Abatement report bldg 433
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Macrotec Consulting, LLC.
9724 Mild Weather Ct. · Las Vegas, NV 89148 Phone: (702) 338-8213 · Fax: (702) 629-5677
Demolition Investigation Report Asbestos and Lead Based Paint Survey
Project Information:
Nellis Air Force Base Bldg. 433
Report Info:
Macrotec Project # 11802 July 22, 2011
Prepared For:
Vince Bowers 99th Civil Engineering Squadron – CES/CEV Nellis AFB, NV 89191
Prepared By:
Dustin McAllister - Macrotec Consulting, LLC.
Table of Contents:
Introduction Scope of Services Site Description Sample Collection Methodology Sample Analysis Methodology Sample Assessment Recommendations Inspection Limitations
Appendix A Asbestos Assessment Appendix B Lead Assessment Appendix C Asbestos Sample Location Diagram Appendix C.1 Lead Sample Location Diagram Appendix D Asbestos Laboratory Report Appendix D.1 Lead Laboratory Report
Asbestos / Lead Survey Macrotec Project # 11802 Nellis Air Force Base – Bldg. 433 Page 2
INTRODUCTION
Macrotec Consulting performed an inspection for Asbestos-Containing Building Materials and Lead Based Paint on July 8, 2011. The inspection was conducted for the project defined as: Demolition of building 433 at Nellis Air Force Base in Las Vegas, NV.
The intent of this inspection was to identify materials containing asbestos and lead based paint, within the subject site, that may be impacted during planned demolition activities. Macrotec’s inspection services were conducted at the request of Vince Bowers of the 99th Civil Engineering Squadron.
Dustin McAllister, a certified lead inspector, License No. NV-I-16781-1, and a Nevada Asbestos Abatement Consultant, License No.IM0961, and Jason McAllister, a Nevada Asbestos Abatement Consultant, License No. IM0901, conducted these services for Macrotec Consulting.
SCOPE OF SERVICES
Asbestos
Macrotec’s inspection services were conducted to identify the presence of any materials containing asbestos pursuant to the requirements of NAC 618.960 and in accordance with the inspection requirements of the EPA’s: 40 CFR Part 61 National Emission Standard for Hazardous Air Pollutants (NESHAP).
These regulations outline inspection and abatement requirements for materials containing asbestos, prior to renovation and/or demolition activities.
Lead
Macrotec collected paint chip samples to identify the presence and content level of lead for compliance with the Occupational Safety and Health Administration’s (OSHA) and the Environmental Protection Agencies (EPA) regulatory requirements pertaining to worker protection and waste disposal.
SITE DESCRIPTION
The subject site was the interior and exterior of a one-story building.
Macrotec’s inspection was limited to the location within the site planned for demolition as described above.
Nellis Air Force Base – Bldg. 433 Page 3
SAMPLE COLLECTION METHODOLOGY
An initial walk through of the subject site was conducted to identify homogeneous suspect materials containing asbestos and/or lead based paint, and their respective locations. This information was then used to develop a sample collection strategy.
Samples were collected by pre-wetting sample areas with water, then cutting or scraping the sample from the substrate with an appropriate sampling tool.
Whenever possible, samples were collected from areas previously damaged or deteriorating. To avoid potential contamination due to unknown asbestos and/or lead based paint content; no building systems, components, or structures were demolished to obtain samples of potentially hidden materials containing asbestos.
Each suspect bulk sample was sealed in its own zip lock plastic container and labeled with a unique identification number. Sampling tools were individually cleaned before and after each sample was collected to avoid sample cross contamination. Decontamination was accomplished using single use, pre-moistened cloths.
Samples were recorded on Macrotec’s chain-of-custody form. This form accompanied the samples to Triangle Enivronmental Service Center, Inc.
(TESC), located in Moseley, Virginia. The National Voluntary Laboratory Accreditation Program (NVLAP) accredits TESC for analysis of bulk building material samples for asbestos. The American Industrial Hygiene Association (AIHA) accredits Schneider Laboratories Inc. in Richmond Virginia, for analysis of paint chip samples for lead.
SAMPLE ANALYSIS METHODOLOGY
Asbestos
Suspect asbestos samples were subjected to analysis by polarized light microscopy (PLM). Bulk sample analysis was conducted in accordance with the EPA’s “Test Method for the Determination of Asbestos in Bulk Building Materials, EPA/600/R-93/116, 1993.
Lead
To determine lead content, the samples were submitted for analysis. Suspect paint chip samples were subjected to analysis in accordance with the EPA’s Method SW846-7420.
Nellis Air Force Base – Bldg. 433 Page 4
SAMPLE ASSESSMENT
Asbestos
Macrotec’s inspection of the subject site found Fifteen (15) separate suspect asbestos building materials, of which a total of Nineteen (19) samples were collected and submitted for analysis.
The following table summarizes the materials that were found to be asbestos containing, the locations where the material is located, the material’s friability and its NESHAP classification.
Material Number
Material Description
Material Locations
Material Friability
NESHAP
6 Gray Roof Penetration Mastic This material is on the penetrations on the roof.
Non- Friable
Category I
10 12x12 Floor Tile This material is located on the interior floor of the building.
Non- Friable
Category I1
11 & 15 Black Floor Mastic This material is beneath the floor tile and sheet flooring throughout the building
Non- Friable
Category II
See Appendix A for a listing of the materials, material locations, samples, sample locations and results for this project.
Lead
Macrotec collected Twenty One (21) paint samples of the predominate paint colors within the subject site.
Although none of the painted surfaces were found to be lead based paint (results above 5,000 parts per million), Nellis AFB may have further regulations for the handling of materials with paint over 600 parts per million. Those results are listed in the following table, which summarizes the locations of the painted surface and laboratory result.
Painted Surface Description
Material Locations
Lab Result (Parts / Million)
Brown Wood Fascia This material is located around the exterior perimeter of the building.
1,092
Brown Wood Soffit This material is located around the exterior perimeter of the building.
Brown Metal Flashing This material is located around the exterior perimeter of the building.
White/Green Ceramic Wall Tile This material is located in the restroom. 1,342
Category I nonfriable asbestos-containing material means asbestos containing packings, gaskets, resilient floor covering, and asphalt roofing products containing more than 1% asbestos as determined by Polarized Light Microscopy (PLM).
Category II non-friable asbestos-containing material means any material, excluding Category I, containing more than 1 percent asbestos.
Nellis Air Force Base – Bldg. 433 Page 5
See Appendix B for a listing of the painted surfaces, samples, sample locations and results for this project.
RECOMMENDATIONS
Asbestos
No asbestos containing materials were identified in this investigation. If suspect materials are found during renovation activities outside what was identified in this report, stop work immediately until further testing can be completed.
Lead
None of the paints sampled in this investigation were found to be a lead based paint (above 5,000 parts per million). Please be advised that Nellis AFB may have further regulations for the handling of materials with paint over 600 parts per million. If suspect materials are found during renovation activities outside what was identified in this report, stop work immediately until further testing can be completed.
INSPECTION LIMITATIONS
The information contained in this report is limited to those areas and suspect materials found to be visually accessible through reasonable means.
Macrotec conducted a non-destructive survey. No demolition of building materials was conducted to determine the presence of asbestos in wall cavities, chases or other inaccessible areas. Macrotec cannot warrant that these areas do not contain asbestos in locations other than those noted in this report, however, a good faith effort was made to conduct a comprehensive survey.
• Macrotec accepts no liability for additional materials or under reporting of asbestos materials that exist below other floor coverings.
• This report is not represented as, nor is it intended to be, an asbestos abatement scope of work or project specification.
• If suspect materials are discovered during future demolition operations, cease all general work activities which could impact the discovered suspect materials, until confirmation sampling can be conducted.
Nellis Air Force Base – Bldg. 433 Page 6
Thank you for allowing Macrotec Consulting to assist you with your environmental consulting needs. Please contact me with any questions regarding this report at (702) 338-8213.
Appendix A
Appendix A - Asbestos Assessment
Macrotec Job #11802 - WO #18000 - Bldg. 433
The following table lists each of the materials suspected to contain asbestos at the subject site. For each material the sample number, location and laboratory result are listed. If the material was found to contain asbestos, the friablity and NESHAP classification is identified.
1 Stucco This material is located is located on the exterior walls.
No Asbestos Detected
AB1 Exterior - N Wall None Detected
AB2 Exterior - E Wall None Detected
AB3 Exterior - S Wall None Detected
2 Gray Tar Paper Behind Stucco This material is located is located on the exterior walls.
No Asbestos Detected
AB4 Exterior - S Wall None Detected
3 Asphalt Roof Shingle - Top Layer This material is located on the roof.
No Asbestos Detected
AB5 Exterior - Roof - N End None Detected
4 Asphalt Roof Shingle - Bottom Layer This material is located on the roof.
No Asbestos Detected
AB6 Exterior - Roof - N End None Detected
5 Black Tar Paper Beneath Shingles This material is located on the roof.
No Asbestos Detected
AB7 Exterior - Roof - N End None Detected
6 Gray Roof Mastic on Pipe Penetration This material is located on the roof.
Non-Friable, Category I
AB8 Exterior - Roof - Center 8% Chrysotile
7 Sheet Rock Mud & Tape This material is the component of the interior walls.
No Asbestos Detected
AB9 Interior - Entrance - W Wall None Detected
Asbestos Survey
Bldg. 433
Macrotec Job #11802
Appendix A Macrotec Job #11802 - WO #18000 - Bldg. 433
AB10 Interior - Room 2 - Adj. Door None Detected
AB11 Interior - Room 5 - S Wall None Detected
8 Sheet Rock Mud & Tape This material is the component of the interior walls.
No Asbestos Detected
AB12 Interior - Hallway Rest Room - Adj. Door None Detected
9 Yellow Mastic Beneath Carpet This material is located beneath the carpet in the building.
No Asbestos Detected
AB13 Interior - Entrance - Center None Detected
10 12X12 Floor Tile This material is located on the interior floors.
Non-Friable, Category I
AB14 Interior - Hallway Closet - Center 2% Chrysotile
11 Black Mastic Beneath Floor Tile This material is located on the interior floors.
Non-Friable, Category II
AB15 Interior - Hallway Closet - Center 5% Chrysotile
12 12X12 Floor Tile - On Crawl Space Access This material is located on the interior floors.
No Asbestos Detected
AB16 Interior - Hallway Closet - Center None Detected
13 Yellow Mastic Beneath Floor Tile This material is located on the interior floors.
No Asbestos Detected
AB17 Interior - Hallway Closet - Center None Detected
14 Sheet Flooring This material is located on the interior floors.
No Asbestos Detected
AB18 Interior - Hallway Rest Room - Adj. Door None Detected
15 Black Mastic Beneath Sheet Flooring This material is located on the interior floors.
Non-Friable, Category II
AB19 Interior - Hallway Rest Room - Adj. Door 3% Chrysotile
Asbestos Survey
Bldg. 433
Appendix B
Appendix B - Lead Assessment
Macrotec Job #11802 - WO #18000 - Bldg. 433
The following table lists each of the painted surfaces suspected to contain lead at the subject site. For each painted surface, the sample number, location and laboratory result are listed.
Sample
Painted Surface Description
Sample Location Description
Lab Result (Parts per Million)
L1 Exterior - N Wall Below Reportable LimitBeige Stucco Wall
L2 Exterior - S Wall 55Beige Stucco Wall
L3 Exterior - S Door Below Reportable LimitBrown Wood Door/Fame
L4 Exterior - S End 1,092Brown Wood Fascia
L5 Exterior - S End 769Brown Wood Sophit
L6 Exterior - S End 716Brown Metal Flashing
L7 Exterior - N Door Below Reportable LimitTan Wood Door
L8 Exterior - N & S Doors Below Reportable LimitBrown Metal Hand Rail
L9 Interior - Entrance - SW Corner 31White Sheet Rock/Wood Walls &
Ceilings
L10 Interior - Room 5 - Center 61White Sheet Rock/Wood Walls &
Ceilings
L11 Interior - Room 4 - W Wall 266White Sheet Rock/Wood Walls &
Ceilings
L12 Interior - Room 6 - S Wall 43White Sheet Rock/Wood Walls &
Ceilings
L13 Interior - Room 4 Rest Room - Adj. Door 391White Sheet Rock/Wood Walls &
Ceilings
L14 Interior - Room 5 - Doorway 53White Wood Door Frame
L15 Interior - Room 2 - Doorway 32White Metal Door Frame
L16 Interior - Hallway - Center Below Reportable LimitWhite Wood Base
L17 Interior - Room 4 - S Door 289White Wood Window Frame
L18 Interior - Room 3 - E Wall 73White Wood Cabinets/Shelves
Lead Paint Survey
Bldg. 433
Appendix B Macrotec Job #11802 - WO #18000 - Bldg. 433
Sample
Painted Surface Description
Sample Location Description
Lab Result (Parts per Million)
L19 Interior - Hallway - S Wall 34White Metal Vents
L20 Interior - Entrance - Door to Exterior Below Reportable LimitWhite Wood Door
L21 Interior - Hallway Rest Room - Adj. Door 1,342White/Green Ceramic Wall Tile
Lead Paint Survey
Bldg. 433
Appendix C
Asbestos & Lead Based Paint Survey
Nellis AFB, Bldg. 433
Macrotec Project # 11802
Appendix C
* Diagram Not Drawn To Scale
Sample Location Diagram
N
AB2
AB5
AB6
AB13
AB9
AB3
AB11
AB1
AB4
AB15
AB17
AB7
AB18
AB16
AB14
AB8
AB10
AB19
Asbestos & Lead Based Paint Survey
Nellis AFB, Bldg. 433
Macrotec Project # 11802
Appendix C
* Diagram Not Drawn To Scale
Sample Location Diagram
N
L1
L2
L3
L4
L5
L6
L7
L8
L9
L10
L11
L13
L12
L14
L15
L16
L17
L18
L19
L20
L21
Appendix D
| 1 11802 - Bldg. 433.pdf |
| 2011-7-8 _ Demo bldg 433.pdf |
File details come from the government source that posted it. Updated .