AFLDBSEFORM66.xls
XLS spreadsheet 150 KB Posted
- Attached to
- Airfield Paving Federal contract opportunity
- Solicitation number
- FA4887-07-R-0012
About this file
Attachment 5 AF Form 66
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Q As.doc | DOC document | |
| ConformedSolicitation07R0012Amendment 4.doc | DOC document | |
| Amendment 4.doc | DOC document | |
| Conformed07R0012 7Aug07.doc | DOC document | |
| Amendment 3.doc | DOC document | |
| Amendment 2.doc | DOC document | |
| Amendment 1.doc | DOC document | |
| ConformedSolicitation07R0012.doc | DOC document | |
| 07-R-0012AirfieldPavementIDIQ.doc | DOC document | |
| DavisBacon20Jul07.doc | DOC document | |
| AirfieldPavementSpecifications...doc | DOC document | |
| Attachment 4Drawings.zip | ZIP file | |
| PastPerformanceInformation.doc | DOC document | |
| BIDSCHEDULEAirfieldPavementsIDIQFY07.xls | XLS spreadsheet | |
| PASTPERFORMANCEQUESTIONNAIRE(2).doc | DOC document | |
| afi32-1042.pdf |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Spec Sort
| PROJECT NUMBER | PROJECT TITLE | SOLICITATION / CONTRACT NO. | ||||||||||||||||||||||||
| 2/22/07 | SCHEDULE OF MATERIAL SUBMITTALS | NUEX 07-XXXX | MAINTAIN AFLD PVMTS. | FO2604 | ||||||||||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | |||||||||||||||||||||||||
| NO. OF COPIES REQUIRED | ||||||||||||||||||||||||||
| LINE NO. | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION | OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACUTER'S | RECOMMENDATIONS | MANUFACUTER'S | WARRANTY | CATALOG DATA | OPERATING | INSTRUCTIONS | SEE PARAGRAPH | REFERENCE | OTHER | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CON-TRACTING | DATE TO CIVIL ENGINEER-ING | RETURN SUSPENSE DATE | FOLLOW-UP | DATE CONTRACTOR NOTIFIED | CONTRAC-TOR RE- SUBMIT-TAL | FINAL APPROVAL | REMARKS | |
| APPROVED | DISAPPROVED | |||||||||||||||||||||||||
| Contract Closeout | 5 Days | |||||||||||||||||||||||||
| 1 | 01010, 1.5 | 4 | after | |||||||||||||||||||||||
| As Built Drawings | NTP | |||||||||||||||||||||||||
| Preliminary Network | 5 Days | |||||||||||||||||||||||||
| 2 | [01310, 1.02, A, 1] | 4 | after | |||||||||||||||||||||||
| Construction Pregress Schedule | NTP | |||||||||||||||||||||||||
| Network Analysis | 5 days | |||||||||||||||||||||||||
| 3 | [01310, 1.02, A, 2] | 4 | after | |||||||||||||||||||||||
| Construction Progress Schedule | NTP | |||||||||||||||||||||||||
| Construction Progress | 5 Days | |||||||||||||||||||||||||
| 4 | [01310, 1.02, A, 3] | 4 | after | |||||||||||||||||||||||
| Construction Pregress Schedule | NTP | |||||||||||||||||||||||||
| Network Analysis Software | 5 Days | |||||||||||||||||||||||||
| 5 | [01310, 1.02, A, 4] | 4 | after | |||||||||||||||||||||||
| Construction Progress Schedule | NTP | |||||||||||||||||||||||||
| Final Inspection Request | 5 Days | |||||||||||||||||||||||||
| 6 | [01700, 1.03, A] | 4 | after | |||||||||||||||||||||||
| Contract Closeout | NTP | |||||||||||||||||||||||||
| Utlity Outages | 5 Days | |||||||||||||||||||||||||
| 7 | [01800, 1.04, A] | 4 | after | |||||||||||||||||||||||
| Special Conditions | NTP | |||||||||||||||||||||||||
| Certification | 5 Days | |||||||||||||||||||||||||
| 8 | [02231, 1.04, A] | 4 | After | |||||||||||||||||||||||
| Aggregate Base Course | NTP | |||||||||||||||||||||||||
| Mix Design | 5 Days | |||||||||||||||||||||||||
| 9 | [02238, 1.04, A] | 4 | After | |||||||||||||||||||||||
| Port. Cement Stab. Base Course | NTP | |||||||||||||||||||||||||
| Mix Design | 5 Days | |||||||||||||||||||||||||
| 10 | [02510, 1.04, A] | 4 | after | |||||||||||||||||||||||
| Asphalt Pavement Surf. Treatment | NTP | |||||||||||||||||||||||||
| Mix Design | 5 days | |||||||||||||||||||||||||
| 11 | [02515, 1.03, A] | 4 | after | |||||||||||||||||||||||
| Hot Mix (HMA)Asphalt for Airfields | NTP | |||||||||||||||||||||||||
| Mix Design | ||||||||||||||||||||||||||
| 12 | [02529, 1.04, A] | 4 | See Specs | |||||||||||||||||||||||
| Portland Cement Pvmt for Airfields | ||||||||||||||||||||||||||
| Mix Design /Tests | ||||||||||||||||||||||||||
| 13 | [02543, 1.02 A] | 4 | See Specs | |||||||||||||||||||||||
| Coal Tar Sealent | ||||||||||||||||||||||||||
| Equip. / Surface Smoothness | ||||||||||||||||||||||||||
| 14 | [02546, 1.02, A] | 4 | See Specs | |||||||||||||||||||||||
| Cold-Mill Bitimum | ||||||||||||||||||||||||||
| Proceedure | 5 days | |||||||||||||||||||||||||
| 15 | [02566, 1.02, A] | 4 | after | |||||||||||||||||||||||
| Reseal Joints In Rigid Pavement | NTP | |||||||||||||||||||||||||
| Proceedure / Mix Design | 5 days | |||||||||||||||||||||||||
| 16 | [02572, 2.03, A] | 4 | after | |||||||||||||||||||||||
| Asphalt Slurry Seal | NTP | |||||||||||||||||||||||||
| Proceedure | 5 days | |||||||||||||||||||||||||
| 17 | [02574, 2.01, A] | 4 | after | |||||||||||||||||||||||
| Preservitive Seal | NTP | |||||||||||||||||||||||||
| Proceedure | 5 Days | |||||||||||||||||||||||||
| 18 | [02575, 2.03, A] | 4 | after | |||||||||||||||||||||||
| Hot Asphalt Rubber Chip Seal | NTP | |||||||||||||||||||||||||
| Product Data | 5 Days | |||||||||||||||||||||||||
| 19 | [02577, 1.02, A] | 4 | after | |||||||||||||||||||||||
| Pavement Marking For Airfields | NTP | |||||||||||||||||||||||||
| Proceedure / Product Data | 5 days | |||||||||||||||||||||||||
| 20 | [02579, 2.01, A] | 4 | after | |||||||||||||||||||||||
| Crack Sealing | sampling | |||||||||||||||||||||||||
| Product Data | 5 days | |||||||||||||||||||||||||
| 21 | [03100, 1.02, C] | 4 | after | |||||||||||||||||||||||
| Concrete Form Work | NTP | |||||||||||||||||||||||||
| Product Data | 5 days | |||||||||||||||||||||||||
| 22 | [03200, 1.02 A] | 4 | after | |||||||||||||||||||||||
| Concrete Reinforcement | NTP | |||||||||||||||||||||||||
| Product Data | 5 days | |||||||||||||||||||||||||
| 23 | [03250, 1.03, A] | 4 | after | |||||||||||||||||||||||
| Joint Seal & Reinf., Conc. Pvmts. | NTP | |||||||||||||||||||||||||
| Proceedure / Product Data | 5 days | |||||||||||||||||||||||||
| 24 | [03732, 1.04, A] | 4 | after | |||||||||||||||||||||||
| Concrete Repair | NTP | |||||||||||||||||||||||||
| 4 |
&L&"Arial"&BAF Form 66, Computer Generated
Sub Date Sort
| PROJECT NUMBER | PROJECT TITLE | SOLICITATION / CONTRACT NO. | ||||||||||||||||||||||||
| 6 June 1997 | SCHEDULE OF MATERIAL SUBMITTALS | NUEX94-3008 | CENTRAL CHIILER PLANT | |||||||||||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | |||||||||||||||||||||||||
| NO. OF COPIES REQUIRED | ||||||||||||||||||||||||||
| LINE NO. | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION | OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACUTER'S | RECOMMENDATIONS | MANUFACUTER'S | WARRANTY | CATALOG DATA | OPERATING | INSTRUCTIONS | SEE PARAGRAPH | REFERENCE | OTHER | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CON-TRACTING | DATE TO CIVIL ENGINEER-ING | RETURN SUSPENSE DATE | FOLLOW-UP | DATE CONTRACTOR NOTIFIED | CONTRAC-TOR RE- SUBMIT-TAL | FINAL APPROVAL | REMARKS | |
| APPROVED | DISAPPROVED | |||||||||||||||||||||||||
| Safety Program | 5 Days | |||||||||||||||||||||||||
| 1 | [01070, 1.02, A] | 4 | after | |||||||||||||||||||||||
| Safety Requirements | NTP | |||||||||||||||||||||||||
| Preliminary Network | 5 Days | |||||||||||||||||||||||||
| 2 | [01310, 1.02, A, 1] | 4 | after | |||||||||||||||||||||||
| Construction Pregress Schedule | NTP | |||||||||||||||||||||||||
| Network Analysis | 5 days | |||||||||||||||||||||||||
| 3 | [01310, 1.02, A, 2] | 4 | after | |||||||||||||||||||||||
| Construction Progress Schedule | NTP | |||||||||||||||||||||||||
| Construction Progress | 5 Days | |||||||||||||||||||||||||
| 4 | [01310, 1.02, A, 3] | 4 | after | |||||||||||||||||||||||
| Construction Pregress Schedule | NTP | |||||||||||||||||||||||||
| Network Analysis Software | 5 Days | |||||||||||||||||||||||||
| 5 | [01310, 1.02, A, 4] | 4 | after | |||||||||||||||||||||||
| Construction Progress Schedule | NTP | |||||||||||||||||||||||||
| Quality Control Plan | 5 Days | |||||||||||||||||||||||||
| 6 | [01450, 1.03, A, 1] | 4 | after | |||||||||||||||||||||||
| Contractor Quality Control | NTP | |||||||||||||||||||||||||
| QC Manager Qualifications | 5 Days | |||||||||||||||||||||||||
| 7 | [01450, 1.03, A, 2] | 4 | after | |||||||||||||||||||||||
| Contractor Quality Control | NTP | |||||||||||||||||||||||||
| Final Inspection request | Date of | |||||||||||||||||||||||||
| 8 | [01700, 1.03, A] | 4 | Substancial | |||||||||||||||||||||||
| Contract Closeout | Completion | |||||||||||||||||||||||||
| Utlity Outages | ||||||||||||||||||||||||||
| 9 | [01800, 1.04, A] | 4 | See Specs | |||||||||||||||||||||||
| Special Conditions | ||||||||||||||||||||||||||
| Asbestos Certifications | 5 Days | |||||||||||||||||||||||||
| 10 | [02080, 1.06, A] | 4 | 4 | after | ||||||||||||||||||||||
| Asbestos Abatement | NTP | |||||||||||||||||||||||||
| Asbestos Licenses | 5 days | |||||||||||||||||||||||||
| 11 | [02080, 1.06, B] | 4 | 4 | after | ||||||||||||||||||||||
| Asbestos Abatement | NTP | |||||||||||||||||||||||||
| Notification of Asbestos Removal | ||||||||||||||||||||||||||
| 12 | [02080, 1.06, C] | 4 | See Specs | |||||||||||||||||||||||
| Asbestos Abatement | ||||||||||||||||||||||||||
| Asbestos Inventory | ||||||||||||||||||||||||||
| 13 | [02080, 1.06, D] | 4 | See Specs | |||||||||||||||||||||||
| Asbestos Abatement | ||||||||||||||||||||||||||
| Asbestos Removal Plan | ||||||||||||||||||||||||||
| 14 | [02080, 1.06, E] | 4 | See Specs | |||||||||||||||||||||||
| Asbestos Abatement | ||||||||||||||||||||||||||
| Asbestos Safety Plan | 5 days | |||||||||||||||||||||||||
| 15 | [02080, 1.06, F] | 4 | after | |||||||||||||||||||||||
| Asbestos Abatement | NTP | |||||||||||||||||||||||||
| Asbestos Waste Disposal Plan | 5 days | |||||||||||||||||||||||||
| 16 | [02080, 1.06, G] | 4 | after | |||||||||||||||||||||||
| Asbestos Abatement | NTP | |||||||||||||||||||||||||
| Affidavid of Vegitation Control | 5 days | |||||||||||||||||||||||||
| 17 | [02252, 1.02, A] | 4 | 4 | after | ||||||||||||||||||||||
| Vegitation Control | NTP | |||||||||||||||||||||||||
| Chemical Product Data | 5 Days | |||||||||||||||||||||||||
| 18 | [02281, 1.02, B] | 4 | 4 | after | ||||||||||||||||||||||
| Termite Control | NTP | |||||||||||||||||||||||||
| Certification of Test | 5 Days | |||||||||||||||||||||||||
| 19 | [02675, 1.02, A] | 4 | 4 | after | ||||||||||||||||||||||
| Disinfection of Water System | NTP | |||||||||||||||||||||||||
| Bacteriological Report | 5 days | |||||||||||||||||||||||||
| 20 | [02675, 1.02, B] | 4 | after | |||||||||||||||||||||||
| Disinfection of Water System | sampling | |||||||||||||||||||||||||
| Disinfection Report | 5 days | |||||||||||||||||||||||||
| 21 | [02675, 1.02, C] | 4 | after | |||||||||||||||||||||||
| Disinfection of Water System | NTP | |||||||||||||||||||||||||
| Chain of Custody Records | 5 days | |||||||||||||||||||||||||
| 22 | [02675, 1.02, D] | 4 | after | |||||||||||||||||||||||
| Disinfection of Water System | NTP | |||||||||||||||||||||||||
| Data, catalog cut | 5 days | |||||||||||||||||||||||||
| 23 | [02698, 1.03, A] | 4 | 4 | after | ||||||||||||||||||||||
| Prefabricated U/G Dist System | NTP | |||||||||||||||||||||||||
| Shop Drawings | 5 days | |||||||||||||||||||||||||
| 24 | [02698, 1.03, B] | 4 | 4 | after | ||||||||||||||||||||||
| Prefabricated U/G Dist System | NTP | |||||||||||||||||||||||||
| Manufacturer's Certificate | 5 days | |||||||||||||||||||||||||
| 25 | [02698, 1.03, C] | 4 | 4 | after | ||||||||||||||||||||||
| Prefabricated U/G Dist System | NTP | |||||||||||||||||||||||||
| O & M Manuals | 5 days | |||||||||||||||||||||||||
| 26 | [02698, 1.03, D] | 4 | 4 | after | ||||||||||||||||||||||
| Prefabricated U/G Dist System | NTP | |||||||||||||||||||||||||
| Component Product Data | 5 days | |||||||||||||||||||||||||
| 27 | [02811, 1.02, B] | 4 | 4 | after | ||||||||||||||||||||||
| Landscape Irrigation | NTP | |||||||||||||||||||||||||
| Irrigation System Shop Drawings | 5 Days | |||||||||||||||||||||||||
| 28 | [02811, 1.02, C] | 4 | 4 | after | ||||||||||||||||||||||
| Landscape Irrigation | NTP | |||||||||||||||||||||||||
| As-Built Record Drawings | Date of | |||||||||||||||||||||||||
| 29 | [02811, 1.02, D] | 4 | Substantial | |||||||||||||||||||||||
| Landscape Irrigation | Completion | |||||||||||||||||||||||||
| O&M Manuals | Date of | |||||||||||||||||||||||||
| 30 | [02811, 1.02, E] | 4 | 4 | Substantial | ||||||||||||||||||||||
| Landscape Irrigation | Completion | |||||||||||||||||||||||||
| Landscape Planting Shop Drawings | 5 Days | |||||||||||||||||||||||||
| 31 | [02900, 1.02, A] | 4 | after | |||||||||||||||||||||||
| Landscaping | NTP | |||||||||||||||||||||||||
| Certificates | 5 Days | |||||||||||||||||||||||||
| 32 | [02900, 1.02, B] | 4 | after | |||||||||||||||||||||||
| Landscaping | NTP | |||||||||||||||||||||||||
| Concrete Form Shop Drawings | 5 Days | |||||||||||||||||||||||||
| 33 | [03100, 1.02, B] | 4 | 4 | after | ||||||||||||||||||||||
| Concrete Formwork | NTP | |||||||||||||||||||||||||
| Product data | 5 Days | |||||||||||||||||||||||||
| 34 | [03100, 1.02, C] | 4 | 4 | after | ||||||||||||||||||||||
| Concrete Formwork | NTP | |||||||||||||||||||||||||
| Concrete Shop Drawings | 5 Days | |||||||||||||||||||||||||
| 35 | [03200, 1.02, B] | 4 | 4 | after | ||||||||||||||||||||||
| Concrete Reinforcement | NTP | |||||||||||||||||||||||||
| Mill Test Report | 5 Days | |||||||||||||||||||||||||
| 36 | [03200, 1.02, C] | 4 | after | |||||||||||||||||||||||
| Concrete Reinforcement | NTP | |||||||||||||||||||||||||
| Product data on Accessory Items] | 5 Days | |||||||||||||||||||||||||
| 37 | [03300, 1.02, B] | 4 | 4 | after | ||||||||||||||||||||||
| Cast-in-Place Concrete | NTP | |||||||||||||||||||||||||
| Samples, Exp/Cont Joints | 5 Days | |||||||||||||||||||||||||
| 38 | [03300, 1.02, C] | 1 | 1 | after | ||||||||||||||||||||||
| Cast-in-Place Concrete | NTP | |||||||||||||||||||||||||
| Record Documents | Date of | |||||||||||||||||||||||||
| 39 | [03300, 1.02, D] | 4 | Substantial | |||||||||||||||||||||||
| Cast-in-Place Concrete | Completion | |||||||||||||||||||||||||
| Mix Designs, Mortar and Grout | 5 Days | |||||||||||||||||||||||||
| 40 | [04100, 1.02, B] | 4 | after | |||||||||||||||||||||||
| Mortar and Masonry Grout | NTP | |||||||||||||||||||||||||
| Samples, Mortar Channels | 5 Days | |||||||||||||||||||||||||
| 41 | [04100, 1.02, C] | 1 | 1 | after | ||||||||||||||||||||||
| Mortar and Masonry Grout | NTP | |||||||||||||||||||||||||
| Test Reports, as required | 5 days | |||||||||||||||||||||||||
| 42 | [04100, 1.02, D] | 4 | after | |||||||||||||||||||||||
| Mortar and Masonry Grout | Test | |||||||||||||||||||||||||
| Samples | 5 Days | |||||||||||||||||||||||||
| 43 | [04220, 1.02, B] | 1 | 1 | after | ||||||||||||||||||||||
| Concrete Unit masonry | NTP | |||||||||||||||||||||||||
| Certification, Certified Block Pgm | 5 Days | |||||||||||||||||||||||||
| 44 | [04220, 1.02, C] | 4 | 4 | after | ||||||||||||||||||||||
| Concrete Unit masonry | NTP | |||||||||||||||||||||||||
| Shop Drawings, Shop and Erection | 5 Days | |||||||||||||||||||||||||
| 45 | [05110, 1.03, B] | 4 | 4 | after | ||||||||||||||||||||||
| Structural Steel | NTP | |||||||||||||||||||||||||
| Methods of Erection | 5 Days | |||||||||||||||||||||||||
| 46 | [05110, 1.03, C] | 4 | after | |||||||||||||||||||||||
| Structural Steel | NTP | |||||||||||||||||||||||||
| Ceritifications | 5 Days | |||||||||||||||||||||||||
| 47 | [05110, 1.03, D] | 4 | 4 | after | ||||||||||||||||||||||
| Structural Steel | NTP | |||||||||||||||||||||||||
| Shop and Erection Drawings | 5 Days | |||||||||||||||||||||||||
| 48 | [05310, 1.03, B] | 4 | 4 | after | ||||||||||||||||||||||
| Steel Roof Deck | NTP | |||||||||||||||||||||||||
| Shop and Erection Drawings | 5 Days | |||||||||||||||||||||||||
| 49 | [05313, 1.02, B] | 4 | 4 | after | ||||||||||||||||||||||
| Steel Floor Deck | NTP | |||||||||||||||||||||||||
| Product Data | 5 Days | |||||||||||||||||||||||||
| 50 | [05400, 1.02, B] | 4 | 4 | after | ||||||||||||||||||||||
| Cold-Formed Metal Framing | NTP | |||||||||||||||||||||||||
| Shop Drawings | 5 Days | |||||||||||||||||||||||||
| 51 | [05400, 1.02, C] | 4 | 4 | after | ||||||||||||||||||||||
| Cold-Formed Metal Framing | NTP | |||||||||||||||||||||||||
| Shop Drawings | 5 Days | |||||||||||||||||||||||||
| 52 | [05500, 1.02, B] | 4 | 4 | after | ||||||||||||||||||||||
| Metal Fabrications | NTP | |||||||||||||||||||||||||
| Shop Drawings | 5 Days | |||||||||||||||||||||||||
| 53 | [05510, 1.02, B] | 4 | 4 | after | ||||||||||||||||||||||
| Metal Stairs | NTP | |||||||||||||||||||||||||
| Shop Drawings | 5 Days | |||||||||||||||||||||||||
| 54 | [05520, 1.02, B] | 4 | 4 | after | ||||||||||||||||||||||
| Handrails and Railings | NTP | |||||||||||||||||||||||||
| Shop Drawings | 5 Days | |||||||||||||||||||||||||
| 55 | [06100, 1.03, A] | 4 | 4 | after | ||||||||||||||||||||||
| Rough Carpentry | NTP | |||||||||||||||||||||||||
| Samples, rigid sheathing | 5 Days | |||||||||||||||||||||||||
| 56 | [06100, 1.03, B] | 1 | 1 | after | ||||||||||||||||||||||
| Rough Carpentry | NTP | |||||||||||||||||||||||||
| Product Data | 5 Days | |||||||||||||||||||||||||
| 57 | [06100, 1.03, C] | 4 | 4 | after | ||||||||||||||||||||||
| Rough Carpentry | NTP | |||||||||||||||||||||||||
| Product Data | 5 Days | |||||||||||||||||||||||||
| 58 | [07180, 1.02, B] | 4 | 4 | after | ||||||||||||||||||||||
| Water Repellents | NTP | |||||||||||||||||||||||||
| Samples, Coating | 5 Days | |||||||||||||||||||||||||
| 59 | [07180, 1.02, C] | 1 | 1 | after | ||||||||||||||||||||||
| Water Repellents | NTP | |||||||||||||||||||||||||
| Product Data | 5 Days | |||||||||||||||||||||||||
| 60 | [07200, 1.02, B] | 4 | 4 | after | ||||||||||||||||||||||
| Insulation | NTP | |||||||||||||||||||||||||
| Product Data | 5 Days | |||||||||||||||||||||||||
| 61 | [07270, 1.02, B] | 4 | 4 | after | ||||||||||||||||||||||
| Firestopping | NTP | |||||||||||||||||||||||||
| Test Reports, as required | 5 Days | |||||||||||||||||||||||||
| 62 | [07270, 1.02, C] | 4 | 4 | after | ||||||||||||||||||||||
| Firestopping | NTP | |||||||||||||||||||||||||
| Shop Drawings, Detail Drawings | 5 Days | |||||||||||||||||||||||||
| 63 | [07415, 1.04, A] | 4 | 4 | after | ||||||||||||||||||||||
| Metal Roofing and Siding, Fact Color | NTP | |||||||||||||||||||||||||
| Samples | 5 Days | |||||||||||||||||||||||||
| 64 | [07415, 1.04, B] | 1 | 1 | after | ||||||||||||||||||||||
| Metal Roofing and Siding, Fact Color | NTP | |||||||||||||||||||||||||
| Certificates of Compliance | 5 Days | |||||||||||||||||||||||||
| 65 | [07415, 1.04, C] | 4 | 4 | after | ||||||||||||||||||||||
| Metal Roofing and Siding, Fact Color | NTP | |||||||||||||||||||||||||
| Warranty | 5 Days | |||||||||||||||||||||||||
| 66 | [07600, 1.02, A] | 4 | 4 | after | ||||||||||||||||||||||
| Flashing and Sheet Metal | NTP | |||||||||||||||||||||||||
| Product Data | 5 Days | |||||||||||||||||||||||||
| 67 | [07900, 1.02, B] | 4 | 4 | after | ||||||||||||||||||||||
| Joint Sealers | NTP | |||||||||||||||||||||||||
| Shop Drawings | 5 Days | |||||||||||||||||||||||||
| 68 | [08110, 1.03, B] | 4 | 4 | after | ||||||||||||||||||||||
| Steel Doors and Frames | NTP | |||||||||||||||||||||||||
| Shop Drawings | 5 Days | |||||||||||||||||||||||||
| 69 | [08361, 1.02, B] | 4 | 4 | after | ||||||||||||||||||||||
| Insulated Sectional Overhead Doors | NTP | |||||||||||||||||||||||||
| Product Data | 5 Days | |||||||||||||||||||||||||
| 70 | [08520, 1.03, B] | 4 | 4 | after | ||||||||||||||||||||||
| Aluminum Windows | NTP | |||||||||||||||||||||||||
| Shop Drawings | 5 Days | |||||||||||||||||||||||||
| 71 | [08520, 1.03, C] | 4 | 4 | after | ||||||||||||||||||||||
| Aluminum Windows | NTP | |||||||||||||||||||||||||
| Samples | 5 Days | |||||||||||||||||||||||||
| 72 | [08520, 1.03, D] | 1 | 1 | after | ||||||||||||||||||||||
| Aluminum Windows | NTP | |||||||||||||||||||||||||
| Shop Drawings and Schedule | 5 Days | |||||||||||||||||||||||||
| 73 | [08712, 1.02, A] | 4 | 4 | 4 | after | |||||||||||||||||||||
| Door Hardware | NTP | |||||||||||||||||||||||||
| Samples | 5 Days | |||||||||||||||||||||||||
| 74 | [08712, 1.02, B] | 1 | 4 | after | ||||||||||||||||||||||
| Door Hardware | NTP | |||||||||||||||||||||||||
| Manufacturer's Certificate | 5 Days | |||||||||||||||||||||||||
| 75 | [08712, 1.02, C] | 4 | 4 | after | ||||||||||||||||||||||
| Door Hardware | NTP | |||||||||||||||||||||||||
| O&M Manuals | 10 days | |||||||||||||||||||||||||
| 76 | [08712, 1.02, D] | 4 | 4 | Prior to Work | ||||||||||||||||||||||
| Door Hardware | ||||||||||||||||||||||||||
| Keying Schedule | 10 days | |||||||||||||||||||||||||
| 77 | [08712, 1.02, E] | 4 | Prior to Work | |||||||||||||||||||||||
| Door Hardware | ||||||||||||||||||||||||||
| Samples | 5 Days | |||||||||||||||||||||||||
| 78 | [08800, 1.03, B] | 1 | 1 | after | ||||||||||||||||||||||
| Glazing | NTP | |||||||||||||||||||||||||
| Product Data | 5 Days | |||||||||||||||||||||||||
| 79 | [09100, 1.02, A] | 4 | 4 | after | ||||||||||||||||||||||
| Metal Support Systems | NTP | |||||||||||||||||||||||||
| Samples, Wall Texture | 5 Days | |||||||||||||||||||||||||
| 80 | [09250, 1.02, B] | 1 | 1 | after | ||||||||||||||||||||||
| Gypsum Board | NTP | |||||||||||||||||||||||||
| Product Data | 5 Days | |||||||||||||||||||||||||
| 81 | [09310, 1.02, A] | 4 | 4 | after | ||||||||||||||||||||||
| Ceramic Tile | NTP | |||||||||||||||||||||||||
| Samples, ceramic tile | 5 Days | |||||||||||||||||||||||||
| 82 | [09310, 1.02, B] | 1 | 1 | after | ||||||||||||||||||||||
| Ceramic Tile | NTP | |||||||||||||||||||||||||
| Shop Drawings, Layout | 5 Days | |||||||||||||||||||||||||
| 83 | [09510, 1.02, B] | 4 | 4 | after | ||||||||||||||||||||||
| Acoustical Ceilings | NTP | |||||||||||||||||||||||||
| Samples, finish color | 5 Days | |||||||||||||||||||||||||
| 84 | [09510, 1.02, C] | 1 | 1 | after | ||||||||||||||||||||||
| Acoustical Ceilings | NTP | |||||||||||||||||||||||||
| Product Data | 5 Days | |||||||||||||||||||||||||
| 85 | [09650, 1.02, B] | 4 | 4 | after | ||||||||||||||||||||||
| Resilent Flooring | NTP | |||||||||||||||||||||||||
| Samples, Colors & Patterns | 5 Days | |||||||||||||||||||||||||
| 86 | [09650, 1.02, C] | 1 | 1 | after | ||||||||||||||||||||||
| Resilent Flooring | NTP | |||||||||||||||||||||||||
| Moisture Testing Results | 5 Days | |||||||||||||||||||||||||
| 87 | [09650, 1.02, D] | 4 | 4 | after | ||||||||||||||||||||||
| Resilent Flooring | NTP | |||||||||||||||||||||||||
| O&M Manuals | Date of | |||||||||||||||||||||||||
| 88 | [09650, 1.02, E] | 4 | 4 | 4 | 4 | Substantial | ||||||||||||||||||||
| Resilent Flooring | Completion | |||||||||||||||||||||||||
| Product Data | 5 Days | |||||||||||||||||||||||||
| 89 | [09900, 1.02, B] | 4 | 4 | after | ||||||||||||||||||||||
| Painting | NTP | |||||||||||||||||||||||||
| Samples, colors | 5 Days | |||||||||||||||||||||||||
| 90 | [09900, 1.02, C] | 1 | 1 | after | ||||||||||||||||||||||
| Painting | NTP | |||||||||||||||||||||||||
| Product Data | 5 Days | |||||||||||||||||||||||||
| 91 | [10520, 1.02, B] | 4 | 4 | after | ||||||||||||||||||||||
| Fire Protection Specialties | NTP | |||||||||||||||||||||||||
| Shop Drawings, Brochures | 5 Days | |||||||||||||||||||||||||
| 92 | [10810, 1.02, A] | 4 | 4 | 4 | after | |||||||||||||||||||||
| Toilet Accessories | NTP | |||||||||||||||||||||||||
| Product Data | 5 Days | |||||||||||||||||||||||||
| 93 | [15070, 1.02, A] | 4 | 4 | after | ||||||||||||||||||||||
| Condensate & Equip Drain Systems | NTP | |||||||||||||||||||||||||
| Product Data | 5 Days | |||||||||||||||||||||||||
| 94 | [15080, 1.02, A] | 4 | 4 | after | ||||||||||||||||||||||
| Chilled & Condenser Water Piping | NTP | |||||||||||||||||||||||||
| Product Data | 5 Days | |||||||||||||||||||||||||
| 95 | [15150, 1.02, A] | 4 | 4 | after | ||||||||||||||||||||||
| Meters and Gauges | NTP | |||||||||||||||||||||||||
| Shop Drawings, Isolators | 5 Days | |||||||||||||||||||||||||
| 96 | [15240, 1.02, A] | 4 | 4 | after | ||||||||||||||||||||||
| Mech Sound, Vibration & Seismic | NTP | |||||||||||||||||||||||||
| Product Data | 5 Days | |||||||||||||||||||||||||
| 97 | [15240, 1.02, B] | 4 | 4 | after | ||||||||||||||||||||||
| Mech Sound, Vibration & Seismic | NTP | |||||||||||||||||||||||||
| Certification, Installation | 5 Days | |||||||||||||||||||||||||
| 98 | [15240, 1.02, C] | 4 | 4 | after | ||||||||||||||||||||||
| Mech Sound, Vibration & Seismic | NTP | |||||||||||||||||||||||||
| Product Data | 5 Days | |||||||||||||||||||||||||
| 99 | [15250, 1.02, A] | 4 | 4 | after | ||||||||||||||||||||||
| Mechanical Insulation | NTP | |||||||||||||||||||||||||
| Preliminary Shop Drawings | 5 Days | |||||||||||||||||||||||||
| 100 | [15330, 1.02, A] | 4 | 4 | after | ||||||||||||||||||||||
| Wet-Pipe Sprinkler Systems | NTP | |||||||||||||||||||||||||
| Shop Drawings, Hydraulic Calcs | Date of | |||||||||||||||||||||||||
| 101 | [15330, 1.02, B] | 4 | 4 | Substantial | ||||||||||||||||||||||
| Wet-Pipe Sprinkler Systems | Completion | |||||||||||||||||||||||||
| Product Data | 5 Days | |||||||||||||||||||||||||
| 102 | [15330, 1.02, C] | 4 | 4 | after | ||||||||||||||||||||||
| Wet-Pipe Sprinkler Systems | NTP | |||||||||||||||||||||||||
| Manufacturer's Certificate | 5 Days | |||||||||||||||||||||||||
| 103 | [15330, 1.02, E] | 4 | 4 | after | ||||||||||||||||||||||
| Wet-Pipe Sprinkler Systems | NTP | |||||||||||||||||||||||||
| Product Data | 5 Days | |||||||||||||||||||||||||
| 104 | [15410, 1.02, A] | 4 | 4 | after | ||||||||||||||||||||||
| Plumbing Piping | NTP | |||||||||||||||||||||||||
| Product Data | 5 Days | |||||||||||||||||||||||||
| 105 | [15430, 1.02, A] | 4 | 4 | after | ||||||||||||||||||||||
| Plumbing Specialties | NTP | |||||||||||||||||||||||||
| Product Data | 5 Days | |||||||||||||||||||||||||
| 106 | [15440, 1.02, A] | 4 | 4 | after | ||||||||||||||||||||||
| Plumbing Fixtures & Trim | NTP | |||||||||||||||||||||||||
| Shop Drawings | 5 Days | |||||||||||||||||||||||||
| 107 | [15451, 1.02, A] | 4 | 4 | after | ||||||||||||||||||||||
| Water Heaters | NTP | |||||||||||||||||||||||||
| Product Data | 5 Days | |||||||||||||||||||||||||
| 108 | [15451, 1.02, B] | 4 | 4 | after | ||||||||||||||||||||||
| Water Heaters | NTP | |||||||||||||||||||||||||
| Product Data | 5 Days | |||||||||||||||||||||||||
| 109 | [15481, 1.02, A] | 4 | 4 | after | ||||||||||||||||||||||
| Fuel Gas Systems | NTP | |||||||||||||||||||||||||
| Product Data | 5 Days | |||||||||||||||||||||||||
| 110 | [15500, 1.02, A] | 4 | 4 | after | ||||||||||||||||||||||
| Circulating Pumps | NTP | |||||||||||||||||||||||||
| Installation Instructions | 5 Days | |||||||||||||||||||||||||
| 111 | [15500, 1.02, B] | 4 | 4 | after | ||||||||||||||||||||||
| Circulating Pumps | NTP | |||||||||||||||||||||||||
| Product Data | 5 Days | |||||||||||||||||||||||||
| 112 | [15670, 1.02, A] | 4 | 4 | after | ||||||||||||||||||||||
| Cooling Towers | NTP | |||||||||||||||||||||||||
| Installation Instructions | 5 Days | |||||||||||||||||||||||||
| 113 | [15670, 1.02, B] | 4 | 4 | after | ||||||||||||||||||||||
| Cooling Towers | NTP | |||||||||||||||||||||||||
| Product Data | 5 Days | |||||||||||||||||||||||||
| 114 | [15682, 1.04, A] | 4 | 4 | after | ||||||||||||||||||||||
| Direct Fired, Gas Absop Chillers | NTP | |||||||||||||||||||||||||
| Installation Instructions | 5 Days | |||||||||||||||||||||||||
| 115 | [15682, 1.04, B] | 4 | 4 | after | ||||||||||||||||||||||
| Direct Fired, Gas Absop Chillers | NTP | |||||||||||||||||||||||||
| Data | 5 Days | |||||||||||||||||||||||||
| 116 | [15682, 1.04, C] | 4 | 4 | after | ||||||||||||||||||||||
| Direct Fired, Gas Absop Chillers | NTP | |||||||||||||||||||||||||
| Product Data | 5 Days | |||||||||||||||||||||||||
| 117 | [15685, 1.03, A] | 4 | 4 | after | ||||||||||||||||||||||
| Rotary Screw Chiller | NTP | |||||||||||||||||||||||||
| Installation Instructions | 5 Days | |||||||||||||||||||||||||
| 118 | [15685, 1.03, B] | 4 | 4 | after | ||||||||||||||||||||||
| Rotary Screw Chiller | NTP | |||||||||||||||||||||||||
| Data | 5 Days | |||||||||||||||||||||||||
| 119 | [15685, 1.03, C] | 4 | 4 | after | ||||||||||||||||||||||
| Rotary Screw Chiller | NTP | |||||||||||||||||||||||||
| Product Data | 5 Days | |||||||||||||||||||||||||
| 120 | [15712, 1.02, A] | 4 | 4 | after | ||||||||||||||||||||||
| Plate & Frame Heat Exchangers | NTP | |||||||||||||||||||||||||
| Installation Instructions | 5 Days | |||||||||||||||||||||||||
| 121 | [15712, 1.02, B] | 4 | 4 | after | ||||||||||||||||||||||
| Plate & Frame Heat Exchangers | NTP | |||||||||||||||||||||||||
| Shop Drawings | 5 Days | |||||||||||||||||||||||||
| 122 | [15815, 1.02, A] | 4 | 4 | after | ||||||||||||||||||||||
| Evaporative Coolers | NTP | |||||||||||||||||||||||||
| Product Data | 5 Days | |||||||||||||||||||||||||
| 123 | [15815, 1.02, B] | 4 | 4 | after | ||||||||||||||||||||||
| Evaporative Coolers | NTP | |||||||||||||||||||||||||
| Shop Drawings | 5 Days | |||||||||||||||||||||||||
| 124 | [15816, 1.02, A] | 4 | 4 | after | ||||||||||||||||||||||
| Gas Unit Heaters | NTP | |||||||||||||||||||||||||
| Product Data | 5 Days | |||||||||||||||||||||||||
| 125 | [15816, 1.02, B] | 4 | 4 | after | ||||||||||||||||||||||
| Gas Unit Heaters | NTP | |||||||||||||||||||||||||
| Product Data | 5 Days | |||||||||||||||||||||||||
| 126 | [15855, 1.02, A] | 4 | 4 | after | ||||||||||||||||||||||
| Heat Pump - Split System | NTP | |||||||||||||||||||||||||
| Shop Drawings | 5 Days | |||||||||||||||||||||||||
| 127 | [15855, 1.02, B] | 4 | 4 | after | ||||||||||||||||||||||
| Heat Pump - Split System | NTP | |||||||||||||||||||||||||
| Certificates, Manufacturer | 5 Days | |||||||||||||||||||||||||
| 128 | [15855, 1.02, C] | 4 | 4 | after | ||||||||||||||||||||||
| Heat Pump - Split System | NTP | |||||||||||||||||||||||||
| Shop Drawings, dimensions | 5 Days | |||||||||||||||||||||||||
| 129 | [15870, 1.02, A] | 4 | 4 | after | ||||||||||||||||||||||
| Power Ventilators | NTP | |||||||||||||||||||||||||
| Product Data | 5 Days | |||||||||||||||||||||||||
| 130 | [15870, 1.02, B] | 4 | 4 | after | ||||||||||||||||||||||
| Power Ventilators | NTP | |||||||||||||||||||||||||
| Product Data | 5 Days | |||||||||||||||||||||||||
| 131 | [15890, 1.02, A] | 4 | 4 | after | ||||||||||||||||||||||
| Ductwork | NTP | |||||||||||||||||||||||||
| Shop Drawings, layout | 5 Days | |||||||||||||||||||||||||
| 132 | [15890, 1.02, B] | 4 | 4 | after | ||||||||||||||||||||||
| Ductwork | NTP | |||||||||||||||||||||||||
| Product Data, Drawings | 5 Days | |||||||||||||||||||||||||
| 133 | [15900, 1.03, A] | 4 | 4 | 4 | after | |||||||||||||||||||||
| Energy Manag Cont System | NTP | |||||||||||||||||||||||||
| Data- Control Points | 5 Days | |||||||||||||||||||||||||
| 134 | [15900, 1.03, B] | 4 | after | |||||||||||||||||||||||
| Energy Manag Cont System | NTP | |||||||||||||||||||||||||
| Shop Drawings | 5 Days | |||||||||||||||||||||||||
| 135 | [15910, 1.02, A] | 4 | 4 | after | ||||||||||||||||||||||
| Ductwork, Accessories | NTP | |||||||||||||||||||||||||
| Product Data | 5 Days | |||||||||||||||||||||||||
| 136 | [15910, 1.02, B] | 4 | 4 | after | ||||||||||||||||||||||
| Ductwork Accessories | NTP | |||||||||||||||||||||||||
| Certification, UL Listing | 5 Days | |||||||||||||||||||||||||
| 137 | [15910, 1.02, C] | 4 | 4 | after | ||||||||||||||||||||||
| Ductwork, Accessories | NTP | |||||||||||||||||||||||||
| Product Data | 5 Days | |||||||||||||||||||||||||
| 138 | [15940, 1.02, A] | 4 | 4 | after | ||||||||||||||||||||||
| Air Outlets and Inlets | NTP | |||||||||||||||||||||||||
| Shop Drawings | 5 Days | |||||||||||||||||||||||||
| 139 | [15940, 1.02, B] | 4 | 4 | after | ||||||||||||||||||||||
| Air Outlets and Inlets | NTP | |||||||||||||||||||||||||
| Color Chart | 5 Days | |||||||||||||||||||||||||
| 140 | [15940, 1.02, C] | 4 | 4 | 4 | after | |||||||||||||||||||||
| Air Outlets and Inlets | NTP | |||||||||||||||||||||||||
| Data, Technician, Certification | 5 Days | |||||||||||||||||||||||||
| 141 | [15990, 1.02, A] | 4 | 4 | after | ||||||||||||||||||||||
| Test, Adjust, & Balance of Systems | NTP | |||||||||||||||||||||||||
| Reports | Date of | |||||||||||||||||||||||||
| 142 | [15990, 1.02, B] | 4 | 4 | Substantial | ||||||||||||||||||||||
| Test, Adjust, & Balance of Systems | Completion | |||||||||||||||||||||||||
| Record Drawings, Closeout | Date of | |||||||||||||||||||||||||
| 143 | [16010, 1.06, A] | 4 | 4 | Substantial | ||||||||||||||||||||||
| Basic Electrical Requirements | Completion | |||||||||||||||||||||||||
| O&M Manuals, Closeout | Date of | |||||||||||||||||||||||||
| 144 | [16010, 1.06, B] | 4 | 4 | Substantial | ||||||||||||||||||||||
| Basic Electrical Requirements | Completion | |||||||||||||||||||||||||
| Product Data | 5 Days | |||||||||||||||||||||||||
| 145 | [16110, 1.02, A] | 4 | 4 | after | ||||||||||||||||||||||
| Raceways | NTP | |||||||||||||||||||||||||
| Product Data | 5 Days | |||||||||||||||||||||||||
| 146 | [16117, 1.02, A] | 4 | 4 | after | ||||||||||||||||||||||
| Handholes | NTP | |||||||||||||||||||||||||
| Shop Drawings, Hanholes | 5 Days | |||||||||||||||||||||||||
| 147 | [16117, 1.02, B] | 4 | 4 | after | ||||||||||||||||||||||
| Handholes | NTP | |||||||||||||||||||||||||
| Shop Drawings, layout | 5 Days | |||||||||||||||||||||||||
| 148 | [16120, 1.02, A] | 4 | 4 | after | ||||||||||||||||||||||
| Wires & Cables (600V or Less) | NTP | |||||||||||||||||||||||||
| Product Data | 5 Days | |||||||||||||||||||||||||
| 149 | [16120, 1.02, B] | 4 | 4 | after | ||||||||||||||||||||||
| Wires & Cables (600V or Less) | NTP | |||||||||||||||||||||||||
| Product Data | 5 Days | |||||||||||||||||||||||||
| 150 | [16121, 1.02, A] | 4 | 4 | after | ||||||||||||||||||||||
| High Voltage Wires & Cables | NTP | |||||||||||||||||||||||||
| Product Data | 5 Days | |||||||||||||||||||||||||
| 151 | [16130, 1.02, A] | 4 | 4 | after | ||||||||||||||||||||||
| Boxes | NTP | |||||||||||||||||||||||||
| Shop Drawings, layout | 5 Days | |||||||||||||||||||||||||
| 152 | [16130, 1.02, B] | 4 | 4 | after | ||||||||||||||||||||||
| Boxes | NTP | |||||||||||||||||||||||||
| Product Data | 5 Days | |||||||||||||||||||||||||
| 153 | [16140, 1.02, A] | 4 | 4 | after | ||||||||||||||||||||||
| Wiring Devices | NTP | |||||||||||||||||||||||||
| Samples | 5 Days | |||||||||||||||||||||||||
| 154 | [16140, 1.02, B] | 1 | 1 | 1 | after | |||||||||||||||||||||
| Wiring Devices | NTP | |||||||||||||||||||||||||
| Product Data | 5 Days | |||||||||||||||||||||||||
| 155 | [16400, 1.02, A] | 4 | 4 | after | ||||||||||||||||||||||
| Service and Distribution | NTP | |||||||||||||||||||||||||
| Shop Drawings | 5 Days | |||||||||||||||||||||||||
| 156 | [16400, 1.02, B] | 4 | 4 | after | ||||||||||||||||||||||
| Service and Distribution | NTP | |||||||||||||||||||||||||
| Shop Drawings | 5 Days | |||||||||||||||||||||||||
| 157 | [16425, 1.02, A] | 4 | 4 | after | ||||||||||||||||||||||
| Switchboards | NTP | |||||||||||||||||||||||||
| Product Data | 5 Days | |||||||||||||||||||||||||
| 158 | [16425, 1.02, B] | 4 | 4 | after | ||||||||||||||||||||||
| Switchboards | NTP | |||||||||||||||||||||||||
| Product Data | 5 Days | |||||||||||||||||||||||||
| 159 | [16430, 1.02, A] | 4 | 4 | after | ||||||||||||||||||||||
| Metering | NTP | |||||||||||||||||||||||||
| Data - Wiring Diagrams | 5 Days | |||||||||||||||||||||||||
| 160 | [16430, 1.02, B] | 4 | 4 | after | ||||||||||||||||||||||
| Metering | NTP | |||||||||||||||||||||||||
| O&M Manuals | 5 Days | |||||||||||||||||||||||||
| 161 | [16430, 1.02, C] | 4 | 4 | after | ||||||||||||||||||||||
| Metering | NTP | |||||||||||||||||||||||||
| Shop Drawings, Disconnects | 5 Days | |||||||||||||||||||||||||
| 162 | [16440, 1.02, A] | 4 | 4 | after | ||||||||||||||||||||||
| Disconnect Switches | NTP | |||||||||||||||||||||||||
| Data | 5 Days | |||||||||||||||||||||||||
| 163 | [16440, 1.02, B] | 4 | 4 | after | ||||||||||||||||||||||
| Disconnect Switches | NTP | |||||||||||||||||||||||||
| Test Report, Ground | 5 Days | |||||||||||||||||||||||||
| 164 | [16450, 1.02, A] | 4 | 4 | after | ||||||||||||||||||||||
| Grounding | Test | |||||||||||||||||||||||||
| Shop Drawings, Transformers | 5 Days | |||||||||||||||||||||||||
| 165 | [16460, 1.02, A] | 4 | 4 | after | ||||||||||||||||||||||
| Transformers (Oil Filled) | NTP | |||||||||||||||||||||||||
| Product data | 5 Days | |||||||||||||||||||||||||
| 166 | [16460, 1.02, B] | 4 | 4 | after | ||||||||||||||||||||||
| Transformers (Oil Filled) | NTP | |||||||||||||||||||||||||
| Certificates | 5 Days | |||||||||||||||||||||||||
| 167 | [16460, 1.02, C] | 4 | 4 | after | ||||||||||||||||||||||
| Transformers (Oil Filled) | NTP | |||||||||||||||||||||||||
| Shop Drawings | 5 Days | |||||||||||||||||||||||||
| 168 | [16461, 1.02, A] | 4 | 4 | after | ||||||||||||||||||||||
| Transformers (Dry-Type) | NTP | |||||||||||||||||||||||||
| Product Data | 5 Days | |||||||||||||||||||||||||
| 169 | [16461, 1.02, B] | 4 | 4 | after | ||||||||||||||||||||||
| Transformers (Dry-Type) | NTP | |||||||||||||||||||||||||
| Certificates | 5 Days | |||||||||||||||||||||||||
| 170 | [16461, 1.02, C] | 4 | 4 | after | ||||||||||||||||||||||
| Transformers (Dry-Type) | NTP | |||||||||||||||||||||||||
| Product Data | 5 Days | |||||||||||||||||||||||||
| 171 | [16470, 1.02, A] | 4 | 4 | after | ||||||||||||||||||||||
| Panelboards | NTP | |||||||||||||||||||||||||
| Data | 5 Days | |||||||||||||||||||||||||
| 172 | [16470, 1.02, B] | 4 | 4 | after | ||||||||||||||||||||||
| Panelboards | NTP | |||||||||||||||||||||||||
| Shop Drawings (Fuses) | 5 Days | |||||||||||||||||||||||||
| 173 | [16475, 1.02, A] | 4 | 4 | after | ||||||||||||||||||||||
| Overcurrent Protective Devices | NTP | |||||||||||||||||||||||||
| Shop Drawings (Circuit Breakers) | 5 Days | |||||||||||||||||||||||||
| 174 | [16475, 1.02, B] | 4 | 4 | after | ||||||||||||||||||||||
| Overcurrent Protective Devices | NTP | |||||||||||||||||||||||||
| Shop Drawings | 5 Days | |||||||||||||||||||||||||
| 175 | [16482, 1.02, A] | 4 | 4 | after | ||||||||||||||||||||||
| Motor Starters | NTP | |||||||||||||||||||||||||
| Product Data | 5 Days | |||||||||||||||||||||||||
| 176 | [16482, 1.02, B] | 4 | 4 | after | ||||||||||||||||||||||
| Motor Starters | NTP | |||||||||||||||||||||||||
| O&M Manuals | Date of | |||||||||||||||||||||||||
| 177 | [16482, 1.02, C] | 4 | 4 | Substantial | ||||||||||||||||||||||
| Motor Starters | Completion | |||||||||||||||||||||||||
| Shop Drawings | 5 Days | |||||||||||||||||||||||||
| 178 | [16483, 1.02, A] | 4 | 4 | after | ||||||||||||||||||||||
| Variable Frequency Drives | NTP | |||||||||||||||||||||||||
| Product Data | 5 Days | |||||||||||||||||||||||||
| 179 | [16483, 1.02, B] | 4 | 4 | after | ||||||||||||||||||||||
| Variable Frequency Drives | NTP | |||||||||||||||||||||||||
| O&M Manuals | 5 Days | |||||||||||||||||||||||||
| 180 | [16483, 1.02, C] | 4 | 4 | after | ||||||||||||||||||||||
| Variable Frequency Drives | NTP | |||||||||||||||||||||||||
| Data - Wiring Diagrams | 5 Days | |||||||||||||||||||||||||
| 181 | [16490, 1.02, A] | 4 | 4 | after | ||||||||||||||||||||||
| Transient Voltage Surge Suppress | NTP | |||||||||||||||||||||||||
| Manufacturer's Data | 5 Days | |||||||||||||||||||||||||
| 182 | [16500, 1.02, A] | 4 | 4 | after | ||||||||||||||||||||||
| Lighting | NTP | |||||||||||||||||||||||||
| Shop Drawings - Fixtures | 5 Days | |||||||||||||||||||||||||
| 183 | [16500, 1.02, B] | 4 | 4 | after | ||||||||||||||||||||||
| Lighting | NTP | |||||||||||||||||||||||||
| Shop Drawings | 5 Days | |||||||||||||||||||||||||
| 184 | [16721, 1.02, A] | 4 | 4 | after | ||||||||||||||||||||||
| Fire Alarm & Detection system | NTP | |||||||||||||||||||||||||
| Product Data | 5 Days | |||||||||||||||||||||||||
| 185 | [16721, 1.02, B] | 4 | 4 | after | ||||||||||||||||||||||
| Fire Alarm & Detection system | NTP | |||||||||||||||||||||||||
| Certification | 5 Days | |||||||||||||||||||||||||
| 186 | [16721, 1.02, C] | 4 | 4 | after | ||||||||||||||||||||||
| Fire Alarm & Detection system | NTP | |||||||||||||||||||||||||
| Record Drawings, Closeout | Date of | |||||||||||||||||||||||||
| 187 | [16721, 1.02, D] | 4 | 4 | Substantial | ||||||||||||||||||||||
| Fire Alarm & Detection system | Completion | |||||||||||||||||||||||||
| Product Data | 5 Days | |||||||||||||||||||||||||
| 188 | [16741, 1.02, A] | 4 | 4 | after | ||||||||||||||||||||||
| Telephone System | NTP | |||||||||||||||||||||||||
| Record Drawings, Closeout | Date of | |||||||||||||||||||||||||
| 189 | [16741, 1.02, B] | 4 | 4 | Substantial | ||||||||||||||||||||||
| Telephone System | Completion | |||||||||||||||||||||||||
| Test Reports, as required | 5 Days | |||||||||||||||||||||||||
| 190 | [16950, 1.02, A] | 4 | 4 | after | ||||||||||||||||||||||
| Testing | Test | |||||||||||||||||||||||||
| Test Report, (Graphs) | 5 Days | |||||||||||||||||||||||||
| 191 | [16965, 1.02, A] | 4 | 4 | after | ||||||||||||||||||||||
| High Potential Testing | Test | |||||||||||||||||||||||||
| 192 | ||||||||||||||||||||||||||
| 193 | ||||||||||||||||||||||||||
| 194 | ||||||||||||||||||||||||||
| 195 | ||||||||||||||||||||||||||
| 196 | ||||||||||||||||||||||||||
| 197 | ||||||||||||||||||||||||||
| 198 | ||||||||||||||||||||||||||
| 199 | ||||||||||||||||||||||||||
| 200 | ||||||||||||||||||||||||||
| 201 | ||||||||||||||||||||||||||
| 202 | ||||||||||||||||||||||||||
| 203 | ||||||||||||||||||||||||||
| 204 |