Atch 8_RFI Log_25B0001_RKMF230064_B47_Rev_5Aug25.xlsx
XLSX spreadsheet 11 KB Posted
- Solicitation number
- FA486125B0001
About this file
The document is an RFI Log dated 5 August 2025 for a Design-Build construction project at Nellis Air Force Base, Nevada. The solicitation (FA486125B0001) seeks an 8(a) small business contractor to construct an addition and repair the interior of Building 47 for the 328 WPS, with a project magnitude between $10-$25 million and a 730-calendar day performance period. The procurement is a firm fixed-price contract using sealed bidding procedures, with a bid bond guarantee of 20% of the bid price (not to exceed $3 million) and bonding capability up to $15 million.
Key dates include a proposal site visit on 14 July 2025, with new Request for Information (RFI) submissions due by 7 August 2025 using the attached RFI Log. The sealed bid due date is 20 August 2025 at 4:30 PM PDT, with bid opening on 21 August 2025 at 2:00 PM PDT. The contract is specifically restricted to 8(a) contractors classified as "small" under NAICS code 236220, with the government awarding to the most advantageous bidder based on price and price-related factors. The point of contact for this opportunity is Nina Young at nina.young@us.af.mil.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFI LOG, 5 AUG 25
| FA486125FB0001 |
| CONSTRUCT ADDITION & REPAIR INTERIOR, 328 WPS, BLDG 47 |
| RKMF230064 |
| INSTRUCTIONS: All columns A through E must be filled out in order to be considered responsive. |
| Must state SOW, document section, drawing sheet, etc. in column D, and Division in column E. |
| Please read the SOW and all solicitation docs thoroughly before submitting an RFI. |
| ITEM | DATE SUBMITTED | QUESTION | SOW or DOCUMENT (INCL SECTION #, or PAGE, DWG SHEET, ETC.) | DIVISION (ELEC, MECH, COMM, STRUCT, ETC.) |
| 00 | 3-Jul-25 | EXAMPLE. Type your question here after reviewing all docs. | SOW 1.2.3.45 | ELECTRICAL |
| 1 | ||||
| 2 | ||||
| 3 | ||||
| 4 | ||||
| 5 | ||||
| 6 | ||||
| 7 | ||||
| 8 | ||||
| 9 | ||||
| 10 |
File details come from the government source that posted it. Updated .