DRAFT_CAF_ADAIR_Hickam_PWS_25_Jul_17.pdf

PDF 107 KB Posted

Attached to
CAF Contracted Air Support (CAS) Federal contract opportunity
Solicitation number
FA4890-17-R-0007
Issued by
Department of the Air Force Air Combat Command

About this file

Draft CAF ADAIR Hickam PWS

View the file

Other files for this federal contract opportunity

Other files attached to CAF Contracted Air Support (CAS), newest first.
File Type Posted
WD2015-5253_Rev_6.pdf PDF
Appendix_I_-_Aircraft_Attributes.pdf PDF
FA4890-17-R-0007-0001_Conformed_Solicitation.pdf PDF
Appendix_L_-_CAF_CAS_Draft_DD_254.pdf PDF
FA4890-17-R-0007_QA.pdf PDF
CDRL_2_-_Air_Worthiness_Data_Package.pdf PDF
Appendix_N_-_CAF_CAS_Blue_1_and_Mission_Lead_Evaluation.pdf PDF
Appendix_M_-_Definitions,_Abbreviations,_and_Acronyms.pdf PDF
Appendix_D_-_Government_Furnished_Equipment.pdf PDF
Appendix_G_-_Quality_Management_System.pdf PDF
Appendix_C_-_Publications_and_Forms.pdf PDF
Appendix_I_-_Aircraft_Attributes.pdf PDF
Appendix_B_-_Contract_Data_Requirements_List_(CDRL).docx DOCX document
Section_L_Attachment_Task_Order_1_PWS.pdf PDF
QAs_in_Response_to_FBO_Posting_16_Aug_18.pdf PDF
Pre-RFP_Conference_Attendees_(7_June_2018).pdf PDF
Pre-RFP_Conference_-_CAF_CAS__slides.pdf PDF
DRAFT_CAF_CAS_Appendix_I_-_Aircraft_Attributes_4_Jun_2018.pdf PDF
DRAFT_CAF_CAS_Sections_L_M_5_Jun_2018.pdf PDF
Telecom_Points_of_Interest.pdf PDF
CAF_CAS_Proposal_Writing_Conf_-_24_May_18.pdf PDF
Notice_to_Industry_for_NEPA_23_Apr_18.pdf PDF
Attachment_X_CAF_CAS_Engineering_Feasibility_Assessment.docx DOCX document
DRAFT_CAF_CAS_Appendix_C_-_Publications_and_Forms_2_Apr_2018.pdf PDF
DRAFT_CAF_CAS_Appendix_G_-_Quality_Management_System_-_2_Apr_2018.pdf PDF
DRAFT_FA4890-17-R-0007_2_Apr_2018.pdf PDF
Q&A_Format.docx DOCX document
DRAFT_CAF_CAS_Appendix_M_-_Definitions,_Abbreviations,_and_Acronyms.pdf PDF
DRAFT_CAF_CAS_Appendix_N_-_CAF_ADAIR_Blue_1_Evaluation_2_Apr_2018.pdf PDF
DRAFT_TO_Ordering_Guide_2_Apr_2018.pdf PDF
DRAFT_CAF_CAS_Appendix_B_-_Contract_Data_Requirements_List_(CDRL)_2_Apr_2018.docx DOCX document
DRAFT_CAF_CAS_Appendix_I_-_Aircraft_Attributes_2_Apr_2018.pdf PDF
DRAFT_IDIQ_Pricing_Table_Section_J_Attachment_2_-2_Apr_18_-_Protected.xlsx XLSX spreadsheet
Attachment_2-AFSOC_CCAS_PWS_(similar_past_effort).PDF PDF
Attachment_1-Market_Research_Questionnaire.pdf PDF
Notice_to_Industry_17_Jan_18.pdf PDF
CAF_ADAIR_Sections_L&M_17_Jan_18.pdf PDF
DRAFT_CAF_ADAIR_Appendix_I_-_Aircraft_Attributes_17_Jan_18_-_Abbreviated.pdf PDF
Airworthiness_Assessment_Technical_Evaluation_Training.pdf PDF
Notice_to_Industry_5_Dec_17.pdf PDF
Follow-up_Questions_for_Industry_19_Sep17.pdf PDF
Additional_Questions_for_Industry.pdf PDF
JBLE_Base_Map_with_71_FTS.pdf PDF
DRAFT_CAF_ADAIR_Kingsley_PWS_25_Jul_17.pdf PDF
DRAFT_CAF_ADAIR_Kelly_PWS_25_Jul_17.pdf PDF
DRAFT_CAF_ADAIR_Appendix_G_-_Quality_Management_System_25_Jul_17.pdf PDF
DRAFT_Pricing_Table_Section_J_Attachment_2_-_25_Jul_17.xlsx XLSX spreadsheet
CAF_ADAIR_Questions_for_Industry_-_25_Jul_17.pdf PDF
DRAFT_CAF_ADAIR_Tyndall_PWS_25_Jul_17.pdf PDF
DRAFT_CAF_ADAIR_Master_PWS_25_Jul_17.pdf PDF
Show all 50

CAF Contracted Air Support (CAS) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT

FOR

THE COMBAT AIR FORCES (CAF)

CONTRACT ADVERSARY AIR (ADAIR) SERVICES

HICKAM AFB SUPPORT

SECTION A

DESCRIPTION OF SERVICES

1.0 SCOPE AND COMPLIANCE. The objective of the CAF ADAIR acquisition is to provide realistic advanced adversary air threats from commercial ADAIR sources to support pilot combat readiness training. For the purpose of this document and program, the terminology

“CAF” refers to both the Combat Air Forces and those Formal Training Units (FTU) supplying

Combat Air Forces. This PWS is the task order servicing 15 Wing/154 Wing (WG). This PWS is must be utilized concurrent with the core PWS on CAF ADAIR. The contractor will provide sorties to facilitate 15 WG/154 WG and Hickam AFB missions. ADAIR sorties will integrate as part of the 15 WG/154 WG force in support of adversary air requirements. The Government will identify within Appendix I the required threshold and objective aircraft performance attributes needed to progressively expand aircraft system capabilities to replicate peer combatant threats. CAF ADAIR contractors may support multiple customers/locations across the CAF with Operations and Maintenance services. The contractor will be responsible for all supplies and services to meet task order requierments, except for those outlined in the PWS

Section C, Government-Furnished Property and Services, regardless of on- or off-base beddown.

1.1 Hickam Task Order. Contractors shall provide complete ADAIR services including, aircraft, pilots, aircraft maintenance, program and contract management to meet this PWS requirements. Hickam ADAIR contractor operations are projected to be on-station.

1.1.1 Task Order requirements may expand over time to support additional CAF ADAIR requirements. Additional exercise support for events or an increased required level of support may be best suited to be met through a contractor deployment capability versus a continual presence but is at the discretion of the contractor.

1.1.2 15 WG/154 WG will provide a GFR and GGR and alternates, responsible to the AMIC

Government Program Office (GPO), to surveil flight and ground operations, including deployment locations. GFRs and GGRs will surveil the Contractor using the criteria outlined in the core PWS, this task order, AFI 10-220, Contractor’s Flight and Ground Operating

Procedures, Quality Assurance Surveillance Plan (QASP), and the approved Quality

Management System (QMS).

3.0. OPERATIONS AND MAINTENANCE

3.1. Operations. Contractors will: Provide advanced ADAIR sorties to meet 15 WG/154 WG

Task Order PWS requirements and integrate as part of the sponsoring unit.

3.1.1. Flying hour program. The projected 15 WG ADAIR mission requirements are 3,809 hours, 1.3 Average Sortie Duration (ASD) and 2,930 sorties. The typical turn-pattern is 6 T 4 with a projected maximum pattern of 8 T 6. Included within this projection are night flying requirements of two weeks per quarter. The unit operates on a 5-4-9 compressed alternate work schedule. Weekend support is required one Saturday per month for the lead 19 FS and the 199

FS associate unit. Flying hour program may deviate 5% any given month or annually based upon mission needs and operational scheduling constraints.

3.1.2. Contractor shall also:

3.1.2.1. Ensure all contract pilots are qualified to serve as Red 1 Mission Commander.

3.1.2.2. Ensure all contract pilots are qualified pilots to augment as Baron Controllers.

3.1.2.3. Provide an ICADs capable mission data file for each aircraft to support debrief requirements.

3.2. Contractor Flight Operations Plan (FOP). The Contractor shall operate their aircraft

IAW 14 CFR. Ensure adherence to Government approved Core Contractor Flight Operations

Plan IAW AFI 10-220, and augmented by the 15 WG/154 WG Contractor Flight Operations

Plan. Contractor 15 WG/154 WG FOP must specifically address the following:

3.2.1. Integration of operations with: AFI 11-2F-22AV3, 154 OG Supplement, F-22A

Operations Procedures, 27 Jan 2015; 154th Wing and FACSFAC Letter of Agreement, Coordination Procedures for Air Defense Aircraft Attached to the HIANG (23 Nov 2011), HIANG Letter of Agreement, Air Traffic Control Procedures for HIANG F-22 and Hosted

Fighter Aircraft (15 Aug 2014); FACSFACSDINST 3120.1F, Promulgation of the Manual of

Eastpac and Midpac Fleet Operating Areas (23 Aug 2008);

3.2.2. Integration of flight safety operations with 15WG WI 91-202, The 15th Wing Mishap

Prevention Program (23 Feb 2012) and 15WG BASH Plan, Bird/Wildlife Aircraft Strike

Hazard Plan (30 Sep 2011).

3.2.3. A program to provide to the supported unit a complete ICADS-compatible mission file for all participating Contractor aircraft, not later than 30 minutes after the last Contractor aircraft landing, to support debrief requirements.

3.2.4. A program to integrate assigned pilots into 15 WG/154 WG Baron Control checkout and scheduling.

3.2.5. Typical profiles will require contract aircraft to travel to the Warning areas: W188, W188 Rainbow, W189, W190, W192, W193, and W194 Surface to Unlimited with a 1000’

ACBT floor, including MELA, NENE, MAKO, LONO and RYAN ATCAAs.

3.3. Ground Operations Plan (GOP). The Contractor shall maintain the aircraft IAW applicable FAA regulations and standards. Ensure the GOP includes all procedures required by

AFI 10-220, plus any hazardous ground operations not specifically mentioned in the core PWS but required to operate at Hickam AFB. Ensure adherence to Government approved Core GOP in accordance with AFI 10-220, and 15 WG/154 WG GOP.

3.3.1. Ensure contractor OL GOP is integrated with (INSERT 15 WG/154 WG MX

REGULATIONS)

3.3.1.1. Maintenance personnel shall receive Joint Base Pearl Harbor Hickam (JBPHH) flight line maintenance support training as it pertains to flight line vehicle operations (day and night), maintenance safety requirements, Foreign Object Damage (FOD) prevention and reporting, flight line security, aircraft tow procedures including runway crossing, and all other subjects as deemed necessary by the 154OSS / OSA Airfield Management /154MXG Maintenance Group / and 154OG/SA Sentry Aloha to ensure safe flight line maintenance operations. This training will be provided by appropriate organizations if certificates are deemed acceptable by the responsible party.

3.3.1.2. Acceptance and loading of equipment provided as Hickam GFE in Appendix D.

3.3.2. Integration of ground operations with 15WG WI 91-202, The 15th Wing Mishap

Prevention Program (23 Feb 2012).

3.3.3. Integration of scheduling with (INSERT HICKAM LOCAL SCHEDULING

REGULATION)

3.3.3.1. Airspace scheduling is accomplished in co-ordination with FASFAC (Navy) through the HH Raptor Scheduling Shop or internally by contractor for non-government related flying events.

3.3.3.2. During Sentry Aloha, combat scheduling will be used. Sentry Aloha are two-week exercises conducted in January and March.