AFLDBSEFORM66.xls

XLS spreadsheet 150 KB Posted

Attached to
Airfield Paving Federal contract opportunity
Solicitation number
FA4887-07-R-0012
Issued by
Department of the Air Force Air Education and Training Command

About this file

Attachment 5 AF Form 66

View the file

Other files for this federal contract opportunity

Other files attached to Airfield Paving, newest first.
File Type Posted
Q As.doc DOC document
ConformedSolicitation07R0012Amendment 4.doc DOC document
Amendment 4.doc DOC document
Conformed07R0012 7Aug07.doc DOC document
Amendment 3.doc DOC document
Amendment 2.doc DOC document
Amendment 1.doc DOC document
ConformedSolicitation07R0012.doc DOC document
07-R-0012AirfieldPavementIDIQ.doc DOC document
DavisBacon20Jul07.doc DOC document
AirfieldPavementSpecifications...doc DOC document
Attachment 4Drawings.zip ZIP file
PastPerformanceInformation.doc DOC document
BIDSCHEDULEAirfieldPavementsIDIQFY07.xls XLS spreadsheet
PASTPERFORMANCEQUESTIONNAIRE(2).doc DOC document
afi32-1042.pdf PDF
Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Spec Sort

PROJECT NUMBERPROJECT TITLESOLICITATION / CONTRACT NO.
2/22/07SCHEDULE OF MATERIAL SUBMITTALSNUEX 07-XXXXMAINTAIN AFLD PVMTS.FO2604
TO BE COMPLETED BY PROJECT ENGINEERTO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
LINE NO.ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALCERTIFICATIONOF COMPLIANCESHOP DRAWINGSSAMPLESCOLOR SELECTIONMANUFACUTER'SRECOMMENDATIONSMANUFACUTER'SWARRANTYCATALOG DATAOPERATINGINSTRUCTIONSSEE PARAGRAPHREFERENCEOTHERREQUIRED SUBMISSION DATEDATE RECEIVED IN CON-TRACTINGDATE TO CIVIL ENGINEER-INGRETURN SUSPENSE DATEFOLLOW-UPDATE CONTRACTOR NOTIFIEDCONTRAC-TOR RE- SUBMIT-TALFINAL APPROVALREMARKS
APPROVEDDISAPPROVED
Contract Closeout5 Days
101010, 1.54after
As Built DrawingsNTP
Preliminary Network5 Days
2[01310, 1.02, A, 1]4after
Construction Pregress ScheduleNTP
Network Analysis5 days
3[01310, 1.02, A, 2]4after
Construction Progress ScheduleNTP
Construction Progress5 Days
4[01310, 1.02, A, 3]4after
Construction Pregress ScheduleNTP
Network Analysis Software5 Days
5[01310, 1.02, A, 4]4after
Construction Progress ScheduleNTP
Final Inspection Request5 Days
6[01700, 1.03, A]4after
Contract CloseoutNTP
Utlity Outages5 Days
7[01800, 1.04, A]4after
Special ConditionsNTP
Certification5 Days
8[02231, 1.04, A]4After
Aggregate Base CourseNTP
Mix Design5 Days
9[02238, 1.04, A]4After
Port. Cement Stab. Base CourseNTP
Mix Design5 Days
10[02510, 1.04, A]4after
Asphalt Pavement Surf. TreatmentNTP
Mix Design5 days
11[02515, 1.03, A]4after
Hot Mix (HMA)Asphalt for AirfieldsNTP
Mix Design
12[02529, 1.04, A]4See Specs
Portland Cement Pvmt for Airfields
Mix Design /Tests
13[02543, 1.02 A]4See Specs
Coal Tar Sealent
Equip. / Surface Smoothness
14[02546, 1.02, A]4See Specs
Cold-Mill Bitimum
Proceedure5 days
15[02566, 1.02, A]4after
Reseal Joints In Rigid PavementNTP
Proceedure / Mix Design5 days
16[02572, 2.03, A]4after
Asphalt Slurry SealNTP
Proceedure5 days
17[02574, 2.01, A]4after
Preservitive SealNTP
Proceedure5 Days
18[02575, 2.03, A]4after
Hot Asphalt Rubber Chip SealNTP
Product Data5 Days
19[02577, 1.02, A]4after
Pavement Marking For AirfieldsNTP
Proceedure / Product Data5 days
20[02579, 2.01, A]4after
Crack Sealingsampling
Product Data5 days
21[03100, 1.02, C]4after
Concrete Form WorkNTP
Product Data5 days
22[03200, 1.02 A]4after
Concrete ReinforcementNTP
Product Data5 days
23[03250, 1.03, A]4after
Joint Seal & Reinf., Conc. Pvmts.NTP
Proceedure / Product Data5 days
24[03732, 1.04, A]4after
Concrete RepairNTP
4

&L&"Arial"&BAF Form 66, Computer Generated

Sub Date Sort

PROJECT NUMBERPROJECT TITLESOLICITATION / CONTRACT NO.
6 June 1997SCHEDULE OF MATERIAL SUBMITTALSNUEX94-3008CENTRAL CHIILER PLANT
TO BE COMPLETED BY PROJECT ENGINEERTO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
LINE NO.ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALCERTIFICATIONOF COMPLIANCESHOP DRAWINGSSAMPLESCOLOR SELECTIONMANUFACUTER'SRECOMMENDATIONSMANUFACUTER'SWARRANTYCATALOG DATAOPERATINGINSTRUCTIONSSEE PARAGRAPHREFERENCEOTHERREQUIRED SUBMISSION DATEDATE RECEIVED IN CON-TRACTINGDATE TO CIVIL ENGINEER-INGRETURN SUSPENSE DATEFOLLOW-UPDATE CONTRACTOR NOTIFIEDCONTRAC-TOR RE- SUBMIT-TALFINAL APPROVALREMARKS
APPROVEDDISAPPROVED
Safety Program5 Days
1[01070, 1.02, A]4after
Safety RequirementsNTP
Preliminary Network5 Days
2[01310, 1.02, A, 1]4after
Construction Pregress ScheduleNTP
Network Analysis5 days
3[01310, 1.02, A, 2]4after
Construction Progress ScheduleNTP
Construction Progress5 Days
4[01310, 1.02, A, 3]4after
Construction Pregress ScheduleNTP
Network Analysis Software5 Days
5[01310, 1.02, A, 4]4after
Construction Progress ScheduleNTP
Quality Control Plan5 Days
6[01450, 1.03, A, 1]4after
Contractor Quality ControlNTP
QC Manager Qualifications5 Days
7[01450, 1.03, A, 2]4after
Contractor Quality ControlNTP
Final Inspection requestDate of
8[01700, 1.03, A]4Substancial
Contract CloseoutCompletion
Utlity Outages
9[01800, 1.04, A]4See Specs
Special Conditions
Asbestos Certifications5 Days
10[02080, 1.06, A]44after
Asbestos AbatementNTP
Asbestos Licenses5 days
11[02080, 1.06, B]44after
Asbestos AbatementNTP
Notification of Asbestos Removal
12[02080, 1.06, C]4See Specs
Asbestos Abatement
Asbestos Inventory
13[02080, 1.06, D]4See Specs
Asbestos Abatement
Asbestos Removal Plan
14[02080, 1.06, E]4See Specs
Asbestos Abatement
Asbestos Safety Plan5 days
15[02080, 1.06, F]4after
Asbestos AbatementNTP
Asbestos Waste Disposal Plan5 days
16[02080, 1.06, G]4after
Asbestos AbatementNTP
Affidavid of Vegitation Control5 days
17[02252, 1.02, A]44after
Vegitation ControlNTP
Chemical Product Data5 Days
18[02281, 1.02, B]44after
Termite ControlNTP
Certification of Test5 Days
19[02675, 1.02, A]44after
Disinfection of Water SystemNTP
Bacteriological Report5 days
20[02675, 1.02, B]4after
Disinfection of Water Systemsampling
Disinfection Report5 days
21[02675, 1.02, C]4after
Disinfection of Water SystemNTP
Chain of Custody Records5 days
22[02675, 1.02, D]4after
Disinfection of Water SystemNTP
Data, catalog cut5 days
23[02698, 1.03, A]44after
Prefabricated U/G Dist SystemNTP
Shop Drawings5 days
24[02698, 1.03, B]44after
Prefabricated U/G Dist SystemNTP
Manufacturer's Certificate5 days
25[02698, 1.03, C]44after
Prefabricated U/G Dist SystemNTP
O & M Manuals5 days
26[02698, 1.03, D]44after
Prefabricated U/G Dist SystemNTP
Component Product Data5 days
27[02811, 1.02, B]44after
Landscape IrrigationNTP
Irrigation System Shop Drawings5 Days
28[02811, 1.02, C]44after
Landscape IrrigationNTP
As-Built Record DrawingsDate of
29[02811, 1.02, D]4Substantial
Landscape IrrigationCompletion
O&M ManualsDate of
30[02811, 1.02, E]44Substantial
Landscape IrrigationCompletion
Landscape Planting Shop Drawings5 Days
31[02900, 1.02, A]4after
LandscapingNTP
Certificates5 Days
32[02900, 1.02, B]4after
LandscapingNTP
Concrete Form Shop Drawings5 Days
33[03100, 1.02, B]44after
Concrete FormworkNTP
Product data5 Days
34[03100, 1.02, C]44after
Concrete FormworkNTP
Concrete Shop Drawings5 Days
35[03200, 1.02, B]44after
Concrete ReinforcementNTP
Mill Test Report5 Days
36[03200, 1.02, C]4after
Concrete ReinforcementNTP
Product data on Accessory Items]5 Days
37[03300, 1.02, B]44after
Cast-in-Place ConcreteNTP
Samples, Exp/Cont Joints5 Days
38[03300, 1.02, C]11after
Cast-in-Place ConcreteNTP
Record DocumentsDate of
39[03300, 1.02, D]4Substantial
Cast-in-Place ConcreteCompletion
Mix Designs, Mortar and Grout5 Days
40[04100, 1.02, B]4after
Mortar and Masonry GroutNTP
Samples, Mortar Channels5 Days
41[04100, 1.02, C]11after
Mortar and Masonry GroutNTP
Test Reports, as required5 days
42[04100, 1.02, D]4after
Mortar and Masonry GroutTest
Samples5 Days
43[04220, 1.02, B]11after
Concrete Unit masonryNTP
Certification, Certified Block Pgm5 Days
44[04220, 1.02, C]44after
Concrete Unit masonryNTP
Shop Drawings, Shop and Erection5 Days
45[05110, 1.03, B]44after
Structural SteelNTP
Methods of Erection5 Days
46[05110, 1.03, C]4after
Structural SteelNTP
Ceritifications5 Days
47[05110, 1.03, D]44after
Structural SteelNTP
Shop and Erection Drawings5 Days
48[05310, 1.03, B]44after
Steel Roof DeckNTP
Shop and Erection Drawings5 Days
49[05313, 1.02, B]44after
Steel Floor DeckNTP
Product Data5 Days
50[05400, 1.02, B]44after
Cold-Formed Metal FramingNTP
Shop Drawings5 Days
51[05400, 1.02, C]44after
Cold-Formed Metal FramingNTP
Shop Drawings5 Days
52[05500, 1.02, B]44after
Metal FabricationsNTP
Shop Drawings5 Days
53[05510, 1.02, B]44after
Metal StairsNTP
Shop Drawings5 Days
54[05520, 1.02, B]44after
Handrails and RailingsNTP
Shop Drawings5 Days
55[06100, 1.03, A]44after
Rough CarpentryNTP
Samples, rigid sheathing5 Days
56[06100, 1.03, B]11after
Rough CarpentryNTP
Product Data5 Days
57[06100, 1.03, C]44after
Rough CarpentryNTP
Product Data5 Days
58[07180, 1.02, B]44after
Water RepellentsNTP
Samples, Coating5 Days
59[07180, 1.02, C]11after
Water RepellentsNTP
Product Data5 Days
60[07200, 1.02, B]44after
InsulationNTP
Product Data5 Days
61[07270, 1.02, B]44after
FirestoppingNTP
Test Reports, as required5 Days
62[07270, 1.02, C]44after
FirestoppingNTP
Shop Drawings, Detail Drawings5 Days
63[07415, 1.04, A]44after
Metal Roofing and Siding, Fact ColorNTP
Samples5 Days
64[07415, 1.04, B]11after
Metal Roofing and Siding, Fact ColorNTP
Certificates of Compliance5 Days
65[07415, 1.04, C]44after
Metal Roofing and Siding, Fact ColorNTP
Warranty5 Days
66[07600, 1.02, A]44after
Flashing and Sheet MetalNTP
Product Data5 Days
67[07900, 1.02, B]44after
Joint SealersNTP
Shop Drawings5 Days
68[08110, 1.03, B]44after
Steel Doors and FramesNTP
Shop Drawings5 Days
69[08361, 1.02, B]44after
Insulated Sectional Overhead DoorsNTP
Product Data5 Days
70[08520, 1.03, B]44after
Aluminum WindowsNTP
Shop Drawings5 Days
71[08520, 1.03, C]44after
Aluminum WindowsNTP
Samples5 Days
72[08520, 1.03, D]11after
Aluminum WindowsNTP
Shop Drawings and Schedule5 Days
73[08712, 1.02, A]444after
Door HardwareNTP
Samples5 Days
74[08712, 1.02, B]14after
Door HardwareNTP
Manufacturer's Certificate5 Days
75[08712, 1.02, C]44after
Door HardwareNTP
O&M Manuals10 days
76[08712, 1.02, D]44Prior to Work
Door Hardware
Keying Schedule10 days
77[08712, 1.02, E]4Prior to Work
Door Hardware
Samples5 Days
78[08800, 1.03, B]11after
GlazingNTP
Product Data5 Days
79[09100, 1.02, A]44after
Metal Support SystemsNTP
Samples, Wall Texture5 Days
80[09250, 1.02, B]11after
Gypsum BoardNTP
Product Data5 Days
81[09310, 1.02, A]44after
Ceramic TileNTP
Samples, ceramic tile5 Days
82[09310, 1.02, B]11after
Ceramic TileNTP
Shop Drawings, Layout5 Days
83[09510, 1.02, B]44after
Acoustical CeilingsNTP
Samples, finish color5 Days
84[09510, 1.02, C]11after
Acoustical CeilingsNTP
Product Data5 Days
85[09650, 1.02, B]44after
Resilent FlooringNTP
Samples, Colors & Patterns5 Days
86[09650, 1.02, C]11after
Resilent FlooringNTP
Moisture Testing Results5 Days
87[09650, 1.02, D]44after
Resilent FlooringNTP
O&M ManualsDate of
88[09650, 1.02, E]4444Substantial
Resilent FlooringCompletion
Product Data5 Days
89[09900, 1.02, B]44after
PaintingNTP
Samples, colors5 Days
90[09900, 1.02, C]11after
PaintingNTP
Product Data5 Days
91[10520, 1.02, B]44after
Fire Protection SpecialtiesNTP
Shop Drawings, Brochures5 Days
92[10810, 1.02, A]444after
Toilet AccessoriesNTP
Product Data5 Days
93[15070, 1.02, A]44after
Condensate & Equip Drain SystemsNTP
Product Data5 Days
94[15080, 1.02, A]44after
Chilled & Condenser Water PipingNTP
Product Data5 Days
95[15150, 1.02, A]44after
Meters and GaugesNTP
Shop Drawings, Isolators5 Days
96[15240, 1.02, A]44after
Mech Sound, Vibration & SeismicNTP
Product Data5 Days
97[15240, 1.02, B]44after
Mech Sound, Vibration & SeismicNTP
Certification, Installation5 Days
98[15240, 1.02, C]44after
Mech Sound, Vibration & SeismicNTP
Product Data5 Days
99[15250, 1.02, A]44after
Mechanical InsulationNTP
Preliminary Shop Drawings5 Days
100[15330, 1.02, A]44after
Wet-Pipe Sprinkler SystemsNTP
Shop Drawings, Hydraulic CalcsDate of
101[15330, 1.02, B]44Substantial
Wet-Pipe Sprinkler SystemsCompletion
Product Data5 Days
102[15330, 1.02, C]44after
Wet-Pipe Sprinkler SystemsNTP
Manufacturer's Certificate5 Days
103[15330, 1.02, E]44after
Wet-Pipe Sprinkler SystemsNTP
Product Data5 Days
104[15410, 1.02, A]44after
Plumbing PipingNTP
Product Data5 Days
105[15430, 1.02, A]44after
Plumbing SpecialtiesNTP
Product Data5 Days
106[15440, 1.02, A]44after
Plumbing Fixtures & TrimNTP
Shop Drawings5 Days
107[15451, 1.02, A]44after
Water HeatersNTP
Product Data5 Days
108[15451, 1.02, B]44after
Water HeatersNTP
Product Data5 Days
109[15481, 1.02, A]44after
Fuel Gas SystemsNTP
Product Data5 Days
110[15500, 1.02, A]44after
Circulating PumpsNTP
Installation Instructions5 Days
111[15500, 1.02, B]44after
Circulating PumpsNTP
Product Data5 Days
112[15670, 1.02, A]44after
Cooling TowersNTP
Installation Instructions5 Days
113[15670, 1.02, B]44after
Cooling TowersNTP
Product Data5 Days
114[15682, 1.04, A]44after
Direct Fired, Gas Absop ChillersNTP
Installation Instructions5 Days
115[15682, 1.04, B]44after
Direct Fired, Gas Absop ChillersNTP
Data5 Days
116[15682, 1.04, C]44after
Direct Fired, Gas Absop ChillersNTP
Product Data5 Days
117[15685, 1.03, A]44after
Rotary Screw ChillerNTP
Installation Instructions5 Days
118[15685, 1.03, B]44after
Rotary Screw ChillerNTP
Data5 Days
119[15685, 1.03, C]44after
Rotary Screw ChillerNTP
Product Data5 Days
120[15712, 1.02, A]44after
Plate & Frame Heat ExchangersNTP
Installation Instructions5 Days
121[15712, 1.02, B]44after
Plate & Frame Heat ExchangersNTP
Shop Drawings5 Days
122[15815, 1.02, A]44after
Evaporative CoolersNTP
Product Data5 Days
123[15815, 1.02, B]44after
Evaporative CoolersNTP
Shop Drawings5 Days
124[15816, 1.02, A]44after
Gas Unit HeatersNTP
Product Data5 Days
125[15816, 1.02, B]44after
Gas Unit HeatersNTP
Product Data5 Days
126[15855, 1.02, A]44after
Heat Pump - Split SystemNTP
Shop Drawings5 Days
127[15855, 1.02, B]44after
Heat Pump - Split SystemNTP
Certificates, Manufacturer5 Days
128[15855, 1.02, C]44after
Heat Pump - Split SystemNTP
Shop Drawings, dimensions5 Days
129[15870, 1.02, A]44after
Power VentilatorsNTP
Product Data5 Days
130[15870, 1.02, B]44after
Power VentilatorsNTP
Product Data5 Days
131[15890, 1.02, A]44after
DuctworkNTP
Shop Drawings, layout5 Days
132[15890, 1.02, B]44after
DuctworkNTP
Product Data, Drawings5 Days
133[15900, 1.03, A]444after
Energy Manag Cont SystemNTP
Data- Control Points5 Days
134[15900, 1.03, B]4after
Energy Manag Cont SystemNTP
Shop Drawings5 Days
135[15910, 1.02, A]44after
Ductwork, AccessoriesNTP
Product Data5 Days
136[15910, 1.02, B]44after
Ductwork AccessoriesNTP
Certification, UL Listing5 Days
137[15910, 1.02, C]44after
Ductwork, AccessoriesNTP
Product Data5 Days
138[15940, 1.02, A]44after
Air Outlets and InletsNTP
Shop Drawings5 Days
139[15940, 1.02, B]44after
Air Outlets and InletsNTP
Color Chart5 Days
140[15940, 1.02, C]444after
Air Outlets and InletsNTP
Data, Technician, Certification5 Days
141[15990, 1.02, A]44after
Test, Adjust, & Balance of SystemsNTP
ReportsDate of
142[15990, 1.02, B]44Substantial
Test, Adjust, & Balance of SystemsCompletion
Record Drawings, CloseoutDate of
143[16010, 1.06, A]44Substantial
Basic Electrical RequirementsCompletion
O&M Manuals, CloseoutDate of
144[16010, 1.06, B]44Substantial
Basic Electrical RequirementsCompletion
Product Data5 Days
145[16110, 1.02, A]44after
RacewaysNTP
Product Data5 Days
146[16117, 1.02, A]44after
HandholesNTP
Shop Drawings, Hanholes5 Days
147[16117, 1.02, B]44after
HandholesNTP
Shop Drawings, layout5 Days
148[16120, 1.02, A]44after
Wires & Cables (600V or Less)NTP
Product Data5 Days
149[16120, 1.02, B]44after
Wires & Cables (600V or Less)NTP
Product Data5 Days
150[16121, 1.02, A]44after
High Voltage Wires & CablesNTP
Product Data5 Days
151[16130, 1.02, A]44after
BoxesNTP
Shop Drawings, layout5 Days
152[16130, 1.02, B]44after
BoxesNTP
Product Data5 Days
153[16140, 1.02, A]44after
Wiring DevicesNTP
Samples5 Days
154[16140, 1.02, B]111after
Wiring DevicesNTP
Product Data5 Days
155[16400, 1.02, A]44after
Service and DistributionNTP
Shop Drawings5 Days
156[16400, 1.02, B]44after
Service and DistributionNTP
Shop Drawings5 Days
157[16425, 1.02, A]44after
SwitchboardsNTP
Product Data5 Days
158[16425, 1.02, B]44after
SwitchboardsNTP
Product Data5 Days
159[16430, 1.02, A]44after
MeteringNTP
Data - Wiring Diagrams5 Days
160[16430, 1.02, B]44after
MeteringNTP
O&M Manuals5 Days
161[16430, 1.02, C]44after
MeteringNTP
Shop Drawings, Disconnects5 Days
162[16440, 1.02, A]44after
Disconnect SwitchesNTP
Data5 Days
163[16440, 1.02, B]44after
Disconnect SwitchesNTP
Test Report, Ground5 Days
164[16450, 1.02, A]44after
GroundingTest
Shop Drawings, Transformers5 Days
165[16460, 1.02, A]44after
Transformers (Oil Filled)NTP
Product data5 Days
166[16460, 1.02, B]44after
Transformers (Oil Filled)NTP
Certificates5 Days
167[16460, 1.02, C]44after
Transformers (Oil Filled)NTP
Shop Drawings5 Days
168[16461, 1.02, A]44after
Transformers (Dry-Type)NTP
Product Data5 Days
169[16461, 1.02, B]44after
Transformers (Dry-Type)NTP
Certificates5 Days
170[16461, 1.02, C]44after
Transformers (Dry-Type)NTP
Product Data5 Days
171[16470, 1.02, A]44after
PanelboardsNTP
Data5 Days
172[16470, 1.02, B]44after
PanelboardsNTP
Shop Drawings (Fuses)5 Days
173[16475, 1.02, A]44after
Overcurrent Protective DevicesNTP
Shop Drawings (Circuit Breakers)5 Days
174[16475, 1.02, B]44after
Overcurrent Protective DevicesNTP
Shop Drawings5 Days
175[16482, 1.02, A]44after
Motor StartersNTP
Product Data5 Days
176[16482, 1.02, B]44after
Motor StartersNTP
O&M ManualsDate of
177[16482, 1.02, C]44Substantial
Motor StartersCompletion
Shop Drawings5 Days
178[16483, 1.02, A]44after
Variable Frequency DrivesNTP
Product Data5 Days
179[16483, 1.02, B]44after
Variable Frequency DrivesNTP
O&M Manuals5 Days
180[16483, 1.02, C]44after
Variable Frequency DrivesNTP
Data - Wiring Diagrams5 Days
181[16490, 1.02, A]44after
Transient Voltage Surge SuppressNTP
Manufacturer's Data5 Days
182[16500, 1.02, A]44after
LightingNTP
Shop Drawings - Fixtures5 Days
183[16500, 1.02, B]44after
LightingNTP
Shop Drawings5 Days
184[16721, 1.02, A]44after
Fire Alarm & Detection systemNTP
Product Data5 Days
185[16721, 1.02, B]44after
Fire Alarm & Detection systemNTP
Certification5 Days
186[16721, 1.02, C]44after
Fire Alarm & Detection systemNTP
Record Drawings, CloseoutDate of
187[16721, 1.02, D]44Substantial
Fire Alarm & Detection systemCompletion
Product Data5 Days
188[16741, 1.02, A]44after
Telephone SystemNTP
Record Drawings, CloseoutDate of
189[16741, 1.02, B]44Substantial
Telephone SystemCompletion
Test Reports, as required5 Days
190[16950, 1.02, A]44after
TestingTest
Test Report, (Graphs)5 Days
191[16965, 1.02, A]44after
High Potential TestingTest
192
193
194
195
196
197
198
199
200
201
202
203
204

&L&"Arial"&BAF Form 66, Computer Generated

File details come from the government source that posted it. Updated .