Atch 3_Bid Sched_25B0001_RKMF230064_B47_Rev_5Aug25.pdf

PDF 144 KB Posted

Attached to
CONSTRUCT ADDITION & REPAIR INTERIOR, BLDG 47, 328 WPS, NELLIS AFB NV
Solicitation number
FA486125B0001
Issued by

About this file

This document is a Bid Schedule for a design-build construction project at Nellis Air Force Base, Nevada, identified as Project RKMF230064 for Constructing Addition & Repair Interior at Building 47, 328 WPS. The solicitation (FA486125B0001) is structured with three Contract Line Item Numbers (CLINs): CLIN 0001 for Design (100% professional design), CLIN 0002 for Construction, and CLIN 0003 for Repair, with a statutory cost limit of $4,100,000 for the construction portion. The bid includes three potential deductive line items with priorities for parking lot, landscaping, and domestic water lateral work, following DFARS 252.236-7007 guidelines for additive or deductive items.

The procurement is a firm fixed-price, design-build contract set aside exclusively for 8(a) small businesses with a NAICS code 236220 size standard. The project has a 730-calendar day performance period, with a bid magnitude between $10-25 million. Specific requirements include furnishing design, labor, equipment, materials, and all necessary services to complete the addition and repair of Building 47 at Nellis Air Force Base. The solicitation requires a bid bond guarantee of 20% of the bid price, not to exceed $3 million, and is being conducted by the 99th Contracting Squadron with Nina Young as the point of contact.

View the file

Other files

File Type Posted
Solicitation Amendment - FA486125B00010009.pdf PDF
Solicitation Amendment FA486125B00010009 SF 30.pdf PDF
Attch 11_25B0001_RFI Log 2_Govt Response_CLOSED_15Aug25 rev.pdf PDF
Solicitation Amendment FA486125B00010008 SF 30.pdf PDF
Atch 11_25B0001_RFI Log 2_Govt Response_CLOSED_14Aug25.pdf PDF
Solicitation Amendment - FA486125B00010008_Conformed_14Aug25.pdf PDF
Atch 3_Bid Sched_25B0001_RKMF230064_B47_Rev_14Aug25.pdf PDF
Atch 3_Bid Sched_25B0001_RKMF230064_B47_Rev_12Aug25.pdf PDF
Solicitation Amendment FA486125B00010007 SF 30.pdf PDF
Solicitation Amendment FA486125B00010006 SF 30.pdf PDF
Solicitation Amendment FA486125B00010005 SF 30.pdf PDF
Atch 8_RFI Log_25B0001_RKMF230064_B47_Rev_5Aug25.xlsx XLSX spreadsheet
Solicitation Amendment FA486125B00010004 SF 30.pdf PDF
Solicitation Amendment FA486125B00010003 SF 30.pdf PDF
Atch 10_25B0001_RFI Log_Govt Response_CLOSED_29Jul25.pdf PDF
Solicitation Amendment FA486125B00010002 SF 30.pdf PDF
Atch 9_25B0001_SV Sign-In Sheets_14Jul25.pdf PDF
Solicitation Amendment FA486125B00010001 SF 30.pdf PDF
Atch 1_SOW_25B0001_RKMF230064_B47_5Jun25.pdf PDF
Atch 3_Bid Sched_25B0001_RKMF230064_B47.pdf PDF
Atch 2_Wage Det Bldg NV20250038_2May25.pdf PDF
Atch 5_Apx X-B47 As-Builts_1Jun23.zip ZIP file
Atch 4_SOW_Apx A-W and Y-Z.pdf PDF
Atch 7_Nellis Mass Pass Request_FIRM NAME_29May25.xlsx XLSX spreadsheet
Atch 8_RFI Log_25B0001_RKMF230064_B47_26Jun25.xlsx XLSX spreadsheet
Atch 6_35pct Design CAD_10Jul24.zip ZIP file
Solicitation - FA486125B0001.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Atch 3, Revised 5 Aug 25 Solicitation FA486125B0001

COMPANY NAME:

BID SCHEDULE

for

RKMF230064, Construct Addition & Repair Interior, 328 WPS, B47 Nellis Air Force Base, Nevada

BID AMOUNTS (IN WHOLE US DOLLARS):

CLIN 0001 Furnish all labor, supervision, equipment, tools, material, transportation, and all else necessary to complete a 100% professional DESIGN for Project RKMF230064, Construct Addition & Repair, 328 WPS, Building 47, Nellis AFB, Nevada as ordered by the Contracting Officer.

All work is to be performed in strict accordance with the terms, and conditions specified herein.

DESIGN

LUMP SUM BID (CLIN 0001 ONLY) $

CLIN 0002 Furnish all labor, supervision, equipment, tools, material, transportation, and all else necessary to complete the CONSTRUCTION portion for Project RKMF230064, Construct Addition & Repair, 328 WPS, Building 47, Nellis AFB, Nevada as ordered by the Contracting Officer.

All work is to be performed in strict accordance with the specifications, terms, and condition specified herein.

CONSTRUCTION

LUMP SUM BID (CLIN 0002 ONLY)

NOTE: CLIN 0002 is subject to statutory cost limit of $4,100,000) $

CLIN 0003 Furnish all labor, supervision, equipment, tools, material, transportation, and all else necessary to complete the REPAIR portion for Project RKMF230064, Construct Addition & Repair, 328 WPS, Building 47, Nellis AFB, Nevada as ordered by the Contracting Officer. All work is to be performed in strict accordance with the specifications, terms, and condition specified herein.

REPAIR

LUMP SUM BID (CLIN 0003 ONLY) $

TOTAL LUMP SUM BASE BID

(CLIN 0001 + CLIN 0002 + CLIN 0003) $

Atch 3, Revised 5 Aug 25 Solicitation FA486125B0001

POSSIBLE DEDUCTIVE LINE ITEMS FROM CLIN 0001 (DESIGN) AND

CLIN 0003 (REPAIR):

IAW DFARS 252.236-7007, Additive or Deductive Items

Deductive D0001

PRIORITY 1

Furnish all labor, supervision, equipment, tools, material, transportation, and all else necessary to complete the REPAIR PARKING LOT portion for Project RKMF230064, Construct Addition & Repair, 328 WPS, Building 47, Nellis AFB, Nevada as ordered by the Contracting Officer. All work is to be performed in strict accordance with the specifications, terms, and condition specified herein.

DESIGN, PARKING LOT - $

REPAIR, PARKING LOT - $

TOTAL, PARKING LOT

(DESIGN + REPAIR) = LUMP SUM

(Deductive D0001 ONLY) - $

Deductive D0002

PRIORITY 2

Furnish all labor, supervision, equipment, tools, material, transportation, and all else necessary to complete the REPAIR LANDSCAPING portion for Project RKMF230064, Construct Addition & Repair, 328 WPS, Building 47, Nellis AFB, Nevada as ordered by the Contracting Officer. All work is to be performed in strict accordance with the specifications, terms, and condition specified herein.

DESGIN, LANDSCAPING - $

REPAIR, LANDSCAPING - $

TOTAL, LANDSCAPING

(Deductive D0002 ONLY) - $

Deductive D0003

PRIORITY 3

Furnish all labor, supervision, equipment, tools, material, transportation, and all else necessary to complete the REPAIR DOMESTIC WATER LATERAL portion for Project RKMF230064, Construct Addition & Repair, 328 WPS, Building 47, Nellis AFB, Nevada as ordered by the Contracting Officer. All work is to be performed in strict accordance with the specifications, terms, and condition specified herein.

DESGIN, DOMESTIC WATER LATERAL - $

REPAIR, DOMESTIC WATER LATERAL - $

TOTAL, DOMESTIC WATER LATERAL

(Deductive D0003 ONLY) - $