Repair Fac 2610 - Addendum 1.doc

DOC document 28 KB Posted

Attached to
Repair Facility 2610 Federal contract opportunity
Solicitation number
FA4897-09-R-0015_
Issued by
Department of the Air Force Air Combat Command

About this file

Addendum 1

View the file

Other files for this federal contract opportunity

Other files attached to Repair Facility 2610, newest first.
File Type Posted
2610A-Amendment 0006 Drawing.pdf PDF
Amendment 0006.doc DOC document
Amendment 0005.doc DOC document
Amendment 0004.doc DOC document
AMENDMENT 0003.doc DOC document
FAC 2610 - Furnishings List.docx DOCX document
Emergency Roof Shoring B2610 - Final Report —
DIGITALSENDER_20090729_084248_0150.pdf PDF
SITE VISIT ANNOUCEMENT.docx DOCX document
Drawings Repair 2610.pdf PDF
Amendment 0002.doc DOC document
Solicitation 15 Jul 09 Amendment .doc DOC document
3836 - HDR Engineering - Final Report - MHAFB Bld 2610.pdf PDF
Notification of Complaince with Insurance.doc DOC document
DETERMINATION OF RESPONSIBILITY RFP.doc DOC document
2610 MHAFB 100 Resubmittal PDF SET.pdf PDF
B2610 - ACM-LBP Technical Specs(Use).doc DOC document
Approved PPT Questionnaire.doc DOC document
Solicitation 15 Jul 09 .doc DOC document
Information to Offerors.doc DOC document
ID10_dvb_July 3.mht MHT file
Show all 21

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REPAIR FACILITY 2610

ADDENDUM #1

July 16, 2009

DRAWINGS:

Sheet AD101

General Note 4 – revise “AD104” to “A-514”.

Sheet A-103 Note 4 – revise “AD104” to “A-514”. The west perimeter Post Office wall, along grid F, is wall type 9 the full length, extending to grid 7. The east perimeter Post Office wall, along grid H, shows wall type 8 at two places; revise to wall type 9 at both places.

Sheet A-401 Elevations A & B – provide downspouts from each of the canopy gutters and connect with piping to storm water collection system, coordinate with CS106.

Sheet A-514 Third general note – at two locations, after “downspouts” add “and gutters”.

Sheet A-601 At doors 106 & 108 the correct size should be 8’-0” x 11’-0”.

Sheet SD101 At General Note #4 – it shall be the Contractor’s responsibility to provide the required pesticide testing of the soils, and submit the results to the Contracting Officer.

Sheet SB401 Detail 1 – the void shown in the concrete landing (ramp), against the building wall, shall be deleted; providing a continuous unbroken concrete landing.

SPECIFICATIONS:

Section 03201 3.4.A – replace sentence with “Re-seal all panel joints.”

Section 08700 3.4.M.2 (HW-13) – at local alarm note, delete door 68 and replace with door 66.

FA4897-09-R-0015