MASS_PPC_Brief_-_20131218.pdf
PDF 529 KB Posted
- Attached to
- Mobile Air Surveillance System Federal contract opportunity
- Solicitation number
- FA4890-13-R-0007
About this file
Slide Deck for the MASS Pre-Proposal Conference held 18 December 2013
View the file
Other files for this federal contract opportunity
Show all 50
Mobile Air Surveillance System has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Headquarters Air Combat Command
This Briefing is Classified:
UNCLASSIFIED
Mobile Air Surveillance System (MASS)
Pre-Proposal Conference
Solicitation Number: FA4890-13-R-0007
18 Dec 2013
Government Team
Project Lead (PL)
Program Manager (PM)
Contracting Officer (CO)
Contract Manager (CM)
Ms. Tiffany Bray, AMIC/DRXA
Mr. David Coburn, AMIC/PSU
Capt Alfred “Trey” Fryman III, AMIC/PKC
Mr. John Bonafede, AMIC/PKC
Requirement Owner
Civil Engineering
Civil Engineering
Comm/Electronics
Logistics
Logistics
Quality Assurance
Quality Assurance
Mr. Wayne Deviley, ACC/A3O
Ms. Pam Lane, AMIC/PCE
Mr. Mike Miller, AMIC/PCE
MSgt David Caturla, AMIC/PSC
MSgt Johnny Fernandez, AMIC/PLG
TSgt Nicole Brown, AMIC/PLG
Mr. Steve Decker, AMIC/DRQ
MSgt Tom DesLauriers, AMIC/DRQ
• To familiarize contractors with Government’s requirement
• Review Request for Proposal (RFP)
• Clarify Requirements
• Answer Advance Questions
• Invite Additional Questions (in writing)
Purpose
• Contracting office (ACC AMIC/PKC) is the POC for all information
• Any remarks, explanations, or answers to questions at this conference shall not qualify the terms of the solicitation
• Terms of the solicitation and PWS remain unchanged unless the solicitation is formally amended in writing and issued by the CO
• Questions must be written to receive an official Government response
• Final RFP issued 12 Dec, 2013
• Proposals due NLT 1600 hrs on 17 Jan, 2014
• Conference minutes and questions will be posted on FEDBIZOPS (http://www.fedbizopps.gov/)
Rules of Engagement
Agenda
• Program Overview
• Requirement Overview
• MASS Site Locations
• Summary of PWS Changes
• Summary of Incentive Fee Plan Changes
• Request For Proposal Overview
• Key Contractual Aspects
• Funding
• CLIN Structure
• Notional Milestones
• Evaluation Criteria
• Source Selection Procedures
• Important Information
• Question and Answer Session
PROGRAM OVERVIEW
Mr. David Coburn, GS-13
MASS Program Manager
HQ ACC AMIC/PSU
Requirement Overview
• Program Management
• Program Management Office (PMO) in CONUS available to respond to government inquiries 24/7
• Management Information System (MIS)
• Secure, web-based
• Maintain document repository, including configuration control documents (as-built drawings, Communications-Computer
Systems Installation Records [CSIRs])
• Computerized Maintenance Management System
• Material Management Accounting System
• Program Management Information System
• Document Management Information System
• Warranty Management Information System
• Warehouse facility in CONUS
• Program Management (cont)
• Qualified work force
• Radar, communications systems, power production
• Key personnel: PMO, Security Coordinator, site managers, rapid response technicians
• Foreign travel – clearance, Synchronized Pre-Deployment and
Operational Tracker (SPOT) registration
• Special reports
• Future requirements
• Special Projects – not covered by specific CLIN, but within general PWS requirements
• Site additions, transfers, closures
• Partner Nation Training
• Sustainment and integration
• Operations and Maintenance (O&M)
• General Maintenance
• Maintenance Control Plan
• Communications-Electronics (C&E)
• Comm circuits – 99.50% operational reliability
• O&M of satellite communication (SATCOM) sites in Key West, FL; Bogota, Colombia; and Davis-Monthan AFB, AZ
• O&M of Tactical Data Information Link (TADIL) equipment at
Cerro Azul, Costa Rica and Tres Esquinas, Colombia
• Emergency SATCOM cutovers
• Daily Status Reports
• Site Logs and Trip Reports
• Operations and Maintenance (O&M) (cont)
• Civil Engineer
• Preventive Maintenance and Corrective Maintenance of real property (RP), real property installed equipment (RPIE), and real property similar equipment (RPSE) for facilities listed in
App J
• Annual facilities report
• Environmental Safety and Health Program (EPP/S&HP)
• Mission Support
• Logistics
• Supply Chain Management
• Depot Support
• Additional Support
• Transportation
• Freight movement – Colombian Air Force (FAC), commercial, charter
• Customs – International Traffic in Arms Regulations (ITAR)
• Measurement and Analysis
• Maintenance Analysis and Reverse Engineering
• Security
• Security Coordinator
• Security Plans – Host Nation (HN) and US security policies and procedures
• Technical Support to FAC
• Warehouse/Repair Facility in Bogota
• Configuration control
• Emergency technical response
• Routine site visits
• Pre-site visit plan
• Trip report
• Training assistance
• Airlift support
• Armored vehicles
INTELSAT
CERRO
Azul
SAN
ANDRES
SAN JOSE
MARANDUA
CERRO
MACO
RIOHACHA
SANTA
ANA
TRES ESQUINAS
BOGOTA
JIATF-S – Key West, FL
MASS Radar Site
PN Integrated Radar
SATCOM Site
Feed to JIATF-S
Feed to Satellite
MASS Site Locations
CERRO
VERDE
TADIL Site
Peru Mobile Radar
CURACAO
Leticia
Dominican
Republic
Jamaica
Key West
SAN JOSE
Panama
Davis-Monthan AFB
Summary of PWS Changes
Summary of changes in PWS since Industry Day (12 July 13):
• Par 2.1.1.7 – Eliminated requirement for minimum 1-year warranty except for CE corrective maintenance projects; added to CE section, par 3.3.5.3
• Par 2.1.1.8.7 – Added configuration management repository requirement as part of MIS
• Par 2.1.2 – Changed requirement for 200% task coverage at contract start to 100% task coverage at contract start and 200% task coverage at 90 days after contract start
• Par 2.1.2.2 – Clarified that only management personnel within PMO are required to be designated as key personnel
• Par 2.1.2.2.4 – Eliminated requirement for US citizen on standby during non-duty hours at Bogota Host Nation Control Center
Summary of PWS Changes (cont)
• Par 2.1.7 – Added drug testing requirement
• Table 1 – Changed thresholds for PM approval for most categories;
changed threshold for depot repairs to > $150K for CO approval;
added Test, Measurement & Diagnostic Equipment (TMDE), Prime Mission Equipment (PME), and consumables to table
• Par 2.3.2 – Significantly lowered number of potential site additions (2 SATCOM sites, 10 radar integrations, 1 TADIL site, 1 JIATF-S communications site, 1 deployed radar site)
• Par 3.3.7 – Changed reference for sites requiring annual facility inspection from App A to App J
• Par 4.1.1 – Dropped requirement to maintain 90% asset issue effectiveness
• Par 4.1.1.1.1 – Changed requirement for a fully operational depot repair program from 30 days after contract start to fully operational at contract start
• Par 4.1.1.1.3 – Added requirement to attempt depot repairs at
CONUS in-house prior to sending to external depot
• Par 4.1.1.3 – Added requirement to use GSA Advantage as first source for all commercial CR procurements, when available
• Throughout supply section – Changed many references from AFMAN 23-110 to AFMAN 23-122
• Par 4.1.2.7 – Added requirement to sustain one TPS-70 radar system at the CONUS depot repair facility with option to sustain a second system
• Par 4.2.3.3 - 4.2.3.4 – Clarified that vehicle inspections and reports are only for government furnished vehicles
• Par 4.2.5 – Added requirement to provide a cargo movement report
• Par 4.2.5.2 – Added requirement to provide government means to monitor shipments through MIS
• Par 4.2.6.3.2 – Added requirement to apply for licenses within 30 days after contract award and changed requirement to have licenses within 90 days after contract start to within 60 days after contract start; also added qualification that licenses could be delayed for reasons beyond contractor’s control
• Section C, Par 2.2.3.1 – Changed reference for maintenance management data format and sample data from App S to App G
• Section B, Service Summary Table – Updated service summary items and realigned the table throughout
• Section E – Updated Appendix listing; deleted App S (Historical Data); added some new ones (Publications and Forms [F], Level of Effort Data [G&H], Incentive Plan [Q]) and changed designation for Transition from App F to App T
Summary of Incentive Plan Changes
Summary of changes since latest draft version (30 Sep 13):
• Par 3.3 – Added paragraph to describe the philosophy behind the Quality Assessment: Quality Control program that exceeds minimum requirements and expectations
• Par 3.3.1 – Added definition for minor non-conformances
• Par 3.3.2 – Changed monthly Quality point assignment to:
• -1 point for one or more major non-conformances as denoted in a corrective action report (CAR)
• 0 points for one or more second notices, but no major non-conformances (CAR)
• 1 point for no second notices, no major non-conformances
(CAR)
• Par 3.4.1 – Replaced Quality Assurance Manager (QAM) with the FAC to complete customer service survey (added FAC survey as attachment 3)
Summary of Incentive Plan Changes
(Cont)
• Par 4.1 – Clarified that parts repaired on-site or at the repair facility in Colombia are not to be included in the CI calculations; also removed statement that the target fee will be zero
RFP OVERVIEW
Capt Trey Fryman
Contracting Officer
HQ ACC AMIC/PKC
Key Contractual Aspects
• Re-compete acquisition
• 100% small business set-aside
• Contract Type
– Single Award
– Firm-Fixed Price (FFP)
– Cost Reimbursable (CR) line items
– Incentive Fee
– Non-personal services
Funding
• The authority for the obligation of funds is FAR Clause
52.232-18, Availability of Funds
• Incremental funding may be required due to budget constraints. The authority for incremental funding is DFARS 252.232-7007, Limitation of Government's Obligation
• FY14 Phase-In (1 – 30 Sep 14)
• Base Period FY15 (1 Oct 14 – 30 Sep 15)
• FY16-19 – Option Years
• FY 20 – 6-month Optional Extension (Priced)
CLIN Structure
CLIN # TITLE DESCRIPTION
X001 CONUS Support
Program Management Office, CONUS
Warehouse, Key West and D-M SATCOM
Terminals
X002 OCONUS Support – Colombia Support to Colombian Air Force (FAC)
X003 OCONUS Support – Costa Rica Support to Costa Rica sites
X004 OCONUS Support – Dom. Rep. Support to Dominican Republic sites
X005 OCONUS Support – Jamaica Support to Jamaica sites
X006 OCONUS Support – Panama Support to Panama sites
X007 Negotiated FFP Special Projects Work negotiated as FFP IAW PWS
X008 Special Projects & Travel CR Travel, Labor, and Projects (Fixed Fee)
X009 Other Direct Costs CR Parts and Supplies (Handling Rate)
X010 Incentive Fee IAW Appendix Q
0011 Transition Transition Services
Note: CLINs are FFP unless noted otherwise
CLIN Structure (cont)
CLIN # Qty TITLE DESCRIPTION
X012 2 O&M of Additional SATCOM Sites Reserves CLIN for optional SATCOM sites TBD as noted in the PWS
X013 10 O&M of Partner Nation (PN) radar integrations
Reserves CLIN for optional PN radar integrations. TBD as noted in the PWS
X014 1 O&M of Additional TADIL site Reserves CLIN for optional TADIL site
TBD as noted in the PWS
X015 1 Deployment and O&M of Radar Site Reserves CLIN for optional radar site
TBD as noted in the PWS
Note: CLINs are FFP unless noted otherwise
• Optional CLINS for Potential Program Growth Areas
• Pre-priced based on a representative site
Notional Milestones
Milestones Date
Final RFP Issued 12 Dec13
Pre-Proposal Conference 18 Dec 13
RFP Questions Cutoff 10 Jan 14
Proposals Due 17 Jan 14
IEB to SSA
Pre-FPRB to SSA
SSDB to SSA
FPRs Due
Contract Award 1 Aug14
Transition Start 1 Sep 14
Performance Start 1 Oct 14
Source Selection Procedures
Lowest Price Technically Acceptable (LPTA)
• Source selection will be conducted using the LPTA source selection process IAW DoD Source Selection Guide (1 Jul 11) and AFFARS MP 5315.3 (27 Mar 13)
• Award will be made to the offeror(s) who is deemed responsible in accordance with FAR part 9, whose proposal conforms to the solicitation requirements, is the lowest evaluated price with an “Acceptable” rating in all technical subfactors and past performance
• FACTORS –
• FACTOR 1 – Technical
• FACTOR 2 – Past Performance
• FACTOR 3 – Price
Evaluation Criteria
FACTOR 1 – Technical
• Subfactor A: Program Management
• Aspect 1: Management and Integration
• Aspect 2: Human Resources
• Aspect 3: Quality Management System
• Subfactor B: Logistics
• Aspect 1: Depot Repair Functions
• Aspect 2: Diminishing Manufacture Sources
• Aspect 3: Required Licenses and Regulations
• Subfactor C: Transition
• Aspect 1: Key Milestones
• Aspect 2: Organizational Structure
• Aspect 3: Qualified Workforce
Evaluation Criteria
FACTOR 2 – Past Performance
• Past performance will be assigned a rating of "Acceptable" or "Unacceptable“
• Recency (3yrs, minimum of 12 months performance)
• Relevancy (only rated on recent references)
• Relevant - Past performance effort involving operations and/or maintenance services and technical services similar to the size, scope and complexity of the MASS program
• Not Relevant - No experience with any of the above
• Quality of performance (only evaluated on recent references)
FACTOR 3 – Price
• Price/cost will be evaluated using techniques established in FAR 15.404-1 to ensure the Government receives a fair, reasonable, and balanced price
• Review proposal against subfactor criteria in RFP to assess whether proposed approach meets technical requirements:
Meets … Evaluation Criteria (PWS)
Does Not Meet
• Document individual evaluation assessments
Why proposal meets or does not meet
• Assign Acceptable / Unacceptable Rating to Subfactor
Any subfactor rated Unacceptable will result in an overall
Unacceptable rating at the Factor level
Proposals that exceed the evaluation criteria will not receive higher ratings
Technical Evaluation Process
Subfactor Rating Description
Acceptable Proposal clearly meets the minimum requirements of the solicitation.
Unacceptable Proposal does not clearly meet the minimum requirements of the solicitation.
DoD Source Selection Procedures, Table A-1
Technical Evaluation Ratings
Obtain Past Performance Information on Each Offeror and Determine Recency
Determine Relevancy for Each Recent Contract
Review PPI Quality for Each Recent & Relevant Contract
Assign Offeror’s PAST PERFORMANCE FACTOR
Acceptable/Unacceptable Rating
Past Performance Rating Process
Rating Description
Acceptable Based on the offeror’s performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort, or the offeror’s performance record is unknown. (See note below.)
Unacceptable Based on the offeror’s performance record, the Government has no reasonable expectation that the offeror will be able to successfully perform the required effort.
Note: In the case of an offeror without a record of relevant past performance or for whom information on past performance is not available or so sparse that no meaningful past performance rating can be reasonably assigned, the offeror may not be evaluated favorably or unfavorably on past performance (FAR 15.305 (a)(2)(iv)). Therefore, the offeror shall be determined to have unknown past performance. In the context of acceptability/unacceptability, “unknown” shall be considered “acceptable”.
Past Performance Ratings
• Price reasonableness will be determined based on a comparison of each offeror’s total overall evaluated price
• Conduct Cost/Price Analysis – determine fair and reasonable
Fair and reasonable is normally established by Adequate Price
Competition which is the FAR preferred technique and is when:
Two or more responsible offerors, competing independently;
Submit priced offers that satisfy gov’t expressed requirement;
Award made to offeror whose proposal represent best value (LPTA);
and
No finding that price of successful offeror is unreasonable
• Determine if prices are balanced
Exists when price of one or more CLINs is significantly overstated
(despite acceptable total evaluated price)
Mathematically unbalanced – offer is based on nominal prices for some work and enhanced prices for other work
Price Evaluation Process
Important Information
• RFP requirements
• Pricing Table
• Reps & Certs
• Fill-in clauses
• L-9.1.1 Labor Rates:
• Both Fully burdened rate and hourly rate
ADVANCE QUESTIONS
Source Selection Sensitive – See FAR 3.104
Advance Questions
1. Where are the workload estimates and the historical data that was said to be provided in November’s Q&A.
a) Where is the location of this information if placed in a share drive somewhere?
2. What are the current specific databases and format used for PM systems to determine appropriate solution? We never received answer to include in our solution (Question 15 – December 9, 2013)
3. Per Appendix C, the contractor is required to price there are some inconsistencies to meet that requirement:
a) There is no info to price.
b) Personnel requirement (only shows Pm and Asst PM)
i. Generic CLINs
ii. No information in 09 1.1.1
iii. The requirements appear to be inconsistent
4. Where is the public information identifying ODCs
5. What are reimbursables
6. Are the following reimbursable
a) Foreign Taxes (which countries should we use to price)
b) Setting up all new contracts
c) Deposit fees etc
d) ITAR licencse (ODCs)
e) Training
i. Are employees required to attend CRC training (Who pays )
ii. Government provided training (Info Assurance, TIP)
iii. Are these are required to be on government domain
iv. Can trainers be foreign nationals
f) Travel
i. Since travel is in FFP, are we supposed to use the amount in proposal with expected government support if cost goes over $150K
g) Medical costs (transition of new personnel)
h) Frequency Clearances (who is paying for it)
i. Are we pricing?
ii. Are there not government people currently doing this?
i) CE type functions
i. Ex. Invoice from electricity going to US government or to contractor
ii. Is there an easy line of delineation of where the costs start and stop regarding facilities and who pays (Governement/Contractor)
j) What is the current run rate of the current contract
k) How many email, telephony, and data users per site
l) What is the minimum manning requirements for “the” 24/7 site
m) Please provide “What foreign Taxes need to be included in the price”
Are there any special foreign taxes or duties the need to be added to the price? Specific examples
n) FAR 52.225-2 Buy American Act Certificate –Will we be purchasing any non-US items? How do you know what to price in the will we be able to comply?
o) Do any of the foreign governments control wage rates or material prices in any of the locations?
p) Appendix E, “The contractors minimum education and experience requirements, submitted as part of the proposal, will be incorporated here as Appendix E.” Does not specify Minimum Education and
Experience Requirements. Indicate security clearance requirements and “Section L9.1.1.1.
q) Since we are determining our own FTE solutions? Are we to develop our own minimum requirements per labor category
Question and Answer Session