MASS PWS Appendix H-Optional Sites Level of Effort Data dated 11 Dec 13
View the file
Other files for this federal contract opportunity
Show all 50
Mobile Air Surveillance System has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation FA4890-13-R-0007
Appendix H - 1
11 Dec 2013
APPENDIX H
OPTIONAL SITES
1. Site specific Personnel Requirements
1.1. Contractor shall provide best estimate of personnel required to meet the stated requirements for the sites described below
1.2. Representative location are intended to provide estimate of typical workload should the
AF need MASS O&M support at additional locations
2. Site specific Mission Requirements
2.1. SATCOM Sites (2) – Location TBD
Representative Location Bogota, Colombia HNCC
Normal Operating Hours 24/7
Expected Equipment Consistent with the GFE maintained at the Bogota HNCC site.
Standards Operations & Maintenance:
Support prime mission and support equipment maintained to meet or exceed established standards.
PWS Section A, Paragraph Error! Reference source not found..4, Error! Reference source not found., & Appendix B
Preventive Maintenance
Inspection (PMI)
Daily, Weekly, Bi-Weekly, Monthly, Quarterly, Semi-
Annually, and Annually (Similar PMI’s are performed at
Bogota HNCC site)
Exceptions N/A
2.2. TADIL Site – Location TBD
Representative Location Cerro Azul, Costa Rica
Normal Operating Hours At least one visit per month to complete PMIs and as necessary to respond to unscheduled outages
Expected Equipment Consistent with the GFE maintained at the Cerro Azul and
Tres Esquinas sites
Standards IAW PWS 4.1.2.4
Preventive Maintenance
Inspection (PMI)
Weekly, Monthly, Quarterly, and Semi-Annually
Solicitation FA4890-13-R-0007
Appendix H - 2
11 Dec 2013
2.3. Partner Nation Radar Integrations (10) – Locations TBD
Representative Location Kingston, Jamaica
Normal Operating Hours At least one visit every six months following acceptance and when requested for corrective maintenance
Expected Equipment Consistent with the GFE maintained at the Jamaica site.
- 1ea Cisco Router (requires HWIC-4ESW Fast Ethernet
Module (4 port) and VIC3-2FSX/DID Module 2 port voice (telephone))
- 1ea Cisco RPS-2300
- 2ea Sunhillo Rici w/software
- 1ea Liebert UPS
- Misc serial and cat 5e cables
- 1ea NTRD computer and s/w, optical scroll mouse, and keyboard
Standards IAW PWS 4.1.2.5.6
Preventive Maintenance
Inspection (PMI)
Weekly, Monthly, Quarterly, and Semi-Annually
2.4. Deployed Radar Site – Location TBD
Representative Location San Jose, COL
Supported Operations Air Surveillance; Drug Interdiction
Normal Operating Hours 24/7
Equipment Reliability (Er) 95%
Expected Equipment Shelter (Van), Antenna, 400Hz Generator, Transmitter, Receiver, Processor, Display Units, Interrogator, and radio equipment
Site Setup Contractor prepare site and setup equipment
Preventive Maintenance
Inspection (PMI)
Daily, Weekly, Bi-Weekly, Monthly, Quarterly, Semi-
Annually, and Annually (Similar PMI’s are performed at Tres
Esquinas by FAC personnel)
Expected Site Parameters 100’ X 100’ Chain link fence, Security lighting, Low level lighting, Bathroom, Guard shack, Generator shelter, Concrete slabs, Sidewalk pavement (See attachment below)
Exceptions
Example site contains equipment and facilities that would not be included in the deployed site; Deployed site would be less
“hardened;” Contractor would be required to prepare the site location, set up/tear down equipment, and provide O&M.
Orange Walk Site Layout Drawing after setup 31 Jan 13.pdf
10 ft
Light
Light Power Production Pad
SATCOM Pad
Driveway / Parking
Genset
GensetK ato
MD-4 Load Bank
MSK
(Storage)
Bathroom
Septic tank
Power Dist
Fuel tank pad
Gray indicates concrete pad
N
Scale 1:10
Guard Shack
Water Tank
Personnel Gate
MSK
(Operations)
P D
P
Antenna platform – Compacted gravel and dirt with 8" stem walls
R ad ar
Concrete Pad for Van and Equip
400 Hz
PDP
60 Hz
PDP
Fuel pump
150 Amp Panel
Orange Walk Site Layout Drawing after setup 31 Jan 13.vsd