Appendix_H_-_Optional_Sites.pdf

PDF 373 KB Posted

Attached to
Mobile Air Surveillance System Federal contract opportunity
Solicitation number
FA4890-13-R-0007
Issued by
Department of the Air Force Air Combat Command

About this file

MASS PWS Appendix H-Optional Sites Level of Effort Data dated 11 Dec 13

View the file

Other files for this federal contract opportunity

Other files attached to Mobile Air Surveillance System, newest first.
File Type Posted
Questions_9_Jan_14_FBO_MASS.pdf PDF
Appendix_M_-_Foreign_Travel_Clearance_Jan14.pdf PDF
MASS_Q A_-_6_Jan_14.pdf PDF
MASS_PPC_Brief_-_20131218.pdf PDF
Pre_Performance_Conference_Attendance.pdf PDF
MASS_Pre-Proposal_Conf_letter_Update_1.pdf PDF
Appendix_L_-_Gov_Furnished_Vehicles.pdf PDF
Appendix_I_-_Govt_Furnished_Prop.pdf PDF
Appendix_D_-_Circuit_Demarcation_Points.pdf PDF
Appendix_N_-_Force_Protection.pdf PDF
Appendix_W_-_Acronyms.pdf PDF
Appendix_G_-_Level_of_Effort_Data_Format.pdf PDF
Appendix_K_-_Logistics_Data_Fields.pdf PDF
Appendix_E_-_Contractor_Education.pdf PDF
Appendix_M_-_Foreign_Travel_Clearance.pdf PDF
MASS_Pre-Proposal_Conf_letter.pdf PDF
2_Atch_2_DD-254_Pre-Award.pdf PDF
3_Atch_3_WD_05_2120_R14_Monroe_FL.pdf PDF
1_Atch_1_-_MASS_Performance_Work_Statement.pdf PDF
5_Atch_5_Price_Table_MASS_RFP.xlsx XLSX spreadsheet
9_Dec_Q A.pdf PDF
MASS_solicitation_update.pdf PDF
Q A_12_Nov_13.pdf PDF
Draft_MASS_PWS_Solicitation_20131003.pdf PDF
Draft_Price_Table_MASS_RFP.xlsx XLSX spreadsheet
Draft_MASS_RFP_-_FA4890-13-R-0007.pdf PDF
DRAFT_Appendix_O_-_HN_Agreements.pdf PDF
Draft_MASS_PWS_Solicitation_FA4890-13-R-0007_20130614_(posted).pdf PDF
Price_Table_MASS_RFP_DRFT.xlsx XLSX spreadsheet
Draft_MASS_Incentive_Plan_20130930.pdf PDF
Draft_MASS_PWS_20130930.pdf PDF
Q A_30Sep13.pdf PDF
DRAFT_Appendix_S_-_Historical_Data_Format.pdf PDF
DRAFT_Appendix_J_-_Real_Prop_List.pdf PDF
DRAFT_Appendix_W_-_Acronyms.pdf PDF
WD_05-2120_R14_Monroe_FL.pdf PDF
DRAFT_Appendix_C_-_Quality_Mgt_Sys.pdf PDF
DRAFT_Appendix_K_-_Logistics_Data_Fields.pdf PDF
DRAFT_Appendix_Y_-_Proposal_Incorporation.pdf PDF
DRAFT_Appendix_M_-_Foreign_Travel_Clearance.pdf PDF
Draft_Price_Table-MASS.pdf PDF
DRAFT_Appendix_B_-_Work_Management_Information.pdf PDF
DRAFT_Appendix_H_-_Optional_Sites.pdf PDF
DRAFT_Appendix_T_-_Transition.pdf PDF
DRAFT_Appendix_I_-_Government_Furnished_Property.pdf PDF
DRAFT_Appendix_R_-_Reports.pdf PDF
Draft_MASS_DD-254.pdf PDF
DRAFT_Appendix_O_-_HN_Agreements.pdf PDF
DRAFT_Appendix_A_-_Site_Locations.pdf PDF
DRAFT_Appendix_E_-_Contractor_Education.pdf PDF
Show all 50

Mobile Air Surveillance System has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation FA4890-13-R-0007

Appendix H - 1

11 Dec 2013

APPENDIX H

OPTIONAL SITES

1. Site specific Personnel Requirements

1.1. Contractor shall provide best estimate of personnel required to meet the stated requirements for the sites described below

1.2. Representative location are intended to provide estimate of typical workload should the

AF need MASS O&M support at additional locations

2. Site specific Mission Requirements

2.1. SATCOM Sites (2) – Location TBD

Representative Location Bogota, Colombia HNCC

Normal Operating Hours 24/7

Expected Equipment Consistent with the GFE maintained at the Bogota HNCC site.

Standards Operations & Maintenance:

Support prime mission and support equipment maintained to meet or exceed established standards.

PWS Section A, Paragraph Error! Reference source not found..4, Error! Reference source not found., & Appendix B

Preventive Maintenance

Inspection (PMI)

Daily, Weekly, Bi-Weekly, Monthly, Quarterly, Semi-

Annually, and Annually (Similar PMI’s are performed at

Bogota HNCC site)

Exceptions N/A

2.2. TADIL Site – Location TBD

Representative Location Cerro Azul, Costa Rica

Normal Operating Hours At least one visit per month to complete PMIs and as necessary to respond to unscheduled outages

Expected Equipment Consistent with the GFE maintained at the Cerro Azul and

Tres Esquinas sites

Standards IAW PWS 4.1.2.4

Preventive Maintenance

Inspection (PMI)

Weekly, Monthly, Quarterly, and Semi-Annually

Solicitation FA4890-13-R-0007

Appendix H - 2

11 Dec 2013

2.3. Partner Nation Radar Integrations (10) – Locations TBD

Representative Location Kingston, Jamaica

Normal Operating Hours At least one visit every six months following acceptance and when requested for corrective maintenance

Expected Equipment Consistent with the GFE maintained at the Jamaica site.

- 1ea Cisco Router (requires HWIC-4ESW Fast Ethernet

Module (4 port) and VIC3-2FSX/DID Module 2 port voice (telephone))

- 1ea Cisco RPS-2300

- 2ea Sunhillo Rici w/software

- 1ea Liebert UPS

- Misc serial and cat 5e cables

- 1ea NTRD computer and s/w, optical scroll mouse, and keyboard

Standards IAW PWS 4.1.2.5.6

Preventive Maintenance

Inspection (PMI)

Weekly, Monthly, Quarterly, and Semi-Annually

2.4. Deployed Radar Site – Location TBD

Representative Location San Jose, COL

Supported Operations Air Surveillance; Drug Interdiction

Normal Operating Hours 24/7

Equipment Reliability (Er) 95%

Expected Equipment Shelter (Van), Antenna, 400Hz Generator, Transmitter, Receiver, Processor, Display Units, Interrogator, and radio equipment

Site Setup Contractor prepare site and setup equipment

Preventive Maintenance

Inspection (PMI)

Daily, Weekly, Bi-Weekly, Monthly, Quarterly, Semi-

Annually, and Annually (Similar PMI’s are performed at Tres

Esquinas by FAC personnel)

Expected Site Parameters 100’ X 100’ Chain link fence, Security lighting, Low level lighting, Bathroom, Guard shack, Generator shelter, Concrete slabs, Sidewalk pavement (See attachment below)

Exceptions

Example site contains equipment and facilities that would not be included in the deployed site; Deployed site would be less

“hardened;” Contractor would be required to prepare the site location, set up/tear down equipment, and provide O&M.

Orange Walk Site Layout Drawing after setup 31 Jan 13.pdf

10 ft

Light

Light Power Production Pad

SATCOM Pad

Driveway / Parking

Genset

GensetK ato

MD-4 Load Bank

MSK

(Storage)

Bathroom

Septic tank

Power Dist

Fuel tank pad

Gray indicates concrete pad

N

Scale 1:10

Guard Shack

Water Tank

Personnel Gate

MSK

(Operations)

P D

P

Antenna platform – Compacted gravel and dirt with 8" stem walls

R ad ar

Concrete Pad for Van and Equip

400 Hz

PDP

60 Hz

PDP

Fuel pump

150 Amp Panel

Orange Walk Site Layout Drawing after setup 31 Jan 13.vsd

Page-1

File details come from the government source that posted it. Updated .