Attch 11 - Davis-Bacon WD.docx

DOCX document 17 KB Posted

Attached to
Electrical IDIQ Federal contract opportunity
Solicitation number
FA4887-11-R-0014
Issued by
Department of the Air Force Air Education and Training Command

About this file

Attch 11 - Davis-Bacon WD

View the file

Other files for this federal contract opportunity

Other files attached to Electrical IDIQ, newest first.
File Type Posted
Attch 16 Questions Answers.PDF PDF
Attch 17 - Luke Master Specs(update).docx DOCX document
amendment.PDF PDF
Section J - Table of Contents.doc DOC document
FA4887-11-R-0014-001 Pre-Performance Conference Location Update.docx DOCX document
Attch 12 Sample Project SOW.docx DOCX document
Attch 13 Sample Project One-Line Diagrams.xls XLS spreadsheet
Attch 1 - Past and Present Performance Questionnaire.docx DOCX document
Attch 2 - Past Performance Information.rtf RTF text file
Attch 10 - ufc_3_560_01 1 Electrical Safety.pdf PDF
Attch 8 - Base Elect IDIQ Specifications FY07.doc DOC document
Attch 6 - AFOSHSTD 91-501.pdf PDF
Section J - Table of Contents.docx DOCX document
Attch 4 - AFI 32-1065 Grounding Systems.pdf PDF
Attch 14 Sample Project Work Area.ppt PPT presentation
FA4887-11-R-0014 Electrical IDIQ.pdf PDF
Attch 9 - Luke AFB Master Specs CSI 48 Div.docx DOCX document
Attch 7 - HNDBK 419A.pdf PDF
Attch 3 - Final Electrical IDIQ SOW - 20110527.docx DOCX document
Attch 5 - AFOSHSTD91-66.pdf PDF
Show all 20

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA4887-11-R-0014 Attachment 12 Luke AFB Electrical IDIQ

General Decision Number: AZ100001 05/13/2011 AZ1

Superseded General Decision Number: AZ20080001

State: Arizona

Construction Type: Building

Counties: Coconino, Maricopa, Mohave, Pima, Pinal and Yuma Counties in Arizona.

BUILDING CONSTRUCTION PROJECTS (does not include residential construction consisting of single family homes and apartments up to and including 4 stories)

Modification Number Publication Date 0 03/12/2010 1 06/04/2010 2 07/02/2010 3 07/09/2010 4 07/23/2010 5 08/06/2010 6 08/27/2010 7 09/10/2010 8 10/15/2010 9 11/05/2010 10 11/19/2010 11 12/03/2010 12 01/21/2011 13 02/04/2011 14 04/01/2011 15 04/08/2011 16 04/15/2011 17 05/13/2011

BRAZ0003-003 11/23/2009

COCONINO, MARICOPA, MOHAVE, PINAL (Area West and North of the San Francisco River to the Gila River), & YUMA COUNTIES

Rates Fringes

Bricklayer - Cement Block Layer............................$ 24.62 4.57

BRAZ0003-008 11/23/2009

PIMA AND PINAL (Area East and South of the San Francisco River to the Gila River) COUNTIES

Bricklayer - Cement Block Layer............................$ 18.00 4.49

CARP0408-001 07/01/2009

Rates Fringes

CARPENTER........................$ 23.00 7.24

CARP1327-001 01/01/2010

Rates Fringes

DRYWALL HANGER...................$ 19.25 6.61

ELEC0570-003 12/01/2010

PIMA, PINAL (Southern Part), AND YUMA COUNTIES

Rates Fringes

Electrician/Wireman..............$ 22.90 18%+4.70

Zone Definitions

(b) ZONE PAY -Workmen employed in Zones B and C shall be paid Zone Pay as follows:

Zone B............an additional $ 1.25 per hour Zone C............an additional $ 3.75 per hour

SECTION 3.05 ZONES

(a) Zones shall be created in Tucson, Arizona, the headquarters of the Union. Zones may be established in other localities by mutual consent of the parties hereto (Section 1.03). Zones and the applicable rates of pay shall be the same for all Employers coming under the terms of this Agreement.

In Tucson, Zone A shall be the area within a twenty-nine (29) mile radius from a basing point at the City Hall.

Zone B shall be the area from the outer limits of the twenty-nine (29) mile radius, extending out another seventeen (17) miles (a 46 mile radius total).

Zone C shall be the area from the forty-six (46) mile radius, extending to the outside limits of the Local Union's jurisdiction.

If any owner's contiguous property falls within more than one Zone, it shall all be considered to be within the closer Zone.

ELEC0640-005 06/21/2010

COCONINO, MARICOPA, MOHAVE, and PINAL (Area North and West of the boundary line beginning at a point where Papago Indian Reservation Road No. 15 crosses the Pima-Pinal County line, then Northeasterly on Road No. 15 to the intersection with Highway FAS-267, extending North on FAS-267 to the intersection with Florence Canal, North & East on Florence Canal to the intersection of the line "Second Guide Meridian East" then North to the Maricopa-Pinal County Lines) COUNTIES

Electrician/Wireman..............$ 24.80 3%+7.14

ENGI0428-003 06/01/2010

Rates Fringes

Power Equipment Operator

(2) Crane under 15 tons.....$ 25.22 9.79

(3) Crane,15 tons to 100 tons........................$ 26.30 9.79

(4) Crane, 100 tons and over........................$ 27.33 9.79

IRON0075-002 08/01/2009

Rates Fringes

IRONWORKER, STRUCTURAL

Zone 1:.....................$ 26.52 17.59

Zone 1: 0 to 50 miles from City Hall in Phoenix or Tucson Zone 2: 050 to 100 miles - Add $4.00 Zone 3: 100 to 150 miles - Add $5.00 Zone 4: 150 miles & over - Add $6.50

LABO0383-005 06/01/2009

Rates Fringes

LABORER (Brick/Block Tender).....$ 16.72 4.35

PAIN0086-003 04/01/2010

Rates Fringes

PAINTER..........................$ 17.85 4.70

* PAIN0086-005 07/01/2010

Rates Fringes

GLAZIER..........................$ 25.75 6.29

PLUM0469-002 07/01/2010

ZONE A: COCONINO, MARICOPA, MOHAVE & YUMA COUNTIES

ZONE B: PIMA AND PINAL COUNTIES

PLUMBER/PIPEFITTER

Zone A......................$ 31.65 14.90 Zone B......................$ 28.55 14.65

SFAZ0669-001 04/01/2011

Rates Fringes

SPRINKLER FITTER (Fire Sprinklers)......................$ 29.85 17.45

SHEE0359-002 01/01/2011

PIMA and PINAL (South of the 33rd Parallel) COUNTIES

Rates Fringes

Sheet Metal Worker (Including

HVAC)

Zone 1......................$ 28.75 13.00+3%

SHEE0359-003 01/01/2011

COCONINO, MARICOPA, MOHAVE, PINAL (North of the 33rd Parallel), and YUMA COUNTIES

Sheet Metal Worker (Including

HVAC)............................$ 28.75 13.00+3%

SUAZ2004-001 01/14/2004

Rates Fringes

Cement Mason/Finisher............$ 15.25 5.01

Laborers Concrete Worker.............$ 8.88 0.00 Form Setter.................$ 9.63 0.00 General/Cleanup.............$ 11.37 2.91 Waterproofing...............$ 12.59 0.00

PLASTERER........................$ 15.00 0.00

Power Equipment Operator Backhoe.....................$ 14.78 0.00

TILE FINISHER....................$ 11.00 0.00

TILE SETTER......................$ 14.98 0.00

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

13 May 2011