Amended solicitation Summary of Changes Clin bid structure and List of Attachments updating Bid Schedule attachment All design pricing was removed from CLINs 2 3 4. The total design cost should now be bid as part of CLIN 1.

View the file

Other files

File Type Posted
RKMF_13-0135_as-builts.zip ZIP file
2011-7-8___Demo_bldg_433.pdf PDF
2011-7-7___Demolish_bldg_438.pdf PDF
2011-7-7___Demolish_Bldg_436.pdf PDF
2011-7-7___Demolish_bldg_434.pdf PDF
Atch_5 _Bid_Schedule_RKMF_13-0135_revised_16Sep2013.docx DOCX document
13-R-A014_Site_Visit_Attendance_Sheet.pdf PDF
Attachment_19-_Past_Performance_Survey.docx DOCX document
FA4861-13-R-A014-P00001.pdf PDF
Atch_6 __Nellis-Creech_ID2_Handbook_2011.pdf PDF
Atch_10 _AF_Form_3064.xfdl XFDL file
Atch_2 _WD_NV130034_Hwy __Mod_34.docx DOCX document
Atch_13 _DD_Form_1354.pdf PDF
Atch_7 _ETL__02-12.pdf PDF
Atch_4 _AF_Form_3052_Cost_Estimate_Breakdown.xls XLS spreadsheet
Atch_1 _SOW_Demo_Pool_dtd_20_Aug_13.docx DOCX document
Atch_15 _ACC_Arch_ _Interior_Design_Stand.doc DOC document
Atch_09 _AF_Form_66.doc DOC document
Atch_17 __ID_Warranty.Guarantee_Items.doc DOC document
Atch_11 _AF_Form_3000.xfdl XFDL file
Atch_5 _Bid_Schedule_RKMF_13-0135.docx DOCX document
Atch_16 _AF_Form_103.xfdl XFDL file
Atch_19 _PastPerformance.pdf PDF
Atch_12 _AF_Form_3065 _ProgRpt.xls XLS spreadsheet
Atch_3 _WD_NV130004 _Bldg _Mod_05.docx DOCX document
Atch_14 _UFC_1-300-08_With_C2.pdf PDF
Atch_08 _UFC_3-580-01.docx DOCX document
FA4861-13-R-A014.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA4861-13-R-A014

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION B - SUPPLIES OR SERVICES AND PRICES

CLIN 0001

The CLIN extended description has changed from Furnish all labor, supervision, equipment, tools, materials, incidental works and professional design as necessary to perform all work to complete DESIGN and DEMOLITION of building 433 for Project: RKMF 13-0135 DEMO POOL FACILITIES at Nellis AFB, Nevada, as ordered by the Contracting Officer. All work is to be performed in strict accordance with the terms and conditions specified herein. to Furnish all labor, supervision, equipment, tools, materials, incidental works and professional design as necessary to perform all work to complete CONTRACT DESIGN and DEMOLITION of building 433 for Project: RKMF 13-0135 DEMO POOL FACILITIES at Nellis AFB, Nevada, as ordered by the Contracting Officer. All work is to be performed in strict accordance with the terms and conditions specified herein.CONTRACT DESIGN: $______________________DEMO BLDG 433: $___________________________.

CLIN 0002

The CLIN extended description has changed from Furnish all labor, supervision, equipment, tools, materials, incidental works and professional design as necessary to perform all work to complete DESIGN and DEMOLITION of building 434 for Project: RKMF 13-0135 DEMO POOL FACILITIES at Nellis AFB, Nevada, as ordered by the Contracting Officer. All work is to be performed in strict accordance with the terms and conditions specified herein. to Furnish all labor, supervision, equipment, tools, materials, incidental works and professional design as necessary to perform all work to complete DEMOLITION of building 434 for Project: RKMF 13-0135 DEMO POOL FACILITIES at Nellis AFB, Nevada, as ordered by the Contracting Officer. All work is to be performed in strict accordance with the terms and conditions specified herein..

CLIN 0003

The CLIN extended description has changed from Furnish all labor, supervision, equipment, tools, materials, incidental works and professional design as necessary to perform all work to complete DESIGN and DEMOLITION of building 436 for Project: RKMF 13-0135 DEMO POOL FACILITIES at Nellis AFB, Nevada, as ordered by the Contracting Officer. All work is to be performed in strict accordance with the terms and conditions specified herein. to Furnish all labor, supervision, equipment, tools, materials, incidental works and professional design as necessary to perform all work to complete DEMOLITION of building 436 for Project: RKMF 13-0135 DEMO POOL FACILITIES at Nellis AFB, Nevada, as ordered by the Contracting Officer. All work is to be performed in strict accordance with the terms and conditions specified herein..

CLIN 0004

The CLIN extended description has changed from Furnish all labor, supervision, equipment, tools, materials, incidental works and professional design as necessary to perform all work to complete DESIGN and DEMOLITION of building 438 for Project: RKMF 13-0135 DEMO POOL FACILITIES at Nellis AFB, Nevada, as ordered by the Contracting Officer. All work is to be performed in strict accordance with the terms and conditions specified herein. to Furnish all labor, supervision, equipment, tools, materials, incidental works and professional design as necessary to perform all work to complete DEMOLITION of building 438 for Project: RKMF 13-0135 DEMO POOL FACILITIES at Nellis AFB, Nevada, as ordered by the Contracting Officer. All work is to be performed in strict accordance with the terms and conditions specified herein..

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

The following have been modified:

ATTACHMENTS

Attachment
Title
Date
Pages
1
Statement of Work Demo Pool Facilities 433, 434, 436 & 438
20-Aug-13
58
2
WD NV130034, Highway, Mod 34
4-Jan-13
16
3
WD NV130004, Building, Mod 5
9-Aug-13
7
4
AF Form 3052 Cost Estimate Breakdown
Undated
2
5
Bid Schedule
17-Sep-13
2
6
Nellis-Creech ID2 Handbook
Aug-11
146
7
Engineering Technical Letter (ETL) 02-12
27 Jun 02
26
8
UFC 3-580-01, Telcom, Bldg Cabling System
22 Jun 07
45
9
AF Form 66 Schedule of submittals
Sep-89
1
10
AF Form 3064 Contractor Progress Schedule
1-Sep-03
2
11
AF Form 3000 Material Approval Submittal
1-Sep-03
2
12
AF Form 3065, Progress Report
1-Apr-96
1
13
DD Form 1354, Transfer and Acceptance of DoD Real Property
Apr-13
2
14
UFC 1-300-08 Criteria for Transfer and Acceptance of DoD Real Property
16-Apr-09
45
15
ACC Architectural & Interior Design Standards
27 Jun 02
81
16
AF Form 103, Base Civil Engineering Work Clearance Request
11 Mar 03
1
17
ID of Warranty/Guarantee Items
17-Mar-10
1
19
Past Performance Information Survey
Undated
6
20
Abatement Reports
Undated
92
21
As-Built Drawings
Undated
100

(End of Summary of Changes) image1.wmf

File details come from the government source that posted it. Updated .