This document is a Government's Response to Request for Information (RFI) Log for a design-build construction contract for Building 47 at Nellis Air Force Base, Nevada. The solicitation (FA486125B0001) is for constructing an addition and repairing the interior of Building 47 for the 328th Weather Production Squadron, with a project magnitude between $10-25 million and a 730-calendar day performance period. The procurement is set aside exclusively for 8(a) small businesses with NAICS code 236220, using sealed bidding procedures under FAR Part 14.
Key details include a site visit on 14 July 2025, initial RFI submissions due 17 July 2025, and a sealed bid due date of 13 August 2025 at 10:00 AM PDT. The document contains 208 detailed government responses to contractor questions covering diverse technical aspects such as electrical systems, communications infrastructure, HVAC design, structural modifications, sustainability requirements, and Secure Compartmented Information Facility (SCIF) compliance. The responses provide clarifications on design specifications, acceptable design deviations, government-furnished equipment, and specific technical requirements across architectural, mechanical, electrical, and communications disciplines.
View the file
Other files for this federal contract opportunity
Show all 27
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA486125FB001
CONSTRUCT ADDITION & REPAIR INTERIOR, 328 WPS, BLDG 47
RKMF230064
GOVERNMENT'S RESPONSE TO RFIs
ITEM DATE
SUBMITTED QUESTION SOW or DOCUMENT (INCL
SECTION #)
DIVISION
(ELEC, MECH, COMM, STRUCT,
ETC.)
GOV'T ANSWER
1 17-Jul-25 Within CLIN 003 Repair, are we to include the cost of deductive items 001-003? And in the event that CLIN 001-003 exceed the budget, the duductive items 1-3 would be deducted from CLIN 003? CONTRACTING
Yes, CLIN 0003 includes all the items identified on Attachment 3 Bid Schedule CLIN 0003 and Attachment 1 Statement of Work, Repair. In accordance with the Solicitation Section M, in the event the lowest Offeror's bid exceeds the funds available, the offeror's base bid shall proceed through deductive items D0001-D0003 (Attachment 3 Bid Schedule) in stated order of priority until the aggregate total is less than or equal to the amount of funds available for the project.
2 17-Jul-25 Will deductive items be awarded at the same time as base bid Clin 001-003? If not, will they be awarded within 90 days of base bid award? Bid schedule CONTRACTING
Yes, deductive line items will be omitted from award, at the time of award, in the event the lowest offeror's bid exceeds the amount of funds available for the project- Attachment 1 Statement of Work, Deductives.
3 17-Jul-25 Is there any chance that CLIN 002 be awarded without CLIN 003? Or Clin 003 without CLIN 002? Bid schedule CONTRACTING No.
4 17-Jul-25 Why are CLINS 002 and 003 seperated? Can these be combined to one CLIN as they flow to eachother and are difficult to correctly separate. Bid schedule CONTRACTING No, these cannot be combined to one CLIN.
5 17-Jul-25 The proposed HVAC system in 35% design will not work due to the lack of space above ceiling and below roof deck. Will another system be acceptable? SOW HVAC
The 35% design provided is a conceptual design and as long as proposed HVAC design meets the SOW section 1.3.20, UFC, IBC, Nellis IFS, and all other standards, contractor may use another system.
6 17-Jul-25
Per the supplied 35% drawings there are two package units shown. Due to the space constraints the duct work sizing from these units will not be feasable or will it fit in the allowable space above the ceiling. Will the Gov. accept another design such as a 4 pipe system with low profile fan coils that will fit in the allowable ceiling space?
SOW HVAC Yes, the government will accept deviation from the 35% conceptual design as long as the SOW, UFC, IBC, Nellis IFS, and any other standards are met.
7 17-Jul-25 Can other long lead items outside of electrical be submitted for approval before the IFC set? This would help construction timeline. SOW CONTRACTING
Per SOW Section 1.3.1.5 Project Phasing, Long lead items that are identified by the contractor’s engineer shall be identified in the contractor’s proposal and submitted to the Contracting Officer with a request to purchase them early in the project timeline to avoid construction delays. It is expected that the approved 65% drawings be complete enough to submit submittals for the new service transformer, the main service entrance panel at 480v, the main 208v panel(s) and the electric meter for approval to purchase them early to avoid construction delays. This submittal(s) shall not include any other equipment.
8 17-Jul-25 Please define the quantity of plants or trees desired for Deductive item #2 Landscaping. SOW CIVIL / LANDSCAPE See Note 8 on sheet C-102 in Appendix A - 35% Concp Dsg PDF; Removal of 8 tress, stumps and roots are indicated.
9 17-Jul-25 Will England Ave. be able to be closed while all new utility work is being completed? Or will this need to remain open after a temporary closure? 35% dwgs CIVIL Temporary road closures of England Ave are assumed. The Contractor must submit AF103 for
Road Closure requests, including the duration, dates and details for 99 CES review and approval.
10 17-Jul-25 Please provide requirements for ,QCM, SSHO, and Superintendent CONTRACTING Requirements for each role are indicated in the SOW.
11 17-Jul-25 Can any site management rols be overlapped or multi hat? Or will each role be independent and designated (SSHO, Super and QCM)? CONTRACTING The roles can be multi-hat, however, the assigned individual cannot share time with other projects.
Additionally, a backup/alternate shall be available if the primary takes time off for any reason.
12 17-Jul-25 The SBA is switching from DSBS to SBS, should we include both searches to show eligibility of our SBA 8(a) status? CONTRACTING SBA website has been updated to https://search.certifications.sba.gov; see Solicitation, Section L.
13 17-Jul-25 Where is the 18" depressed slab located within the building? Design Analysis ARCH / STRUCT
See sheet S-200 in Appendix A - 35% Concp Dsg PDF. Between Grids E-2/3 and J-2/3. See 1969 Original Build, File S14.TIF in Attachment 5 - Appendix X. Per SOW section 1.3.14.3 The depressed portion of the slab on grade is to be patched and repaired as required. This shall be with level floor in accordance with the 35% design intent. No Access Flooring is required in this area.
14 17-Jul-25 The sow calls for STC 50 Doors, what is the desired goal STC rating? If the goal is 50, we would recommend a STC 55 door so you can guarantee a STC 50 rating after installation. SOW ARCHITECTURAL / ICD 705 STC 50 doors are the minmium rating per the desired sound group rating. Acoustic Testing is required to confirm compliance with ICD 705.
15 17-Jul-25 We are required to provide a structural analysis of the existiing building. If any defiecienies are found, will these be treated as a change order or contract amendment? SOW CONTRACTING Contractor shall provide a structural analysis per the SOW Section 1.3.4. If any deficiencies are noted, they will be treated as an unforeseen sight condition.
16 17-Jul-25 is primavera P6 a requirement? PACES or MII are the base standard.
17 17-Jul-25 Are there any tempest requirements within the ICD-705 spaces? If so, please provide the frequencies we are to test for. ICD 705
RF shielding is not required for contract award as it is not a requirement in the SOW, however, if guidance becomes available after award in which RF shielding is required, the government will modify the contract.”
18 17-Jul-25 Is there a borrow pit on base for soils import and export? CIVIL / CONSTRUCTION No, there is no borrow pit on base for soils import and export. Contractor is responsible for the procurement and storage of soils as needed for the project based on Appendix F Geotechnical Evaluation Report and any additional testing the contractor performs as a part of this project.
19 17-Jul-25 Is there a location on base we can stockpile boulders and gravel for re use? CIVIL / CONSTRUCTION No, there is no location outside of the project site and laydown yard for the stockpile of boulders and gravel. Contractor is responsible for the storage of these items.See SOW Section 1.19 Material Storage.
29-Jul-25
FA486125B0001 1 OF 12
ITEM DATE
SUBMITTED QUESTION SOW or DOCUMENT (INCL
SECTION #)
DIVISION
(ELEC, MECH, COMM, STRUCT,
ETC.)
GOV'T ANSWER
20 17-Jul-25 Please confirm the Gov. is to provide FFE. INTERIOR DESIGN / FFE An updated FFE Schedule and Layout shall be provided in accordance with SOW sections 1.8.1.2 and 1.8.2.5. FFE shall be Government Furnished Government Installed. Contractor shall provide all utilities for a a fully functional FFE Design.
21 17-Jul-25 Will the existing furniture and any other govt. equipment be removed prior to the contract starting? INTERIOR DESIGN / FFE Existing furniture and equipment that is not a part of the building's real propoerty (e.g. auditorium seating) will be removed as part of current B47 user's turnover of the facility. They must remove all their items.
22 17-Jul-25 Will certified STC testing be required at the end of the project? ICD 705 Acoustic Testing shall be conducted in accordance with ICD 705. See Chapter 9 Section C for the requirements.
23 17-Jul-25 During demo we will remove all power to the building, will the gov. provide any temp power for construction use? Or should we budget for temp power (generator)? CONSTRUCTION
Power will be available throughout the construction at B47. Temporary power will not be provided by the Government during transformer installation. It is assumed that temporary generator power will not be needed as power is availble at B47. However, contractor is responsible for determining generator power needs throughout the construction of the project.
24 17-Jul-25 Will nearest fire hydrants be used for site water and dust control? SITE / CONSTRUCTION
Contractor is responsible for dust control per SOW Section 1.27.7. NAFB water resources shall not be used for dust control. See SOW Sections 1.20.1 Water and Electricity. Irrigation of existing trees and vegetation that will remain shall be maintained by the contractor during the entire duration of the construction contract.
25 17-Jul-25 Statement of Work, Section 01 11 00 - 11 paragraph 1.3.1.4 indicates IDS and ACS scope consists of empty conduits with pull strings; please confirm CCTV system will aso consist of empty conduit and pull strings.
SOW 1.3.1.4 CCTV CCTV requiremnets were removed from the scope of the project per the End User prior to solicitation. There are no current requirements for CCTV.
26 17-Jul-25
The RFP is silent about existing or new OSP Outside Plant (site telephone and fiber optic) telecommunications cable requirements. Please indicate if existing OSP cables will be reused or if new need to be provided and if so, provide requirements (POC, # of telephone pairs, # of fibers, # of conduits, termination points, etc.) if applicable.
COMM The existing fiber optic cables can be reused if preserved/protected properly. The copper will not be so easy. It is direct buried
27 17-Jul-25 Confirm parking lot along Devlin Drive does not need to be provided with parking lot lighting. CIVIL / ELECTRICAL Additional parking lot lighting is not required at the parking lot along Devlin Drive.
28 17-Jul-25 Confirm B47 sidewalks do not need to be provided with pole or bollard mounted light fixtures CIVIL / ELECTRICAL
See Nellis & Creech Air Force Bases IFS C09.1.12. Install lighted bollards only at Group 1 and high-traffic Group 2 facilities. Reference Section C07.2.5 for information on lighted bollards. Lighted bollards are not required along the sidewalks. Refer to Appendix I for Nellis and Creech AFB IFS Lighting Requirements.
29 17-Jul-25 Drawing ED-101 keynote 10 indicates: "relocate existing communications pole". If pole has existing communications cables, then provide information about such cables including type, size, # of pairs, fiber type and count, etc. and the new location of the existing pole.
Drawing ED-101 ELECTRICAL / COMM Contractor shall relcoate communications pole as stated in the drawing sheet. The logistics of all cables shall be gathered after contract award, during the design process.
30 17-Jul-25
a) The primary (12.47kV) feeder shows a change of direction; per UFC, a manhole needs to be provided at all changes of direction. Please confirm a manhole needs to be provided at this change of direction. b) keynotes 2, 3, & 4 indicate fused cut-outs, primary feeder conductors and secondary feeder conductors are provided by the utility company; please confirm all the equipment in notes 2, 3 & 4 is to be provided by the contractor not the utility company, c) indicate if any lighting or power needs to be provided to the shade shelter.
Drawing E-101 ELECTRICAL
a) Since the 35% design was completed, B47 is now fed from 6-way switch at the corner of Devlin & Grissom. Therefore, no pole mounted feed is required. Contractor shall replace the cable from new T47 to Switch as the current cable is too short. Conduits are existing and can be modified at the new transformer pad. No manhole is required.
b) These items are no longer required.
c) Power to the shade structure is not required.
31 17-Jul-25 Where the RFP requires the use of exposed raceways on walls: is EMT acceptable or are combo (power/data) metallic raceways required (similar to wiremold 4000 series)? ELECTRICAL / ICD 705 The use of rigid or EMT is required.
32 17-Jul-25 Please confirm RF filters are not required for power and low voltage signals entering secured spaces. ELECTRICAL / ICD 705
RF shielding is not required for contract award as it is not a requirement in the SOW, however, if guidance becomes available after award in which RF shielding is required, the government will modify the contract.”
33 17-Jul-25 The Telecom/Data MPOE is shown in the Utility Room (See E-301) in the same wall where fire alarm equipment is located (see FA101). Recommend the MPOE be located in a different room;
please clarify.
Drawing E-301 & FA101 ELECTRICAL / COMM Panels shall remain in the same room. Note that conditioning shall be provided to the mechanical/utility room.
34 17-Jul-25
The Preliminary Electrical Load Calcuations include a 70% UFC Demand Factor per UFC 3-501- 01, Table 1. Per UFC 3-501-01 paragraph 3-2.3.1: "Do not apply these factors to distribution equipment downstream of the service entrance transformer". Therefore, the 70% demand factor may be applied to the pad-mounted transformer but not to the Main Switchboard MSB. If applicable, please provide the required new MSB amps size to meet UFC requirements.
Attachment 4, Appendix Y - Preliminary Calculation B47 ELECTRICAL MSB shall be 800A and service transformer shall be at a minumum 750 KVA.
35 17-Jul-25
Per the SOW, the offcie rooms, large auditorium, multipurposed rooms and brifing rooms inside renovated area, and new addition are to be constructed to meet the requirements of ICD-705 Physical Security requirements located in Appendix P. However, the specific criteria listed in SOW sections pertaining to different disciplines only mentions STC requirements and penetration treatment for secure boundary walls. Please confirm whether the RFP Statement of Work as pertains to the ICD 705 compliance has been reviewed with the CTTA per ICD 705 Chapter 3, Section C.4 "Radio Frequency at Perimeter Walls", and that the boundary of the secure spaces in B47 DO NOT require RF attenuation, which could include RF Shielding at the secure areas' boundary (walls, true floor and true ceiling), RF Shielded doors, power filter, RF filters for low votage copper and cabling, honeycomb waveguides at ductwork and piping penetration secure boundary, etc.
SOW 1.3.1 / ICD 705, V1.5.1,
Chapter 3, Section C.4 ICD 705 / USER
RF shielding is not required for contract award as it is not a requirement in the SOW, however, if guidance becomes available after award in which RF shielding is required, the government will modify the contract.”
FA486125B0001 2 OF 12
SECTION #)
DIVISION
(ELEC, MECH, COMM, STRUCT,
ETC.)
GOV'T ANSWER
36 17-Jul-25 If the CTTA does require RF shielding for this facility, please define the level of RF attenuation required and the RF frequency range.
ICD 705, V1.5.1, Chapter 3, Section C.4 ICD 705 / USER
RF shielding is not required for contract award as it is not a requirement in the SOW, however, if guidance becomes available after award in which RF shielding is required, the government will modify the contract.”
37 17-Jul-25
Please confirm that the only 50 STC-rated walls are the boundary walls of the (2) ICD 705 secure suites, and that none on the rooms inside the secure secure suites require 50 STC separation from each other (for example, MPR-Large to Office-1). SOW 1.3.6.5 indicates to provide 50 STC doors to mid-size mission planning rooms (as well to the secure boundary openings), but 1.3.6.4 only requires 50 STC walls for the secure boundary. If there are additional spaces within the suites that require acoustical separation, please identify rooms and define the acoustic rating required.
SOW 1.3.6.4 and 1.3.6.5 ICD 705 / USER Correct. The only 50 STC-rated walls are the boundary walls.
38 17-Jul-25
Existing Roof Conditions: The existing (and new) roof above the secure suite areas are considered to be the "true ceiling" which is required to meet the same 50 STC performance as the secure boundary walls; per as-built drawings provided, we know the existing roof was replaced in 2003, but the drawings only describe 90 MIL EPDM membrane over R-30 insulation - there is no mention of a coverboard as part of the assembly, and the set does not include any roof details. It is unclear whether this roof assembly, which is indicated to be repaired/reused will meet the 50 STC requirement. Can the Government provide the shop drawings for the roof replacment project, so we can determine the acoustical performance of the roof? If not, provide direction for acoustical mitigation.
SOW 1.3.16.10 ARCHITECTURAL Shop drawings are not available for the previous roof replacement project at B47. Contractor may propose acoustical mitigation methods after contract award, during the design process.
39 17-Jul-25
Per the 35% drawings, the Classified Server Room is located inside the south secure area, which is separated from the northwest secure area by uncontrolled space. The plan configuration will required the classified data to leave a secure space, cross an uncontrolled area, and enter a different secure space. Please confirm this configuration has been approved by the AO or CTTA and whether a protected distribution system (PDS) will be required.
ICD 705, V1.5.1, Chapter 3, Section G SCIF Penetrations
Criteria, A-101 and LV201
ICD 705 / USER
Unencrypted communication cables transmitting SCI between classified facilities shall be installed in a Protective Distribution System that complies with standards established in CNSSI 7003, Protected Distribution System.
40 17-Jul-25
The SOW structural section referenced describes an area of depressed slab that be repaired/remain, and this area is identified on S-200 (between GL 2-3 and E-J). However, this area of depressed slab is not identified on the architectural drawings or described in architectural SOW to receive access floor. During the 7/14/25 site visit, it appeared to us that this proeviously depressed slab area in Room DDS-2 has been infilled with concrete at some earlier date. Please confirm whether this area has a level or depressed floor slab, and it is depressed, provide direction as to treatment.
SOW 1.3.14.3, 35% Drawings AD-101, A-101 and S-200;
Original As-Built Drawing 9.
ARCH / STRUCT
See sheet S-200 in Appendix A - 35% Concp Dsg PDF. Between Grids E-2/3 and J-2/3. See 1969 Original Build, File S14.TIF in Attachment 5 - Appendix X. Per SOW section 1.3.14.3 The depressed portion of the slab on grade is to be patched and repaired as required. This shall be with level floor in accordance with the 35% design intent. No Access Flooring is required in this area.
41 17-Jul-25
The SOW and referenced 35% drawings indicate the new CMU walls; the SOW states to "Provide CMU walls, both split-faced and honed to match existing color and pattern of adjacent buildings, but A2.01 indicates to paint the new CMU to match existing. Per the site visit, it appears that the existing CMU walls have an EIFS finish applied over the existing CMU, approximately 2" thick.
Please confirm whether we need to provide an EIFS finish over the new CMU to align with the face and color of the existing finish wall, or if we are to paint the exposed "New" CMU (which will not align with the face of the exterior walls) to match the EIFS color.
SOW 1.4.7.2, 35% Drawings A- 101, A-201 and S-200. ARCHITECTURAL
New CMU site walls shall match the existiing split-faced, honed and vented CMU as applicable.
EIFS is not to be used on the new CMU walls. Per SOW 1.4.7.2 Existing exterior masonry walls shall be painted to match the new exterior masonry walls.
42 17-Jul-25 Please confirm whether it is acceptable for our design team to include the civil engineering firm (J.B Young and Associates), who were responsible for the civil engineering design for the 35% submittal for this project?
GENERAL Yes, that is acceptable.
43 17-Jul-25
The Basis of Design section referenced mentions compliance required with Executive Order 14057 (decarbonization and clean energy (i.e., electrification)) which is reflected in the proposed mechanical system equipment design shown onthe 35% drawings. This EO was revoked by the Federal Government on January 20, 2025. Please confirm whether the "electrification" requirements shown in the 35% design are still applicable, or whether HVAC systems using natural gas may be considered.
Appendix C Basisi of Design, 5.3, 35% Drawings C102, MD101, and M101 MECH / ELEC HVAC systems using natural gas can be considered if natural gas is available, otherwise, electrical shall be used.
44 17-Jul-25
1. The zoning plan on M002 does not seem to have adequate zones to provide temperature control based on occupancy and orientation. We suggest requiring additional zones for Zone-1 (due to size), and the following zones to make better temperature control between heavily occupied dense rooms in one zone: Zone-3, Zone-9 and Zone-8. If the government wants to add these zones, please revise the RFP accordingly to require this.
35% Drawings, M002 MECHANICAL The 35% design provided is a conceptual design. Contractor may propsoe zone revisions, provided the HVAC design meets the SOW sections 1.3.10, 1.3.20, 1.4.42, UFC, IBC, Nellis IFS, and all other standards.
45 17-Jul-25
The referenced section in the SOW states that no mechanical equipment may be located on the roof. Please confirm that this does not appliy to ductwork. M101 appears to show new ductwork routed to the roof, anf per the building sections referenced, it does not appear there is sufficient clearance above the ceiling to for all ductwork. Note As-Built Drawing A2 Section 1 shows an even lower top of masonry elevation (9'-7") than is shown on the 35% drawings A301 Section 2B (10'-8"), sop some areas of the building will have even less clearance.
SOW 1.3.10.2, 35% Drawing A- 301 and M101, As-Built
Drawings for 1985 Addition, Drawing 2.
ARCH / MECH
Per APPENDIX J Nellis and Creech AFB IFS Mechanical & Plumbing Requirements 9.i. Roof mounted mechanical equipment is prohibited. However for some renovation projects and unavoidable configurations, roof equipment may be allowed on a case basis per BCE office approval.
46 17-Jul-25
Section 1.3.21 describes the requirements for the FA/MNS system, and in 1.3.21.1, it states that "The control units are anticipated to be reused. Existing devices, conduit and wiring in like-new conditins may be reused". Section 1.3.21.4 includes a note which reads "FA and MNS shall be replaced with Monaco throughout. Wheelock MNS devices are compatible with Monaco MAAP-X Fire Alarm Panel." Unclear whether the statement is supposed to read that the Wheelock MNS devices are not compatible, as the prior statement says to all devices replace with Monaco throughout. Please clarify which, if any, components or devices associated with the existing FA/MNS may be reused.
SOW 1.3.21.1 AND 1.3.21.4 FIRE ALARM The Wheelocks are compatible, however, the Hochiki devices are not compatible and shall be replaced.
FA486125B0001 3 OF 12
SECTION #)
DIVISION
(ELEC, MECH, COMM, STRUCT,
ETC.)
GOV'T ANSWER
47 17-Jul-25 Is the Government requesting only one CD that includes all required items (1–7), or are offerors required to submit both hard copies of items (1–7) and a CD containing those same items? Solicitation Not applicable The Government is requesting 1 paper copy each of Items 1-7, and 1 CD that includes electronic copies of all required items 1-7, see updated Solicitation, Section L.
48 17-Jul-25
Due to the hard copy submission requirement and pending responses to vendor questions, we’re concerned about having enough time to finalize and deliver a complete, compliant bid.
We respectfully request a 14-business-day extension from the date Q&A responses are posted to allow sufficient time for printing and delivery.
Solicitation Not applicable As of 28 Jul 25, bid due date is extended to 10am (PDT) 13 August 2025. See updated Solicitation amendment(s).
49 17-Jul-25
Per the supplied 35% drawing there are two package units shown due to the space constraints the duct work sizing from these units will not be feasable or will it fit in the allowable space above the ceiling Are other design aceptable such as a 4 pipe system with low profile fan coils that will fit in the allowable ceiling space?
35% drawings MECHANICAL Yes, the government will accept deviation from the 35% conceptual design as long as the SOW, UFC, IBC, Nellis IFS, and any other standards are met.
50 17-Jul-25 What are the escort requirement during construction? Will the Gov't provide the escorts? General/Not Applicable General/Not Applicable This is managed by the site security officer which is provided by the governement
51 17-Jul-25 Please confirm that the building will be emptied out prior to start of construction and that it is the responsibility of the Gov't. General/Not Applicable General/Not Applicable
Existing furniture and equipment that is not a part of the building's real propoerty (e.g. auditorium seating) will be removed as part of current B47 user's turnover of the facility. They must remove all their items.
52 17-Jul-25 What is the requirement from floor to deck? SOW 1.3.4 ARCHITECTURAL Minimum ceiling height is 8', Floor to deck differs between existing and new addition. See SOW.
Contractor shall follow ICD 705.
53 17-Jul-25 Confirm the temperature parameter required for the comms room. SOW 1.3.18 COMM
Contractor shall follow NC2710.
1.8 ENVIRONMENTAL REQUIREMENTS
Equipment in CELs shall be rated for continuous operation under ambient temperature control (24 hours/day, 365 days/year), with an independent thermostat to protect all installed electronic equipment as defined in TIA-569-C and TIA-569-C-1.
Reference TIA-569-C, TIA-569-C-1, and TIA-569-D-1 for Dew Point and HVAC requirements.
54 17-Jul-25 Will the entire building be classified as SCIF or 2 seperate SCIFs? Will the government please provide clarification on the tempest ratings for all the SCIF areas? ICD 705 / USER No, see outlined areas in drawings. 2 SCIFs shall be established.
55 17-Jul-25
On sheet E-301 of the RFP 35% drawings there are 2qty Panel L3 and 2qty Panel L4 shown in different locations. Panel L3 is shown in the classified server room and the breakroom. Panel L4 is shown in the Lobby and in the server room. Which location is correct? Are more panels required than what is shown on E-501 one-line diagram?
35% drawings ELECTRICAL Panels shall be renamed to avoid the conflict, however, the panels shown in the design are required. Note that panels inside the SCIF shall be provided for all types of circuits and these panels shall not share circuits with non-class.
56 17-Jul-25 On sheet E-301 of the RFP 35% drawings there is a Panel LM2 shown in the Hallway but there is only a Panel LM1 shown on E-501 one-line diagram. Is panel LM2 required and if so what size amperage for the panel?
35% drawings ELECTRICAL Provisions for LM2 shall be shown/included on the awarded contractor's one-line diagram.
Amperage shall be determined by DOR.
57 17-Jul-25 On Drawing sheet LV-801 the server room detail #5 show 6qty Networks but the outlet details #1 & #4 only describe NIPR & SIPR networks. How many networks are required? 35% drawings COMM / USER
Please see current SOW:
a. Each desk requires 12 outlets per user’s workstation requirements.
b. Instructor office:
i. 6 fiber ports available for every desk to support
1. NIPR
2. SIPR
3. JWICS
4. SAP
5. 2x Simulator network
ii. 1x NIPR VoIP at each instructor desk
iii. 1x TSVoIP at each instructor desk iv.Dual monitors
v. KVM for each desk
vi. UPS for each desk
c. Mission planning room:
i. 6 fiber ports available for every desk to support
1. NIPR
2. SIPR
3. JWICS
4. SAP
5. 2x Simulator network
ii. 2x NIPR VoIP in every room
iii. 2x TSVoIP in every room
iv. Dual monitors
v. KVM for each desk
vi. UPS for each desk
58 17-Jul-25 There is no legend for the communications outlets. Which outlets shown on LV-201 are to be NIPR, SIPR, or phone outlets? 35% drawings COMM / USER See detailed IT requirements noted in Item 57. User to confirm exact locations during design.
59 17-Jul-25
Section 1.10.7.5 states to provide “Quad Fiber Optic Receptacles”. Does this mean 4qty (2-strand OM4 fiber)? The details on LV-801 show 2qty CAT-6 with 2qty (2-strand OM4 fiber) for NIPR outlet and 2qty (2-strand OM4 fiber) for SIPR outlet. Will the requirement be what is on the drawings or what is described in the SOW?
SOW 1.10.7.5 COMM / USER Please see current SOW updated to reflect 6.
FA486125B0001 4 OF 12
SECTION #)
DIVISION
(ELEC, MECH, COMM, STRUCT,
ETC.)
GOV'T ANSWER
60 17-Jul-25
Section 1.10.7.6 states to provide “Quad Port Cat-6 Receptacles within the new classified as shown on the 35% conceptual design” however, there is no legend stating which outlets are to be Cat-6 and which are to be fiber on LV-201. The outlet details do not show any Quad Cat-6 Outlets on LV-801. What is the communications requirement for the outlets of this building?
SOW 1.10.7.6 COMM / USER Please see current SOW updated to reflect 6.
61 17-Jul-25
Section 1.10.7.7 states that “99 Comm Squadron plans to advise the contractor on the fiber connection type, order, and fiber count during the splicing process.” Is this for the OSP plant fiber that will feed the building? For bidding purposes please provide a count on the number of strands desired for the OSP fiber feed.
SOW 1.10.7.7 COMM
OLC preferred, but open to 99 CS recommendations. Per 99 CS/SCXP, Bldg 66 currently has 12 strand fiber coming in. Bldg 47 has 48 strands of fiber. We don’t see a reason for any more than that in Bldg 47.
62 17-Jul-25 Please provide the Nellis AFB manhole matrix that details where we will derive the OSP fiber from.
Will the OSP need to be pulled all the way from Building 6?
SOW 1.4.43.21, SOW
1.8.1.1.4, SOW 1.8.1.2.2 COMM
See RFI 83_Picture1.png and RFI 83_Picture2.png; the manhole and conduit line are indicated in yellow.
| a. | New fiber will be installed from B47 to P6 through existing manhole duct system. |
| b. | Manhole duct system will need to be verified by the contractor to ensure pathway is clear and |
unobstructed.
c. A map can be provided depicting the fiber route if the customer wants an additional fiber optic cable
63 17-Jul-25
SOW Section 1.11.3.21 states “Field Training: Provide field training course (minimum 8 hours) in operation and maintenance of the fire alarm system for Base Fire personnel as stipulated by Contracting Officer. “All Fire Alarm shop personnel are already Monaco Certified. Monaco training is only held in Spokane Washington. Is this a necessary requirement?
SOW 1.11.3.21 CE / CONTRACTING Monaco training is not required.
64 17-Jul-25 Will the government provide a DD254 for this project? Not applicable Not applicable No. Contractor's will not have access to classified information.
65 17-Jul-25 Will the Government please clarify who is responsible for provisioning? Not applicable Not applicable See SOW Section 1.20 for Government provided utilites.
66 17-Jul-25 Who provides server room equipment (patch panels, switches, racks, etc.) Contractor or USAF IT? Apx A-35% Concp Dsg PDF, B47 Sheet LV-801 COMM / USER USAF IT
67 17-Jul-25 Will any PV system be required? SOW 1.4.27 ELECTRICAL No
68 17-Jul-25 Will any EV charging be required? SOW 1.4.27 ELECTRICAL No
69 17-Jul-25
UFC 1-200-02 is listed as a standard that is required for compliance. The overall building square footage with the additions and existing building area exceeds the 10,000 sf threshold for High Performing Sustainable Buildings (HPSB) Guiding Principles Third-Party Certification (TPC) eligibility, per UFC 1-200-02, Change 2 from Jun 2022. A new UFC 1-200-02, Change 3 was released July 8, 2025 which increases the threshold for TPC eligibility to 25,000 sf. Please confirm that the latest UFC is required for compliance (with Change 3, released July 2025) and that while Guiding Principles tracking and reporting are required, TPC is not required.
1.4.42.22 Energy Conservation SUSTAINABILITY
SOW 1.12, All design and construction must be in compliance with the most recent versions of the applicable codes and standards. Per Table 1-1 the existing building and added additions do not meet or exceed the threshold of ≥ 25,000 GSF.
70 17-Jul-25
Specification section 01 33 29 Sustainability Requirements and Reporting is listed on the 35% specifications Table of Contents. Please confirm if the government will be providing the sustainable requirements for this project via section 01 33 29, or if the DOR will be required to compile the specifications for this section.
Apx D 35% Specs TOC SUSTAINABILITY DOR shall develop the specifications for this section and all other sections using the United Facilities Guide Specifications (UFGS) per SOW Section 1.16.3.1
71 17-Jul-25 RFP states that a minimum of 50% waste diversion is required. However, the current sustainability requirements per UFC 1-200-02 HPSB Guiding Principles require at least 60% diverted waste for each project. Please confirm that 60% construction and demolition waste diversion is required.
SoW 1.27.13.3 SUSTAINABILITY SOW 1.12, All design and construction must be in compliance with the most recent versions of the applicable codes and standards.
72 17-Jul-25 Please confirm that an energy model is required for this project to demonstrate that 30% energy savings compared to ASHRAE 90.1-2019 have been achieved, if LCCE. SoW 1.4.42.23 to 1.4.42.25 SUSTAINABILITY
Yes, per SOW 1.4.42.23 An Energy Compliance Analysis (Building Simulation Program) utilizing TRANE Trace 3D Plus, Carrier Hourly Analysis Program (HAP), or another full simulation software to provide system energy consumptions is required.
73 17-Jul-25 Please provide any special door hardware requirments for all doors other than the communications room and offices in unclassified spaces. Or that doors are to comply with ICD-705, Chapter 3.E.2? SOW 1.3.6.7 ARCHITECTURAL Door hardware is to comply with ICD-705, Chapter 3.E and will be reviewed by the SSO/SSM for compliance.
74 17-Jul-25 Please confirm new STC 50 perimeter walls in the classified area will be ID-705, "Wall A, Sound Group 4"? SOW 1.3.16.4 ARCHITECTURAL Yes, Wall A, Sound Group 4
75 17-Jul-25 Please confirm new partition walls for the various offices, MPRs, and Briefing Rooms in the classified area will be STC 50 ICD-705, "Wall A, Sound Group 4"? SOW 1.3.16.5 ARCHITECTURAL Yes, Wall A, Sound Group 4
76 17-Jul-25 From SOW 1.3.16.4 & 1.3.16.5, will wall require RF shielding? SOW 1.3.16.6 ICD 705 /
USER
RF shielding is not required for contract award as it is not a requirement in the SOW, however, if guidance becomes available after award in which RF shielding is required, the government will modify the contract.”
77 17-Jul-25 If deteremined existing EPDM roof system insulation is less than R-30 per SOW 1.4.7.6, is upgrading roof insulation value including a new EPDM roof to be included in this scope of work? SOW 1.3.16.10 ARCHITECTURAL
Roof was replaced in 2019. Installation was to include 2 layers of insulation staggeed to total R-30 or better. If it's determined that the existing roof insulation value is less than R-30, this would be an unforseen condition.
78 17-Jul-25 Are all new "wall" systems required to have a mininum no dollar limit 20 year warranty from the single source manufacturer? SOW 1.4.7.4 ARCHITECTURAL UFC 3-110-03 – 1-8.12 Warranty Requirements apply to any new roof only.
79 17-Jul-25 Are exterior wall mounted roof access ladders with safety measures acceptble for this facility? SOW 1.4.9.1 ARCHITECTURAL / ICD 705 Contractor shall design roof access in accordance with UFC 3-410-01, OSHA and IBC standards.
Per UFC 3-410-01 Section 3-15.2, secure external ladders or stairways with locked cages or similar mechanisms. Location of ladder to be confirmed in 65% design.
FA486125B0001 5 OF 12
SECTION #)
DIVISION
(ELEC, MECH, COMM, STRUCT,
ETC.)
GOV'T ANSWER
80 17-Jul-25 Per Life Safety drawings, sheets GI002 and GI003 drawings indicate a code "non-separated" use approach for both IBC and NFPA, 1.4.25.7 indicates a code "separated" use approach. Please advise which approach is to be followed.
SOW 1.4.25.7 ARCHITECTURAL Life safety plans and calculations shall be updated to reflect non-seperated use approach.
81 17-Jul-25
Per SOW 1.4.42.37.1 and 1.4.42.37.2 building pressurization was maintain a maximum of 0.1" w.c. and most be monitored, and space pressurization of environmental/toxic air must be contained in the spaces as required. Can it be confirmed that positive 0.1" w.c. maximum is desired? Can it be also confirmed the restrooms, janitors rooms are the only spaces that should be negative to the rest of the building, and the server rooms are not required to be positive to the rest of the building?
SOW 1.4.42.37.1 to 1.4.42.37.2 MECHANICAL Yes, .1" w.c. is desired per the SOW. Contractor shall follow the requirements as set forth in the SOW, however, it can be assumed that the restrooms and janitors shall be negative to the rest of the facility and the servers rooms positive to the rest of the facility.
82 17-Jul-25 Per SOW 1.3.10.2 the server room shall be provided with a split system cooling unit for redundancy. Can it be confirmed that an additional system from the house system and it's built in redundancy is not desired over a split system direction expansion unit?
SOW 1.3.10.2 MECHANICAL
Concur. The cooling redundacy shall be provided by a split system and not by the building's HVAC built in redundancy. The server room shall be provided with cooling from the facilities HVAC system and provided with a mini-split for redundancy.
83 17-Jul-25 SOW Section 1.9.6.20 states that all exterior panels shall be NEMA 3. Electrical Panel enclosures are not made NEMA 3. Will NEMA 3R with a gasket to meet NEMA 3R/12 be acceptable? SOW 1.9.6.20 ELECTRICAL Exterior panels shall be NEMA 3 or 3R/12 or 4.
84 17-Jul-25 Please clarify the tempest level required in secured spaces. Not applicable ICD 705 / USER It is a SCIF.
85 17-Jul-25
The design-build construction solicitation currently employs sealed bidding under FAR Part 14.
Given the substantial design effort anticipated (e.g., analyzing the 35% design, running preliminary calculations, and validating SCIF requirements) necessary to develop pricing and considering the expected level of interest from industry, could the Government explain its rationale or internal analysis for choosing sealed bidding instead of using FAR Part 15 and the mandatory two-phase design-build procedures authorized by 10 U.S.C. § 3241 and outlined in FAR Subpart 36.3?
Solicitation (SF 1442) CONTRACTING
FAR 6.401 (a) states Contracting Officers shall solicit sealed bids using procedures at FAR Part 14 if the conditions identified are met. The conditions at FAR 6.401 were met: Time permits the solicitation, submission, and evaluation of sealed bids; award will be made on the basis of price;
the SOW provided is comprehensive, negating the necessity for Discussions; and there is reasonable expectation of receiving more than one sealed bid.
86 17-Jul-25
If the Government concluded that the two-phase design-build procedures were not required, can you describe how the current FAR Part 14 approach (which prohibits technical discussions, clarifications, and price-realism evaluations) will mitigate key performance risks (design assumptions, SCIF security compliance, unrealistically low pricing) and ensure award of the most advantageous contract?
Solicitation (SF 1442) CONTRACTING
To further mitigate risk to the government, Offerors were provided an opportunity to view the site and ask technical questions and/or address ambiguities during this RFI process that would otherwise prohibit designing and proposing to the Statement of Work as provided. Any bid may be rejected if the Contracting Officer determines the bid is unreasonable as to price, or the prices for any line items are materially unbalanced. Awardee must also conform to the Invitiation for Bid, and be considered responsible in accordance with FAR 9.104-1. An offeror who does not meet the general standards of FAR 9.104-1 may be considered ineligible for award.
87 17-Jul-25
The current SAM announcement identifies this solicitation as “8(a) competitive.” However, the solicitation includes FAR 52.219-6 (Notice of Total Small Business Set-Aside) rather than 52.219- 18 (Notification of Competition Limited to Eligible 8(a) Participants) and 52.219-17 (Section 8(a) Award). Could the Government clarify its intended set-aside approach, including the status or timeline of SBA acceptance, and whether the solicitation will be updated to include the appropriate clauses?
Solicitation (SF 1442) Page 13 CONTRACTING FAR 52.219-6 removed; FAR 52.219-18 and FAR 52.219-17 included. Solicitation is limited to active SBA Certified 8(a) program participants with NAICS 236220 listed under service classifications.
88 17-Jul-25
Given the extended performance period and recent volatility in key construction materials such as steel, copper, and concrete, has the Government conducted any analysis on the appropriateness of including an Economic Price Adjustment (EPA) clause (i.e., 52.216-4)? If the Government decides against incorporating an EPA clause, please briefly explain how the Government can otherwise address potential risks from market fluctuations over the performance period in a sealed bidding environment.
Solicitation (SF 1442) CONTRACTING Award shall be a firm fixed price where price is not subject to any adjustment on the basis of a contractor's cost experience in performing the contract. This contract type places upon the contractor maximum risk and full responsibility for all costs and resulting profit or loss.
89 17-Jul-25
The solicitation includes DFARS 252.204-7012 (Safeguarding Covered Defense Information and Cyber Incident Reporting). The solicitation should include 252.204-7012 (DEVIATION 2024-O0013, Revision 1), and we request that the Government update the solicitation with the Class Deviation for this clause.
Solicitation (SF 1442) Page 14 CONTRACTING DFARS 252.204-7012 Deviation 2024-O0013 updated in Solicitation.
90 17-Jul-25 Will the governmet please calify the requirment for red power? SOW 1.4.27 ELECTRICAL Government is unsure of what is being asked.
91 17-Jul-25 SOW Section 1.3.7.8 states to provide a counterpoise ground loop be added around the building additions. Will this be required around the entirety of the building and the additions as described in SOW Section 1.3.17.20?
SOW 1.3.7.8, 1.3.17.20 ELECTRICAL Contractor shall furnish counterpoise ground loop around the entire building per Nellis IFS.
92 17-Jul-25 SOW Section 1.3.17.5 mentions a Motor Control Center (MCC). What is the purpose of the MCC?
Suggest eliminating the MCC and powering the HVAC units from electrical panels instead. Is this acceptable?
SOW 1.3.17.5 ELEC / MECH Contractor shall determine whether there is a need for a MCC or not pending their HVAC design.
93 17-Jul-25 There are multiple conflicting cable tray requirements. SOW Sections 1.3.24.5, 1.4.4.1, and 1.4.4.9 state to provide 12” x 3” basket tray. SOW Section 1.4.4.2 states to provide solid bottom welded tray. What is the requirement for the cable tray system?
SOW 1.3.24.5, 1.4.4.1, 1.4.4.9,
1.4.4.2 ELEC / COMM Cable trays of basket type are to be used for drop ceilings and ladder tray shall be used for raised floor. Where basket type is used, it shall be structurally supported.
94 17-Jul-25 SOW 1.3.24.5 States basket tray is not acceptable under the raised floor. What style cable tray is acceptable under the raised floor of the auditorium and multipurpose room? Suggest allowing basket tray throughout to minimize cost.
SOW 1.3.24.5 ELEC / COMM Ladder tray shall be used under raised floors. See RFI response 93.
95 17-Jul-25 Neither the SOW Sections 1.3.17.4, 1.4.28.9, and 1.4.28.10 nor the 35% drawings state where the primary power is to derive from. Where will the 12.47kv Primary Power derive from?
SOW 1.23.17.4, 1.4.28.9,
1.4.28.10 ELECTRICAL
Since the 35% design was completed, B47 is now fed from 6-way switch at the corner of Devlin & Grissom. Therefore, no pole mounted feed is required. Contractor shall replace the cable from new T47 to Switch as the current cable is too short. Conduits are existing and can be modified at the new transformer pad.
96 17-Jul-25 Since this project was last walked in 2024 it appears the electrical vault that fed Building 47’s transformer has been replaced with a 6-way MV Switch. Will this Switch be the source of Primary power for the new Building 47 Transformer?
SOW 1.4.27 ELECTRICAL
Since the 35% design was completed, B47 is now fed from 6-way switch at the corner of Devlin & Grissom. Therefore, no pole mounted feed is required. Contractor shall replace the cable from new T47 to Switch as the current cable is too short. Conduits are existing and can be modified at the new transformer pad.
FA486125B0001 6 OF 12
SECTION #)
DIVISION
(ELEC, MECH, COMM, STRUCT,
ETC.)
GOV'T ANSWER
97 17-Jul-25 There is a single-phase clamshell transformer to the south of where the addition is to be. Will this transformer and its riser need to be demolished? SOW 1.4.27 ELECTRICAL No, the clamshell transformer being refered to is a base street lighting circuit and shall not be demolished.
98 17-Jul-25 SOW Section 1.4.28.10 Identifies a manhole. Will this manhole still be required if we are deriving primary power directly from the New MV Switch or nearby overhead power lines? SOW 1.4.28.10 ELECTRICAL
No manhole is required. Since the 35% design was completed, B47 is now fed from 6-way switch at the corner of Devlin & Grissom. Therefore, no pole mounted feed is required. Contractor shall replace the cable from new T47 to Switch as the current cable is too short. Conduits are existing and can be modified at the new transformer pad.
99 17-Jul-25 The SOW in sections 1.4.4.2 & 1.4.4.11 have verbiage for CAT-6 and Fiber for Classified workstations. What is required for Classified workstations Fiber or Shielded CAT-6? SOW 1,4,4,2 & 1.4.4.11 COMM / USER
a. Each desk requires 12 outlets per user’s workstation requirements.
b. Instructor office:
i. 6 fiber ports available for every desk to support
1. NIPR
2. SIPR
3. JWICS
4. SAP
5. 2x Simulator network
ii. 1x NIPR VoIP at each instructor desk
iii. 1x TSVoIP at each instructor desk iv.Dual monitors
v. KVM for each desk
vi. UPS for each desk
c. Mission planning room:
i. 6 fiber ports available for every desk to support
1. NIPR
2. SIPR
3. JWICS
4. SAP
5. 2x Simulator network
ii. 2x NIPR VoIP in every room
iii. 2x TSVoIP in every room
iv. Dual monitors
v. KVM for each desk
vi. UPS for each desk
100 17-Jul-25
The SOW in sections 1.4.4.2 & 1.4.4.11 have verbiage for a 6-port angled face plate but also states to provide a single 6-strand fiber cable. Each of the 6 networks will require 2-strands (Tx/Rx). This is 12-strands total. It is also stated in previous sections that each network shall require it’s own color coding. Will 6qty 2-strand fibers (12-strands total), all colored different, satisfy what is required for the classified workstations?
SOW 1,4,4,2 & 1.4.4.11 COMM / USER Contractor to determine after award.
101 17-Jul-25 Are all 6qty networks of the classified workstation to be in the same box with a 6-port data plate? SOW 1.3.18 COMM / USER Contractor to follow ICD 705 and NC 2710.
102 17-Jul-25 Which networks are allowed to be installed in the same rack or will each network be required to have its own rack. SOW 1.3.18 COMM / USER Contractor to follow ICD 705 and NC 2710.
103 17-Jul-25
1.4.4.2 States that the workstations will terminate in Government provided racks. Are all communication racks required for this project Government Furnished and Contractor installed
(GFCI)?
SOW 1.4.4.2 COMM / USER Racks will be government furnished.
104 17-Jul-25 There is no guidance for the Outside Plant (OSP) Fiber that will feed the building. Will the existing OSP cables be re-routed to the new communications room and be reused? SOW 1.3.18 COMM
If the existing fiber optic cables are to be rerouted to a new comm room location, it must be confirmed that there is enough slack to do so. If there is not enough slack, then a splice may be needed to be created in MH 287A for each cable, making them long enough to reach the new comm room location. As for the copper, as stated above, it is direct buried and is not in the MH system. A house cable may have to be terminated at the copper’s existing location and pulled into the new comm room location.
105 17-Jul-25 Section 1.3.18.6 states to provide “quadport” and “(6) port fiber receptacles. Is the quadport for the unclassified CAT-6 and the 6-port for the classified fiber? SOW 1.3.18.6 COMM / USER Both are required but primarily fiber. Only Cat-6 requirement will be supporting SEL & DO offices in addition to small unclassified conference room.
106 17-Jul-25 SOW Section 1.4.4.2 states to provide 6’ and 8’ factory made patch cords. This is typically and “end user” provided item when the network switches are installed. Will patch cords be required for every network port installed on this project?
SOW 1.4.4.2 COMM / USER User shall provide patch cords for network ports from patch panels to servers.
107 17-Jul-25 There are two communications manholes that require the duct bank to be re-routed out of the addition’s footprint. What buildings will this effect? Does building 47 feed OSP communications to other buildings?
SOW 1.3.18 COMM Relocating the conduits should only affect B47’s service
108 17-Jul-25
SOW Sections 1.3.1.1, 1.3.2.1, and 1.3.6.11 all state to provide a 6” raised floor in the auditorium and multipurpose room. A 6” raised floor does not leave enough space for Classified Comm trays, Unclassified comm trays, Electrical conduit, Comm/Power floor boxes, Fire Alarm conduit and devices, and Fire suppression. Can the raised floor be increased to 12-18” to allow space for these items?
SOW 1.3.1.1, 1.3.2.1 &1.3.6.11 ARCH / MECH / ELEC / LV / FA / FS