Amendment 3 (FA4887-07-R-0012)

View the file

Other files for this federal contract opportunity

Other files attached to Airfield Paving, newest first.
File Type Posted
Q As.doc DOC document
ConformedSolicitation07R0012Amendment 4.doc DOC document
Amendment 4.doc DOC document
Conformed07R0012 7Aug07.doc DOC document
Amendment 2.doc DOC document
Amendment 1.doc DOC document
ConformedSolicitation07R0012.doc DOC document
07-R-0012AirfieldPavementIDIQ.doc DOC document
DavisBacon20Jul07.doc DOC document
AFLDBSEFORM66.xls XLS spreadsheet
afi32-1042.pdf PDF
AirfieldPavementSpecifications...doc DOC document
Attachment 4Drawings.zip ZIP file
PastPerformanceInformation.doc DOC document
BIDSCHEDULEAirfieldPavementsIDIQFY07.xls XLS spreadsheet
PASTPERFORMANCEQUESTIONNAIRE(2).doc DOC document
Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS

The following have been modified:

INSTRUCTION TO OFFERORS

PROPOSAL PREPARATION INSTRUCTIONS

(a) To assure timely and equitable evaluation of proposals, offerors must follow the instructions contained herein. Offerors are required to meet all solicitation requirements, including terms and conditions, representations and certifications, and technical requirements, in addition to those identified as evaluation factors or subfactors. Failure to meet a requirement may result in an offer being ineligible for award. Offerors must clearly identify any exception to the solicitation terms and conditions and provide complete accompanying rationale. The response shall consist of three (3) separate parts; Part I - Management Plan, Part II - Price Proposal and Part III – Past Performance.

(b) The contracting officer has determined there is a high probability of adequate price competition in this acquisition. Upon examination of the initial offers, the contracting officer will review this determination and if, in the contracting officer’s opinion, adequate price competition exists no additional cost information will be requested and certification under FAR 15.406-2 will not be required. However, if at any time during this competition the contracting officer determines that adequate price competition no longer exists offerors may be required to submit information to the extent necessary for the contracting officer to determine the reasonableness and affordability of the price.

(c) Documents submitted in response to this RFP must be fully responsive to and consistent with the following:

1. Requirements of the RFP (Contract Line Items Numbers (CLINS) & Specifications, and government standards and regulations pertaining to the Specifications).

2. Evaluation factors for Award in Section M of this RFP.

3. Any limitation on the number of proposal pages. Pages exceeding the page limitations set forth in this Section L will not be read or evaluated, and will be removed from the proposal.

4. Format for proposal Parts I and III shall be as follows:

i. The proposals will be 8 1/2” x 11” paper except for fold-outs used for charts, tables, or diagrams, which may not exceed 11” x 17”. Printed on front/back if possible.

ii. Typing shall not be less than 12 pitch.

iii. Elaborate formats, bindings or color presentations are not desired or required.

(d) Specific Instructions:

(1) PART I – MANAGEMENT PLAN – Offeror shall submit the proposed management plan on a CD AND provide one (1) hard copy.

a. The offeror is required to provide a management plan addressing the offeror’s ability to accomplish the requirements of this contract, to include the offerors Ability to obtain resources and the contractor’s management organization. The Management plan will be evaluated on the ability of the offeror to accomplish the required in-house work performance and the functions, authorities and credentials of key management personnel. Manpower resources and utilization should show distinct evidence of quality of executive and top supervisory personnel as verified by experience, education, background, and proven ability in a managerial capacity.

b. The offeror shall include in the plan a proposal for meeting the required in-house performance percentage for work on this contract which has been set at 25%; Provide resumes of each key management personnel showing extent of previous experience applicable to support this contract, including current and previous Airfield work performed and documentation that the construction superintendent has a minimum of two to three (2-3) year’s experience in Airfield Construction and Repairs; and Provide a brief resume of each proposed subcontractors including construction experience, and type of work they will perform.

(2) PART II – PRICE PROPOSAL – Offeror shall submit the price schedule on a Compact Disk (CD) AND provide one (1) hard copy.

a. The offeror is required to complete blocks 14,15,16,17, 19, 20A, 20B, and 20C of the RFP, Section A, Standard Form 1442. By completion of the SF 1442 in this manner, the offeror accedes to the contracts terms and conditions as written in the RFP sections A through K.

b. The offeror shall insert its lump sum price in Section B and its proposed unit and extended prices in the Attached Price Schedule as referenced in Section J; for each item number in the spaces provided.

c. Complete the necessary fill-ins and certifications in Sections I through K. Section K shall be returned in its entirety. For Sections C through I, the offeror shall submit only those pages that require a fill-in.

d. ARIZONA DEPARTMENT OF REVENUE TRANSACTION PRIVILEGE TAX. There are certain Arizona taxes that are applicable to any contract resulting from this solicitation. The offeror may contact the State of Arizona, Revenue Department, Sales Tax Audit Section, 1160 W. Monroe, Phoenix, AZ 85007, to determine the taxes and the base upon which such taxes must be paid. Such taxes, if any, shall be considered as being included in the offeror’s price as stated in the proposal schedule. The taxes are applicable to out-of-state as well as in-state firms.

(3) PART III – Past Performance Information - Limited to no more than 5 pages per contract listed. Only references for contracts that are the same or similar in size, scope, cost and complexity to subject solicitation are desired. Submit original plus three (3) copies. IT IS THE GOVERNMENTS DESIRE TO HAVE THIS INFORMATION TWO WEEKS PRIOR TO SOLICITATION CLOSING DATE.

a. Quality and Satisfaction Rating for Contracts Completed in the Past Three Years: Provide any information currently available (letters, metrics, customer surveys, independent surveys, etc.) which demonstrates customer satisfaction with overall job performance and quality of completed work relating to airfield paving construction/repair/maintenance. In addition, explain corrective actions taken in the past, if any, for substandard performance and any current performance problems such as cost overruns, extended performance periods, numerous warranty calls, etc.

b. Past Performance Surveys: The Government will evaluate the quality and extent of offeror’s performance deemed relevant to the requirements of this RFP. The Government will use information submitted by the offeror and other sources such as other Federal Government offices and commercial sources, to assess performance. Provide a list of at least three (3), but no more than five (5) of the most relevant contracts performed for Federal agencies and commercial customers within the last three (3) years. Relevant contracts include contracts for work related to airfield paving construction/repair/maintenance. The evaluation of past performance information will take into account past performance information regarding predecessor companies, key personnel who have relevant experience, or subcontractors that will perform major or critical aspects of the requirement when such information is relevant to the instant acquisition. Furnish the following information for each contract referenced:

(A) Company/Division name

(B) Point of Contact

(C) Phone Number

(D) Description of Work

(E) Contract Type

(F) Contract Number

(G) Project Award Date, Scheduled Completion Date, Current/Final Completion Date

(H) Project Award Amount, Current Final Project Amount

(I) Contractor being evaluated performed as: Prime Contractor Subcontractor Supplier on contract/order

(J) Authorization Granted to Provide Information in Section B of Questionnaire

(K) Comments regarding any known performance deemed unacceptable to the customer, or not in accordance with the contract terms and conditions

c. The offeror shall fully complete Past Performance Information Form (see Attachment #7 to this solicitation). If another evaluation form has been used by a government office, the offeror may submit that existing form/survey; however it shall contain the same information requested by this solicitation.

d. Should offerors wish to provide information on problems encountered on the identified contracts and their corrective action in accordance with FAR 15.305(2), please submit such information with proposals as well.

If a teaming arrangement is contemplated, provide complete information as to the arrangement, including any relevant and recent past performance information on previous teaming arrangements with same partner. If this is a first time joint effort, each party to the arrangement must provide a list of past and present relevant contracts.

e. Subcontractor Consent: Past performance information pertaining to a subcontractor cannot be disclosed to the prime offeror without the subcontractor’s consent. Provide with the proposal a letter from all subcontractors that will perform major or critical aspects of the requirement, consenting to the release of their past performance information to the prime contractor.

f. Questionnaires. The offeror shall send out the Past Performance Questionnaires (See RFP Attachment #8) to each of the offeror’s reference points of contacts (POC). The responsibility to send out the Past Performance questionnaires rests solely with the offeror-i.e., it shall not be delegated to any other entity. Once the Past Performance Questionnaires are completed by your POCs, the information contained therein shall be considered source selection sensitive and shall not be released to you, the offeror. Questionnaires shall be sent directly back to the Government from their references by the offeror due date of 20 Aug 07. Address to send past performance questionnaires:

56 CONS/LGCB

ATTN: TSgt Alvina Andrews

14100 W Eagle Street

Luke Air Force Base, AZ 85309-1217

Or via email to: alvina.andrews@luke.af.mil AND mary.peetz@luke.af.mil

g. Offerors are encouraged to have the questionnaires submitted early to the Contracting Office. Any past performance questionnaires sent directly from a proposing offeror will not be accepted or evaluated. For the purpose of expediency of evaluation, please instruct references to respond to the Past Performance survey as soon as possible. The questionnaire need not be sent to customers on projects where past performance records exist in the government’s Construction Contractor Assessment Systems (CCASS). The contractors are encouraged to follow-up with respondents for completed questionnaires, but are not required to.

(e) Offerors are cautioned that Luke AFB has visitor control procedures requiring individuals not affiliated with the installation to report to the main entrance to obtain a visitor pass prior to entrance. Some delay should be anticipated if hand-carrying proposals. Offerors should allow sufficient time to obtain a visitor pass and arrive at the Contracting Office prior to the set closing time. It is recommended that proposals be mailed rather than hand carried due to extensive and rapidly changing base security measures. Late proposals will be processed in accordance with the provision “Late Submissions, Modifications and Withdrawals of Proposals”. Proposals will not be considered “received” until physically delivered to the 56th Contracting Squadron, 14100 W. Eagle Street, Luke AFB, AZ 85309-1217.

(End of Summary of Changes)