TO_000F_(Ft._Huachuca)_Unique_Requirements.pdf
PDF 8 KB Posted
- Attached to
- Remotely Piloted Aircraft (RPA)
- Solicitation number
- FA4890-16-R-0032
About this file
RPA Draft RFP Attachment 8- Task Order Unique Requirements Site F - Ft. Huachuca AZ - ANG Will be incorporated as Attachment 1 to site's Task Order.
View the file
Other files
Show 40 more
Latest 50 of 69 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation: FA4890-16-R-0032-000F DRAFT - 16 Nov 16
ATTACHMENT 1
TECHNICAL TASK ORDER REQUIREMENTS
1.0 INTRODUCTION/BACKGROUND: ACC AMIC requires RPA organizational-level (O-level) support at the CONUS location as identified below.
2.0 TASK ORDER OBJECTIVE: Provide O-level maintenance to CONUS military units tasked for local and OCONUS missions.
3.0 REFERENCE: RPA Performance Work Statement (PWS), Appendix N (Operational Requirements), and Attachment 3 – Manpower, Labor Rates, and Pricing Tables.
4.0 UNIQUE TASK ORDER REQUIREMENTS.
Task Order
Adjustments to Appendix N (Operational Requirements)
000F
Ft. Huachuca, AZ
- Single shift maintenance operation.
- AFI 21-101 ANG Supplement replaces AFI 21-101 CAF Supplement in Appendix C.
- Analyst shall be stationed at Ft Huachuca, AZ.
- No weapons load support required.
- Support MQ-1 crash recovery as required within 25 mile radius of Ft Huachuca; notify AMIC Program Manager within 2 hours when supporting off-base crash recovery;
under no circumstances will contractor personnel enter Mexico.
- Manage Mission Readiness Spares Package (MRSP) located at the 162 WG in Tucson, AZ. Transport all parts and supplies that fit in a full size pickup truck between Ft Huachuca and the 162 WG. The 162 WG will transport all parts that do not fit into a full size pickup truck.
- Use Gov’t-provided TCMax tool control software in place of Tool Accountability System.
- 18 fly days per month, to include 1 ANG UTA weekend per month.
- Preflight spare GCS as required to support remote split operations (RSO). RSO missions shall not extend contractor’s duty day beyond normal shift schedule.
- Average Sorties per Day/Average Sortie Duration:
- MQ-9 = 1 sortie/8 hours
- Any sortie deemed non-effective due to an abort may require the contractor to launch a spare aircraft provided the follow-on sortie does not extend the contractor’s duty day.