GDN_AZ20190018_-_AZ18_-_Heavy.pdf

PDF 104 KB Posted

Attached to
FY19-24 Davis-Monthan SABER Solicitation Federal contract opportunity
Solicitation number
FA487719RA017
Issued by
Department of the Air Force Air Combat Command

About this file

This document contains a general wage determination for heavy construction projects in Pima County, Arizona issued by the Department of Labor. The wage determination outlines prevailing wage rates for various construction crafts such as carpenter, electrician, equipment operators, laborers, painters, truck drivers, and welders that would apply to any heavy construction projects in the county covered by the Davis-Bacon Act. The rates are effective from February 8, 2019 through the duration of any contract awarded prior to the next revision.

The related federal contract opportunity is a solicitation issued by the Department of the Air Force Air Combat Command for construction services at Davis-Monthan Air Force Base in Tucson, Arizona under solicitation number FA487719RA017. The solicitation seeks proposals for heavy construction work under the SABER program from February 8, 2019 until the completion of any awarded contracts. The wage determination provides the applicable prevailing wage rates for any labor categories involved in proposals for this opportunity.

AZ18 Heavy

View the file

Other files for this federal contract opportunity

Other files attached to FY19-24 Davis-Monthan SABER Solicitation, newest first.
File Type Posted
Solicitation_Amendment_FA487719RA0170002_SF_30_(1).pdf PDF
Attachment_4_Drawing_Cover_Sheet.pdf PDF
Conceptual_Sketch_A1.pdf PDF
Attachment_5_D_Size_Drawing_Sheet_Title_Block.pdf PDF
2012-06_Asbestos_Survey.pdf PDF
04300-009-001.PDF PDF
04300-016-020.pdf PDF
04300-016-014.pdf PDF
2004-11_Asbestos_Survey.pdf PDF
1996-01-11_Asbestos_Survey.pdf PDF
04300-016-013.pdf PDF
1995-01_Asbestos_Survey.pdf PDF
1992-04_Asbestos_Survey.pdf PDF
Seed_Project_FBNV180044-SABER_AF_Form_66.pdf PDF
04300-016-004.pdf PDF
04300-016-009.pdf PDF
04300-009-002.PDF PDF
1987-07_Asbestos_Survey.pdf PDF
FBNV180044_SABER_Statement_of_Work_26_Aug_19.pdf PDF
GDN_AZ20190032_-_AZ32_-_Building.pdf PDF
Attachment_2_Non_Pre-Priced_Item_Bid_Sheet.pdf PDF
04300-012-003.PDF PDF
04300-013-002.PDF PDF
04300-016-006.pdf PDF
2000-07_Air_Sampling.pdf PDF
Attachment_6_-_Past_Performance_Questionaire.docx DOCX document
04300-013-001.PDF PDF
Seed_Project_FBNV180044_Conceptual_Sketch_Drawing.pdf PDF
Contractor_Environmental_Guide_(15_May_2019).pdf PDF
GDN_AZ20190008_-_AZ08_-_Highway.pdf PDF
2003-04_Asbestos_Survey.pdf PDF
1998-06_Asbestos_Survey.pdf PDF
Attachment_1_SABER_Estimate_Cover_Sheet.pdf PDF
04300-011-001.PDF PDF
04300-013-003.PDF PDF
Appendix_C_SABER_Specifications_Vol_03.pdf PDF
Attachment_5_D_Size_Drawing_Sheet_Title_Block.dwg DWG drawing
2001-04_Asbestos_Survey.pdf PDF
04300-016-012.pdf PDF
04300-012-004.PDF PDF
04300-016-015.pdf PDF
1996-08_Asbestos_Survey.pdf PDF
GDN_AZ20190002_-_AZ02_-_Residential.pdf PDF
Solicitation_-_FA487719RA017.pdf PDF
04300-016-019.pdf PDF
04300-016-008.pdf PDF
2003-07_Air_Sampling.pdf PDF
Scanned_As_Built_Abatement_2004.pdf PDF
04300-016-005.pdf PDF
Base_Access_Request_-_Event_EAL.xls XLS spreadsheet
Show all 50

FY19-24 Davis-Monthan SABER Solicitation has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

"General Decision Number: AZ20190018 02/08/2019

Superseded General Decision Number: AZ20180019

State: Arizona

Construction Type: Heavy HEAVY CONSTRUCTION, Includes Water and Sewer Lines and Heavy Construction on Treatment Plant Sites

County: Pima County in Arizona.

HEAVY CONSTRUCTION PROJECTS (DOES NOT INCLUDE DAM CONSTRUCTION)

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.60 for calendar year 2019 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.60 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2019. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate,if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the

Page 1 of 9beta.SAM.gov

7/3/2019https://beta.sam.gov/wage-determination/AZ20190018/1/document federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/04/2019 1 02/08/2019

CARP0408-006 07/01/2018

Rates Fringes

CARPENTER (Excludes Form Work)...$ 26.88 12.44

ELEC0570-009 12/01/2018

Rates Fringes

ELECTRICIAN......................$ 26.96 18%+5.60

ZONE DEFINITIONS-

Zone A: the area within a twenty-nine (29) mile radius from a basing point at the Tucson Town Hall.

Zone B: 29 to 46 mile radius from the town hall in Tucson- an additional $ 1.25 per hour Zone C: 47 mile radius from the town hall in Tucson to the outer limits of the geographic jurisdiction- an additional $ 3.75 per hour

* ENGI0428-009 06/01/2018

Page 2 of 9beta.SAM.gov

Rates Fringes

POWER EQUIPMENT OPERATOR

Group 1.....................$ 24.84 10.86 Group 2.....................$ 28.11 10.86 Group 3.....................$ 29.19 10.86

POWER EQUIPMENT OPERATORS CLASSIFICATIONS

GROUP 1: Small Self-Propelled Compactor (with blade), Bobcat/Skidsteer/Skid Loader, Oiler

GROUP 2: Self-Propelled Compactor (with blade), Bulldozer, Grader/Blade (rough), Scraper

GROUP 3: Grader/Blade(finish)

PAIN0086-002 04/01/2017

Rates Fringes

PAINTER (Brush Only).............$ 19.58 6.40

SUAZ2012-007 05/17/2012

Rates Fringes

BRICKLAYER.......................$ 21.00 0.00

CARPENTER (Form Work Only).......$ 22.50 5.97

CEMENT MASON/CONCRETE FINISHER...$ 17.83 3.45

IRONWORKER, REINFORCING..........$ 20.66 13.59

IRONWORKER, STRUCTURAL...........$ 20.59 13.85

Page 3 of 9beta.SAM.gov

LABORER: Asphalt Raker/Shoveler/Spreader..........$ 15.76 4.42

LABORER: Common or General......$ 14.52 2.75

LABORER: Concrete Saw (Hand Held/Walk Behind)................$ 17.00 4.55

LABORER: Grade Checker..........$ 18.14 4.55

LABORER: Mason Tender - Cement/Concrete..................$ 12.91 0.00

LABORER: Pipelayer..............$ 14.52 2.35

LABORER: Power Tool Operator....$ 16.55 4.20

OPERATOR:

Backhoe/Excavator/Trackhoe.......$ 19.96 4.98

OPERATOR: Crane.................$ 20.76 4.42

OPERATOR: Drill.................$ 23.99 7.60

OPERATOR: Forklift..............$ 19.86 4.75

OPERATOR: Loader (Front End)....$ 18.00 5.19

OPERATOR: Mechanic..............$ 17.41 4.03

OPERATOR: Paver (Asphalt, Aggregate, and Concrete).........$ 17.07 3.20

OPERATOR: Roller................$ 21.13 8.36

OPERATOR: Screed................$ 16.82 2.52

Page 4 of 9beta.SAM.gov

OPERATOR: Tractor...............$ 24.43 7.70

OPERATOR: Trencher..............$ 16.11 2.25

OPERATOR: Broom/Sweeper..........$ 15.40 2.45

PAINTER: Pavement Marking/Parking Lot Striping.....$ 19.94 4.10

PAINTER: Roller and Spray.......$ 20.65 4.45

PIPEFITTER.......................$ 27.00 12.03

TRUCK DRIVER: Dump Truck........$ 14.43 1.16

TRUCK DRIVER: Flatbed Truck.....$ 16.84 3.51

TRUCK DRIVER: Water Truck.......$ 16.00 2.21

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other

Page 5 of 9beta.SAM.gov health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing

Page 6 of 9beta.SAM.gov the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage

Page 7 of 9beta.SAM.gov determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division

Page 8 of 9beta.SAM.gov

U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION"

Page 9 of 9beta.SAM.gov

File details come from the government source that posted it. Updated .