Attachment_14_-_Construction_Cost_Estimate_Breakdown.xlsx

XLSX spreadsheet 126 KB Posted

Attached to
Simplified Acquisition of Base Engineering Requirements (SABER) Federal contract opportunity
Solicitation number
FA4887-15-R-0001
Issued by
Department of the Air Force Air Education and Training Command

About this file

Construction Cost Estimate Breakdown for use with the sample project proposal

View the file

Other files for this federal contract opportunity

Other files attached to Simplified Acquisition of Base Engineering Requirements (SABER), newest first.
File Type Posted
Questions_3.docx DOCX document
Questions_2.docx DOCX document
0001_Ammendment.pdf PDF
B938-Rstrm_plumbing.pdf PDF
RFIs_Q A's.docx DOCX document
B938-RstrmFlrpln.pdf PDF
Project-1357525_Bldg_938_Restrooms.pdf PDF
B938-bldg_floor_plan.pdf PDF
B938-restrms_dimensions.pdf PDF
B938-One-Line_Plumbing.pdf PDF
B938_elect_panel_location.pdf PDF
Attachment_12_-_Hazardous_Material_Questionaire.doc DOC document
Attachment_22_-_Bonding_Information_Request.docx DOCX document
Attachment_13_-_Contractors_Environmental_Reporting_Entry_Form.doc DOC document
Attachment_7_-_Engineering_Technical_Letter_(ETL_02-12).pdf PDF
Attachment_4_-_Luke_AFB_Landscape_Design_and_Maintenance_Standards.pdf PDF
Attachment_23_-_Base_Access_Instructions.pdf PDF
Attachment_3-_AZ150031_AZ31_WDOL_Coconino.pdf PDF
Attachment_26-_Sample_Project_SOW.docx DOCX document
Attachment_5_-_Architectural_Design_Compatibility_Guide.PDF PDF
Attachment_11_-_AF_Form_3000_Material_Approval_Submittal.pdf PDF
Attachment_16_-_DD_1354_Transfer_and_Acceptance_of_DoD_Real_Property.pdf PDF
Attachment_17_-_USACE_Safety_and_Health_Requirements.pdf PDF
Solicitation_FA4887-15-R-0001.doc DOC document
Attachment_15_-_Luke_AFB_Master_Specifications.dot DOT file
Attachment_24-_Resume_Template.dot DOT file
Attachment_9_-_AF_Form_3064_Progress_Schedule.xlsx XLSX spreadsheet
Attachment_19_-_AFI_33-118_Radio_Communications.pdf PDF
Attachment_18_-_DoD_Unified_Facilities_Criteria_(link).docx DOCX document
Attachment_20_-_Client_Authorization_Letter.doc DOC document
Attachment_2-_AZ150032_AZ32_WDOL_Maricopa.doc DOC document
Attachment_21_-_Financial_Information_Request.docx DOCX document
Attachment_10_-_AF_Form_3065_Progress_Report.pdf PDF
Attachment_8_-_AF_Form_66_Schedule_of_Material_Submittals.doc DOC document
Attachment_6_-_Luke_AFB_Design_and_Construction_Standards.doc DOC document
Show all 35

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AF 3052 FRONT

CONSTRUCTION COST ESTIMATE BREAKDOWNOMB No. 0704-0193
Expires
CONTRACTORADDRESS
CONTRACT FOR (Work to be preformed)PROPOSED TOTAL CONTRACT PRICE
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
MATERIAL COSTLABOR COSTS
LINEUNITOTHER
NO.ITEMOFMANHOURAVERAGEDIRECTLINE
MEASUREQUANTITYUNITTOTALMANDAYSRATETOTALCOSTSTOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
AF FORM 3052 Jan 88PREVIOUS EDITION IS OBSOLETE

Attachment 14

AF 3052 CONT SHT 1

CONSTRUCTION COST ESTIMATE BREAKDOWN CONTINUATION SHEETOMB No. 0704-0193
Expires
CONTRACTORADDRESS
CONTRACT FOR (Work to be preformed)PROPOSED TOTAL CONTRACT PRICE
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
MATERIAL COSTLABOR COSTS
LINEUNITOTHER
NO.ITEMOFMANHOURAVERAGEDIRECTLINE
MEASUREQUANTITYUNITTOTALMANDAYSRATETOTALCOSTSTOTAL

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

AF 3052 BACK SHT

INSTRUCTIONS FOR COMPLETING AF FORM 3052

Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all direct costs.

Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples - square yards - SY, cubic yards - CY, square feet - SF, linear feet - LF, board feet - BF, each - EA, pound - LB).

Col 3 Quantity. Contractor's estimate of quantity required in terms of unit of measure (column 2). Items and units of measure will be furnished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will be issed. Otherwise, the contractor is responsible for determining quantity estimates.

Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (col 5) for item listed in column 1.

Col 6, 7 and 8 Labor Costs. Enter in col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1. Enter in col 7 the average rate per manhour (manday) and in col 8 the total labor cost.

Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1) which are special to the contract and of significant dollar value.

Col 10 Line Total. Self-explanatory.

NOTE: In addition to other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on the last page as follows:
TOTAL MATERIAL COSTS$- 0

TOTAL LABOR COSTS $ - 0

TOTAL OTHER DIRECT COSTS $ - 0

TOTAL DIRECT COSTS $ - 0

OVERHEAD ___ % $ - 0

SUBTOTAL $ - 0

PROFIT ___ % $ - 0

TOTAL PRICE$- 0
DATE ______________________________FIRM NAME ________________________________________
TITLE ______________________________BY _________________________________________________
(Signature)
_________________________________________________________________________________________________________________________
INSTRUCTIONS TO OFFERORS

1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs (and attached supporting information) suitable for detailed review and analysis. Prior to the award of a contract resulting from this proposal the offeror shall, under the conditions stated in ASPR 3-807.3, be required to submit a certificate of current cost or pricing data (see ASPR 3-807.3(e) and 3.807.4).

2. In addition to the specific information required by this form, the offeror is expected, in good faith, to incorporate in and submit with this form any additional data, supporting schedules, or substantiation which are reasonably required for the conduct of an appropriate review and analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that there be a clear understanding of

a. The existing, verifiable data.
b. The judgmental factors applied in projecting from known data to the estimate, and
c. The contingencies used by the offeror in his proposed price.

In short, the offeror's estimating process itself needs to be disclosed.

3. When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate), and made available to the contracting officer or his authorized representative upon request.

4. By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate evaluation of such cost or pricing data, along with the computations and projections used therein. This right may be exercised in connection with any negotiations prior to contract award.
(Reverse of AF Form 3052, Jan 88)

AF 3052 BACK - SAMPLE

INSTRUCTIONS FOR COMPLETING AF FORM 3052
Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of
all direct costs.
Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples - square yards - SY, cubic yards - CY, square feet - SF, linear
feet - LF, board feet- BF, each - EA, pound - LB).
Col 3 Quantity. Contractor's estimate of quantity required in terms of unit of measure (column 2). Items and units of measure will be furnished by the
Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will be issed. Otherwise, the
contractor is responsible for determining quantity estimates.
Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (col 5) for item listed in column 1.
Col 6, 7 and 8 Labor Costs. Enter in col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1. Enter in col 7
the average rate per manhour (manday) and in col 8 the total labor cost.
Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1) which are special to the contract and of significant
dollar value.
Col 10 Line Total. Self-explanatory.
NOTE: In addition to other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on
the last page as follows:
TOTAL MATERIAL COSTS$
TOTAL LABOR COSTS$
TOTAL OTHER DIRECT COSTS$
TOTAL DIRECT COSTS$
OVERHEAD%$
SUBTOTAL$
PROFIT%$
TOTAL PRICE$
DATE ______________________________FIRM NAME _______________________________________________
TITLE ______________________________BY ________________________________________________________
(Signature)
____________________________________________________________________________________________________________
INSTRUCTIONS TO OFFERORS
1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and
estimated costs (and attached supporting information) suitable for detailed review and analysis. Prior to the award of a contract resulting from
this proposal the offeror shall, under the conditions stated in ASPR 3-807.3, be required to submit a certificate of current cost or pricing data
(see ASPR 3-807.3(e) and 3.807.4).
2. In addition to the specific information required by this form, the offeror is expected, in good faith, to incorporate in and submit with this form any
additional data, supporting schedules, or substantiation which are reasonably required for the conduct of an appropriate review and
analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that there be a clear understanding of
a. The existing, verifiable data.
b. The judgmental factors applied in projecting from known data to the estimate, and
c. The contingencies used by the offeror in his proposed price.
In short, the offeror's estimating process itself needs to be disclosed.
3. When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate), and made
available to the contracting officer or his authorized representative upon request.
4. By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the purpose of verifying
the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate evaluation
of such cost or pricing data, along with the computations and projections used therein. This right may be exercised in connection with any
negotiations prior to contract award.