Solicitation_FA4887-15-R-0001.doc

DOC document 529 KB Posted

Attached to
Simplified Acquisition of Base Engineering Requirements (SABER) Federal contract opportunity
Solicitation number
FA4887-15-R-0001
Issued by
Department of the Air Force Air Education and Training Command

About this file

Luke AFB SABER Solicitation

View the file

Other files for this federal contract opportunity

Other files attached to Simplified Acquisition of Base Engineering Requirements (SABER), newest first.
File Type Posted
Questions_3.docx DOCX document
Questions_2.docx DOCX document
0001_Ammendment.pdf PDF
B938-Rstrm_plumbing.pdf PDF
RFIs_Q A's.docx DOCX document
B938-One-Line_Plumbing.pdf PDF
B938_elect_panel_location.pdf PDF
B938-RstrmFlrpln.pdf PDF
Project-1357525_Bldg_938_Restrooms.pdf PDF
B938-bldg_floor_plan.pdf PDF
B938-restrms_dimensions.pdf PDF
Attachment_12_-_Hazardous_Material_Questionaire.doc DOC document
Attachment_22_-_Bonding_Information_Request.docx DOCX document
Attachment_13_-_Contractors_Environmental_Reporting_Entry_Form.doc DOC document
Attachment_14_-_Construction_Cost_Estimate_Breakdown.xlsx XLSX spreadsheet
Attachment_18_-_DoD_Unified_Facilities_Criteria_(link).docx DOCX document
Attachment_20_-_Client_Authorization_Letter.doc DOC document
Attachment_2-_AZ150032_AZ32_WDOL_Maricopa.doc DOC document
Attachment_21_-_Financial_Information_Request.docx DOCX document
Attachment_10_-_AF_Form_3065_Progress_Report.pdf PDF
Attachment_8_-_AF_Form_66_Schedule_of_Material_Submittals.doc DOC document
Attachment_6_-_Luke_AFB_Design_and_Construction_Standards.doc DOC document
Attachment_7_-_Engineering_Technical_Letter_(ETL_02-12).pdf PDF
Attachment_4_-_Luke_AFB_Landscape_Design_and_Maintenance_Standards.pdf PDF
Attachment_23_-_Base_Access_Instructions.pdf PDF
Attachment_3-_AZ150031_AZ31_WDOL_Coconino.pdf PDF
Attachment_26-_Sample_Project_SOW.docx DOCX document
Attachment_5_-_Architectural_Design_Compatibility_Guide.PDF PDF
Attachment_11_-_AF_Form_3000_Material_Approval_Submittal.pdf PDF
Attachment_16_-_DD_1354_Transfer_and_Acceptance_of_DoD_Real_Property.pdf PDF
Attachment_17_-_USACE_Safety_and_Health_Requirements.pdf PDF
Attachment_15_-_Luke_AFB_Master_Specifications.dot DOT file
Attachment_24-_Resume_Template.dot DOT file
Attachment_9_-_AF_Form_3064_Progress_Schedule.xlsx XLSX spreadsheet
Attachment_19_-_AFI_33-118_Radio_Communications.pdf PDF
Show all 35

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Section B - Supplies or Services and Prices

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

UNDEFINED

SABER: Luke, AZ ANG and Gila Bend AFAF

FFP

FFP-Base year. Contractor shall furnish all plant, labor, equipment, supervision and materials to perform all operations in connection with the Simplified Acquisition Base Engineering Requirements (SABER) Program for Luke AFB, AZ Air National Guard Refueling Wing at Sky Harbor International Airport, AZ and Gila Bend AFAF, AZ. Work will be completed in strict accordance with the General Specifications, Applicable Wage Determinations, Statement of Work, schedule, and subject to terms and conditions of the contract. Offerors are encouraged to submit tiered coefficients based on cumulative dollars awarded over the life of the contract, including options.

FOB: Destination

NSN: Z199-50-SAB-ER

SIGNAL CODE: A

MAX

NET AMT

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

UNDEFINED

SABER: Fort Tuthill, Flagstaff, AZ

FFP-Base year. Contractor shall furnish all plant, labor, equipment, supervision and materials to perform all operations in connection with the Simplified Acquisition Base Engineering Requirements (SABER) Program for Fort Tuthill, Flagstaff, AZ. Work will be completed in strict accordance with the General Specifications, Applicable Wage Determinations, Statement of Work, schedule, and subject to terms and conditions of the contract.

The coefficient for CLIN 0002 for work performed at Fort Tuthill will be determined by adding 0.15 to the coefficient of CLIN 0001 for each tier proposed.

FOB: Destination

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

UNDEFINED

SABER:E4Clicks

FFP Base year. Initial E4Clicks Software and training and minimum guarantee project

FOB: Destination

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

UNDEFINED

OPTION
SABER: Luke, AZ ANG and Gila Bend AFAF

FFP

FFP-Option Year 1. Contractor shall furnish all plant, labor, equipment, supervision and materials to perform all operations in connection with the Simplified Acquisition Base Engineering Requirements (SABER) Program for Luke AFB, AZ Air National Guard Refueling Wing at Sky Harbor International Airport, AZ and Gila Bend AFAF, AZ. Work will be completed in strict accordance with the General Specifications, Applicable Wage Determinations, Statement of Work, schedule, and subject to terms and conditions of the contract. Offerors are encouraged to submit tiered coefficients based on cumulative dollars awarded over the life of the contract, including options.

FOB: Destination

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

UNDEFINED

OPTION
SABER:Fort Tuthill

FFP

FFP-Option Year 1. Contractor shall furnish all plant, labor, equipment, supervision and materials to perform all operations in connection with the Simplified Acquisition Base Engineering Requirements (SABER) Program for Fort Tuthill, Flagstaff, AZ. Work will be completed in strict accordance with the General Specifications, Applicable Wage Determinations, Statement of Work, schedule, and subject to terms and conditions of the contract.

The coefficient for CLIN 1002 for work performed at Fort Tuthill will be determined by adding 0.15 to the coefficient of CLIN 1001 for each tier proposed.

FOB: Destination

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

UNDEFINED

OPTION
SABER: E4Clicks

FFP

E4Clicks software

FOB: Destination

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

UNDEFINED

OPTION
SABER: Luke, AZ ANG and Gila Bend AFAF

FFP

FFP-Option Year 2. Contractor shall furnish all plant, labor, equipment, supervision and materials to perform all operations in connection with the Simplified Acquisition Base Engineering Requirements (SABER) Program for Luke AFB, AZ Air National Guard Refueling Wing at Sky Harbor International Airport, AZ and Gila Bend AFAF, AZ. Work will be completed in strict accordance with the General Specifications, Applicable Wage Determinations, Statement of Work, schedule, and subject to terms and conditions of the contract. Offerors are encouraged to submit tiered coefficients based on cumulative dollars awarded over the life of the contract, including options.

FOB: Destination

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

UNDEFINED

OPTION
SABER:Fort Tuthill

FFP

FFP-Option Year 2. Contractor shall furnish all plant, labor, equipment, supervision and materials to perform all operations in connection with the Simplified Acquisition Base Engineering Requirements (SABER) Program for Fort Tuthill, Flagstaff, AZ. Work will be completed in strict accordance with the General Specifications, Applicable Wage Determinations, Statement of Work, schedule, and subject to terms and conditions of the contract.

The coefficient for CLIN 2002 for work performed at Fort Tuthill will be determined by adding 0.15 to the coefficient of CLIN 2001 for each tier proposed.

FOB: Destination

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

UNDEFINED

OPTION
SABER:E4Clicks

FFP

E4Clicks Software

FOB: Destination

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

UNDEFINED

OPTION
SABER: Luke, AZ ANG and Gila Bend AFAF

FFP

FFP-Option Year 3. Contractor shall furnish all plant, labor, equipment, supervision and materials to perform all operations in connection with the Simplified Acquisition Base Engineering Requirements (SABER) Program for Luke AFB, AZ Air National Guard Refueling Wing at Sky Harbor International Airport, AZ and Gila Bend AFAF, AZ. Work will be completed in strict accordance with the General Specifications, Applicable Wage Determinations, Statement of Work, schedule, and subject to terms and conditions of the contract. Offerors are encouraged to submit tiered coefficients based on cumulative dollars awarded over the life of the contract, including options.

FOB: Destination

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

UNDEFINED

OPTION
SABER: Fort Tuthill, Flagstaff, AZ

FFP

FFP-Option Year 3. Contractor shall furnish all plant, labor, equipment, supervision and materials to perform all operations in connection with the Simplified Acquisition Base Engineering Requirements (SABER) Program for Fort Tuthill, Flagstaff, AZ. Work will be completed in strict accordance with the General Specifications, Applicable Wage Determinations, Statement of Work, schedule, and subject to terms and conditions of the contract.

The coefficient for CLIN 3002 for work performed at Fort Tuthill will be determined by adding 0.15 to the coefficient of CLIN 3001 for each tier proposed.

FOB: Destination

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

UNDEFINED

OPTION
SABER:E4Clicks

FFP

E4Clicks Software.

FOB: Destination

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

UNDEFINED

OPTION
SABER: Luke, AZ ANG and Gila Bend AFAF

FFP

FFP-Option Year 4. Contractor shall furnish all plant, labor, equipment, supervision and materials to perform all operations in connection with the Simplified Acquisition Base Engineering Requirements (SABER) Program for Luke AFB, AZ Air National Guard Refueling Wing at Sky Harbor International Airport, AZ and Gila Bend AFAF, AZ. Work will be completed in strict accordance with the General Specifications, Applicable Wage Determinations, Statement of Work, schedule, and subject to terms and conditions of the contract. Offerors are encouraged to submit tiered coefficients based on cumulative dollars awarded over the life of the contract, including options.

FOB: Destination

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

UNDEFINED

OPTION
SABER: Fort Tuthill, Flagstaff, AZ

FFP

FFP-Option Year 4. Contractor shall furnish all plant, labor, equipment, supervision and materials to perform all operations in connection with the Simplified Acquisition Base Engineering Requirements (SABER) Program for Fort Tuthill, Flagstaff, AZ. Work will be completed in strict accordance with the General Specifications, Applicable Wage Determinations, Statement of Work, schedule, and subject to terms and conditions of the contract.

The coefficient for CLIN 4002 for work performed at Fort Tuthill will be determined by adding 0.15 to the coefficient of CLIN 4001 for each tier proposed.

FOB: Destination

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

UNDEFINED

OPTION
SABER:E4Clicks

FFP

E4Clicks Software.

FOB: Destination

MAX

CONTRACT MINIMUM/MAXIMUM QUANTITY AND CONTRACT VALUE

The minimum quantity and contract value for all orders issued against this contract shall not be less than the minimum quantity and contract value stated in the following table. The maximum quantity and contract value for all orders issued against this contract shall not exceed the maximum quantity and contract value stated in the following table.

MINIMUM

QUANTITY

MINIMUM

AMOUNT

MAXIMUM

QUANTITY

MAXIMUM

AMOUNT

$2,000.00

$6,000,000.00

DELIVERY/TASK ORDER MINIMUM/MAXIMUM QUANTITY AND ORDER VALUE

The minimum quantity and order value for each Delivery/Task Order issued shall not be less than the minimum quantity and order value stated in the following table. The maximum quantity and order value for each Delivery/Task Order issued shall not exceed the maximum quantity and order value stated in the following table.

MINIMUM

QUANTITY

MINIMUM

AMOUNT

MAXIMUM

QUANTITY

MAXIMUM

$2,000.00

$1,000,000.00

CLIN DELIVERY/TASK ORDER MINIMUM/MAXIMUM QUANTITY AND CLIN ORDER VALUE

The minimum quantity and order value for the given Delivery/Task Order issued for this CLIN shall not be less than the minimum quantity and order value stated in the following table. The maximum quantity and order value for the given Delivery/Task Order issued for this CLIN shall not exceed the maximum quantity and order value stated in the following table.

CLIN
MINIMUM

QUANTITY

MINIMUM

AMOUNT

MAXIMUM

QUANTITY

MAXIMUM

$2,000.00

$1,000,000.00

$2,000.00

$1,000,000.00

$2,000.00

$1,000,000.00

$2,000.00

$1,000,000.00

$2,000.00

$1,000,000.00

$2,000.00

$1,000,000.00

$2,000.00

$1,000,000.00

$2,000.00

$1,000,000.00

$2,000.00

$1,000,000.00

$2,000.00

$1,000,000.00

$2,000.00

$1,000,000.00

$2,000.00

$1,000,000.00

$2,000.00

$1,000,000.00

$2,000.00

$1,000,000.00

$2,000.00

$1,000,000.00

Section E - Inspection and Acceptance

ADDITIONAL

E. 1. INSPECTION AND ACCEPTANCE: The Base Civil Engineer, or his authorized representative, is designated as the representative of the Contracting Officer for the purpose of technical surveillance of the workmanship and inspection of materials for work being performed under this contract. This designation in no way authorizes anyone other than the Contracting Officer to commit the Government to changes in the terms of the contract or Task Orders thereto.

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN
INSPECT AT
INSPECT BY
ACCEPT AT
ACCEPT BY
0001
Destination
Government
Destination
Government
0002
Destination
Government
Destination
Government
0003
Destination
Government
Destination
Government
1001
Destination
Government
Destination
Government
1002
Destination
Government
Destination
Government
1003
Destination
Government
Destination
Government
2001
Destination
Government
Destination
Government
2002
Destination
Government
Destination
Government
2003
Destination
Government
Destination
Government
3001
Destination
Government
Destination
Government
3002
Destination
Government
Destination
Government
3003
Destination
Government
Destination
Government
4001
Destination
Government
Destination
Government
4002
Destination
Government
Destination
Government
4003
Destination
Government
Destination
Government

CLAUSES INCORPORATED BY REFERENCE

52.246-12
Inspection of Construction
AUG 1996
52.246-13
Inspection--Dismantling, Demolition, or Removal of Improvements
AUG 1996

Section F - Deliveries or Performance

DELIVERY INFORMATION

CLIN
DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
UIC
0001
POP 14-AUG-2015 TO

13-AUG-2016

N/A
56 CIVIL ENG/CECS-F2U308-(FA4887)

BRAYDEN HARDY

13970 GILLESPIE DRIVE

BLDG 343

ENGINEERING SECTION

LUKE AFB AZ 85309

623-856-4720

FOB: Destination F2U308

0002
POP 14-AUG-2015 TO

13-AUG-2016

N/A
(SAME AS PREVIOUS LOCATION)

F2U308

0003
POP 14-AUG-2015 TO

13-AUG-2016

N/A
(SAME AS PREVIOUS LOCATION)

F2U308

1001
POP 14-AUG-2016 TO

13-AUG-2017

N/A
(SAME AS PREVIOUS LOCATION)

F2U308

1002
POP 14-AUG-2016 TO

13-AUG-2017

N/A
(SAME AS PREVIOUS LOCATION)

F2U308

1003
POP 14-AUG-2016 TO

13-AUG-2017

N/A
(SAME AS PREVIOUS LOCATION)

F2U308

2001
POP 14-AUG-2017 TO

13-AUG-2018

N/A
(SAME AS PREVIOUS LOCATION)

F2U308

2002
POP 14-AUG-2017 TO

13-AUG-2018

N/A
(SAME AS PREVIOUS LOCATION)

F2U308

2003
POP 14-AUG-2017 TO

13-AUG-2018

N/A
(SAME AS PREVIOUS LOCATION)

F2U308

3001
POP 14-AUG-2018 TO

13-AUG-2019

N/A
(SAME AS PREVIOUS LOCATION)

F2U308

3002
POP 14-AUG-2018 TO

13-AUG-2019

N/A
(SAME AS PREVIOUS LOCATION)

F2U308

3003
POP 14-AUG-2018 TO

13-AUG-2019

N/A
(SAME AS PREVIOUS LOCATION)

F2U308

4001
POP 14-AUG-2019 TO

13-AUG-2020

N/A
(SAME AS PREVIOUS LOCATION)

F2U308

4002
POP 14-AUG-2019 TO

13-AUG-2020

N/A
(SAME AS PREVIOUS LOCATION)

F2U308

4003
POP 14-AUG-2019 TO

13-AUG-2020

N/A
(SAME AS PREVIOUS LOCATION)

F2U308

CLAUSES INCORPORATED BY REFERENCE

52.211-13
Time Extensions
SEP 2000
52.242-14
Suspension of Work
APR 1984
52.242-15
Stop-Work Order
AUG 1989
52.247-34
F.O.B. Destination
NOV 1991

CLAUSES INCORPORATED BY FULL TEXT

52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEP 2000)

(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount to be determined upon issuance of each individual task order for each additional calendar day of delay until the work is completed or accepted.

(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.

(End of clause)

Section G - Contract Administration Data

CLAUSES INCORPORATED BY REFERENCE

252.204-7006
Billing Instructions
OCT 2005
252.232-7003
Electronic Submission of Payment Requests and Receiving Reports
JUN 2012

252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (MAY 2013)

(a) Definitions. As used in this clause--

Department of Defense Activity Address Code (DoDAAC) is a six position code that uniquely identifies a unit, activity, or organization.

Document type means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).

Local processing office (LPO) is the office responsible for payment certification when payment certification is done external to the entitlement system.

(b) Electronic invoicing. The WAWF system is the method to electronically process vendor payment requests and receiving reports, as authorized by DFARS 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(c) WAWF access. To access WAWF, the Contractor shall--

(1) Have a designated electronic business point of contact in the System for Award Management at https://www.acquisition.gov; and

(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this Web site.

(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through

WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/.

(e) WAWF methods of document submission. Document submissions may be via Web entry, Electronic Data Interchange, or File Transfer Protocol.

(f) WAWF payment instructions. The Contractor must use the following information when submitting payment requests and receiving reports in WAWF for this contract/order:

(1) Document type. The Contractor shall use the following document type.

Construction Payment Invoice

(2) Inspection/acceptance location. The Contractor shall select the following inspection/acceptance location(s) in WAWF, as specified by the contracting officer.

FA4887

(Contracting Officer: Insert inspection and acceptance locations or “Not applicable”.)

(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.

Routing Data Table*

Field Name in WAWF

Data to be entered in WAWF

Pay Official DoDAAC

F87700

Issue By DoDAAC

FA4887

Admin DoDAAC

Inspect By DoDAAC

Ship To Code

Ship From Code

Mark For Code

Service Approver (DoDAAC)

FA4887

Service Acceptor (DoDAAC)

FA4887

Accept at Other DoDAAC

LPO DoDAAC

DCAA Auditor DoDAAC

Other DoDAAC(s)

(*Contracting Officer: Insert applicable DoDAAC information or “See schedule” if multiple ship to/acceptance locations apply, or “Not applicable.”)

(4) Payment request and supporting documentation. The Contractor shall ensure a payment request includes appropriate contract line item and subline item descriptions of the work performed or supplies delivered, unit price/cost per unit, fee (if applicable), and all relevant back-up documentation, as defined in DFARS Appendix F, (e.g. timesheets) in support of each payment request.

(5) WAWF email notifications. The Contractor shall enter the email address identified below in the “Send Additional Email Notifications” field of WAWF once a document is submitted in the system.

shelia.stoddard@us.af.mil

(g) WAWF point of contact. (1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.

shelia.stoddard@us.af.mil

(2) For technical WAWF help, contact the WAWF helpdesk at 866-618-5988.

(End of clause)

Section H - Special Contract Requirements

CLAUSES INCORPORATED BY FULL TEXT

5352.201-9101 OMBUDSMAN (APR 2014)

(a) An ombudsman has been appointed to hear and facilitate the resolution of concerns from offerors, potential offerors, and others for this acquisition. When requested, the ombudsman will maintain strict confidentiality as to the source of the concern. The existence of the ombudsman does not affect the authority of the program manager, contracting officer, or source selection official. Further, the ombudsman does not participate in the evaluation of proposals, the source selection process, or the adjudication of protests or formal contract disputes. The ombudsman may refer the interested party to another official who can resolve the concern.

(b) Before consulting with an ombudsman, interested parties must first address their concerns, issues, disagreements, and/or recommendations to the contracting officer for resolution. Consulting an ombudsman does not alter or postpone the timelines for any other processes (e.g., agency level bid protests, GAO bid protests, requests for debriefings, employee-employer actions, contests of OMB Circular A-76 competition performance decisions).

(c) If resolution cannot be made by the contracting officer, the interested party may contact the ombudsman, David E. Jones, Deputy Director, AFICA/KT, 2035 First Street West, Ste 1, JBSA Randolph, TX 78150, Telephone: 210-652-1722, E-Mail: david.jones.3@us.af.mil. Concerns, issues, disagreements, and recommendations that cannot be resolved at the Center/MAJCOM/DRU/HQ AFICA/AFISRA/SMC ombudsman level, may be brought by the interested party for further consideration to the Air Force ombudsman, Associate Deputy Assistant Secretary (ADAS) (Contracting), SAF/AQC, 1060 Air Force Pentagon, Washington DC 20330-1060, phone number (571) 256-2395, facsimile number (571) 256-2431.

(d) The ombudsman has no authority to render a decision that binds the agency.

(e) Do not contact the ombudsman to request copies of the solicitation, verify offer due date, or clarify technical requirements. Such inquiries shall be directed to the Contracting Officer or Contract Administrator at roger.morris@us.af.mil, shelia.stoddard@us.af.mil .

5352.215-9001 NOTICE OF PRE-BID/PRE-PROPOSAL CONFERENCE (MAY 1996)

(a) A pre-bid/pre-proposal conference will be conducted at Falcon Dunes Golf Course on 11 June 2015 at 0900 for the purpose of answering questions regarding this solicitation.

(b) Submit the names of all attendees (not to exceed 2) to SSgt Shelia Stoddard at shelia.stoddard@us.af.mil prior to 5 June 2015. This information must be provided in advance in order to ensure access to the military base/conference site and adequate seating for the conference attendees.

(c) Bidders/Offerors are requested to submit questions to the point of contact noted above not later than 18 June 2015. Information provided at this conference shall not qualify the terms and conditions of the solicitation and specifications. Terms of the solicitation and specifications remain unchanged unless the solicitation is amended in writing. If an amendment is issued, normal procedures relating to the acknowledgment and receipt of solicitation amendments shall apply.

(d) A record of the conference shall be made and furnished to all prospective bidders/offerors. The record should include minutes of the meeting, including questions (on a non-attribution basis) and answers.

5352.242-9000 CONTRACTOR ACCESS TO AIR FORCE INSTALLATIONS (Nov 2012)

(a) The contractor shall obtain base identification and vehicle passes, if required, for all contractor personnel who make frequent visits to or perform work on the Air Force installation(s) cited in the contract. Contractor personnel are required to wear or prominently display installation identification badges or contractor-furnished, contractor identification badges while visiting or performing work on the installation.

(b) The contractor shall submit a written request on company letterhead to the contracting officer listing the following: contract number, location of work site, start and stop dates, and names of employees and subcontractor employees needing access to the base. The letter will also specify the individual(s) authorized to sign for a request for base identification credentials or vehicle passes. The contracting officer will endorse the request and forward it to the issuing base pass and registration office or Security Forces for processing. When reporting to the registration office, the authorized contractor individual(s) should provide a valid driver’s license, current vehicle registration and valid vehicle insurance certificate to obtain a vehicle pass.

(c) During performance of the contract, the contractor shall be responsible for obtaining required identification for newly assigned personnel and for prompt return of credentials and vehicle passes for any employee who no longer requires access to the work site.

(d) When work under this contract requires unescorted entry to controlled or restricted areas, the contractor shall comply with 56th Fighter Wing Security Forces guidelines citing the appropriate paragraphs as applicable.

(e) Upon completion or termination of the contract or expiration of the identification passes, the prime contractor shall ensure that all base identification passes issued to employees and subcontractor employees are returned to the issuing office.

(f) Failure to comply with these requirements may result in withholding of final payment.

Section I - Contract Clauses

CLAUSES INCORPORATED BY REFERENCE

52.202-1
Definitions
NOV 2013
52.203-5
Covenant Against Contingent Fees
MAY 2014
52.203-6
Restrictions On Subcontractor Sales To The Government
SEP 2006
52.203-7
Anti-Kickback Procedures
MAY 2014
52.203-8
Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity
MAY 2014
52.203-10
Price Or Fee Adjustment For Illegal Or Improper Activity
MAY 2014
52.203-12
Limitation On Payments To Influence Certain Federal Transactions
OCT 2010
52.203-13
Contractor Code of Business Ethics and Conduct
APR 2010
52.203-17
Contractor Employee Whistleblower Rights and Requirement To Inform Employees of Whistleblower Rights
APR 2014
52.204-2 Alt II
Security Requirements (Aug 1996) - Alternate II
APR 1984
52.204-4
Printed or Copied Double-Sided on Postconsumer Fiber Content Paper
MAY 2011
52.204-9
Personal Identity Verification of Contractor Personnel
JAN 2011
52.204-10
Reporting Executive Compensation and First-Tier Subcontract Awards
JUL 2013
52.204-13
System for Award Management Maintenance
JUL 2013
52.209-6
Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, or Proposed for Debarment
AUG 2013
52.209-9
Updates of Publicly Available Information Regarding Responsibility Matters
JUL 2013
52.209-10
Prohibition on Contracting With Inverted Domestic Corporations
DEC 2014
52.215-2
Audit and Records--Negotiation
OCT 2010
52.215-8
Order of Precedence--Uniform Contract Format
OCT 1997
52.215-22
Limitations on Pass-Through Charges--Identification of Subcontract Effort
OCT 2009
52.215-23
Limitations on Pass-Through Charges
OCT 2009
52.219-3
Notice of HUBZone Set-Aside or Sole Source Award
NOV 2011
52.219-8
Utilization of Small Business Concerns
OCT 2014
52.219-9
Small Business Subcontracting Plan
OCT 2014
52.219-14
Limitations On Subcontracting
NOV 2011
52.222-3
Convict Labor
JUN 2003
52.222-4
Contract Work Hours and Safety Standards- Overtime Compensation
MAY 2014
52.222-6
Construction Wage Rate Requirements
MAY 2014
52.222-7
Withholding of Funds
MAY 2014
52.222-8
Payrolls and Basic Records
MAY 2014
52.222-9
Apprentices and Trainees
JUL 2005
52.222-10
Compliance with Copeland Act Requirements
FEB 1988
52.222-11
Subcontracts (Labor Standards)
MAY 2014
52.222-12
Contract Termination-Debarment
MAY 2014
52.222-13
Compliance With Construction Wage Rate Requirements and Related Regulations
MAY 2014
52.222-14
Disputes Concerning Labor Standards
FEB 1988
52.222-15
Certification of Eligibility
MAY 2014
52.222-21
Prohibition Of Segregated Facilities
APR 2015
52.222-26
Equal Opportunity
APR 2015
52.222-27
Affirmative Action Compliance Requirements for Construction
APR 2015
52.222-30
Construction Wage Rate Requirements--Price Adjustment (None or Separately Specified Method)
MAY 2014
52.222-35
Equal Opportunity for Veterans
JUL 2014
52.222-36
Equal Opportunity for Workers with Disabilities
JUL 2014
52.222-37
Employment Reports on Veterans
JUL 2014
52.222-38
Compliance With Veterans' Employment Reporting Requirements
SEP 2010
52.222-40
Notification of Employee Rights Under the National Labor Relations Act
DEC 2010
52.222-50
Combating Trafficking in Persons
MAR 2015
52.222-54
Employment Eligibility Verification
AUG 2013
52.223-2
Affirmative Procurement of Biobased Products Under Service and Construction Contracts
SEP 2013
52.223-3
Hazardous Material Identification And Material Safety Data
JAN 1997
52.223-4
Recovered Material Certification
MAY 2008
52.223-5
Pollution Prevention and Right-to-Know Information
MAY 2011
52.223-5 Alt I
Pollution Prevention and Right-to-Know Information (May 2011) Alternate I
MAY 2011
52.223-6
Drug-Free Workplace
MAY 2001
52.223-11
Ozone-Depleting Substances
MAY 2001
52.223-12
Refrigeration Equipment and Air Conditioners
MAY 1995
52.223-15
Energy Efficiency in Energy-Consuming Products
DEC 2007
52.223-17
Affirmative Procurement of EPA-Designated Items in Service and Construction Contracts
MAY 2008
52.223-18
Encouraging Contractor Policies To Ban Text Messaging While Driving
AUG 2011
52.225-10
Notice of Buy American Requirement--Construction Materials
MAY 2014
52.225-13
Restrictions on Certain Foreign Purchases
JUN 2008
52.225-25
Prohibition on Contracting with Entities Engaging in Certain Activities or Transactions Relating to Iran-- Representation and Certifications.
DEC 2012
52.226-1
Utilization Of Indian Organizations And Indian-Owned Economic Enterprises
JUN 2000
52.227-1
Authorization and Consent
DEC 2007
52.227-2
Notice And Assistance Regarding Patent And Copyright Infringement
DEC 2007
52.227-4
Patent Indemnity-Construction Contracts
DEC 2007
52.228-2
Additional Bond Security
OCT 1997
52.228-5
Insurance - Work On A Government Installation
JAN 1997
52.228-11
Pledges Of Assets
JAN 2012
52.228-12
Prospective Subcontractor Requests for Bonds
MAY 2014
52.228-14
Irrevocable Letter of Credit
NOV 2014
52.228-15
Performance and Payment Bonds--Construction
OCT 2010
52.229-3
Federal, State And Local Taxes
FEB 2013
52.232-5
Payments under Fixed-Price Construction Contracts
MAY 2014
52.232-17
Interest
MAY 2014
52.232-23
Assignment Of Claims
MAY 2014
52.232-27
Prompt Payment for Construction Contracts
MAY 2014
52.232-33
Payment by Electronic Funds Transfer--System for Award Management
JUL 2013
52.232-36
Payment by Third Party
MAY 2014
52.232-37
Multiple Payment Arrangements
MAY 1999
52.232-39
Unenforceability of Unauthorized Obligations
JUN 2013
52.232-40
Providing Accelerated Payments to Small Business Subcontractors
DEC 2013
52.233-1
Disputes
MAY 2014
52.233-3
Protest After Award
AUG 1996
52.233-4
Applicable Law for Breach of Contract Claim
OCT 2004
52.236-2
Differing Site Conditions
APR 1984
52.236-3
Site Investigation and Conditions Affecting the Work
APR 1984
52.236-5
Material and Workmanship
APR 1984
52.236-6
Superintendence by the Contractor
APR 1984
52.236-7
Permits and Responsibilities
NOV 1991
52.236-8
Other Contracts
APR 1984
52.236-9
Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements
APR 1984
52.236-10
Operations and Storage Areas
APR 1984
52.236-11
Use and Possession Prior to Completion
APR 1984
52.236-12
Cleaning Up
APR 1984
52.236-13
Accident Prevention
NOV 1991
52.236-14
Availability and Use of Utility Services
APR 1984
52.236-15
Schedules for Construction Contracts
APR 1984
52.236-17
Layout of Work
APR 1984
52.236-21
Specifications and Drawings for Construction
FEB 1997
52.236-21 Alt I
Specifications and Drawings for Construction (Feb 1997) - Alternate I
APR 1984
52.236-26
Preconstruction Conference
FEB 1995
52.242-13
Bankruptcy
JUL 1995
52.243-4
Changes
JUN 2007
52.244-6
Subcontracts for Commercial Items
APR 2015
52.246-21
Warranty of Construction
MAR 1994
52.248-3
Value Engineering-Construction
OCT 2010
52.249-2
Termination For Convenience Of The Government (Fixed-Price)
APR 2012
52.249-2 Alt I
Termination for Convenience of the Government (Fixed-Price) (Apr 2012) - Alternate I
SEP 1996
52.249-10
Default (Fixed-Price Construction)
APR 1984
52.253-1
Computer Generated Forms
JAN 1991
252.203-7000
Requirements Relating to Compensation of Former DoD Officials
SEP 2011
252.203-7001
Prohibition On Persons Convicted of Fraud or Other Defense-Contract-Related Felonies
DEC 2008
252.203-7002
Requirement to Inform Employees of Whistleblower Rights
SEP 2013
252.203-7003
Agency Office of the Inspector General
DEC 2012
252.204-7003
Control Of Government Personnel Work Product
APR 1992
252.204-7005
Oral Attestation of Security Responsibilities
NOV 2001
252.204-7012
Safeguarding of Unclassified Controlled Technical Information
NOV 2013
252.205-7000
Provision Of Information To Cooperative Agreement Holders
DEC 1991
252.209-7004
Subcontracting With Firms That Are Owned or Controlled By The Government of a Country that is a State Sponsor of Terrorism
DEC 2014
252.223-7001
Hazard Warning Labels
DEC 1991
252.223-7004
Drug Free Work Force
SEP 1988
252.223-7006
Prohibition On Storage, Treatment, and Disposal of Toxic or Hazardous Materials
SEP 2014
252.223-7008
Prohibition of Hexavalent Chromium
JUN 2013
252.225-7048
Export-Controlled Items
JUN 2013
252.227-7033
Rights in Shop Drawings
APR 1966
252.232-7010
Levies on Contract Payments
DEC 2006
252.236-7005
Airfield Safety Precautions
DEC 1991
252.243-7001
Pricing Of Contract Modifications
DEC 1991
252.243-7002
Requests for Equitable Adjustment
DEC 2012
252.247-7023
Transportation of Supplies by Sea
APR 2014
252.247-7024
Notification Of Transportation Of Supplies By Sea
MAR 2000

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984) - ALTERNATE I (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than the time specified in section F of the contract and performance periods stated in each individual task order. The time stated for completion shall include final cleanup of the premises.

The completion date is based on the assumption that the successful offeror will receive the notice to proceed within 10 days after each task order is issued. The completion date will be extended by the number of calendar days after the above date that the Contractor receives the notice to proceed, except to the extent that the delay in issuance of the notice to proceed results from the failure of the Contractor to execute the contract and give the required performance and payment bonds within the time specified in the offer.

(End of clause) 52.216-19 Order Limitations. (OCT 1995)

(a) Minimum order. When the Government requires supplies or services covered by this contract in an amount of less than $2,000.00 the Government is not obligated to purchase, nor is the Contractor obligated to furnish, those supplies or services under the contract.

(b) Maximum order. The Contractor is not obligated to honor:

(1) Any order for a single item in excess of $1,000,000.00

(2) Any order for a combination of items in excess of $6,000,000.00 ; or

(3) A series of orders from the same ordering office within 365 days that together call for quantities exceeding the limitation in subparagraph (1) or (2) above.

(c) If this is a requirements contract (i.e., includes the Requirements clause at subsection 52.216-21 of the Federal Acquisition Regulation (FAR)), the Government is not required to order a part of any one requirement from the Contractor if that requirement exceeds the maximum-order limitations in paragraph (b) above.

(d) Notwithstanding paragraphs (b) and (c) above, the Contractor shall honor any order exceeding the maximum order limitations in paragraph (b), unless that order (or orders) is returned to the ordering office within 10 days after issuance, with written notice stating the Contractor's intent not to ship the item (or items) called for and the reasons. Upon receiving this notice, the Government may acquire the supplies or services from another source.

(End of clause)

52.216-22 Indefinite Quantity. (OCT 1995)

(a) This is an indefinite-quantity contract for the supplies or services specified, and effective for the period stated, in the Schedule. The quantities of supplies and services specified in the Schedule are estimates only and are not purchased by this contract.

(b) Delivery or performance shall be made only as authorized by orders issued in accordance with the Ordering clause. The Contractor shall furnish to the Government, when and if ordered, the supplies or services specified in the Schedule up to and including the quantity designated in the Schedule as the "maximum". The Government shall order at least the quantity of supplies or services designated in the Schedule as the "minimum".

(c) Except for any limitations on quantities in the Order Limitations clause or in the Schedule, there is no limit on the number of orders that may be issued. The Government may issue orders requiring delivery to multiple destinations or performance at multiple locations.

(d) Any order issued during the effective period of this contract and not completed within that period shall be completed by the Contractor within the time specified in the order. The contract shall govern the Contractor's and Government's rights and obligations with respect to that order to the same extent as if the order were completed during the contract's effective period; provided, that the Contractor shall not be required to make any deliveries under this contract after 1 Jun 2021 .

(End of clause)

52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000)

(a) The Government may extend the term of this contract by written notice to the Contractor within 30 days; provided that the Government gives the Contractor a preliminary written notice of its intent to extend at least 60 days before the contract expires. The preliminary notice does not commit the Government to an extension.

(b) If the Government exercises this option, the extended contract shall be considered to include this option clause.

(c) The total duration of this contract, including the exercise of any options under this clause, shall not exceed 5 years.

(End of clause)

52.223-9 ESTIMATE OF PERCENTAGE OF RECOVERED MATERIAL CONTENT FOR EPA-DESIGNATED ITEMS (MAY 2008)

(a) Definitions. As used in this clause--

Postconsumer material means a material or finished product that has served its intended use and has been discarded for disposal or recovery, having completed its life as a consumer item. Postconsumer material is a part of the broader category of “recovered material.”

Recovered material means waste materials and by-products recovered or diverted from solid waste, but the term does not include those materials and by-products generated from, and commonly reused within, an original manufacturing process.

(b) The Contractor, on completion of this contract, shall--

(1) Estimate the percentage of the total recovered material content for EPA-designated item(s) delivered and/or used in contract performance, including, if applicable, the percentage of post-consumer material content; and

(2) Submit this estimate to The 56th Contracting Squadron

(End of clause)

52.225-9 BUY AMERICAN—CONSTRUCTION MATERIALS (MAY 2014)

(a) Definitions. As used in this clause--

Commercially available off-the-shelf (COTS) item—

(1) Means any item of supply (including construction material) that is--

(i) A commercial item (as defined in paragraph (1) of the definition at FAR 2.101);

(ii) Sold in substantial quantities in the commercial marketplace; and

(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and

(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4) such as agricultural products and petroleum products.

Component means an article, material, or supply incorporated directly into a construction material.

Construction material means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.

Cost of components means--

(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or

(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.

Domestic construction material means--

(1) An unmanufactured construction material mined or produced in the United States;

(2) A construction material manufactured in the United States, if--

(i) The cost of its components mined, produced, or manufactured in the United States exceeds 50 percent of the cost of all its components. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic; or

(ii) The construction material is a COTS item.

Foreign construction material means a construction material other than a domestic construction material.

United States means the 50 States, the District of Columbia, and outlying areas.

(b) Domestic preference.

(1) This clause implements 41 U.S.C. chapter 83, Buy American, by providing a preference for domestic construction material. In accordance with 41 U.S.C. 1907, the component test of the Buy American statute is waived for construction material that is a COTS item. (See FAR 12.505(a)(2)). The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.

(2) This requirement does not apply to information technology that is a commercial item or to the construction materials or components listed by the Government as follows:

(3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government determines that

(i) The cost of domestic construction material would be unreasonable. The cost of a particular domestic construction material subject to the requirements of the Buy American Act is unreasonable when the cost of such material exceeds the cost of foreign material by more than 6 percent;

(ii) The application of the restriction of the Buy American Act to a particular construction material would be impracticable or inconsistent with the public interest; or

(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.

(c) Request for determination of inapplicability of the Buy American Act. (1)(i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(3) of this clause shall include adequate information for Government evaluation of the request, including--

(A) A description of the foreign and domestic construction materials;

(B) Unit of measure;

(C) Quantity;

(D) Price;

(E) Time of delivery or availability;

(F) Location of the construction project;

(G) Name and address of the proposed supplier; and

(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this clause.

(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause.

(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty-free certificate may be issued).

(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.

(2) If the Government determines after contract award that an exception to the Buy American statute applies and the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material. However, when the basis for the exception is the unreasonable price of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(3)(i) of this clause.

(3) Unless the Government determines that an exception to the Buy American statute applies, use of foreign construction material is noncompliant with the Buy American statute.

(d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the Contractor shall include the following information and any applicable supporting data based on the survey of suppliers:

Foreign and Domestic Construction Materials Price Comparison

Construction material description Unit of measure Quantity Price (dollars) \1\

Item 1

Foreign construction material.... ........... ___ ........ ....... ………. ___ ................ ........ ___

Domestic construction material... ........ ___ ............... .............. ___ .................. ...... ___

Item 2

Foreign construction material.... ......... ___ ............. ........ ……. ___ ............... ......... ___

Domestic construction material... ....... ___ .................. ............. ___ ................. ....... ___

Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued).

List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary.

Include other applicable supporting information.

(End of clause)

52.225-11 BUY AMERICAN--CONSTRUCTION MATERIALS UNDER TRADE AGREEMENTS (MAY 2014)

(a) Definitions. As used in this clause--

Caribbean Basin country construction material means a construction material that--

(1) Is wholly the growth, product, or manufacture of a Caribbean Basin country; or

(2) In the case of a construction material that consists in whole or in part of materials from another country, has been substantially transformed in a Caribbean Basin country into a new and different construction material distinct from the materials from which it was transformed.

Commercially available off-the-shelf (COTS) item—

(1) Means any item of supply (including construction material) that is--

(i) A commercial item (as defined in paragraph (1) of the definition at FAR 2.101);

(ii) Sold in substantial quantities in the commercial marketplace; and

(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and

(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4)such as agricultural products and petroleum products.

Component means an article, material, or supply incorporated directly into a construction material.

Construction material means an article, material, or supply brought to the construction site by the Contractor or subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.

Cost of components means--

(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or

(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.

Designated country means any of the following countries:

(1) A World Trade Organization Government Procurement Agreement country (Armenia, Aruba, Austria, Belgium, Bulgaria, Canada, Croatia, Cyprus, Czech Republic, Denmark, Estonia, Finland, France, Germany, Greece, Hong Kong, Hungary, Iceland, Ireland, Israel, Italy, Japan, Korea (Republic of), Latvia, Liechtenstein, Lithuania, Luxembourg, Malta, Netherlands, Norway, Poland, Portugal, Romania, Singapore, Slovak Republic, Slovenia, Spain, Sweden, Switzerland, Taiwan or United Kingdom);

(2) A Free Trade Agreement country (Australia, Bahrain, Canada, Chile, Colombia, Costa Rica, Dominican Republic, El Salvador, Guatemala, Honduras, Korea (Republic of), Mexico, Morocco, Nicaragua, Oman, Panama, Peru, or Singapore);

(3) A least developed country (Afghanistan, Angola, Bangladesh, Benin, Bhutan, Burkina Faso, Burundi, Cambodia, Central African Republic, Chad, Comoros, Democratic Republic of Congo, Djibouti, Equatorial Guinea, Eritrea, Ethiopia, Gambia, Guinea, Guinea-Bissau, Haiti, Kiribati, Laos, Lesotho, Liberia, Madagascar, Malawi, Mali, Mauritania, Mozambique, Nepal, Niger, Rwanda, Samoa, Sao Tome and Principe, Senegal, Sierra Leone, Solomon Islands, Somalia, South Sudan, Tanzania, Timor-Leste, Togo, Tuvalu, Uganda, Vanuatu, Yemen, or Zambia); or

(4) A Caribbean Basin country (Antigua and Barbuda, Aruba, Bahamas, Barbados, Belize, Bonaire, British Virgin Islands, Curacao, Dominica, Grenada, Guyana, Haiti, Jamaica, Montserrat, Saba, St. Kitts and Nevis, St. Lucia, St. Vincent and the Grenadines, Sint Eustatius, Sint Maarten, or Trinidad and Tobago).

Designated country construction material means a construction material that is a WTO GPA country construction material, an FTA country construction material, a least developed country construction material, or a Caribbean Basin country construction material.

Domestic construction material means--

(1) An unmanufactured construction material mined or produced in the United States;

(2) A construction material manufactured in the United States, if--

(i) The cost of its components mined, produced, or manufactured in the United States exceeds 50 percent of the cost of all its components. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic; or

(ii) The construction material is a COTS item.

Foreign construction material means a construction material other than a domestic construction material.

Least developed country construction material means a construction material that--

(1) Is wholly the growth, product, or manufacture of a least developed country; or

(2) In the case of a construction material that consists in whole or in part of materials from another country, has been substantially transformed in a least developed country into a new and different construction material distinct from the materials from which it was transformed.

“Free Trade Agreement country construction material” means a construction material that—

(1) Is wholly the growth, product, or manufacture of a Free Trade Agreement (FTA)…