RFIs_Q A's.docx

DOCX document 16 KB Posted

Attached to
Simplified Acquisition of Base Engineering Requirements (SABER) Federal contract opportunity
Solicitation number
FA4887-15-R-0001
Issued by
Department of the Air Force Air Education and Training Command

About this file

RFI's and Responses

View the file

Other files for this federal contract opportunity

Other files attached to Simplified Acquisition of Base Engineering Requirements (SABER), newest first.
File Type Posted
Questions_3.docx DOCX document
Questions_2.docx DOCX document
0001_Ammendment.pdf PDF
B938-Rstrm_plumbing.pdf PDF
B938-One-Line_Plumbing.pdf PDF
B938_elect_panel_location.pdf PDF
B938-RstrmFlrpln.pdf PDF
Project-1357525_Bldg_938_Restrooms.pdf PDF
B938-bldg_floor_plan.pdf PDF
B938-restrms_dimensions.pdf PDF
Attachment_12_-_Hazardous_Material_Questionaire.doc DOC document
Attachment_22_-_Bonding_Information_Request.docx DOCX document
Attachment_13_-_Contractors_Environmental_Reporting_Entry_Form.doc DOC document
Attachment_14_-_Construction_Cost_Estimate_Breakdown.xlsx XLSX spreadsheet
Attachment_18_-_DoD_Unified_Facilities_Criteria_(link).docx DOCX document
Attachment_20_-_Client_Authorization_Letter.doc DOC document
Attachment_2-_AZ150032_AZ32_WDOL_Maricopa.doc DOC document
Attachment_21_-_Financial_Information_Request.docx DOCX document
Attachment_10_-_AF_Form_3065_Progress_Report.pdf PDF
Attachment_8_-_AF_Form_66_Schedule_of_Material_Submittals.doc DOC document
Attachment_6_-_Luke_AFB_Design_and_Construction_Standards.doc DOC document
Attachment_7_-_Engineering_Technical_Letter_(ETL_02-12).pdf PDF
Attachment_4_-_Luke_AFB_Landscape_Design_and_Maintenance_Standards.pdf PDF
Attachment_23_-_Base_Access_Instructions.pdf PDF
Attachment_3-_AZ150031_AZ31_WDOL_Coconino.pdf PDF
Attachment_26-_Sample_Project_SOW.docx DOCX document
Attachment_5_-_Architectural_Design_Compatibility_Guide.PDF PDF
Attachment_11_-_AF_Form_3000_Material_Approval_Submittal.pdf PDF
Attachment_16_-_DD_1354_Transfer_and_Acceptance_of_DoD_Real_Property.pdf PDF
Attachment_17_-_USACE_Safety_and_Health_Requirements.pdf PDF
Solicitation_FA4887-15-R-0001.doc DOC document
Attachment_15_-_Luke_AFB_Master_Specifications.dot DOT file
Attachment_24-_Resume_Template.dot DOT file
Attachment_9_-_AF_Form_3064_Progress_Schedule.xlsx XLSX spreadsheet
Attachment_19_-_AFI_33-118_Radio_Communications.pdf PDF
Show all 35

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFIs

QUESTIONS:

1. Please provide location of Electrical Panel we are to utilize for this project.

2. Confirm it is not the intent of this SOW to have any under-slab sanitary pipe relocated or replaced. Confirm exiting roof vents will be remain for re-use.

3. Can dimension'd as-built drawings of the current bathrooms be provided.

4. Page 50 of 61 paragraph E. (Volume II) Price, subparagraph a. Subfactor 1; You have indicated that we need to provide a completed Construction Cost Breakdown (Attachment 14). Since Attachment 1 – SABER SOW requires task orders under this contract to utilize e4clicks software, will it be acceptable to provide our Construction Cost Breakdown to you in this format (e4clicks)?

5. Will the government please provide as-built or record drawings (in dwg and pdf format) of the existing conditions regarding the area where the seed project will occur?

ANSWERS:

1. See attachment

2. Assume that it is not the intent, that would end up being an unforseen sight condition in which you would only find out if that is required after work began. Per the Technical Expert on 11 June 2015, it was asked about the roof vents, and his answer was they will remain for re-use.

3. See attachments

4. You are required per evaluation critieria to provide the Costruction Cost Breakdown (attachment 14), if you would like to provide the e4Clicks as well, you can do so but you will not be evaluated on e4Clicks. The purpose for this is to make sure everyone can provide a proposal on fair terms as not every contractor has used e4Clicks before and there is a learning curve associated with its use.

5. Reference question 3, see attachments.