DRAFT_Pricing_Table.xlsx

XLSX spreadsheet 107 KB Posted

Attached to
Counter Narcoterrorism & Global Threats Support Services
Solicitation number
FA4890-17-R-0003
Issued by

About this file

Draft Pricing Table

View the file

Other files

File Type Posted
RFP_FA4890-17-R-0003-A0004_Conformed.pdf PDF
RFP_FA4890-17-R-0003-A0004.pdf PDF
Q&A_(Cumulative)_In_Response_to_A0001_&_A0002,_27_Mar_17.pdf PDF
RFP_FA4890-17-R-0003-A0003_-_Conformed_Copy.pdf PDF
RFP_FA4890-17-R-0003-A0003.pdf PDF
Section_L,_Atch_3_-_Pricing_Table_-_A0003,_27_Mar_17.xlsx XLSX spreadsheet
PWS_FA4890-17-R-0003-_A0003_-_27_Mar_17.pdf PDF
RFP_FA4890-17-R0003-0001_21_Mar_17_(Reposted).pdf PDF
SAFE_Instructions.pdf PDF
RFP_FA4890-17-R-0003-A0002,_23_Mar_17.pdf PDF
DD254_AMIC_SUPPORT_DRAFT_17-R-0003_Continuation_Pg.pdf PDF
Section_L,_Atch_3_-_Pricing_Table_-_A0001.xlsx XLSX spreadsheet
A0001_-_Q&As_-_21_Mar_17.pdf PDF
PWS_FA4890-17-R-0003_-_21_Mar_17_-_A0001.pdf PDF
DD254_AMIC_SUPPORT_DRAFT_17-R-0003.pdf PDF
Section_L,_Attachment_3_-_Pricing_Table.xlsx XLSX spreadsheet
Section_L,_Attachment_2_-_Past_Performance_Questionnaire.docx DOCX document
PWS_FA4890-17-R-0003.pdf PDF
Q&A_Format.docx DOCX document
RFP_FA4890-17-R-0003_28Feb17.pdf PDF
Section_L,_Attachment_1_-_Past_Performance_Information_Sheet.docx DOCX document
PWS_Appendix_B_-_Non-Disclosure_Agreement.doc DOC document
PWS_Appendix_A_-_Government_Furnished_Equipment.xls XLS spreadsheet
Q&A_(Posting_on_31_Jan_2017).pdf PDF
Section_L,_Attachment_4_-_SB_Subcontracting_Plan_Checklist.docx DOCX document
CN&GT_Support_Services_QASP_-_Final_-_Preaward.pdf PDF
PWS_Appendix_B_-_Non-Disclosure_Agreement.pdf PDF
PWS_Appendix_A_-_Government_Furnished_Equipment.xls XLS spreadsheet
Q&A_Format.docx DOCX document
Section_L,_Attachment_3_-_Pricing_Table.xlsx XLSX spreadsheet
Q&A.pdf PDF
DRAFT_RFP_FA4890-17-R-0003.pdf PDF
DRAFT_PWS_FA4890-17-R-0003.pdf PDF
DRAFT_CN&GT_Support_Services_QASP.pdf PDF
DRAFT_PWS_FA4890-17-R-0003_9Dec16.doc DOC document
DRAFT_Provisions_And_Clauses.docx DOCX document
Q&A_Format.docx DOCX document
DRAFT_PWS_Appendix_A_-_Government_Furnished_Equipment.xls XLS spreadsheet
DRAFT_Sections_H,_L_and_M.docx DOCX document
DRAFT_PWS_FA4890-17-R-0003_5Aug16.pdf PDF
RFI-SS.pdf PDF
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Total_Contract_Summary

FOR OFFICIAL USE ONLY
Counter Narcotics and Global Threats (CN&GT) Support Services
Contract No:FA4890-17-R-0003
Company:

DONALDSON, DEVOE A JR CTR USAF ACC ACC AMIC/PMT: Select from list.

Date:
Revision:
T/O PERIODS OF PERFORMANCE
PeriodStartEnd
T/O Transition Period (if applicable)

DONALDSON, DEVOE A JR CTR USAF ACC ACC AMIC/PMT: Used only if transition/mobilization period occurs outside the Base Period of Performance. If not applicable, leave blank or hide row.

Base Period27-Mar-201726-Mar-2018
Optional Period 127-Mar-201826-Mar-2019
Optional Period 227-Mar-201926-Mar-2020
6 Month Extension (if required)27-Mar-202026-Sep-2020
TOTAL EVALUATED PRICE (TEP)
CategoryTotals
Labor$ - 0
Miscellaneous Equipment$ - 0
Travel$ 750,000.00
6 Month Extension (if required)

DONALDSON, DEVOE A JR CTR USAF ACC ACC AMIC/PMT: From CLIN_Summary worksheet. If not applicable, leave blank or hide row.

DONALDSON, DEVOE A JR CTR USAF ACC ACC AMIC/PMT: Used only if transition/mobilization period occurs outside the Base Period of Performance. If not applicable,

leave blank or hide row.$ 125,000.00
Total Award Value$ 875,000.00
PHASE-IN PERIOD COST SUMMARY
CategoryTotals
Labor$ - 0
Miscellaneous Equipment$ - 0
Travel$ - 0
Phase-in Period Total$ - 0
BASE PERIOD COST SUMMARY
CategoryTotals
Labor$ - 0
Miscellaneous Equipment$ - 0
Travel$ 250,000.00
Base Period Total$ 250,000.00
OPTIONAL PERIOD 1 COST SUMMARY
CategoryTotals
Labor$ - 0
Miscellaneous Equipment$ - 0
Travel$ 250,000.00
Optional Period 1 Total$ 250,000.00
OPTIONAL PERIOD 2 COST SUMMARY
PWS RequirementTotals
Labor$ - 0
Miscellaneous Equipment$ - 0
Travel$ 250,000.00
Optional Period 2 Total$ 250,000.00
6 Month Extension (if required)
6 Month Extension$ 125,000.00

CLIN Summary

CLIN SUMMARY
CLINPWS Ref.DescriptionContract TypePhase-In

(CLIN 0017)

DONALDSON, DEVOE A JR CTR USAF ACC ACC AMIC/PMT: Use only if transition/mobilization period is outside the Base Period of Performance.

Otherwise leave blank.Base PeriodOption Period 1Option Period 26 Month ExtTotals
Core CLINsX0012.1Contractor Program ManagementFFP-LOE$ - 0
2.3HQ ACC AMIC Civil Engineering Assistant (EA) Support (1 FTE)$ - 0
2.4HQ ACC AMIC Aviation Support (1 FTE)$ - 0
2.5.1Data Management/Entry (1 FTE)$ - 0
2.5.2Database Manager (0.10 FTE)$ - 0
2.7Quality Assurance (2 FTEs)$ - 0
X0022.9.1Program and Policy Support and Technical Assistance (1 FTE)FFP-LOE$ - 0
X0032.10Consolidated Financial Execution System (CFES) (0.10 FTE)FFP-LOE$ - 0
X0042.11CN Metrics Analyst (0.25 FTE)FFP-LOE$ - 0
X0055.7 & 4.0Travel & Misc. Equipment/Supplies/MaterialsCR$ - 0
00175.5Phase-InFFP$ - 0
Optional CLINsX0062.2Program Support (4 FTEs)FFP-LOE$ - 0
X0072.2Program Support (3 FTEs)FFP-LOE$ - 0
X0082.2Program Support (2 FTEs)FFP-LOE$ - 0
X0092.2Program Support (1 FTE)FFP-LOE$ - 0
X0102.9.2HQ AF CD/CN Support (1 FTE)FFP-LOE$ - 0
X0112.9.3Program Management and Quality Assurance Consultant (1 FTE)FFP-LOE$ - 0
X0122.12Contract Administration Support (3 FTEs)FFP-LOE$ - 0
X0132.6.1Security and Travel Support (1 FTE)FFP-LOE$ - 0
X0142.6.2Administrative Support for ACC AMIC (1 FTE)FFP-LOE$ - 0
X0152.7Quality Assurance (1 FTE)FFP-LOE$ - 0
X0162.8Regional Quality Assurance Engineer (1 FTE)FFP-LOE$ - 0
X006ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
X007ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
X008ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
X009ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
X010ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
X011ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
X012ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
X013ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
X014ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
X015ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
X016ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
X017ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
X018ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
X019ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
X020ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
X021ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
X022ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
X023ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
X024ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
X025ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
X026ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
X027ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
X028ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
X029ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
X030ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
X031ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
X032ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
X033ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
X034ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
X035ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
X036ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
X037ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
X038ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
X039ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
TOTALS$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0

Labor

Labor Cost Summary & Details
LaborTotal LaborPhase-In PeriodBase PeriodOption Period 1Option Period 2
Totals$ - 0$ - 0$ - 0$ - 0$ - 0
Phase-In Period - Labor31-Dec-189931-Dec-1899
IDPWS Ref.Labor CategoryPrime or Sub
(select)# of FTEsMultiplier
(Hours)Basic Labor
RateFringe CostOH CostG&A CostOther1
(define)Other2
(define)Subtotal
SUM(L:Q)Profit or Fee
(R * %)Loaded Rate
(R+S)Total
(K1*T1)+(K2*T2)Propsal Ref.Basis of Estimate/Price
2.11.00
12.3$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
22.4$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
32.5.1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
42.5.2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
52.7$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
62.9.1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
72.10$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
82.11$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
92.2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
102.9.2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
112.9.3$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
122.12$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
132.6.1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
142.6.2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
152.7$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
162.8$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
17$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
18$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
19$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
20$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unhide row and insert "copied" row here.$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Transition Period Labor Total$ - 0
Base Period - Labor27-Mar-201726-Mar-2018
IDPWS Ref.Labor CategoryPrime or Sub
(select)# of FTEsMultiplier
(Hours)Basic Labor
RateFringe CostOH CostG&A CostOther1
(define)Other2
(define)Subtotal
SUM(L:Q)Profit or Fee
(R * %)Loaded Rate
(R+S)Total
(K1*T1)+(K2*T2)Propsal Ref.Basis of Estimate/Price
12.11.001920$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
2.3
22.4$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
32.5.1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
42.5.2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
52.7$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
62.9.1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
72.10$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
82.11$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
92.2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
102.9.2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
112.9.3$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
122.12$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
132.6.1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
142.6.2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
152.7$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
162.8$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
17$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
18$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
19$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
20$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unhide row and insert "copied" row here.$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Base Period Labor Total$ - 0
Option Period 1 - Labor27-Mar-201826-Mar-2019
IDPWS Ref.Labor Category
Prime or Sub
(select)# of FTEsMultiplier
(Hours)Basic Labor
RateFringe CostOH CostG&A CostOther1
(define)Other2
(define)Subtotal
SUM(L:Q)Profit or Fee
(R * %)Loaded Rate
(R+S)Total
(K1*T1)+(K2*T2)Propsal Ref.Basis of Estimate/Price
12.11.001920$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
2.3
22.4$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
32.5.1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
42.5.2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
52.7$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
62.9.1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
72.10$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
82.11$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
92.2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
102.9.2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
112.9.3$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
122.12$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
132.6.1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
142.6.2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
152.7$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
162.8$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
17$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
18$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
19$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
20$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unhide row and insert "copied" row here.$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Option Period 1 Labor Total$ - 0
Option Period 2 - Labor27-Mar-201926-Mar-2020
IDPWS Ref.Labor Category
Prime or Sub
(select)# of FTEsMultiplier
(Hours)Basic Labor
RateFringe CostOH CostG&A CostOther1
(define)Other2
(define)Subtotal
SUM(L:Q)Profit or Fee
(R * %)Loaded Rate
(R+S)Total
(K1*T1)+(K2*T2)Propsal Ref.Basis of Estimate/Price
12.11.001920$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
2.3
22.4$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
32.5.1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
42.5.2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
52.7$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
62.9.1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
72.10$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
82.11$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
92.2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
102.9.2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
112.9.3$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
122.12$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
132.6.1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
142.6.2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
152.7$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
162.8$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
17$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
18$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
19$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
20$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unhide row and insert "copied" row here.$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Option Period 2 Labor Total$ - 0
Option Period 3 - LaborERROR:#REF!ERROR:#REF!
IDT/O PWS Ref.Base/Option
(select)CLIN/SLIN
(select)Labor Category
Prime or Sub
(select)# of FTEsRate Unit
Select (Hours/Days)Multiplier
(Est. Hrs/Days)Basic Labor
RateFringe CostOH CostG&A CostOther1
(define)Other2
(define)Subtotal
SUM(L:Q)Profit or Fee
(R * %)Loaded Rate

(R+S)

1Base1.00Hours$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
3$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
4$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
5$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
6$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
7$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
8$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
9$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
10$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
11$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
12$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
13$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
14$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
15$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
16$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
17$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
18$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
19$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
20$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unhide row and insert "copied" row here.$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Option Period 3 Labor Total
Option Period 4 - LaborERROR:#REF!ERROR:#REF!
IDT/O PWS Ref.Base/Option
(select)CLIN/SLIN
(select)Labor Category
Prime or Sub
(select)# of FTEsRate Unit
Select (Hours/Days)Multiplier
(Est. Hrs/Days)Basic Labor
RateFringe CostOH CostG&A CostOther1
(define)Other2
(define)Subtotal
SUM(L:Q)Profit or Fee
(R * %)Loaded Rate

(R+S)

1Base1.00Hours$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
3$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
4$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
5$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
6$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
7$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
8$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
9$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
10$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
11$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
12$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
13$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
14$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
15$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
16$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
17$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
18$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
19$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
20$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unhide row and insert "copied" row here.$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Option Period 4 Labor Total

Misc Equip, Supplies & Materia

Miscellaneous Equipment, Supplies & Materials Cost Summary and Details
Misc. Equipment, Supplies & MaterialsTotal Misc. Equipment, Supplies & MaterialsPhase-In PeriodBase PeriodOption Period 1Option Period 2
Totals$ - 0$ - 0$ - 0$ - 0$ - 0
Phase-In Period - Miscellaneous Equipment
IDPWS Ref.Item DescriptionQtyUnit PriceExtended PriceIndirect Costs
(i.e.,G&A, OH,etc.)Profit/FeeTotal PriceProposal Ref.Basis of Estimate/Price
15.7$ - 0$ - 0$ - 0
2$ - 0$ - 0$ - 0$ - 0
3$ - 0$ - 0$ - 0$ - 0
4$ - 0$ - 0$ - 0$ - 0
5$ - 0$ - 0$ - 0$ - 0
6$ - 0$ - 0$ - 0$ - 0
7$ - 0$ - 0$ - 0$ - 0
8$ - 0$ - 0$ - 0$ - 0
9$ - 0$ - 0$ - 0$ - 0
10$ - 0$ - 0$ - 0$ - 0
11$ - 0$ - 0$ - 0$ - 0
12$ - 0$ - 0$ - 0$ - 0
13$ - 0$ - 0$ - 0$ - 0
14$ - 0$ - 0$ - 0$ - 0
15$ - 0$ - 0$ - 0$ - 0
16$ - 0$ - 0$ - 0$ - 0
17$ - 0$ - 0$ - 0$ - 0
18$ - 0$ - 0$ - 0$ - 0
19$ - 0$ - 0$ - 0$ - 0
20$ - 0$ - 0$ - 0$ - 0
21$ - 0$ - 0$ - 0$ - 0
22$ - 0$ - 0$ - 0$ - 0
23$ - 0$ - 0$ - 0$ - 0
24$ - 0$ - 0$ - 0$ - 0
25$ - 0$ - 0$ - 0$ - 0
26$ - 0$ - 0$ - 0$ - 0
27$ - 0$ - 0$ - 0$ - 0
28$ - 0$ - 0$ - 0$ - 0
29$ - 0$ - 0$ - 0$ - 0
30$ - 0$ - 0$ - 0$ - 0
Unhide rows above, or copy row and insert "copied" row here.$ - 0$ - 0$ - 0$ - 0
Transition Period Miscellaneous Equipment, Supplies & Materials Total$ - 0
Base Period - Miscellaneous Equipment, Supplies & Materials
IDPWS Ref.Item DescriptionQtyUnit PriceExtended PriceIndirect Costs
(i.e.,G&A, OH,etc.)Profit/FeeTotal PriceProposal Ref.Basis of Estimate/Price
15.7$ - 0$ - 0$ - 0$ - 0
2$ - 0$ - 0$ - 0$ - 0
3$ - 0$ - 0$ - 0$ - 0
4$ - 0$ - 0$ - 0$ - 0
5$ - 0$ - 0$ - 0$ - 0
6$ - 0$ - 0$ - 0$ - 0
7$ - 0$ - 0$ - 0$ - 0
8$ - 0$ - 0$ - 0$ - 0
9$ - 0$ - 0$ - 0$ - 0
10$ - 0$ - 0$ - 0$ - 0
11$ - 0$ - 0$ - 0$ - 0
12$ - 0$ - 0$ - 0$ - 0
13$ - 0$ - 0$ - 0$ - 0
14$ - 0$ - 0$ - 0$ - 0
15$ - 0$ - 0$ - 0$ - 0
16$ - 0$ - 0$ - 0$ - 0
17$ - 0$ - 0$ - 0$ - 0
18$ - 0$ - 0$ - 0$ - 0
19$ - 0$ - 0$ - 0$ - 0
20$ - 0$ - 0$ - 0$ - 0
21$ - 0$ - 0$ - 0$ - 0
22$ - 0$ - 0$ - 0$ - 0
23$ - 0$ - 0$ - 0$ - 0
24$ - 0$ - 0$ - 0$ - 0
25$ - 0$ - 0$ - 0$ - 0
26$ - 0$ - 0$ - 0$ - 0
27$ - 0$ - 0$ - 0$ - 0
28$ - 0$ - 0$ - 0$ - 0
29$ - 0$ - 0$ - 0$ - 0
30$ - 0$ - 0$ - 0$ - 0
Unhide rows above, or copy row and insert "copied" row here.$ - 0$ - 0$ - 0$ - 0
Base Period Miscellaneous Equipment, Supplies & Materials Total$ - 0
Option Period 1 - Miscellaneous Equipment, Supplies & Materials
IDPWS Ref.Item DescriptionQtyUnit PriceExtended PriceIndirect Costs
(i.e.,G&A, OH,etc.)Profit/FeeTotal PriceProposal Ref.Basis of Estimate/Price
15.7$ - 0$ - 0$ - 0$ - 0
2$ - 0$ - 0$ - 0$ - 0
3$ - 0$ - 0$ - 0$ - 0
4$ - 0$ - 0$ - 0$ - 0
5$ - 0$ - 0$ - 0$ - 0
6$ - 0$ - 0$ - 0$ - 0
7$ - 0$ - 0$ - 0$ - 0
8$ - 0$ - 0$ - 0$ - 0
9$ - 0$ - 0$ - 0$ - 0
10$ - 0$ - 0$ - 0$ - 0
11$ - 0$ - 0$ - 0$ - 0
12$ - 0$ - 0$ - 0$ - 0
13$ - 0$ - 0$ - 0$ - 0
14$ - 0$ - 0$ - 0$ - 0
15$ - 0$ - 0$ - 0$ - 0
16$ - 0$ - 0$ - 0$ - 0
17$ - 0$ - 0$ - 0$ - 0
18$ - 0$ - 0$ - 0$ - 0
19$ - 0$ - 0$ - 0$ - 0
20$ - 0$ - 0$ - 0$ - 0
21$ - 0$ - 0$ - 0$ - 0
22$ - 0$ - 0$ - 0$ - 0
23$ - 0$ - 0$ - 0$ - 0
24$ - 0$ - 0$ - 0$ - 0
25$ - 0$ - 0$ - 0$ - 0
26$ - 0$ - 0$ - 0$ - 0
27$ - 0$ - 0$ - 0$ - 0
28$ - 0$ - 0$ - 0$ - 0
29$ - 0$ - 0$ - 0$ - 0
30$ - 0$ - 0$ - 0$ - 0
Unhide rows above, or copy row and insert "copied" row here.$ - 0$ - 0$ - 0$ - 0
Option Period 1 Miscellaneous Equipment, Supplies & Materials Total$ - 0
Option Period 2 - Miscellaneous Equipment, Supplies & Materials
IDPWS Ref.Item DescriptionQtyUnit PriceExtended PriceIndirect Costs
(i.e.,G&A, OH,etc.)Profit/FeeTotal PriceProposal Ref.Basis of Estimate/Price
15.7$ - 0$ - 0$ - 0$ - 0
2$ - 0$ - 0$ - 0$ - 0
3$ - 0$ - 0$ - 0$ - 0
4$ - 0$ - 0$ - 0$ - 0
5$ - 0$ - 0$ - 0$ - 0
6$ - 0$ - 0$ - 0$ - 0
7$ - 0$ - 0$ - 0$ - 0
8$ - 0$ - 0$ - 0$ - 0
9$ - 0$ - 0$ - 0$ - 0
10$ - 0$ - 0$ - 0$ - 0
11$ - 0$ - 0$ - 0$ - 0
12$ - 0$ - 0$ - 0$ - 0
13$ - 0$ - 0$ - 0$ - 0
14$ - 0$ - 0$ - 0$ - 0
15$ - 0$ - 0$ - 0$ - 0
16$ - 0$ - 0$ - 0$ - 0
17$ - 0$ - 0$ - 0$ - 0
18$ - 0$ - 0$ - 0$ - 0
19$ - 0$ - 0$ - 0$ - 0
20$ - 0$ - 0$ - 0$ - 0
21$ - 0$ - 0$ - 0$ - 0
22$ - 0$ - 0$ - 0$ - 0
23$ - 0$ - 0$ - 0$ - 0
24$ - 0$ - 0$ - 0$ - 0
25$ - 0$ - 0$ - 0$ - 0
26$ - 0$ - 0$ - 0$ - 0
27$ - 0$ - 0$ - 0$ - 0
28$ - 0$ - 0$ - 0$ - 0
29$ - 0$ - 0$ - 0$ - 0
30$ - 0$ - 0$ - 0$ - 0
Unhide rows above, or copy row and insert "copied" row here.$ - 0$ - 0$ - 0$ - 0
Option Period 2 Miscellaneous Equipment, Supplies & Materials Total$ - 0
Option Period 3 - Material
IDT/O PWS Ref.Base/Option
(select)CLIN/SLIN
(select)Part #Item DescriptionQtyUnit PriceExtended PriceIndirect Costs
(i.e.,G&A, OH,etc.)Profit/Fee
1$ - 0$ - 0$ - 0
2$ - 0$ - 0$ - 0
3$ - 0$ - 0$ - 0
4$ - 0$ - 0$ - 0
5$ - 0$ - 0$ - 0
6$ - 0$ - 0$ - 0
7$ - 0$ - 0$ - 0
8$ - 0$ - 0$ - 0
9$ - 0$ - 0$ - 0
10$ - 0$ - 0$ - 0
11$ - 0$ - 0$ - 0
12$ - 0$ - 0$ - 0
13$ - 0$ - 0$ - 0
14$ - 0$ - 0$ - 0
15$ - 0$ - 0$ - 0
16$ - 0$ - 0$ - 0
17$ - 0$ - 0$ - 0
18$ - 0$ - 0$ - 0
19$ - 0$ - 0$ - 0
20$ - 0$ - 0$ - 0
21$ - 0$ - 0$ - 0
22$ - 0$ - 0$ - 0
23$ - 0$ - 0$ - 0
24$ - 0$ - 0$ - 0
25$ - 0$ - 0$ - 0
26$ - 0$ - 0$ - 0
27$ - 0$ - 0$ - 0
28$ - 0$ - 0$ - 0
29$ - 0$ - 0$ - 0
30$ - 0$ - 0$ - 0
Unhide rows above, or copy row and insert "copied" row here.$ - 0$ - 0$ - 0
Option Period 3 Material Total$ - 0$ - 0$ - 0
Option Period 4 - Material
IDT/O PWS Ref.Base/Option
(select)CLIN/SLIN
(select)Part #Item DescriptionQtyUnit PriceExtended PriceIndirect Costs
(i.e.,G&A, OH,etc.)Profit/Fee
1$ - 0$ - 0$ - 0
2$ - 0$ - 0$ - 0
3$ - 0$ - 0$ - 0
4$ - 0$ - 0$ - 0
5$ - 0$ - 0$ - 0
6$ - 0$ - 0$ - 0
7$ - 0$ - 0$ - 0
8$ - 0$ - 0$ - 0
9$ - 0$ - 0$ - 0
10$ - 0$ - 0$ - 0
11$ - 0$ - 0$ - 0
12$ - 0$ - 0$ - 0
13$ - 0$ - 0$ - 0
14$ - 0$ - 0$ - 0
15$ - 0$ - 0$ - 0
16$ - 0$ - 0$ - 0
17$ - 0$ - 0$ - 0
18$ - 0$ - 0$ - 0
19$ - 0$ - 0$ - 0
20$ - 0$ - 0$ - 0
21$ - 0$ - 0$ - 0
22$ - 0$ - 0$ - 0
23$ - 0$ - 0$ - 0
24$ - 0$ - 0$ - 0
25$ - 0$ - 0$ - 0
26$ - 0$ - 0$ - 0
27$ - 0$ - 0$ - 0
28$ - 0$ - 0$ - 0
29$ - 0$ - 0$ - 0
30$ - 0$ - 0$ - 0
Unhide rows above, or copy row and insert "copied" row here.$ - 0$ - 0$ - 0$ - 0
Option Period 4 Material Total$ - 0$ - 0$ - 0

Travel

Contract No: for Company:
Travel Cost Summary & Details
TravelTotal TravelPhase-In PeriodBase PeriodOption Period 1Option Period 2
Totals$ 750,000.00$ - 0$ 250,000.00$ 250,000.00$ 250,000.00
PWS Ref.
DONALDSON, DEVOE A JR CTR USAF ACC ACC AMIC/PMT: Enter T/O PWS paragraph reference.Base/Option

DONALDSON, DEVOE A JR CTR USAF ACC ACC AMIC/PMT: Select appropriate base or optional requirement, as applicable.

Note: List referenced from SourceData worksheet. CLIN/SLIN DONALDSON, DEVOE A JR CTR USAF ACC ACC AMIC/PMT: Enter proposed CLIN/SLIN.

Note: List referenced from Total TO Summary worksheet.Labor Category/Position
DONALDSON, DEVOE A JR CTR USAF ACC ACC AMIC/PMT: Enter applicable labor category or position.Origin

(From) DONALDSON, DEVOE A JR CTR USAF ACC ACC AMIC/PMT: Enter trip origin. Destination (To)

DONALDSON, DEVOE A JR CTR USAF ACC ACC AMIC/PMT: Enter trip destination.# of People
DONALDSON, DEVOE A JR CTR USAF ACC ACC AMIC/PMT: Enter number of travelers.# of Trips
DONALDSON, DEVOE A JR CTR USAF ACC ACC AMIC/PMT: Enter number of trips.# of Days
DONALDSON, DEVOE A JR CTR USAF ACC ACC AMIC/PMT: Enter number of days.Airfare
DONALDSON, DEVOE A JR CTR USAF ACC ACC AMIC/PMT: Enter airfare total.Rental Car
DONALDSON, DEVOE A JR CTR USAF ACC ACC AMIC/PMT: Enter rental car rate.Lodging
DONALDSON, DEVOE A JR CTR USAF ACC ACC AMIC/PMT: Enter daily lodging rate.M & IE
DONALDSON, DEVOE A JR CTR USAF ACC ACC AMIC/PMT: Insert daily meals and incidental expense rate.Misc.
DONALDSON, DEVOE A JR CTR USAF ACC ACC AMIC/PMT: Enter other miscellaneous expense (as daily rate).Subtotal
DONALDSON, DEVOE A JR CTR USAF ACC ACC AMIC/PMT: = ((Travelrs xTrips) x Airfare)+((Travelers x Trips x Days) x (Daily Expenses)))Indirect Costs
DONALDSON, DEVOE A JR CTR USAF ACC ACC AMIC/PMT: Enter formula for applicable indirect costs (i.e., Travel handling rate).Total Cost
DONALDSON, DEVOE A JR CTR USAF ACC ACC AMIC/PMT: =Extended Price + Indirect CostsProposal Ref.
DONALDSON, DEVOE A JR CTR USAF ACC ACC AMIC/PMT: Enter T/O proposal reference.Basis of Estimate/Price

DONALDSON, DEVOE A JR CTR USAF ACC ACC AMIC/PMT: Enter basis of estimate/basis of price.

Phase-In Period - Travel
IDPWS Ref.Base/Option
(select)CLINLabor Category/PositionOrigin
(From)Destination
(To)# of People# of Trips# of DaysAirfare
(per trip)Rental Car
(Daily Rate)Lodging
(Daily rate)M & IE
(Daily rate)Misc.
(Daily rate)Extended PriceIndirect Costs
(i.e.,G&A, OH,etc.)Total CostProposal Ref.Basis of Estimate/Price
4.0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
1$ - 0$ - 0$ - 0
Base Period Travel Totals$ - 0$ - 0$ - 0
Base Period - Travel
IDPWS Ref.Base/Option
(select)CLINLabor Category/PositionOrigin
(From)Destination
(To)# of People# of Trips# of DaysAirfare
(per trip)Rental Car
(Daily Rate)Lodging
(Daily rate)M & IE
(Daily rate)Misc.
(Daily rate)Extended PriceIndirect Costs
(i.e.,G&A, OH,etc.)Total CostProposal Ref.Basis of Estimate/Price
1$ 250,000.00$ - 0$ 250,000.00Government provided NTE plug figure.
2$ - 0$ - 0$ - 0
3$ - 0$ - 0$ - 0
4$ - 0$ - 0$ - 0
5$ - 0$ - 0$ - 0
Unhide rows above, or copy row and insert "copied" row here.$ - 0$ - 0$ - 0
Base Period Travel Totals$ 250,000.00$ - 0$ 250,000.00
Option Period 1 - Travel
IDPWS Ref.Base/Option
(select)CLINLabor Category/BilletOrigin
(From)Destination
(To)# of People# of Trips# of DaysAirfare
(per trip)Rental Car
(Daily Rate)Lodging
(Daily rate)M & IE
(Daily rate)Misc.
(Daily rate)SubtotalIndirect Costs
(i.e.,G&A, OH,etc.)Total CostProposal Ref.Basis of Estimate/Price
1$ 250,000.00$ - 0$ 250,000.00Government provided NTE plug figure.
2$ - 0$ - 0$ - 0
3$ - 0$ - 0$ - 0
4$ - 0$ - 0$ - 0
5$ - 0$ - 0$ - 0
Option Period 1 Travel Totals$ 250,000.00$ - 0$ 250,000.00
Option Period 2 - Travel
IDPWS Ref.Base/Option
(select)CLINLabor Category/BilletOrigin
(From)Destination
(To)# of People# of Trips# of DaysAirfare
(per trip)Rental Car
(Daily Rate)Lodging
(Daily rate)M & IE
(Daily rate)Misc.
(Daily rate)SubtotalIndirect Costs
(i.e.,G&A, OH,etc.)Total CostProposal Ref.Basis of Estimate/Price
1$ 250,000.00$ - 0$ 250,000.00Government provided NTE plug figure.
2$ - 0$ - 0$ - 0
3$ - 0$ - 0$ - 0
4$ - 0$ - 0$ - 0
5$ - 0$ - 0$ - 0
Unhide rows above, or copy row and insert "copied" row here.$ - 0$ - 0$ - 0
Option Period 2 Travel Totals$ 250,000.00$ - 0$ 250,000.00

Indirect Rates

INDIRECT RATES
TYPEFringeOHG&AOther1Other2Profit/Fee
Labor0.00%0.00%0.00%0.00%0.00%0.00%
Misc. Equipment/ Supplies/Materials0.00%0.00%0.00%0.00%0.00%0.00%
Travel0.00%0.00%0.00%0.00%0.00%0.00%
Subcontractors0.00%0.00%0.00%0.00%0.00%0.00%

File details come from the government source that posted it. Updated .