Atch 11_25B0001_RFI Log 2_Govt Response_CLOSED_14Aug25.pdf
PDF 7 MB Posted
- Attached to
- CONSTRUCT ADDITION & REPAIR INTERIOR, BLDG 47, 328 WPS, NELLIS AFB NV Federal contract opportunity
- Solicitation number
- FA486125B0001
About this file
This is a standard Adobe PDF portfolio opening screen that recommends using Acrobat X or Adobe Reader X (or later versions) to view the document. The image displays the Adobe PDF logo, a red and white document graphic, and provides a button to download Adobe Reader. There are no specific contract, solicitation, or federal procurement details contained in this initial screen.
View the file
Other files for this federal contract opportunity
Show all 27
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
For the best experience, open this PDF portfolio in
Acrobat X or Adobe Reader X, or later.
Get Adobe Reader Now!
http://www.adobe.com/go/reader
FA486125FB0001
CONSTRUCT ADDITION & REPAIR INTERIOR, 328 WPS, BLDG 47
RKMF230064
RFI LOG 2, GOVERNMENT RESPONSES
RFI LOG
No.
ITEM DATE
SUBMITTED
QUESTION SOW or DOCUMENT (INCL SECTION #, or PAGE, DWG SHEET, ETC.)
DIVISION
(ELEC, MECH, COMM,
STRUCT, ETC.)
GOV'T ANSWER
2 1 6-Aug-25 RFI's 57 & 189 describe what is required in the Mission Planning Room and the Offices. It does not address the comm requirements of the Auditorium. The audience typically doesn’t need comm workstations under their seats. Can the 30qty comm workstations under the audience seats be removed and if not removed, what networks are required in the auditorium?
SHEET LV-201 COMM 30 qty workstations to remain, assume SIPR network; TCR to confirm in 65%
2 2 6-Aug-25 RFI 66 response states that all communications equipment including Patch Panels, switches, racks, and etc.
are to be USAF IT provided. Typically only switches and patchcords are USAF IT provided. Will contractor be required to provide and install all racks and patch panels required for the NIPR/SIPR/JWICS/SAP/and SIM Networks?
RFI #66 & #193 Response COMM RFI Log 1, #66 & #193 Response Revision; USAF IT shall provide the switches and patchboards as typical and all other components shall be provided by the contractor.
2 3 6-Aug-25 If Networks are not allowed to share single workstation outlet boxes there will be 5qty workstation outlet boxes at every location, one each for NIPR, SIPR, JWICS, SAP, and 2x SIM Networks. Can any of these networks be combined at the workstation outlet box to minimize the workstation footprint?
RFI #57, #189, & #191 Response COMM Combining workstation outlets must be approved by the TCR during the 65% design review.
2 4 6-Aug-25 There are 30qty floor box Quad receptacles shown under the audience seats of the auditorium. This seems excessive for an audience and would be a cost savings to remove or reduce them. Can the floor box Quad receptacles be reduced or removed from under the audience seats in the Auditorium?
Sheet E-301 ELECTRICAL See RFI Log 2, #1 above.
2 5 6-Aug-25 The responses to these RFI's contradict each other. Will lighting be required for the North, Devlin Drive, Parking lot?
SHEET E-102 RFI #27 & #144 Response ELECTRICAL There are two parking lots on site. RFI#27 refers to the lot North at Devlin and RFI 144 refers to the lot North at Holloman behind B107. Additional parking lot lighting is not required at the parking lot along Devlin Drive.
Behind B47. Lighting is required at the lot north of B107 along current Holloman Ave.
2 6 6-Aug-25 Will items iv. Dual Monitors, v. KVM, and vi UPS be Government Furnished Equipment? SHEET LV-201 RFI #57 & #189 Response COMM Yes, Dual Monitors , KVM and UPS are Government Furnished Equipment.
Contractor must design to accommodate these items though.
2 7 6-Aug-25 With the building utilizing VoIP for phones will it be necessary to re-establish the copper OSP in the new comm room or can that 100-pair copper line be demolished or abandoned in place?
RFI #26, #104 & # 194 Response COMM Contractor is to keep existing copper line. IDS/ACS may require.
2 8 7-Aug-25 Will wet stamped/signed Bonds be required for bid opening, or will electronically sent and printed bonds be acceptable?
Contracting CONTRACTING Bid Bond Guarantee and Proof of Bonding Capability must be paper copies in accordance with Section L. Awardee will be required to furnish stamped performance and payment bonds of full contract price within 10 calendar days (Solicitation pg.1, FAR 52.228-15).
2 9 7-Aug-25 RFI#24 asked if water from adjacent fire hydrants can be used for dust control and construction use. Can the contractor use the building domestic water source for construction use?
Previous RFI Responses/Amd. 0003 Civil Contractor may utilize building domestic water source for construction use, however, building domestic water shall not be used for dust control.
2 10 7-Aug-25 RFI#41 is conflicting. The existing building is CMU wrapped with EIFS. Please provide direction on this since the gov. response says EIFS is not to be used, but the SOW says to match existing.
SOW 1.4.7.2, 35% Drawings A-101, A-201 and S-200.
Arch The complete building shall be painted/repainted a matching color. Please review sheet AD-101 vs A-101. Where existing CMU walls wrapped in EIFS are demolished for openings and require repair, the EIFS shall be repaired as required.. The larger new addition on on the west shall not receive EIFS.
Contractor may propose EIFS on the smaller new addition in the south corner.
2 11 7-Aug-25 If EIFS is not to be used on the new large addition on the west, we would recommend that the small addition south east side to match existing with EIFS.
SOW 1.4.7.2, 35% Drawings A-101, A-201 and S-200.
Arch The complete building shall be painted/repainted a matching color. Please are demolished for openings and require repair, the EIFS shall be repaired as required.. The larger new addition on on the west shall not receive EIFS.
Contractor may propose EIFS on the smaller new addition in the south
(RFI Log 1, #41 Clarification)
2 12 7-Aug-25 If the D0001 is not awarded with Base bid, will the contractor be able to use the existing parking lot and Holman Ave. as yard space?
Contracting CONTRACTING A laydown area is shown in the 35% drawings next to B107. If the contractor requires additional, they may use the spaces at Devline, but should account for any additional fencing requirements.
2 13 7-Aug-25 Will the new mechanical equipment need to be covered? M101/ Mechanical Per UFC 4-010-01 3-3.6 Enclosures. When trash containers, fuel tanks or electrical or mechanical equipment within the unobstructed space provide the opportunity for concealment, they must be enclosed.
Enclosures must have four sides and a top. 35% design shall be updated per SOW 1.3.1.6.6. This wall and top can enclose only the mechanical equipment.
14-Aug-25
FA485125B0001 1 OF 12
2 14 7-Aug-25 Please confirm that Clin 0003 is to include the total cost of all REPAIR work plus the 3 deductive items and the line cost per Deductive item will be taken away from CLIN 0003 if budgets are not met.
Bid schedule CONTRACTING Confirm. CLIN 0003 includes total cost of all Repair work plus the 3 Deductive items. If the low offeror's base bid exceeds the funds determined available, the Contracting Officer shall evaluate all bids on the basis of the same deductive items (See Solicitation, Section M, Steps 5-6). Deductives will reduce bid price from CLIN 0003 Repair and CLIN 0001 according to the Bid Schedule.
2 15 7-Aug-25 In the event that D0001 is not awarded, what is the contractor allowed to demolish and what is the contractor to salvage on sheet C-102?
Contracting See Sheet C-103 in the 35% design drawings and previous RFI Log 1. #158 response.
2 16 7-Aug-25 Can Devlin Ave. be closed off between Grissom and England for contractor use? Or will this need to remain open during construction? If the answer is NO, can the contractor use all parking stalls at Devlin parking area?
Contracting Devlin Ave between Grissom and England shall remain open through construction, unless a scheduled road closure is required and coordinated through and approved by 99 CE. A laydown area is shown in the 35% drawings next to B107. If the contractor requires additional, they may use the spaces at Devline, but should account for any additional fencing requirements.
2 17 7-Aug-25 RFI #109 response said that if a line was found under the building footprint, it would possibly not be treated as an unforeseen. How are we supposed to know what is under the building if a utility map was not provided?
Previous RFI Responses/Amd. 0003 Civil RFI Log 1, #166 See Utility.B47.pdf. GIS may be requested after award. See map now attached to responses.
2 18 7-Aug-25 Is there a % cap for design costs? Example: Other DOD clients have previously not allowed and design costs to be higher than 6% or the project total.
Bid Schedule Clin 0001 Contracting CONTRACTING No.
2 19 7-Aug-25 Please clarify that ‘hone face’ CMU as referenced in SOW 1.4.7.2 means ground face CMU. SOW 1.4.7.2 ARCHITECTURAL See previous RFI Log 1, #41; New CMU site walls shall match the existing split-faced, honed and vented CMU as applicable Additional clarification provided in RFI 10 above.
The complete building shall be painted/repainted a matching color. Please review sheet AD-101 vs A-101. Where existing CMU walls wrapped in EIFS are demolished for openings and require repair, the EIFS shall be repaired as required.. The larger new addition on on the west shall not receive EIFS.
2 20 7-Aug-25 Drawing A-201 Please confirm that paint is to be applied to hone face and split face CMU per the exterior elevations on sheet A-201. Paint will mask the aesthetic quality gained from having hone face CMU. The Exterior Finish Schedule in the SOW appears to indicate that the split and ground face CMU should be provided with integral color finish (Nellis Brown).
Attachment 4, Appendix A 35% Concept Drawings, Sheet A-201, Exterior Finish Schedule and SOW 1.4.10.
ARCHITECTURAL See previous RFI Log 1, #41; New CMU site walls shall match the existing provided in RFI 10 above.
The complete building shall be painted/repainted a matching color. Please review sheet AD-101 vs A-101. Where existing CMU walls wrapped in EIFS are demolished for openings and require repair, the EIFS shall be repaired as required.. The larger new addition on on the west shall not receive EIFS.
2 21 7-Aug-25 RFI 70 regarding sustainability: GOV is asking DB Team to write a Div 1 spec section. Usually GOV edits and provides Div 1 sections for DB RFPs. The concern is that if all proposers edit their own version of this spec section, there will not be a common basis for bidding.
Response to RFI 70 with response provided in Amd. 03. Attachment 4, Appendix D, 35% Specs TOC
SUSTAINABLE DESIGN RFI Log 1, #70 Response remains unchanged. Current SOW shall be included as the basis of the Div 1 Specs.
2 22 7-Aug-25 Please confirm the room acoustics requirement for the Auditorium as it appears this room is configured for presentations to a large group. UFC 3-101-01 Table 2-1 shows a design criteria of reverberation time RT60 <1.0 sec for auditoriums. Please confirm room acoustics design for the Auditorium is to meet RT60 < 1.0 sec.
SOW 1.12 Codes and Standards UFC 3- 101-01 Architecture
ARCHITECTURAL-
ACOUSTICS
Per UFC 3-101-01 Section 1206.4 Spaces such as Special Access Program Facilities (SAPF) and Sensitive Compartmented Information Facilities (SCIF) must comply with specific criteria to be accredited for operation.
Contractor may propose to meet STC 60 as long as the min. STC 50 is achieved per ICD 705.
2 23 7-Aug-25 UFC 3-101-01 Table 2-1 requires Auditoriums to have STC 60 walls and STC 50 doors. Please confirm that we are to follow this requirement for a higher STC at auditorium walls. The 35% Drawing A-101 shows both partitions and doors with STC 50 rating (since they are perimeter SCIF walls and doors).
SOW 1.12 Codes and Standards UFC 3- 101-01 Architecture
Per UFC 3-101-01 Section 1206.4 Spaces such as Special Access Program Facilities (SAPF) and Sensitive Compartmented Information Facilities (SCIF) must comply with specific criteria to be accredited for operation.
Contractor may propose to meet STC 60 as long as the min. STC 50 is achieved per ICD 705.
FA485125B0001 2 OF 12
2 24 7-Aug-25 Please resolve the conflict between the responses to RFIs #37, #74 and # 75 answered with Amd. 03: All questions pertained to SOW 1.3.16.4 and 1.3.16.5, and wanted to confirm whether only the boundary walls of the secure spaces are required to have 50 STC rating (i.e., ICD 705 Wall A, Sound Group 4), or if the non-secure boundary walls of the Mission Planning Rooms are also required to have 50 STC rating, as SOW
1.3.16.5 calls for 50 STC Doors to these rooms, but does not specify 50 STC rated walls.
RFI # 37 response says the only 50 STC walls are the boundary walls.
RFI #74 and #75 responses indicate that both the perimeter walls for the classified area (74) and the partitions for the various offices, MPRs and Briefing Rooms inside the classified area and references ICD 705 Wall A, Sound Group.
Please provide clarification as follows: Identify each room (by Room Number) which requires 50 STC rated partitions/walls (all 4 walls) as well as 50 STC rated door, with the understanding that only the rooms walls which are also part of a secure boundary wall will be constructed to comply with ICD 705, Wall A, Sound Group 4. 50 STC partitions which are not part of a secure boundary do not need to meet other ICD criteria for boundary wall construction (e.g. gauge and stud spacing).
Am 3, RFI Responses for #37, #74 & #75, and SOW 1.3.16.4 and 1.3.16.5
ARCHITECTURAL RFI Log 1, #37 and 74 Response remain unchanged, in addition see above response to RFI Log , #22 and 23 RFI Log 1, #75 Response Revision: New partition walls for the various offices, MPRs, and Briefing Rooms are not required to be STC 50, Wall A, Sound Group 4.
2 25 7-Aug-25 Can an air-cooled chiller with a capacity greater than 40 tons be used on this project? SOW 1.4.42, Attachment 4, Appendix J Nellis-Creech Mechanical and Plumbing Requirements, Item 9f.
MECHANICAL Yes, The government requires all chillers to be air-cooled and water-cooled chillers are not allowed under Clark county regulations.
2 26 7-Aug-25 If a 4-pipe fan coil system is used in the HVAC building design, please confirm that the Server Rooms and Utility Room only need to be served by ductless DX split systems.
SOW 1.3.20.15, 1.3.20.16, and 1.4.42.29.3
MECHANICAL In the Server rooms ductless dx split system are to be redundant systems specific to these room requirements. In the Utility room a ductless dx split system can be used.
2 27 7-Aug-25 Based on the SOW 1.3.1.6.6 and RFI Response 151, this project is required to comply with the 21 minimum ATFP standards given in UFC 4-010-01 dated 12 December 2018 with Change 3, 24 May 2024. Standard 2 requires a zone of unobstructed space to extend 33ft from the outside edge of the existing building and additions. The intent of this space is to prohibit an aggressor from concealing packages or other items which might constitute a threat.
The existing CMU wall to the northwest of Existing Building 47 creates an enclosed area that is only accessible via a lockable gate to the adjacent sidewalk or from Building 47. There is a new break room in Building 47 and a shade area in the enclosed area, which will encourage foot traffic into the enclosed area.
Please confirm this area can be considered a space in which threats would be visually detected by building occupants per Section 3-3 of UFC 4-010-01, and that a lid spanning from the CMU walls to the project buildings would not be required as a physical barrier to keep threats from being tossed from beyond the CMU walls. Please confirm is it acceptable to only enclose site elements within the 33ft unobstructed space that provide opportunity for threat concealment, and no additional enclosures are required.
SOW 1.3.1.6.6 and RFI 151 Response. ATFP See RFI Log 2, #13 above.
2 28 7-Aug-25 Per the response to RFI 41, "New CMU site walls shall match the existing split-faced, honed and vented CMU as applicable. EIFS is not to be used on the new CMU walls. Per SOW 1.4.7.2 Existing exterior masonry walls shall be painted to match the new exterior masonry walls." On Sheet A-201, Key Note1 and Exterior Finish Schedule Note E-1 on the West Elevation identifies this wall as new (CMU) and says to paint to match existing. Please confirm whether the new exterior CMU walls building walls are required to be painted, or have exposed integral color as described in the RFI response cited above.
Response to RFI 41, SOW 1.4.7.2 and 35% Drawing A-201
ARCHITECTURAL The complete building shall be painted/repainted a matching color. Please are demolished for openings and require repair, the EIFS shall be repaired as required.. The larger new addition on on the west shall not receive EIFS.
Contractor may propose EIFS on the smaller new addition in the south
(RFI Log 1, #41 Clarification)
2 29 7-Aug-25 The SOW and 35% Concept Drawings specify the provision of 6" H raised access flooring to be provided for the Auditorium and Large Multi-Purpose Room; the access floor appears to be required to accommodate cabling and receptacles for power and data for Auditorium seating and Multi-Purpose Room cubicles.
On recent projects designed for ICD 705 compliance, access flooring has been eliminated from the design by security; it creates a vulnerability as another concealed space requiring regular inspection. Data has been routed to workstations via cable trays exposed below the ceiling to surface-mounted raceway at walls or to power poles, and at floors using an inspectable system like Connect Rac. Please respond to the following questions:
1. Confirm that the use of the proposed raised access flooring system has been vetted by the AO/SSM or other accrediting authority.
2. Confirm whether the raised access flooring can be deleted at the Auditorium, or must be provided as shown, as a surface-mounted distribution system will be too disruptive for the seating configuration.
3. Confirm whether the raised access flooring can be deleted at the large Multi-Purpose Room, as the power and data cabling can readily be routed to banks of cubicles from adjacent walls.
SOW 1.3.6.11, and Attachment 4, Appendix A 35% Concept Drawings A-201 and E-301
ARCHITECTURAL/TELECO
M/ ELECTRICAL
1. Final review of the design by the AO/SSM or other accrediting authority shall be completed with the 65% design
2. Raised access flooring at the Auditorium, shall not be deleted
3. Raised access flooring at the large Multi-Purpose Room shall not be deleted
The 35% design provided is a conceptual design. Contractor shall develop the 65%, 95% and 100% to maintain the same number of auditorium seats, workstations in the multi purpose room and square footage for the multi purpose room. Changes to the existing design shall meet all accessibility requirements, ICD 705 standards. If the design is modified for increased access under the floor contractor’s may propose a depressed slab, to minimize design changes due to the limited space inside the building addition for longer ramps to accommodate a 12” or 18” access floor at the interior and exterior. The cage requirements under the access flooring may be waived if space restrictions will only accommodate conduit installation.
Design coordination of this change with all disciplines shall be accounted for where the contractor proposes this change.
FA485125B0001 3 OF 12
2 30 7-Aug-25 Please reconsider the response to Amd 03 RFI 108 and height of access floor. Raising the height of the access floor to accommodate all of the below-floor utilities does not appear to be feasible, considering the additional space that would be required for a longer ramp while maintaining the same SF and quantity of seating. If additional clearance is required, it appears that a depressed slab may be needed to accommodate an access flooring system with adequate clearance. Please provide a specific direction for this issue, to ensure all bidders are estimating the same scope.
Response to Amd. 03, Comment 108 ARCHITECTURAL The 35% design provided is a conceptual design. Contractor shall develop the 65%, 95% and 100% to maintain the same number of auditorium seats, workstations in the multi purpose room and square footage for the multi purpose room. Changes to the existing design shall meet all accessibility requirements, ICD 705 standards. To minimize design changes due to the limited space inside the building addition for longer ramps to accommodate a 12” or 18” access floor at the i-terior and exterior, contractors may propose a depressed slab. The cage requirements under the access flooring may be waived if space restrictions will only accommodate conduit installation. Design coordination of this change with all disciplines shall be accounted for where the contractor proposes this change.
2 31 7-Aug-25 The referenced SOW section (and many others) describes STC criteria for the construction of the secure boundary of the ICD 705 spaces and references the Technical Specifications for Construction and Management of Sensitive Compartmented Information Facilities, Version 1.5.1 (ICD 705) in Appendix P.
Please clarify the acoustic testing requirements for the (2) secure building areas.
1. Will the acoustic testing be performed by the Government or will the work be included in the Contractor's scope?
2. If the testing is to be performed by the Contractor, may testing be performed by the D/B acoustic design consultant, or will an independent 3rd party testing agency be required?
3. Please confirm whether the instrumented acoustical testing may be performed per ICD 705, Chapter 9 Acoustic Protection, C. Acoustic Testing, 2.g) to Noise Isolation Class (NIC) Standards, with results to comply with NIC 40 for Sound Group 3 and NIC 45 for Sound Group 4 or whether the acoustic field testing is required to meet or exceed the STC (lab) value cited (i.e. 50 STC-rated wall shall achieve minimum 50 STC in field, not
NIC 45).
SOW 1.3.1.4 and Attachment 4, Appendix P
1. Acoustic testing shall be included in the Contractor's scope
2. An independent 3rd party testing agency would be required
3. Instrumented acoustical testing performed per ICD 705, Chapter 9 Acoustic Protection, C. Acoustic Testing, 2.g is a noted alternative but must be approved by the TCR in 65% design.
2 32 7-Aug-25 The Response to RFI 62 indicates: “See RFI 83_Picture1.png and RFI 83_Picture2.png; the manhole and conduit line are indicated in yellow”. There we no .png or other photo files provided with the response. Please provide the referenced photos.
Amd. 3, Response to RFI 62 COMM See attached photo
2 33 7-Aug-25 The Response to RFI 62 indicates: “a. New fiber will be installed from B47 to P6 through existing manhole duct system” – where is P6? How many fibers and type of FO cable?
Amd. 3, Response to RFI 62 COMM See RFI 2-33_P6 (Bldg 6) Location.png
B47 has 3 single mode fiber optic (SMFO) cables and 1 copper cable
| 1. | 24 strand SMFO cable B47/P6 |
| 2. | 24 strand SMFO cable B47/P6 |
| 3. | 12 strand SMFO cable B47/B282 |
| 4. | 100 pair copper cable (CA13 – 1701-1800) |
99 CS does not see a reason for any more than that in Bldg 47, but Contractor is to confirm the existing fiber is adequate during design.
2 34 7-Aug-25 The Response to RFI 104 refers to MH 287A – please provide a plan which identifies the location of MH 287A?
Amd. 3, Response to RFI 104 COMM See P6, B47 and MH 287A locations.pdf
2 35 7-Aug-25 We noted that there are several missing Key Notes on the 35% Concept Drawings; please provide the missing notes for Drawings listed below:
E-101: Key Note 6 is shown on the plan in the existing utility yard but is missing from the Key Note legend.
Please provide missing note.
E-201: Key Notes 2 and 3 are shown on the lighting plan at multiple locations but are missing from the Key Note legend. Please provide missing notes.
Attachment 4, Appendix A 35% Concept Drawings E-101 and E-201
ELECTRICAL See previous RFI Log1, #141 response.
2 36 7-Aug-25 The original building is a Type V construction with steel roof joists and wood stud interior partitions. If the new additions and the existing building are to be considered as a non-separated occupancy, the construction type would also be Type V. Should the construction type be changed from II-B to V? If so, would wood construction in the additions be acceptable?
GI002 35% Drawings Life Safety No, new wood construction is not permitted.
2 37 7-Aug-25 SOW states under "FLOORS" that "Colors and textures of each item must be selected by the government".
Will the government be providing standard finishes for all interior finishes to be used, or is this limited to flooring only? Will the design team need to provide any finish schemes for government approval?
SOW 1.4.13 INTERIORS Contractor is to propose the finishes for all interior finishes to be used and the government will approve the selections. The design team must provide color schemes for government review and approval. See SOW 1.8.2.5, 1.8.2.6
2 38 7-Aug-25 SOW states under "Interior Design Scheme" to "Provide a complete room finish and color schedule in the construction documents. Schedule shall be coordinated with the color board." Will color scheme be provided by government or is to be developed by design team?
SOW 1.8.2.5. INTERIORS Color scheme is to be developed by design team and submitted to the government for review and approval.
2 39 7-Aug-25 SOW references required "Color Boards". Confirm quantity of binders to be submitted to Government. SOW 1.8.2.6. INTERIORS Samples shall be installed on an 8-1/2"x11" foam core board. If more than one board is necessary to show all materials then boards shall be combined using one (1) three ring binder. This should be submitted at 65%, 95% and 100%. Per SOW 1.8.2.6.
2 40 7-Aug-25 SOW references required "Color Boards" and "Interior Design Scheme", but does not reference a complete FFE package. FFE to be furnished and installed by government. Will complete specifications for furniture be required? Will pricing for furniture be required?
SOW 1.8 INTERIORS A complete FFE package is not required but the sizing of FFE shall be included in the schedule for reference.
FA485125B0001 4 OF 12
2 41 7-Aug-25 SOW states "Provide separate lists of all Government-furnished equipment to be installed by the contractor and equipment furnished and installed by the Government, if applicable." Is there an equipment list apart from the Floor Plan (FFE) and Furniture & Equipment Legend included in 35% Drawings for these Government-furnished contractor installed equipment and Government-furnished Government installed items?
SOW 1.8.1.1.9 INTERIORS No
2 42 7-Aug-25 35% Drawing Sheet A-601 general note references "Furniture and Equipment Legend and Plan are recommended FFE for this facility". Are the items listed in the Furniture & Equipment Legend and Floor Plan (FFE) to be specified in entirety by design team? Some items do not have a manufacturer or finish details listed. Are these to be chosen by government or design team?
35% Drawings, A-601 INTERIORS Items listed in the Furniture & Equipment Legend and Floor Plan (FFE) are to be specified in entirety by design team
2 43 7-Aug-25 SOW Appendix G, Section E references standards for Finishes and Furniture. Confirm exact finishes and color scheme are to be selected by design team with approval from government. Are finishes to comply with requirements of Section E (such as manufacturers listed for carpet), or is Section E to be used as a base guideline for type of finish selection?
SOW Appendix G, Section E. Facilities Interiors
INTERIORS Exact finishes and color scheme are to be selected by design team with approval from government; finishes are to comply with requirements of the
IFS.
2 44 7-Aug-25 Under the requirements for SEALED BID PACKAGE INSTRUCTIONS.
It calls for the requirement of providing a CD with bid items 1-7 burned onto the CD.
Subcontractors and Vendors submit their prices at the last minute. Trying to burn the CD with all 7 documents at the last minute will be problematic.
Items 1,2 and 4-7 can be burned onto the CD without any issue prior to bid day.
Would the government consider accepting items 1,2 and 4-7 burned onto the CD and item 3, the bid schedule, submitted handwritten on the provided bid schedule?
RFP - SEALED BID PACKAGE
INSTRUCTIONS
CONTRACTING The requirement for items 1-7 on CD remains.
2 45 7-Aug-25 It is our understanding that the reason the government is requesting the General Contractors to provide a CD with the Sealed Bid Packages, is to save the government the time of scanning Each General contractors bid packages into their system.
Would the government consider using an electronic submitting system such as PIEE or a DOD safe file rather than the CD?
Burning a CD on bid day will be very problematic.
With Vendors and subcontractors submitting their pricing closer to the bid submission time, burning the CD at the last minute could delay the process and eliminate some General contractors.
RFP - SEALED BID PACKAGE
INSTRUCTIONS
CONTRACTING There is no indication systems such as PIEE or DOD SAFE will be functional at the time bids are due. Contractors must conform to the CD requirement in accordance with Section L.
2 46 7-Aug-25 Per 1.3.10.2, 1.3.20.3 and 1.3.20.15 dedicated split systems with redundancy are required for the two comm rooms in B47. Based on the 35% HVAC drawings, 2 sets of heat pumps ( at 3 tons each) are being provided for each server room to meet these requirements. Based upon previous experience, three tons of cooling may not provide enough to accommodate the number of racks shown in the 35% drawings.
See below for our recommendation:
| a. | Server room 23B, 5 racks are shown |
| i. | Suggest 5 ton split system |
| b. | Server room 23A, 10 racks are shown |
| i. | Suggest 10 tons of cooling (multiple split systems) |
Due to the project being bid based upon low cost (without technical capability consideration), please confirm if the bid should be based upon the 35% drawings or the tonnage listed in the recommendations above.
If the bids are ultimately based upon the 35% drawings and the Contractor’s design calculations show that additional tonnage is required, please confirm there will be a cost adjustment opportunity at the conclusion of the first design deliverable?
SOW 1.3.10.2, 1.3.20.3, 1.3.20.15 MECH Contractor shall address the project based on the tonnage provided and is open to modifications if further design and calculations prove to require additional tonnage.
2 47 7-Aug-25 The 35% drawings do not show independent heating/cooling systems for either the Utility Room #28 or Fire Riser Room #28A, but the SOW states HVAC should be provided. It is our understanding that both the Utility Room and Fire Riser Room will require independent zone control. A potential solution would be to utilize ductless split systems (with condensing units mounted on pads in yard).
Please confirm if the contractor’s bid should include split systems to provide independent HVAC control in each room?
SOW 1.3.20.5 MECH Yes, split systems to provide independent HVAC control in each room can be proposed.
2 48 7-Aug-25 1.3.20.5 states to provide ventilation systems for the entire facility, including restrooms. The 35% drawings only states to reconnect new exhaust grilles to existing exhaust fans on roof. Also, existing exhaust fans are shown to remain for the new restrooms and janitor closet, but no new exhaust grille is shown for janitor closet.
Should the contractor bid for the replacement of existing exhaust systems including grilles, exhaust fan and ductwork, or bid as shown on 35% drawings?
SOW 1.3.20.5 MECH Contractor shall bid to replace the existing exhaust system to include grilles, exhaust fans and duct work per the SOW.
FA485125B0001 5 OF 12
2 49 7-Aug-25 Due to several issues, it is likely that the life cycle cost analysis will show the proposed 35% design concept is NOT the most cost-effective option from an efficiency and constructability perspective.
To help solve these issues, it is our opinion that a 4-pipe HVAC system (with an air-cooled chiller and boiler) will be the best way to meet the building criteria and provide the best overall product to the Air Force.
However, this system will be more expensive from a first cost standpoint and is not able to be bid on with this solicitation format. Please provide clarification on how the contractor should bid on the Mechanical systems.
If contractors are directed to bid the project per the 35% design concept and the life cycle cost analysis shows a different system is required, please confirm that cost modifications will be available after the first design submission.
See list of issues below:
a. Per Appendix Y, the mechanical calculations included in the solicitation show the total cooling load for the building (excluding the two server rooms) to be 36.5 tons. However, the cooling load calculations appear to have been calculated at 106°F outdoor conditions, and not the 117°F requirement listed in the SOW. The total design cooling load for the building will be higher once it is calculated at 117°F, and most likely above 40 tons. Air-cooled packaged equipment is typically derated by 25% when operating in outdoor conditions of 115°, so the total delivered cooling will only be 30 tons for the designed units. Therefore, the 35% design concept will not work.
b. In addition, the new rooms in the building will be densely occupied and require a substantial amount of ventilation. This is not addressed in the 35% design drawing package, as equipment performance criteria for the listed "high performance" 20-ton HVAC units are not given.
Appendix A (pg.40), Appendix Y (pg.32- 83), and SOW 1.4.42.22
MECH The government acknowledges the defect in the provided 35% design and refers back to the SOW where the contractor shall design and provide a HVAC system to meet the facilities cooling requirement. During the design build process, the contractor shall design to 117 deg F per the Nellis IFS.
During the LCCA, the contractor may choose another system as long as it follows all applicable codes and standards.
2 49 c. The 35% design drawings state to route the supply and return ductwork to the roof of the building and then back down through the roof inside each HVAC zone. This will result in a large number of roof penetrations and still will be extremely difficult to fit ductwork and VAV boxes above the ceilings. It is unlikely that ceiling heights higher than 7’-6” will be achievable in most areas.
Contractor is to confirm the achievable heights in their 65% design. Ceiling heights must meet minimum allowable ceiling height per code.
2 50 7-Aug-25 The 35% drawings do not reference demand control ventilation methods. Due to high occupancy, this building would benefit from this design strategy. Please confirm if contractor shall bid demand control ventilation per ASHRAE 90.1?
Appendix A (pg.40) MECH Contractor shall follow all applicable codes, standards, and SOW.
2 51 7-Aug-25 Plumbing plans do not show any water/sewer requirements in the Fire Riser Room. It is typical to have a floor drain and a 4" sewer connection to a hub drain assembly for testing. Should this be provided?
Appendix A (pg.45) PLUMBING The 35% design provided is a conceptual design. Contractor shall update the design to meet code and IFS requirements. Contractor shall provide floor drain and a 4" sewer connection to a hub drain assembly for testing as required.
2 52 7-Aug-25 S200 Foundation Plan Notes 5.B “10mil moisture barrier” contradicts with the SOW 1.4.1.9.7 “15-mil ASTM E1745 Class A poly Sheeting”. Should 10 mil or 15 mil moisture barrier be provided?
S-200 and SOW 1.4.1.9.7 Structural 15 mil per Apx F and SOW.
2 53 7-Aug-25 Room DDS-1 shows an operable partition to be demolished. Is there an existing steel support beam/structure that needs to be demolished as well?
AD-101 Architectural/Structural Please see sheet S-201 in the 35% design drawings. Existing and new beams are indicated. Contractor is to confirm the structural calculations in their design.
2 54 7-Aug-25 Do not capture the slab on grad demo needed to install new plumbing fixtures and drains. Should we assume removal of the slab at these locations for the new fixtures and drains?
S-200 & PD102 Plumbing/Structural Contractor shall assume demo and removal of the slab where required to accommodate the new fixture and drain locations.
2 55 7-Aug-25 Geotechnical report requires the footing embedment depth to be 24". A-201 shows the finished grade 8" below the finished slab. S-301 requires at 1'-3" thick footing. To meet the 24" embedment requirement, the block stem wall will need to be 2 cmu courses below grade. If the finish grade elevation is reduced from 8" to 7" only 1 course of CMU will be needed below grade. Can the finished grade be reduced to 7" below slab?
Table 8 Geotechnical Report; A-201, S-
Structural/Architectural Foundation shall be designed IAW the results of the Geotechnical Report provided unless Contractor performs additional testing to validate their proposed design revisions.
2 56 7-Aug-25 Structural drawings were not provided for the retrofit that converted the CMU wall at Grid 3-D to Grid 3-J to steel framing. Will specifics about the steel framing at this wall line need to be determined though on-site measurements, or can additional information be provided?
S-200 and S-201 Structural All available as-builts have been provided. Contractor will need to field verify the specific steel framing requirements.
2 57 7-Aug-25 Request confirmation of the applicable Buy American Act. The interpretation of the applicable Buy American provision is FAR 52-225-9-Buy American-Construction Materials (Oct 2022), even though it is not included in the solicitation. Per FAR Part 25.401(a)(1), acquisitions set aside for small business are an exception to the applicability of FAR Part 25.4 Trade Agreements, therefore 52.225-11 Buy American-Construction Materials under Trade Agreements (Nov 2023) would not be applicable even though it is incorporated into the Contract.
It is also interpreted that FAR Clause 52.225-9 (Oct 2022) is read into the Contract via the Christian Doctrine, even though it is not expressly incorporated and as a result, 52.225-11 (Nov 2023) would not be applicable.
FAR Clauses Incorporated by Reference, pg 13 of 37 of the solicitation
Section H - Special Contract Requirements
FAR 52.225-9 is not applicable for contracts under $6,708,000. FAR 25.401(a)(1) exemption applies only to acquisition of trade agreements listed in FAR subpart 25.4. Awardee must conform to FAR 52.225-11 Buy American- Construction Materials under Trade Agreements, FAR 52.225-11 Alternate I, and FAR 52.225-11 Alternate II as written in Solicitation.
FA485125B0001 6 OF 12
2 58 7-Aug-25 E-101 Keynote 1 states that the transformer will be provided by the utility company, and the contractor is only responsible for providing the concrete pad. However, utility companies do not supply transformers at Nellis AFB. Should the contractor provide the transformer, or will it be government-furnished?
Appendix A (pg.50) ELECTRICAL Transformers will not be government furnished, but they must be submitted for government approval. The existing pad-mounted transformer will be demolished per SOW 1.3.13.4. See SOW 1.3.17 Electrical for the requirements of the new transformer that is to be provided by the contractor.
Additional clarification are provided in RFI Log 1.
2 59 7-Aug-25 If a transformer is to be provided does the government have a minimum impedance rating for the 500KVA transformer?
Appendix A (pg.50) ELECTRICAL See appendix H for requirements and RFI Log 1, #34 Response.
2 60 7-Aug-25 Are the primary feeders required to be 15KV MV105 Cu cable with 133% EPR insulation with 1/3 Cu concentric neutral with jacket? Or is Tape shields acceptable.
SOW 1.3.17.4 ELECTRICAL Tape Shields are not acceptable as they are not able to be grounded at both ends and cannot carry appreciable ground or neutral current. 1/3 concentric neutrals are able to be grounded at both ends and able to carry any grounding current up to its rating and/or any temp. fault current without damage while the upstream breaker takes the current offline.
It is base policy to ground the primary MV neutral at both ends as a safety measure.
2 61 7-Aug-25 Are the Main panel breakers required to be of the LSI type or are thermal magnetic breakers acceptable? Appendix A (pg.57) ELECTRICAL It is required that all breakers in the main service entrance panel be 100% rated including SPD and metering breakers. Use of 80% rated breakers is prohibited for all service entrance panels greater than 225A. Note that in many cases, LSI breakers are required to meet coordination requirements between main service entrance main breaker and the panel feeder breakers and between main service entrance panel feeder breakers and their downstream panels or major loads, usually the minimum ratio is 1.5 for proper coordination.
2 62 7-Aug-25 E-101 Keynotes 2 and 3 indicate that the fuse cutouts and feeders to and from the transformer are to be provided by the utility company. However, at Nellis AFB, the utility does not provide this equipment. Will these items be government-furnished, or is the contractor responsible for supplying them?
Appendix A (pg.50) ELECTRICAL See RFI Log 1, #30 Response
2 63 7-Aug-25 E-102 specifies dimmer switches for certain areas of the building; however, a dimmer switch is not shown in the auditorium. Would the government like a dimmer switch to be provided in the auditorium as well?
Appendix A (pg.51) ELECTRICAL See UFC 3-530-01 INTERIOR AND EXTERIORLIGHTING SYSTEMS, including design requirements of interior and exterior lighting systems and controls based on the Illuminating Engineering Society (IES) Lighting Library® and the Energy Policy Act of 2005.
Yes, provide dimmers in the Auditorium. See Section 3-5.2 Auditoriums of UFC 3-530-01 for the dimming requirements in the auditoriums.
2 64 7-Aug-25 E-301 illustrates the building's power plan. Is the contractor to assume each office receptacle is a workstation and has no more than 4 workstations per circuit ? Is the est. load of each workstation 300VA or more ?
Appendix A (pg.55) ELECTRICAL In most office areas, most receptacles are planned for workstations.
However, in every office, there must at least one or more general purpose receptacles such that every portion of an office must be reachable with vacuum sweeper with a 15ft cord from one of the GP receptacles.
Office areas must also have dedicated receptacles for floor mounted copiers and shredders as required by the user.
For standard workstations, a maximum of 4 receptacles per dedicated workstation circuit is required and that 300VA continuous load per duplex receptacle is also required in the load calculations. Workstation receptacle loads are considered to be dedicated appliance loads at 300VA each and do not follow the NEC general purpose receptacle rules.
For nonstandard workstations the continuous load is greater and the number of workstations per dedicated circuit is further restricted from 4 to 3 or 2.
2 65 7-Aug-25 Will outdoor disconnects require NEMA3R/12 or NEMA 3 rating or is NEMA 3R acceptable ? Appendix A (pg.55) ELECTRICAL See RFI Log 1, #83 Exterior panels shall be NEMA 3 or 3R/12 or 4.
2 66 7-Aug-25 Other than lighting controllers and dimmer switches, are there any other lighting room by room requirements?
Is a control panel needed be able to control each room in one location? Touch screen interface?
Appendix A (pg.53) ELECTRICAL See Appendix I for lighting control requirements.
FA485125B0001 7 OF 12
2 67 7-Aug-25 Previous RFI response call out for the contractor to install PDUs. How many PDUS are required? Are they to be 75kva or 150kva sizing? What are the main and sub breakers to be sized at?
RFI’s - FA486124R1004 RKMF230064 (question 7)
ELECTRICAL A. For 10 rack classified comm. room a 150KVA PDU is required.
PDU primary input breaker to primary of transformer is to be 300A 100%rated LSI breaker.
PDU main breaker for secondary of transformer is to be 400A 100% rated LSI adjustable breaker. Adjustable settings of 400A, 350A, 300A required.
PDU main panel(4) is to be 150A 100% rated LSI adjustable breaker minimum settable at 150A,125A,100A. Will initially set at 100A Main panel feeder breaker to this PDU is to be a minimum of 450A at 100% rated LSI breaker.
Transformer 480v delta to 208Y120 is to be a minimum impedance of 4.63% and have a K7 or K9 rating.
B. For 5 rack unclassified comm. room a 75KVA PDU is required.
PDU primary input breaker to primary of transformer is to be 150A 100%rated LSI breaker.
PDU main breaker for secondary of transformer is to be 225A 100% rated LSI adjustable breaker. Adjustable settings of 225A, 200A, 150A required.
PDU main panels(2) are to be 150A 100% rated LSI adjustable breaker minimum settable at 150A,125A,100A. Will initially set at 100A Main panel feeder breaker to this PDU is to be a minimum of 225A at 100% rated LSI breaker.
Transformer 480v delta to 208Y120 is to be a minimum impedance of 2.50% and have a K7 or K9 rating.
2 68 7-Aug-25 General Note 6 on E-501 requires the contractor to use Easy Power software. Are alternatives such as ETAP and SKM acceptable, given that these programs can perform the same calculations?
Appendix A (pg.57) ELECTRICAL Easy Power is the only software permitted to be used by AF users due to Cyber Security rules. The voltage drop and short calculation charts are not be software generated. The charts on the drawings are to be filled out by the
DOR.
Note that charts must be filled out by circuits not alphabetically.
Voltage drop charts must include starting voltage and ending voltage, current voltage drop % and cumulative voltage drop% and length of run, number of sets and size of cables.
Fault current charts must include starting fault current and ending fault current , length of run, number of sets and size of cables, and type and size of conduit.
2 69 7-Aug-25 Are there any 208V receptacles needed for communication equipment in the server room or other areas ? Appendix A (pg.55) ELECTRICAL Yes. Contractor shall assume 2 208v-30A 2pole and 2 120v-20A 1pole circuits per each server rack until confirmed during design. Will need a junction box in/under each server rack.
208v receptacles will likely be twist lock with 2w+G 250v
2 70 7-Aug-25 If Priority 1 is deducted, please confirm that the contractor will need to construct an ADA compliant concrete walk from the existing entrance to the new entrance on the west side of the new construction.
Atch 3 Bid Schedule, C-102, C-103 CIVIL The existing entrance will not remain and accessible access must be provided from the parking lot to the front door if the existing parking lot remains unchanged.
2 71 7-Aug-25 Atch 3 Bid Schedule, C-102, C-103 CIVIL The existing entrance will not remain and accessible access must be provided from the parking lot to the front door if the existing parking lot remains unchanged.
2 72 7-Aug-25 If Priority 3 is deducted, please confirm that the existing 2" water feed at the riser will support the additional building SF.
Atch 3 Bid Schedule, C-106 CIVIL Keynote 4 depicts the new fireline, not a part of deductive 3. Deductive 3 is the new water lateral bubbled and shown under keynote 20 (C-106) Riser should move per the design regardless of Deductive 3.
2 73 7-Aug-25 If Priority 3 is deducted, please confirm that the existing riser will need to be relocated to the east to align with the proposed riser location shown on A-101.
Atch 3 Bid Schedule, C-106, A-101, P-101 CIVIL Keynote 4 depicts the new fireline, not a part of deductive 3. Deductive 3 is
FA485125B0001 8 OF 12
2 74 7-Aug-25 Atch 3 Bid Schedule, C-106, A-101, P-101 CIVIL Keynote 4 depicts the new fireline, not a part of deductive 3. Deductive 3 is
2 75 7-Aug-25 Will the government be providing a Technology Coordination Plan outlining all required communications cabling for relocation and demolition?
SOW 1.3.24.2 ELECTRICAL Contractor is to confirm all required communications cabling for relocation and demolition during the design phase.
2 76 7-Aug-25 How many CAT6 cables will be required at each device location? Additionally, what color should the CAT6 cabling be for the access control system?
SOW 1.3.18.3 ELECTRICAL See SOW sections 1.3.18.6 -1.3.18.8, 1.3.24.6, 1.4.4.11. Contractor is to comply with 1.3.19 for the IDS.
2 77 7-Aug-25 How many CAT6 cables will be required at each device location? Additionally, what color should the CAT6 cabling be for the Intrusion Detection system?
SOW 1.3.18.4 ELECTRICAL See SOW sections 1.3.18.6 -1.3.18.8, 1.3.24.6, 1.4.4.11. Contractor is to
2 78 7-Aug-25 To confirm, will (10) communications cabinets be required in the classified server room, and (5) cabinets in the unclassified server room?
SOW 1.3.18.4 ELECTRICAL See 35% design drawings for conceptual layout including (10) communications cabinets in the classified server room, and (5) cabinets in the unclassified server room. (SOW Section noted is incorrect)
2 79 7-Aug-25 Will the communications locations in Auditorium 05 and MPR – Large 08 be required to be installed in floor boxes? The symbol shown on Sheet LV-201 is not included in the legend.
SOW 1.3.18.4 ELECTRICAL See E-001 and E-301. FLUSHED FLOOR BOX SERVICE FOR POWER AND TELECOM noted in the legend and drawings
2 80 7-Aug-25 What type of cabling is required for the communications locations annotated at +84"? Additionally, should the conduit for these locations be routed back to the server room, or to a desk or workstation within the room?
SOW 1.3.18.4 ELECTRICAL These are for wall mounted television/monitor connections and should be routed back to the instructor's podium/desk/workstation; typically through an HDMI cable. (SOW Section noted is incorrect)
2 81 7-Aug-25 Can EMT with weather-rated fittings be used in lieu of rigid conduit? E-0001 ELECTRICAL The use of rigid or EMT is required. See RFI Log1, #31
2 82 7-Aug-25 Roof Access ladders: “Provide OSHA-approved steel ladders, painted, for access to facility roof.”
Requirement suggests there should be multiple permanent ladders (secured with cage and locked per AF/TP) to access the roof. Should a permanent exterior wall-mounted ladder, be provided for both the existing roof and West addition?
SOW 1.4.9 Architectural See RFI Log 1, #79 Per AT/FP External Roof Access must be restricted/controlled if accessible from the exterior of the building. Per UFC UFC 3-101-01, 3-3 Design fixed ladders and roof hatches in accordance with 29 CFR 1910.23 and the IBC, according to the most stringent requirements.