspection Date:
Building & Job Summary
Section Key Plan
Section Information
Section J
Section Summary – J
Inventory Detail – Section J
Roof Condition Score – Section J

Photo Album