Attachment_7_SABER_Price_Evaluation_Worksheet_-_EXAMPLE.xlsx

XLSX spreadsheet 17 KB Posted

Attached to
FY19-24 Davis-Monthan SABER Solicitation
Solicitation number
FA487719RA017
Issued by

About this file

This document contains a price evaluation worksheet template for the Simplified Acquisition of Base Engineer Requirements (SABER) contract solicitation FA487719RA017 issued by the Department of the Air Force Air Combat Command. The worksheet will be used to evaluate offerors' proposed prices, which should be inserted into the highlighted boxes and correspond with prices in the solicitation's contract line items. The evaluation equation multiplies a $25 million aggregate total by the offeror's coefficient and adds that to 75 projects multiplied by the proposed SABER fee per project. It also applies the coefficient to the proposed seed project price. The total evaluated price is the sum of the five-year price and seed project price. No other details are provided about required products or services, response dates, or incumbent.

SOW Attachment 7

View the file

Other files

File Type Posted
Conceptual_Sketch_A2.pdf PDF
Solicitation_Amendment_FA487719RA0170002_SF_30_(1).pdf PDF
Attachment_4_Drawing_Cover_Sheet.pdf PDF
Conceptual_Sketch_A1.pdf PDF
Attachment_5_D_Size_Drawing_Sheet_Title_Block.pdf PDF
SABER_Re-Compete_Consolidated_RFI_Responses.pdf PDF
Attachment_4_PDF_Version.pdf PDF
Solicitation_Amendment_FA487719RA0170001_Address_Correction.pdf PDF
2001-08_Asbestos_Survey.pdf PDF
2001-10_Asbestos_Shipment.pdf PDF
04300-014-001.PDF PDF
04300-016-018.pdf PDF
04300-013-005.PDF PDF
Appendix_D_SABER_Specifications_Vol_04.pdf PDF
04300-012-002.PDF PDF
04300-016-017.pdf PDF
Attachment_3_Non_Pre-Priced_Item_Register.pdf PDF
Attachment_5_D_Size_Drawing_Sheet_Title_Block.dwg DWG drawing
04300-012-004.PDF PDF
GDN_AZ20190018_-_AZ18_-_Heavy.pdf PDF
2001-04_Asbestos_Survey.pdf PDF
04300-016-012.pdf PDF
Attachment_4_Drawing_Cover_Sheet.dwg DWG drawing
Seed_Project_FBNV180044-SABER_AF_Form_66.pdf PDF
2012-06_Asbestos_Survey.pdf PDF
04300-016-009.pdf PDF
04300-016-014.pdf PDF
04300-016-005.pdf PDF
GDN_AZ20190002_-_AZ02_-_Residential.pdf PDF
04300-016-019.pdf PDF
04300-016-020.pdf PDF
1995-01_Asbestos_Survey.pdf PDF
Appendix_C_SABER_Specifications_Vol_03.pdf PDF
04300-011-001.PDF PDF
Solicitation_-_FA487719RA017.pdf PDF
04300-016-002.pdf PDF
Attachment_6_-_Past_Performance_Questionaire.docx DOCX document
04300-009-002.PDF PDF
04300-016-004.pdf PDF
1987-07_Asbestos_Survey.pdf PDF
FBNV180044_SABER_Statement_of_Work_26_Aug_19.pdf PDF
Scanned_As_Built_Abatement_2004.pdf PDF
1996-05_Asbestos_Survey.pdf PDF
1996-01-11_Asbestos_Survey.pdf PDF
1992-04_Asbestos_Survey.pdf PDF
04300-016-013.pdf PDF
2004-11_Asbestos_Survey.pdf PDF
GDN_AZ20190032_-_AZ32_-_Building.pdf PDF
04300-016-006.pdf PDF
Contractor_Environmental_Guide_(15_May_2019).pdf PDF
Show 40 more

Latest 50 of 90 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Total Evaluated Price Worksheet

Estimate Aggregate TotalProposed CoefficientEstimated # of ProjectsProposed SABER Fee (Per Project)Evaluated Total(s)
5 Yrs$25,000,000x1.5+75x$1,500=$ 37,612,500.00
Proposed Seed Project Price w/ Coefficient applied
Seed Project$50,750.00=$50,750.00
($50,000x1.5%)+50,000=$50,750
Total Evaluated Price:$ 37,663,250.00

PRICE EVALUATION WORKSHEET

FA487719R0001

Simplified Acquisition of Base Engineer Requirements (SABER) Contract Equation: (For Evaluation Purposes Only!)

5 Year Price = ($25M x coefficient) + (75 x SABER fee)
Seed Project Price = Offeror’s Proposed Price of Seed Project (w/ coefficient applied)
Total Evaluated Price = 5 Year Price + Seed Project Price

Instructions to Offerors: Provide and fill-in highlighted boxes only; data to correspond with offerors proposed prices as inserted within Solicitation/Contract Line Items.

EXAMPLE ONLY

Fillable Price Worksheet

Estimate Aggregate TotalProposed CoefficientEstimated # of ProjectsProposed SABER Fee (Per Project)Evaluated Total(s)
5 Yrs$25,000,000x+75x=$ - 0
Proposed Seed Project Price w/ Coefficient applied
Seed Project=$0.00

Total Evaluated Price: $ - 0

PRICE EVALUATION WORKSHEET

FA487719R0001

Simplified Acquisition of Base Engineer Requirements (SABER) Contract Equation: (For Evaluation Purposes Only!)

5 Year Price = ($25M x coefficient) + (75 x SABER fee)
Seed Project Price = Offeror’s Proposed Price of Seed Project (w/ coefficient applied)
Total Evaluated Price = 5 Year Price + Seed Project Price

Instructions to Offerors: Provide and fill-in highlighted boxes only; data to correspond with offerors proposed prices as inserted within Solicitation/Contract Line Items.

File details come from the government source that posted it. Updated .