AirfieldPavementSpecifications...doc

DOC document 1 MB Posted

Attached to
Airfield Paving Federal contract opportunity
Solicitation number
FA4887-07-R-0012
Issued by
Department of the Air Force Air Education and Training Command

About this file

Attachment 2 Specifications

View the file

Other files for this federal contract opportunity

Other files attached to Airfield Paving, newest first.
File Type Posted
Q As.doc DOC document
ConformedSolicitation07R0012Amendment 4.doc DOC document
Amendment 4.doc DOC document
Amendment 3.doc DOC document
Conformed07R0012 7Aug07.doc DOC document
Amendment 2.doc DOC document
Amendment 1.doc DOC document
ConformedSolicitation07R0012.doc DOC document
afi32-1042.pdf PDF
Attachment 4Drawings.zip ZIP file
PastPerformanceInformation.doc DOC document
BIDSCHEDULEAirfieldPavementsIDIQFY07.xls XLS spreadsheet
PASTPERFORMANCEQUESTIONNAIRE(2).doc DOC document
07-R-0012AirfieldPavementIDIQ.doc DOC document
DavisBacon20Jul07.doc DOC document
AFLDBSEFORM66.xls XLS spreadsheet
Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SPECIFICATIONS FOR

PROJECT NO. NUEX 07-0500

INDEFINITE DELIVERY, INDEFINITE QUANTITIES

(IDIQ)

AIRFIELD PAVEMENT PROJECT

AT

LUKE AIR FORCE BASE, ARIZONA

23 Feb 2007

TABLE OF CONTENTS

Section

Title

GC

DIVISION 0- GENERAL CONDITIONS

DIVISION 1- GENERAL REQUIREMENTS

01010 Summary of the Work

01060 Regulatory Requirements

01070 Safety Requirements

01080 Fire Protection

01090 Reference Standards

01300 Submittals

01310 Construction Progress Management Schedule

01400 Quality Control

01450 Contractor Quality Control

01500 Construction Facilities & Temporary Controls

01570 Traffic Regulation

01600 Material and Equipment

01700 Contract Closeout

01800 Special Conditions

DIVISION 2- SITEWORK

02050 Demolition and Removal

02200 Earthwork

02221 Excavating, Trenching and Backfill

02223 Excavation & preparation of sub-grade for airfields

02231 Aggregate Base Course

02238 Portland Cement Stabilized Base Course

02510 Asphalt Concrete Pavement Surface Treatment

02515 Asphalt Concrete Pavement For Airfields

02529 Portland Cement Concrete for Airfields

02542 Pavement Reinforcing Fabric

02543 Coal Tar Seal Coat With Un-vulcanized Rubber

02546 Cold-Milling of Bituminous Pavement

02566 Sealing of Joints in Rigid Pavements

02572 Asphalt Slurry Seal Coat

02574 Preservative Seal for Asphalt Concrete

02575 Hot Asphalt Rubber Chip Seal

02577 Pavement Markings, Airfield

02579 Crack Sealing

DIVISION 3 CONCRETE

03100 Concrete Form Work

03200 Concrete Reinforcement

03250 Joint Reinforcement for Concrete Pavement

03732 Concrete Repair

TC-1

SECTION GC

GENERAL CONDITIONS

PART 1

GENERAL

1.01

DEFINITIONS:

A.

C.O. - Where the term “Contracting Officer” or “C.O.” appears in the specifications, it shall be understood to mean “Contracting Officer or his/her Authorized Representative”.

B.

USER - Where the term “USER” appears in the specification, it shall be understood to mean the occupant of the building or area of the contract. All changes, deviations, or deletions Shall be made by the Contracting Officer or his/her Authorized Representative NOT the USER.

1.02

EXECUTION, CORRELATION AND INTENT:

A.

In cases of discrepancy concerning quality and application of materials and non‑technical requirements over materials, the Specifications shall take precedence over the Drawings.

B.

Work shall be executed as per the Contract Documents. No changes shall be made therein without first having received written permission from the C.O.

C.

If the Contractor observes any errors, discrepancies or omissions in the Contract Documents, he shall promptly notify the C.O. requesting clarification. If the Contractor proceeds with work affected by such errors, discrepancies or omissions, without having received such clarification, he does so at his own risk. Any adjustments involving such circumstances made by the Contractor, prior to approval by the C.O., shall be at the Contractor’s risk and the settlement of any complications or disputes arising there from shall be at the Contractor’s sole expense.

D.

All work and material shall be the best of the respective kinds specified or indicated. Should any workmanship or materials be required which are not directly or indirectly called for in the Specifications and/or shown on the Drawings but which are necessary for proper fulfillment of the obvious intent thereof, said workmanship or materials shall be the same or similar parts that are detailed, indicated or specified, and the Contractor shall understand the same to be implied and provide for it in his tender as fully as if it were particularly described or delineated.

GC-1

1.03

LABOR AND MATERIALS:

A.

When requested by the C.O., the Contractor shall deliver to the C.O., prior to final acceptance of the work as a whole, signed certificates from suppliers of materials and manufactured items stating that such items conform to the Contract Documents.

B.

The Contractor, immediately upon Notice to Proceed (or where shop drawings, samples, etc., are required, immediately upon receipt of approval thereof) shall place orders for all materials, work fabrication, and/or equipment to be employed by him in that portion of the work contracted for. The Contractor shall keep all materials, work fabrications and/or equipment specified and to advise the C.O. promptly, in writing, of all orders placed and of such materials, work fabrications and/or equipment which may not be available for the purposes of the Contract.

C.

Mechanics whose work is unsatisfactory to the C.O. to be careless, incompetent, unskilled or otherwise objectionable shall be dismissed from work under the Contract upon written notice from C.O.

1.04

SHOP DRAWINGS, PRODUCT DATA, SAMPLES AND COLOR BOARDS:

A.

Submission of Shop Drawings, Samples and Color Boards to the C.O. is required of only those items specifically mentioned in the Specification Sections. If Contractor submits Shop Drawings for items other than the above the C.O. will not be obliged to review them. Contractor shall be responsible for the procuring of Shop Drawings for his own use as he may require for the progress of the Work.

B.

The term “Shop Drawings” as used herein also includes but is not limited to fabrication, erection, layout and setting drawings, manufacturer’s standard drawings, descriptive literature, catalogs, brochures, performance and test data, wiring and control diagrams, all other drawings and descriptive data pertaining to materials, equipment, piping, duct and conduit systems and methods of construction as may be required to show that the materials equipment or systems and the positions and layout of each conform to the Contract requirements. As used herein the term “manufactured” applies to standard units usually mass produced and “fabricated” means items specifically assembled or made out of selected materials to meet individual design requirements. Shop Drawings shall establish the actual detail of all manufactured or fabricated items; indicate proper relation to adjoining Work; amplify design details of mechanical and electrical equipment in proper relation to physical spaces in the structure; and incorporate minor changes of design or construction to suit actual condition.

GC-2

C.

Samples: Following Contractor’s review and approval, he shall submit to the C.O. samples of all materials in quantities and sizes determined by the C.O. If a sample is rejected, one sample noted so will be returned to the Contractor. If a sample is marked “Approved Except As Noted”, one sample so noted will be returned. Corrected samples shall be resubmitted for approval as per the original submittal.

D.

Color Boards: Following Contractor’s review and approval, he shall submit to the C.O. Color Boards consisting of all interior and exterior finish material samples, a finish schedule, floor plan, and interior elevations if needed to explain finishes. Consolidated Color Boards should be submitted within 30 days of Notice To Proceed. Piecemeal submittals are not acceptable. All Color Boards should be submitted in 8 ½” by 11” card stock in a three‑ring binder. Contractor must certify availability of items at this time. Color Boards shall be submitted in accordance with Section 1300 ‑ Submittals.

E.

Brochures: Following Contractor’s review and approval, he shall submit to the C.O. four (4) copies of all manufacturer’s catalogs or brochures as required by the C.O. If a brochure is stamped “Approved Except As Noted”, one (1) copy will be returned. If stamped “Rejected as Noted”, one (1) marked copy will be returned. Corrected copies shall be resubmitted for approval as per the original submittal.

F.

Equipment Lists: Following Contractor’s review and approval, he shall submit to the C.O. four (4) complete lists of all major items of mechanical, plumbing, and electrical equipment and materials, within fifteen (15) calendar days after award of contract. Submit all items at one time in a neat and orderly manner. Partial lists will not be acceptable. Submittals shall include the manufacturer’s specifications weights space requirements, physical dimensions, ratings of all equipment and supplemental information requested by the C.O. Performance curves for all pumps and fans shall be furnished. Where a submittal sheet described items in addition to that item being submitted, the submitted item shall be clearly marked on the sheet and superfluous information shall be crossed out.

G.

Manufacturer’s Instructions: Where any item or work is required by Specification to be furnished, installed or performed in accordance with a specified product manufacturer’s instructions, Contractor shall procure and distribute the necessary copies as specified on the Schedule of Material Submittal to the C.O.

1.05

CUTTING AND PATCHING OF WORK:

A. In all cases exercise extreme care in cutting operations, and perform such operations under adequate supervision by competent mechanics skilled in the applicable trade. Openings shall be neatly cut and shall be kept as small as possible to avoid unnecessary damage. Careless and/or avoidable cutting damage, etc., will not be tolerated, and the Contractor will be held responsible for such avoidable or willful damage.

GC-3

B.

All replacing, patching and repairing of all materials and surfaces cut or damaged in the execution of the Work shall be performed by experienced mechanics of the several traders involved. Such replacing, repairing or patching shall be done with the applicable materials, in such a manner that all surfaces so replaced, etc., will, upon completion of the Work, match the surrounding similar surfaces.

1.06

SCAFFOLD, STAGING, PROTECTION, ETC:

A.

The Work under each Section of these Specifications shall include providing, installing, and maintaining all scaffold, staging, trestles, and planking necessary for the work under each Section in strict conformity with all applicable laws and ordinances, and maintenance of same so as not to interfere with or obstruct the work of other trades.

B.

All Scaffolding shall comply with OSHA Safety and Health Standards (29 CFR 1910), paragraph 1910.28.

C.

Additionally, the work under each section of these Specifications shall include providing all forms of protection necessary to preserve the work of other trades free from damage.

D. These provisions shall be considered as though repeated under each separate Section of these Specifications.

1.07

SPECIFICATIONS:

A.

In the preparation of these Specifications, an effort has been made to segregate the various branches of the Work under headings by trades. This is done only for convenience and shall not relieve the Contractor of the responsibility of furnishing each item indicated or specified whether properly segregated or not.

B.

Specification arrangement is in accordance with the “Construction Specifications Institute (CSI), Manual of Practice, Specification Writing Techniques, Chapter one, Section Format Outline.”

C.

No responsibility will be assumed by the Government or the C.O. for omissions or duplications by the Contractor in the completion of the Contract due to any alleged error in the arrangement of the material in these Specifications nor shall any such segregation or work and materials operate to make the C.O. an arbiter in defining limits to the agreements between the Contractor and his subcontractors or suppliers.

D.

The misplacement, addition or omission of any letter, word or punctuation mark shall in no way damage the true spirit, intent or meaning of these Specifications.

E.

The words “shown”, “indicated”, “noted”, “scheduled” or words of that effect shall be understood to mean that reference is made to the Drawings accompanying these Specifications.

GC-4

F.

Where reference herein is made to colors or finishes “as selected”, the reference is to the C.O.

1.08

APPROVED APPLICATORS:

A.

Where specific instructions in these Specifications require that a particular product and/or materials be installed and/ or applied by an “approved applicator” of the manufacturer, it shall be the Contractor’s responsibility to insure that any subcontractors used for such work be approved applicators.

1.09

WATERTIGHT ‑ WEATHERTIGHT:

A.

Anything in the Contract Drawings notwithstanding, the Contractor accepts the responsibility of construction of a watertight, weather tight project.

1.10

DELIVERY AND STRORAGE OF MATERIALS:

A.

Deliver all manufactured materials in the original packages, containers or bundles (with the seals unbroken) bearing the name or identification mark of the manufacturer.

B.

Deliver fabrication in as large assemblies as practicable and where specified to be shop‑primed or shop‑finished; they shall be packaged or crated as required to preserve such priming or finish intact and free from abrasion.

C.

Store all materials in such manner as necessary to properly protect same from damage, as materials or equipment damage by handling weather, dirt or from any other cause will not be acceptable.

D.

Store materials so as to cause no obstructions, stored off sidewalks, roadways, and underground services. The Contractor shall be responsible for protecting all material and equipment furnished under the Contract.

1.11

WORKMANSHIP:

A.

Where not more specifically described in any of the various Sections of these Specifications, workmanship shall conform to all of the methods and operations of best standards and accepted practices of the trade or trades involved, and shall include all items of fabrication, construction, or installation regularly furnished or required for completion (including any finish), and for successful operation as intended.

B.

All work shall be executed by mechanics skilled in their respective lines of work.

C.

When completed, all parts shall have been durably and substantially built and shall present a neat, workmanlike appearance.

GC-5

1.12

EARTH MOVING PERMIT

A.

Contractor shall apply for and obtain an Earth Moving Permit from:

Maricopa County Department of Health services

Bureau of Air Pollution Control

P.O. Box 2111

1845 East Roosevelt

Phoenix, Arizona 85001.

Contractor shall pay for all fees for Earth Moving Permit and Application.

C.

Permit is required for all Earth Moving, Soil Disturbance, and Dust Generation.

1.13 EXCAVATION

A. Contractor shall apply for and obtain a Government Excavation Permit ( AF Form 103, Base Civil Engineer Work Clearance Request) prior to any excavation.

B. There is no charge for the permit.

1.14

MILITARY MISSION

A. Luke AFB has a military mission and has restricted areas. DO NOT cross any red lines.

B. Training exercises are periodically conducted and include gate closures, vehicle searches, and identification verifications. The exercises are required for the military mission. Please cooperate during these exercises.

C. High-ranking officers, foreign dignitaries, or DOD employees may approach you. Only the Contracting Officer can make changes to the contract.

1.15

GOVERNMENT INSPECTION

A. The Government is not obligated to inspect a Contractor’s work or to protect a contractor from the consequences of such work.

B. Government inspection is a general examination of the Contractor’s conduct and work is solely for the purpose of the Government.

C. Government inspection is not to be construed as conclusive.

GC-6

D. Information that may be offered to the Contractor does not change the Contract. Only the Contracting Officer can change the Contract.

1.16

CONTRACTOR INSPECTION

A. Contractor inspection is a careful investigation of all work to assure that it conforms to the Contract, and to detect variances and to act to correct them in time to prevent reworking of the Contract.

B. This includes detailed, skillful examination and testing with immediate comparison to the requirements of the Contract.

C. On discovery of a variance the Contractor shall immediately institute corrective action to eliminate the variance and to ensure that all future work conforms to the requirements of the Contract.

END GENERAL CONDITIONS

GC-7

DIVISION 1 – GENERAL REQUIREMENTS

SECTION 01010 - SUMMARY OF WORK

PART 1

GENERAL

1.01

REQUIREMENTS INCLUDED:

A.

Definitions

B.

Work covered by contract documents

C.

Use of premises.

D.

Record drawings

1.02

DEFINITIONS:

A.

Any reference throughout this specification to “Architect ‑Engineer” should be understood as a reference to “Contracting Officer.”

B.

Any reference throughout this specification to “Owner” should be understood as a reference to “The Government.”

C.

Payment provision contained in any portion of the referenced specifications and standards are to be disregarded.

1.03

WORK COVERED BY CONTRACT DOCUMENTS:

A.

The following is a summary of work for Project No. NUEX 07-0500 located at Luke AFB and Gila Bend AFAF, Arizona. The project shall include but is not limited to:

1. All Airfield pavement maintenance, replacement and restoration items included in the bidding documents when defined in the specific Delivery Order Document.

C. The above description of work is for the purpose of general information only and is not intended to include and describe every feature or item of work or to define the scope of work.

01010-1 1.04

UTILITIES:

A. Water, gas, and electricity will be furnished to the Contractor by the government from the Government’s existing system outlets.

01010-2

SECTION 01060

REGULATORY REQUIREMENTS

PART 1

GENERAL

1.01

INDUSTRY STANDARDS

A.

The latest editions of the following codes shall apply to this work:

1. Uniform Building Code

2. Uniform Mechanical Code.

3. Uniform Plumbing Code.

4. National Electric Code

5. National Fire Protection Association.

1.02

U.S. GOVERNMENT AGENCY PUBLICATIONS

A.

US GOVERNMENT AGENCY PUBLICATIONS: Application for copies should be addressed to the Superintendent of Documents, Government Printing Office, Washington, DC 20402.

1. MIL-HDBK-1190, (MILITARY HANDBOOK 1190), Facility Planning and Design, Part II, Technical Guidance, September 1, 1987

2. MIL-HDBK-1191, (MILITARY HANDBOOK 1191), DoD Medical and Dental Treatment Facilities Design and Construction Criteria, October 15, 1991.

3. OSHA, Occupational Safety and Health Act Requirements.

4. Uniform Federal Accessibility Standards (UFAS).

B.

AIR FORCE PUBLICATIONS: Application for copies should be addressed to the Superintendent of Documents, Government Printing Office, Washington, DC 20402.

1. AFI 32-1021, Planning and Programming of Facility Construction Projects.

2. AFI 32-1023, Design and Construction Standards and Execution of Facility Construction Projects.

3. Air Force Occupational Safety and Health Requirements.

1.03

REFERENCE DOCUMENTS

01060-1

A.

Code of Federal Regulations

1. 29 CFR 1910, “Occupational Safety and Health Administration General Industry Standards”.

2. 29 CFR 1910.134, “Respiratory Protection”.

3. 29 CFR 1910.1000, “Air Contaminant ‑ Permissible Exposure Limits”.

4. 29 CFR 1910.1020, “Employee Access to Exposure and Medical Records”.

5. 20 CFR 1926, “Occupational Safety and Health Administration Construction Industry Standards”.

6. 29 CFR 1926.59, “Hazard Communication”.

7. 29 CFR 1926.62, “Lead Exposure in Construction; Interim Final Rule”.

8. 40 CFR 261, “Identification and Listing of Hazardous Waste”.

9. 40 CFR 262, “Standards Applicable to Generators of Hazardous Waste”.

10.40 CFR 263, “Standards Applicable to Transporters of Hazardous Waste”.

11.40 CFR 264, “Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities”.

12.40 CFR, “Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities”.

13.40 CFR 268, “Land Disposal Restrictions”.

14.40 CFR 300, “National Oil and Hazardous Substances Pollution Contingency Plan”.

15.40 CFR 302, “Designation, Reportable Quantities, and Notification”.

16.40 CFR 50, Appendix G, “Reference Method for the Determination of Lead in Suspected Particulate Matter Collected from Ambient Air”

B.

National Institute for Occupational Safety and Health

1. NIOSH Method 7082, “Lead”.

C.

American Conference of Governmental Industrial Hygienists Threshold Limit Values for Chemical Substances and Physical Agents and Biological Exposure Indices:

1. Heat Stress Guidelines

D.

EPA (Environmental Protection Agency) Publications:

1. SW‑846, Test Methods for Evaluating Solid Waste ‑ Physical/ Chemical Methods

2. EPA Method 3050, “Acid Digestion of Sediments, Sludges, and Soils”.

E.

Maricopa County Air Pollution Control Regulations

1. Rule 200, “Permit Requirements”.

2. Rule 312, “Abrasive Blasting”.

F.

National Institute of Building Sciences (NIBS) Guidelines.

1.04

MARICOPA COUNTY REQUIREMENTS

A.

Maricopa County Department of Health services, Bureau of Air Pollution Control

B. Maricopa Association of Governments

01060-2

PART 2

PRODUCTS NOT USED

PART 3

EXECUTION NOT USED

END OF SECTION

01060-3

SECTION 01070

SAFETY REQUIREMENTS

PART I

GENERAL

1.01 GENERAL:

A.

This Section specifies the health and safety requirements to be enforced during the performance of the Work specified herein.

B.

Refer to Section 01080 for Fire Prevention.

1.02

SUBMITTALS

A.

Safety Program: The Contractor shall submit a Safety Program in accordance with paragraph 1.07.

1.03

RESPONSIBILITY:

A.

The Base Ground Safety Officer or his representative will attend preconstruction conferences to brief contractors on pertinent safety regulations and to provide guidance for safe operations during contract performance. Local safety guidance will be furnished to the Contractor for briefing his personnel.

B.

It is the responsibility of any person who discovers a safety violation to report it immediately.

C.

The Contractor shall perform whatever work is necessary for safety and shall be solely and completely responsible for conditions of the job site, including care and safety of all property and safety of all persons whether or not employed by the Contractor during the Contract Period.

1.

This requirement shall apply continuously and not be limited to normal working hours and shall apply to all activities both directly and indirectly associated with all work covered by the Contract.

2.

These requirements do not supersede, but are in addition to any federal, OSHA, state, or local regulations.

3.

If a conflict occurs between these requirements and current regulations, the more stringent shall apply.

D.

The Contractor shall at all times provide proper facilities for safe access to the Work by authorized government officials.

E.

It shall be the responsibility of the Contractor to be familiar with the required health and safety regulations in the performance of this work.

E. It is the Contractor’s responsibility to ensure that:

01070-1 is available for Contractor personnel and is properly maintained.

2.

Use of personal protective equipment and clothing by personnel entering the site is enforced.

3.

Communication with all Contractor Personnel, the Contracting Officer, and other personnel regarding safety matters is maintained.

4.

Corrective actions are implemented immediately in the event of an emergency or unsafe conditions.

1.04

APPLICABLE PUBLICATIONS:

A.

Occupational Safety and Health Guidance Manual for Hazardous Waste Site Activities, U.S. Department of Health and Human Services, October 1985

B.

Environmental Protection Agency (EPA), Standard Operating Safety Guidelines, Office of Emergency and Remedial Response, Hazardous Response Support Division, November 1985, C.

American National Standards Institute (ANSI), American National Standard Practices for Respiratory Protection, 1980.

D.

U.S. Army Corps of Engineers Safety and Health Requirements Manual, EM

385—1—1.

E.

The Arizona Occupational Safety and Health Act of 1972, Arizona Revized Statutes, Title 23, Chapter 2, Article 10.

F.

29 CFR 1910 and 29 CFR 1926, G.

All Luke Air Force Base and State of Arizona Traffic Laws and Regulations.

1.05

EMERGENCY AND FIRST AID REQUIREMENTS

The Contractor shall prearrange for emergency medical care services at a nearby medical facility and establish emergency routes.

The Contractor shall establish communication links with health and emergency services to inform them of any emergency situations that may arise.

C.

In the event of any emergency associated with or resulting from Work at this site, the Contractor shall without delay:

1.

Cease Work activity on the site

2.

Take diligent action to remove or otherwise minimize the cause of the emergency

3.

Render full assistance to Local authorities to remedy any impact on local residents or property.

4.

Alert the Contracting Officer and Government.

5.

Institute whatever measures are necessary to prevent any repetition of the conditions or actions leading to or resulting in the emergency.

01070-2

1.06

PERSONAL PROTECTION EQUIPMENT

A.

The Contractor shall provide all on-site Contractor and Subcontractor personnel with appropriate personal safety equipment.

1.07

SAFETY PROGRAM

A.

The Contractor shall provide no later than five days after receiving Notice of Award, four (4) copies of their written safety program to the Contracting Officer for review. No construction shall commence until the Contractor’s Safety Program has been reviewed by the 56th FW Safety Office, B.

The Safety Program shall include detailed description of the Contractor’s Safety Organization, responsibilities, method of program implementation and description of methods for corrective measures.

C.

The Contractor shall not deviate from their written Safety Program.

D.

All Subcontractors shall follow the Contractor’s Safety Program.

PARTS 2

PRODUCTS: NOT USED

PARTS 3

EXECUTION: NOT USED

END OF SECTION

010300-3

SECTION 1080

FIRE PROTECTION

PART 1

GENERAL

1.01

REQUIREMENTS INCLUDED:

A.

Responsibility.

B.

Fire Prevention Rules.

1.02

RESPONSIBILITY:

A.

The Base Fire Chief or his representative will attend pre‑construction conferences to brief contractors on pertinent fire regulations and to provide guidance for fire safe operations during contract performance. Fire prevention guidance will be furnished to the Contractor for briefing his personnel.

B.

It is the responsibility of any person who discovers a fire to report it immediately, even when it is extinguished without the aid of the Fire Department. To do this:

1. Sound the alarm locally by activating the installed fire alarm or by shouting to notify the occupants.

2. Report the fire by dialing Base emergency number.

3. Give the Fire Department the following information: Building number, name of person reporting the fire, type of fire (building, grass, automobile, etc.), and exact location of the fire in the building (north end, south end, etc.).

1.03

FIRE PREVENTION RULES:

A.

Smoking:

1. Cigars, cigarettes, matches, or mechanical lighters will not be used in the Building, except in areas specifically designated as “Smoking Area”.

2. Smoking will not be permitted within 50 feet of repair dock, paint and dope shops, gasoline storage and dispensing areas, and motor maintenance shops.

3. Smoking materials will be disposed of in special noncombustible receptacles at the close of business or upon cessation of operations each day. These receptacles will be removed from the building and the contents properly disposed of.

01080-1

4. Smoking will be prohibited in any facility or area wherein any painting operation is being accomplished. Smoking permitted at designated areas only, verified by contracting officer.

B.

Heating: Non-explosion proof heaters and all open flame heaters will be prohibited for use in any facility or area where volatile vapors are present or may accumulate.

C.

Electrical:

1. During Fire Prevention inspections conducted by the Luke Air Force Base Fire Department, all appliances deemed unsafe and connected to an electrical distribution system will be disconnected from the electrical system and not be reconnected until approved by the Contracting Officer. The Base Fire Department will perform periodic inspection to verify compliance.

2. Only vapor-proof type drop cords will be used in hangars, sewage plants, and buildings where volatile liquids are used or stored.

3. All flexible cords used on appliances will be used in continuous length and be in good condition without splice tape.

D.

Housekeeping:

1. Trash will not be allowed to remain in any building overnight.

2. Only noncombustible trash containers and waste paper containers will be used.

3. Trash will not be allowed to accumulate on the floors, in attics, or underneath stairwells of buildings. Attics and areas underneath stairwells will not be used for storage without prior written approval of the Base Fire Chief.

4. Outdoor trash receptacles will be located at a reasonably safe distance from buildings. In no instance will trash including scrap lumber be stacked less than 15 feet from any building.

5. Rags will be kept in a metal container with metal lid. Containers will be properly marked, stating contents.

E.

Flammable Liquids:

1. Flammable liquids will only be stored in buildings designated and approved for that purpose. “Flammable” and “No Smoking” signs shall be prominently posted.

2. Gasoline will not be stored in the building without approval from the Base Fire Chief.

3. A supplemental supply of flammable liquids kept on premises will be limited to the amount necessary for one day’s use. This supply will be kept in approved safety cans which will be stenciled with the name of contents and the word “FLAMMABLE”.

4. All paint storage sheds will be at least 50 feet from any building.

5. All spray painting will be done in compliance with established safe practices.

6. Blow torches or any type of open flame will not be used for removing paint or tile from any type of surfaces.

01080-2

F.

Liquid Fuel Powered Equipment:

1. Adequate ventilation will be maintained in all areas when power equipment is to be used and where an accumulation of explosive gases is likely to occur from the use of power equipment.

2. Privately‑owned vehicles will not be parked in any building or structure other than those designated and approved for this purpose.

G.

Fire Hydrants: Water mains and fire hydrants will not be shut off, nor will any maintenance be performed that will interfere with the water supply on the Base without first notifying the Base Fire Department.

H.

Arc Welding, Torch Welding, Cutting, and Brazing:

1. Welding, cutting, or brazing other than in approved welding shops, will require permission from the Base Fire Department and the issuance of a Welding Permit for open flame work.

2. Only certified welders will operate welding equipment.

3. All equipment will be inspected daily for damage, loose connections, or unsafe conditions. Repair or replacement must be made if required.

4. Fire extinguishing equipment will be stationed near the welding location.

5. No welding/cutting and/or open flame operations are allowed in facilities when automatic fire detection and/or suppression systems are out of service.

6. Automatic fire detection and suppression systems shall be returned to service (if possible) during construction and renovation when the facility is unoccupied.

7. Contractor shall post a fire guard for 24 hours ( or certifies the facility fire safe) after welding/cutting and/or open flame operations sin facilities when fire detection/supression systems do not exist or cannot be returned to service.

I.

During all floor finishing such as sanding or varnishing and any other work in which a concentration of flammable vapors or dust is likely, all open flames including gas pilots will be turned off and the building adequately ventilated. Further care must be taken to insure electrical circuits are not activated during any unsafe condition.

J.

Before drilling through masonry walls, the contractor will determine if there is insulation in the wall. The Base Fire Department or contracting officer will be notified and asked to inspect the area prior to any drilling in a hazardous location. Proper safety and fire precautions will be taken at all times.

PART 2

PRODUCT NOT USED

PART 3

EXECUTION NOT USED

END OF SECTION

01080-3

SECTION 01090

REFERENCE STANDARDS

PART 1

GENERAL

1.01

REQUIREMENTS INCLUDED:

A.

Applicability of Reference Standards.

B.

Provision of Reference Standards at Site.

C.

Acronyms used in Contract Documents for Reference Standards. Source of Reference Standards.

1.02

QUALITY ASSURANCE:

A.

For products or workmanship specified by association, trade, or Federal Standards, comply with requirements of the standard, except when more rigid requirements are specified or are required by applicable codes.

B.

The latest standard shall be used, except when a specific date is specified.

C.

When required by individual Specifications section, obtain copy of standard. Maintain copy at jobsite during submittals, planning, and progress of the specific works until completion.

1.03

SCHEDULE OF REFERENCES:

AABC

Associated Air Balance Council

1000 Vermont Avenue NW

Washington, DC 20005

ACI

American Concrete Institute

Box 19150

Reford Station

Detroit, MI 48219

ADC

Air Diffusion Council

435 North Michigan Avenue

Chicago, IL 60611

01090-1

AISC

American Institute of Steel Construction

1221 Avenue of the Americas

New York, NY 10020

AITC

American Institute of Timber Construction

1757 K Street N.W.

Washington, D.C.

APA

America Plywood Association

7011 South 19th Street

P.O. Box 11700

Tacoma, WA 98411

AMCA

Air Movement and Control Association

30 West University Drive

Arlington Heights, IL 60004

ANSI

American National Standards Institute

1430 Broadway

New York, NY 10018

ASHRAE

American Society of Heating, Refrigerating, and

Air‑Conditioning Engineers

1791 Tullie Circle NE

Atlanta, GA 30329

ASTM

American Society of Testing and Materials

1916 Race Street

Philadelphia, PA 19103

AWI

Architectural Woodwork Institute

2310 S. Walter Reed Drive

Arlington, Virginia 22206

AWS

American Welding Society

2501 NW 7th Street

Miami, FL 33125

CS

United States Department of Commerce Standard

FS

Federal Specification

General Services Administration

Specifications and Consumer Information

Distribution Section (WFSIS)

Washington Navy Yard, Bldg. 197

Washington, DC 10407

MAG

Maricopa Association of Governments

1820 West Washington Street

Phoenix, Arizona 85007

01090-2

MCDH

Maricopa County Department of Health Services

Department of Health Services

1845 E. Roosevelt Street

Phoenix, Arizona 85007

NBS

National Bureau of Standards

NEMA

National Electrical Manufacturers’ Association

2101 L Street NW

Washington, DC 20037

NFPA

National Fire Protection Association

60 Batterymarch Street

Boston, MA 02110

NWMA

National Woodwork Manufacturers’ Association

OSHA

Occupational Safety and Health Administration

U.S. Department of Labor c/o Superintendent of Documents

U.S. Government Printing Officer

Washington, DC 20402

SMACNA

Sheet Metal and Air Conditioning Contractors’

National Association

8224 Old Court House Road

Vienna, VA 22180

UL

Underwriters’ Laboratories, Inc.

333 Pfingston Road

Northbrook, IL 60062

UBC

Uniform Building Code

International Conference of Building Officials

5360 South Workman Mill Road

Whittier, CA 90601

UPC

Uniform Plumbing Code

International Conference of Building Officials

5360 South Workman Mill Road

Whittier, CA 90601

WCLIB

West Coast Lumber Inspection Bureau

Box 23145

Portland OR 97223

WWPA

Western Wood Products Association

522 SW 5th Ave Yeon Bldg

Portland, OR 97204‑2122

PART 2

PRODUCTS NOT USED

01090-3

PART 3

EXECUTION NOT USED

END OF SECTION

01090-4

SECTION 01300

SUBMITTALS

PART 1

GENERAL

1.01

REQUIREMENTS INCLUDED:

A.

Procedures.

B.

Color Boards

C.

Samples.

D.

Construction Progress Schedules.

E.

Shop Drawings.

F.

Product Data.

G.

Testing.

1.02

PROCEDURES:

A.

Deliver all submittals to Contracting Officer within 10 days after the Notice to Proceed, unless otherwise specified.

B.

Transmit each item using AF Form 3000. Identify project, Contractor, subcontractor, major supplier; identify pertinent drawing sheet and detail number, and specification section number, as appropriate. Identify deviations from contract documents.

C.

Submit initial progress schedules in quadruplicate within 5 working days after commencement of work. After review by Contracting Officer, revise and resubmit as required.

D.

Government’s review will be limited to determination if submittals are in conformance with design concept and general requirements of the project. Approval by the Government shall not absolve the Contractor from his responsibilities for specific performance of the item or items submitted.

E.

Submittals shall be accepted only from the Contractor (not subcontractor or material supplier), who shall check submittals for completeness, accuracy for construction purposes, and conformance with contract requirements and shall indicate his concurrence on each submittal.

010300-1

F.

Submittals shall be submitted in groups, i.e., all lighting fixures, all paint schedules, all windows, all doors. Individual submittals not containing all the items in a group will not be accepted and will be returned for submittal with the group.

G.

In no case shall material be incorporated into the work unless prior approval is obtained from the Contracting Officer.

1.03

PROPOSED SUBSTITUTIONS:

A.

The Contractor shall submit proposed substitutions to Contracting Officer within 10 days after the date of Notice to Proceed is issued. Submit complete data including performance and chemical makeup for both the specified and proposed item.

1. Submit proposed substitutions relating to particular subcontract or trade at one time.

2. List proposed items.

3. State amounts for all cost variations. No addition cost to the Government will be allowed for substitutions. Additional cost for supply inventory not on hand must be included.

4. Include Shop Drawings, product Data, and all information required to determine suitability of proposed product.

5. Supply additional information if requested by the Contracting Officer.

B.

Approval or Rejection: Approval or rejection of substitutions is at the Contracting Officer’s discretion, whose judgment will be final. The Government reserves the right to determine equality. Factors for acceptability of proposed substitutions are as follows:

1. Quality of materials, structural strength, and details of construction or fabrication.

2. Performance and function.

3. Appearance and finish.

4. Impact on other work shall be identified.

5. Compatibility with existing systems.

6. Additional supply inventories for substitute materials.

7. Additional maintenance training.

8. Special tools, testing, and environmental requirements.

9. Use of hazardous materials.

10.Use of materials not available on Luke AFB, i.e., refrigerant.

C.

Resubmission of Proposed Substitutions: Do not resubmit any previously rejected proposed substitutions.

D.

Compliance: Use of approved substitutions does not relieve the Contractor from compliance with the Contract Documents.

E.

Unauthorized Substitutions: If substitute materials are installed without prior approval, remove the unauthorized materials and install those indicated or specified, at no additional cost to the Government.

010300-2

F.

Restrictions: Contractor shall note that for some items of equipment and materials, the names of selected manufacturers have been specified. Bids shall be based on use of product of one of the selected manufacturers, and only such products may be submitted for approval. No substitutions will be accepted.

G.

It shall be the Contractor’s responsibility to assure the equipment is consistent with the specifications. No extra compensation will be approved for revisions required for any different services, space, clearances, accessories, etc.

H.

All approved substitutes must be compatible with existing systems and supply inventory.

1.04

COLOR BOARDS:

A.

Submission Schedule: Consolidated construction color boards should be submitted within 45 days of the NTP. Piecemeal submittals are not acceptable. All color boards are to be submitted in 8 ½” by 11” card stock in a three‑ring binder. Contractor is required to certify availability of items at this time.

B.

Material Matching: Construction color boards must match those approved during design.

C.

Material samples: Use actual materials rather than catalogs or photographs or colors, materials, or samples.

D.

Color Board Format: Color Boards shall be prepared in the following format:

1. Binders: Provide submittals in 8 ½ by 11 format. Use three‑ring binders.

2. Sheet Material: Sheets containing samples shall be heavy, neutral colored (not white) illustration board capable of supporting a four inch by eight inch quarry tile without distorting binder release or sheet tear‑out due to hole failure.

3. Mounting: Adhesives must be appropriate for the sample. For instance, white glue is appropriate for paper or cloth and construction adhesive is appropriate for masonry.

4. Content. Color Board shall consists of all samples, a finish schedule, floor plan, and interior elevations if needed to explain finishes. Items other than material sample boards may be folded to 8 ½ by 11.

5. Identification. Identify each sample by use, location, and manufacturer’s name.

010300-4

1.05

SAMPLES:

A.

When required by individual specification sections, submit samples that fully illustrate functional characteristics of the product, complete with integral parts and attachments.

B.

Include identification on each sample, giving full information.

C.

Samples will be retained by the Contracting Officer except in those instances, where the specifications permit use of the sample in the actual work.

D.

Provide field finishes at project as required by individual specifications section. Install sample complete and finished. Acceptable finishes in place may be retained in completed work.

1.06

CONSTRUCTION PROGRESS SCHEDULE:

A.

The Progress Schedule shall consist of a minimum of one work element for each division of the specification except Division One. (AF Form 3064)

B.

Progress schedule submitted shall address the following Divisions when they are included in the specification.

Div 1. General Requirements

Div 2. Demolition and removal

Div 3. Concrete

Div 4. Masonry

Div 5. Metals

Div 6. Wood and Plastic

Div 7. Thermal and Moisture Protection

Div 8. Doors and Windows

Div 9. Finishes

Div 10.Specialties

Div 11.Not Applicable

Div 12.Not Applicable

Div 13.Not Applicable

Div 14.Not Applicable

Div 15.Mechanical

Div 16.Electrical

1.07

SHOP DRAWINGS:

A. When required by individual specification sections, submit the number of opaque reproductions which contractor requires, plus three (3) copies which will be retained by the Government.

010300-5

B.

Shop drawings shall be prepared by persons competent and experienced in the trade involved. Drafting skill is not a requirement but accuracy and completeness of Drawings shall reflect field measurements and conditions and shall show the relationship of the item to adjacent materials.

C.

“Shop Drawings” are defined as drawings, diagrams, illustrations, schedules, performance charts, brochures and other data prepared by the Contractor or any subcontractor, manufacturer, supplier, or distributor, which illustrates how specific portions of the work shall be fabricated and/or installed.

D.

Shop drawings are not part of the contract documents. Contract documents are prepared under the guidance of the design professional. Shop drawings by long standing tradition in the construction industry are usually prepared by trades people who are not registered architects or engineers.

E.

The purpose of shop drawings is not to depict or define design but it is to show how the construction document requirements are to be implemented.

1.08

PRODUCT DATA:

A.

When required by individual specification sections, submit product data that indicate compliance to listed standards.

1. Data composed of manufacturer’s catalog cuts, brochures, circulars, specifications and product data, and other information in sufficient detail and scope to verify compliance with requirements of the contract documents shall be submitted. This shall include a description of the system operating characteristics and individual data sheets for each item of equipments indicating descriptive and technical data, operating temperature limits, heat dissipated, electrical requirements and mounting restrictions.

2. If a data sheet covers several types of sizes of equipment, the sheet shall be marked to indicate the specific item provided.

B.

Mark each copy to identify applicable products, models, options, and other data; supplement manufacturers’ standard data to provide information unique to the work. Include manufacturers’ installation instructions when required by the specification section.

1.09

CERTIFICATES:

A.

Each certificate required by the Contract Documents shall be signed by an officer, agent, or individual lawfully authorized to execute the certificate and such authority shall be cited in the certificate by description, title, or other acceptable evidence.

010300-6

B.

Certificates shall be sworn and notarized as to correctness and validity of the contents, and copies shall be notarized to be true copies. Deliver all certificates to Contracting Officer.

1.10

EQUIPMENT DATA SUBMITTALS:

A.

Equipment data submittals, including complete technical, performance, and catalog data, are required for every equipment item proposed for the Work, each submittal bound, indexed, and containing information and data as specified in Article 1.08, “Product Data”.

B.

Each submittal shall include information covering performance and operating curves, ratings, capacities, characteristics, power efficiency, each manufacturer’s standard guarantees and warranties with the terms and conditions fully described, and all other information to fully illustrate and describe the items as may be specified or required for approval.

C.

Submit in sets which cover complete systems of functioning units.

1.10

MANUFACTURERS’ DETAILED INSTRUCTIONS:

A.

Submit the manufacturers’ detailed preparation and installation instructions for various materials specified to be installed in accordance with such instructions.

B.

Furnish copies to all trades involved.

1.11

MATERIALS FURNISHED UNDER STANDARD SPECIFICATIONS:

A.

For various materials specified by reference to standard or reference type specifications, prepare and submit a list of such materials stating manufacturer’s name and identifications to extent requested by the Contracting Officer.

1.12

TESTING

A. Testing shall be provided as required by the Contracting Officer in accordance with the individual sections.

1.13

TECHNICAL DATA

TECHNICAL DATA:

1. Data for maintenance instructions and parts lists shall be furnished in four (4) bound copies.

2. Data for operational test reports and commercial warranty and/or guarantee shall be furnished in one (1) copy only.

010300-8

3. Unacceptable technical data will be returned to the Contractor for re-accomplishment.4. All copies of acceptable technical data will be retained.

5. All technical data must be furnished and accepted prior to fina1 acceptance of the contract work and prior to processing invoice for final payment.

PART 2

PRODUCTS NOT USED

PART 3

EXECUTION NOT USED

END OF SECTION

010300-9

SECTION 01310PRIVATE

CONSTRUCTION PROGRESS MANAGEMENT SCHEDULE

PART 1

GENERAL

1.01

SCOPE:

A.

The Contractor shall prepare a network analysis as described hereinafter to serve as a guide in managing the construction progress.

1.02

SUBMITTALS:

A.

Submittals shall be as follows:

1.

A preliminary network defining the Contractor’s planned operations during the first sixty (60) calendar days after Notice to Proceed shall be submitted within ten (10) days. The Contractor’s general approach for the balance of the project shall be indicated.

2.

The complete network analysis and network diagrams shall be submitted within thirty (30) calendar days after receipt of Notice to Proceed.

3.

The Contractor shall submit at intervals of thirty (30) calendar days a report of the actual construction progress by updating the mathematical analysis. Revisions causing changes in the detailed network shall be noted on a revised issue of affected portions of the network furnished. The report shall show the following:

a.

The activities or portions of activities completed during the reporting period and their total value as basis for the Contractor’s periodic request for payment.

b.

The percentage of work actually completed and the progress along the critical path in terms of days ahead or behind scheduled dates.

c.

The Contractor shall also submit a narrative report with the updated analysis, including a description of problem areas (current and anticipated), delaying factors and their impact, and an explanation of corrective actions, taken or proposed.

4. Network Analysis Software, Microsoft Project ™, Primavera ™, or compatible software.

1.03

GENERAL:

A. The progress chart shall be prepared by the Contractor and shall consist of a network analysis system as described below.

1. In preparing this system, the scheduling of construction is the responsibility of the Contractor.

2. The requirement for the system is included to assure adequate planning and execution of the work and to assist the Contracting Officer in appraising the reasonableness of the proposed schedule and evaluating progress of the work.

1.04

NETWORK ANALYSIS SYSTEM:

A.

The system shall consist of time network scaled logic diagrams and accompanying mathematical analysis. The diagrams shall show elements of the project in detail and the entire project in summary.

B.

Diagrams shall show the order and interdependence of activities and the sequence in which the work is to be accomplished as planned by the Contractor. The basic concept of a network analysis diagram will be followed to show how the start of a given activity is dependent on the completion of preceding activities and its completion restrict the start of the following activities.

C.

Detailed network activities shown on a detailed or sub‑network diagram shall include, in addition to construction activities, the submittal and approval of samples of materials and shop drawings, the procurement of critical materials and equipment to be used in prosecuting the work, fabrication of special material and equipment and their installation and testing. All activities that affect progress, and contract required dates for completion of all parts of the work shall be shown.

1.

The network activities and sub‑network diagrams shall separately identify work in the following areas:

a.

Site b.

New Construction c.

Existing Facility

D.

The selection and number of activities shall be subject to the Contracting Officer’s approval.

E.

Detailed networks shall be drafted to show a continuous flow from left to right with no arrows from right to left. All diagrams shall be drafted neatly and all information shall be legible.

F.

The mathematical analysis of the network diagram shall include a tabulation of each activity in order of preceding event number…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .