Abatement report bldg 436

View the file

Other files

File Type Posted
RKMF_13-0135_as-builts.zip ZIP file
2011-7-8___Demo_bldg_433.pdf PDF
2011-7-7___Demolish_bldg_438.pdf PDF
2011-7-7___Demolish_bldg_434.pdf PDF
Atch_5 _Bid_Schedule_RKMF_13-0135_revised_16Sep2013.docx DOCX document
Solicitation_Amendment_0002.docx DOCX document
13-R-A014_Site_Visit_Attendance_Sheet.pdf PDF
Attachment_19-_Past_Performance_Survey.docx DOCX document
FA4861-13-R-A014-P00001.pdf PDF
Atch_6 __Nellis-Creech_ID2_Handbook_2011.pdf PDF
Atch_10 _AF_Form_3064.xfdl XFDL file
Atch_2 _WD_NV130034_Hwy __Mod_34.docx DOCX document
Atch_13 _DD_Form_1354.pdf PDF
Atch_7 _ETL__02-12.pdf PDF
Atch_4 _AF_Form_3052_Cost_Estimate_Breakdown.xls XLS spreadsheet
Atch_1 _SOW_Demo_Pool_dtd_20_Aug_13.docx DOCX document
Atch_15 _ACC_Arch_ _Interior_Design_Stand.doc DOC document
Atch_09 _AF_Form_66.doc DOC document
Atch_17 __ID_Warranty.Guarantee_Items.doc DOC document
Atch_11 _AF_Form_3000.xfdl XFDL file
Atch_5 _Bid_Schedule_RKMF_13-0135.docx DOCX document
Atch_16 _AF_Form_103.xfdl XFDL file
Atch_19 _PastPerformance.pdf PDF
Atch_12 _AF_Form_3065 _ProgRpt.xls XLS spreadsheet
Atch_3 _WD_NV130004 _Bldg _Mod_05.docx DOCX document
Atch_14 _UFC_1-300-08_With_C2.pdf PDF
Atch_08 _UFC_3-580-01.docx DOCX document
FA4861-13-R-A014.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Macrotec Consulting, LLC.

9724 Mild Weather Ct. · Las Vegas, NV 89148 Phone: (702) 338-8213 · Fax: (702) 629-5677

Demolition Investigation Report Asbestos and Lead Based Paint Survey

Project Information:

Nellis Air Force Base Bldg. 436

Report Info:

Macrotec Project # 11799 July 20, 2011

Prepared For:

Vince Bowers 99th Civil Engineering Squadron – CES/CEV Nellis AFB, NV 89191

Prepared By:

Dustin McAllister - Macrotec Consulting, LLC.

Table of Contents:

Introduction Scope of Services Site Description Sample Collection Methodology Sample Analysis Methodology Sample Assessment Recommendations Inspection Limitations

Appendix A Asbestos Assessment Appendix B Lead Assessment Appendix C Asbestos Sample Location Diagram Appendix C.1 Lead Sample Location Diagram Appendix D Asbestos Laboratory Report Appendix D.1 Lead Laboratory Report

Asbestos / Lead Survey Macrotec Project # 11799 Nellis Air Force Base – Bldg. 436 Page 2

INTRODUCTION

Macrotec Consulting performed an inspection for Asbestos-Containing Building Materials and Lead Based Paint on July 7, 2011. The inspection was conducted for the project defined as: Demolition of building 436 at Nellis Air Force Base in Las Vegas, NV.

The intent of this inspection was to identify materials containing asbestos and lead based paint, within the subject site, that may be impacted during planned demolition activities. Macrotec’s inspection services were conducted at the request of Vince Bowers of the 99th Civil Engineering Squadron.

Dustin McAllister, a certified lead inspector, License No. NV-I-16781-1, and a Nevada Asbestos Abatement Consultant, License No.IM0961, and Jason McAllister, a Nevada Asbestos Abatement Consultant, License No. IM0901, conducted these services for Macrotec Consulting.

SCOPE OF SERVICES

Asbestos

Macrotec’s inspection services were conducted to identify the presence of any materials containing asbestos pursuant to the requirements of NAC 618.960 and in accordance with the inspection requirements of the EPA’s: 40 CFR Part 61 National Emission Standard for Hazardous Air Pollutants (NESHAP).

These regulations outline inspection and abatement requirements for materials containing asbestos, prior to renovation and/or demolition activities.

Lead

Macrotec collected paint chip samples to identify the presence and content level of lead for compliance with the Occupational Safety and Health Administration’s (OSHA) and the Environmental Protection Agencies (EPA) regulatory requirements pertaining to worker protection and waste disposal.

SITE DESCRIPTION

The subject site was the interior and exterior of a one-story, brick building.

Macrotec’s inspection was limited to the location within the site planned for demolition as described above.

Nellis Air Force Base – Bldg. 436 Page 3

SAMPLE COLLECTION METHODOLOGY

An initial walk through of the subject site was conducted to identify homogeneous suspect materials containing asbestos and/or lead based paint, and their respective locations. This information was then used to develop a sample collection strategy.

Samples were collected by pre-wetting sample areas with water, then cutting or scraping the sample from the substrate with an appropriate sampling tool.

Whenever possible, samples were collected from areas previously damaged or deteriorating. To avoid potential contamination due to unknown asbestos and/or lead based paint content; no building systems, components, or structures were demolished to obtain samples of potentially hidden materials containing asbestos.

Each suspect bulk sample was sealed in its own zip lock plastic container and labeled with a unique identification number. Sampling tools were individually cleaned before and after each sample was collected to avoid sample cross contamination. Decontamination was accomplished using single use, pre-moistened cloths.

Samples were recorded on Macrotec’s chain-of-custody form. This form accompanied the samples to Triangle Enivronmental Service Center, Inc.

(TESC), located in Moseley, Virginia. The National Voluntary Laboratory Accreditation Program (NVLAP) accredits TESC for analysis of bulk building material samples for asbestos. The American Industrial Hygiene Association (AIHA) accredits Schneider Laboratories Inc. in Richmond Virginia, for analysis of paint chip samples for lead.

SAMPLE ANALYSIS METHODOLOGY

Asbestos

Suspect asbestos samples were subjected to analysis by polarized light microscopy (PLM). Bulk sample analysis was conducted in accordance with the EPA’s “Test Method for the Determination of Asbestos in Bulk Building Materials, EPA/600/R-93/116, 1993.

Lead

To determine lead content, the samples were submitted for analysis. Suspect paint chip samples were subjected to analysis in accordance with the EPA’s Method SW846-7420.

Nellis Air Force Base – Bldg. 436 Page 4

SAMPLE ASSESSMENT

Asbestos

Macrotec’s inspection of the subject site found Seven (7) separate suspect asbestos building materials, of which a total of Thirteen (13) samples were collected and submitted for analysis.

The sample results indicated that the suspect materials were “None Detected” for asbestos content.

Note: The roof was not sampled during this investigation. The roof appears to have been recently renovated and covered using a vinyl roofing material. There is no way to check if there are older suspect asbestos containing materials beneath the new roofing material without destroying the integrity of the new roof.

The building is currently still in use, so the roof should be tested immediately prior to demolishing the building, when it is no longer in use.

See Appendix A for a listing of the materials, material locations, samples, sample locations and results for this project.

Lead

Macrotec collected Twenty Five (25) paint samples of the predominate paint colors within the subject site.

The following table summarizes the painted surfaces that were found to be lead based paint (results above 5,000 parts per million), the locations where the painted surface is located, and laboratory result. Nellis AFB may have further regulations for the handling of materials with paint over 600 parts per million, so those results are also included.

Painted Surface Description

Material Locations

Lab Result (Parts / Million)

Yellow Metal Handrail This material is located around the perimeter of the pit in the pump room.

9,571

Brown Metal Box This material is on the west exterior wall of the building.

See Appendix B for a listing of the painted surfaces, samples, sample locations and results for this project.

Nellis Air Force Base – Bldg. 436 Page 5

RECOMMENDATIONS

Asbestos

No asbestos containing materials were identified in this investigation. If suspect materials are found during demolition activities outside what was identified in this report, stop work immediately until further testing can be completed.

Conduct an investigation of the roof prior to demolition, but after the building is no longer in use.

Lead

US EPA OSHA regulations require the implementation of worker protection if there is a potential that paint with lead in it will be disturbed during renovation activities. In accordance with these regulations Macrotec recommends:

Hiring an EPA Licensed Lead Consultant to develop a project specification based on this investigation and any other additional findings.

Hiring an EPA Licensed Lead Abatement Contractor to stabilize and/or remove all regulated lead painted materials.

Hiring an EPA Licensed Lead Consultant to monitor the removal activities and provide final clearance inspection reports.

INSPECTION LIMITATIONS

The information contained in this report is limited to those areas and suspect materials found to be visually accessible through reasonable means.

Note: The building was occupied / in use at the time of the investigation, limiting the availability of some materials and areas.

Macrotec conducted a non-destructive survey. No demolition of building materials was conducted to determine the presence of asbestos in wall cavities, chases or other inaccessible areas. Macrotec cannot warrant that these areas do not contain asbestos in locations other than those noted in this report, however, a good faith effort was made to conduct a comprehensive survey.

• Macrotec accepts no liability for additional materials or under reporting of asbestos materials that exist below other floor coverings.

• This report is not represented as, nor is it intended to be, an asbestos abatement scope of work or project specification.

Nellis Air Force Base – Bldg. 436 Page 6

• If suspect materials are discovered during future demolition operations, cease all general work activities which could impact the discovered suspect materials, until confirmation sampling can be conducted.

Thank you for allowing Macrotec Consulting to assist you with your environmental consulting needs. Please contact me with any questions regarding this report at (702) 338-8213.

Appendix A

Appendix A - Asbestos Assessment

Macrotec Job #11799 - Bldg. 436 ; WO #17998

The following table lists each of the materials suspected to contain asbestos at the subject site. For each material the sample number, location and laboratory result are listed. If the material was found to contain asbestos, the friablity and NESHAP classification is identified.

1 Sheet Rock, Mud & Tape This material is the component of the ceiling inside the building.

No Asbestos Detected

AB1 Interior - Pump Room - NW corner None Detected

AB2 Interior - Pump Room - SW corner None Detected

AB3 Interior - Pump Room - SE corner None Detected

2 Spray Texture on Ceiling This material is on the ceiling inside the building.

No Asbestos Detected

AB4 Interior - Storage Room - Center None Detected

AB5 Interior - Pump Room - N end None Detected

AB6 Interior - Pump Room - S end None Detected

3 Brick This material is the component of the walls of the building.

No Asbestos Detected

AB7 Exterior - W Side - Center None Detected

4 Mortar This material is the component of the walls of the building.

No Asbestos Detected

AB8 Exterior - W Side - Center None Detected

5 Concrete Foundation This material is the building's foundation.

No Asbestos Detected

AB9 Exterior - W Side - Center None Detected

6 Stucco This material is on the upper exterior walls.

No Asbestos Detected

AB10 Exterior - N Side - Center None Detected

AB11 Exterior - W Side - Center None Detected

AB12 Exterior - S Side - E end None Detected

Asbestos Survey

Bldg. 436

Macrotec Job #11799

Appendix A Macrotec Job #11799 - Bldg. 436 ; WO #17998

7 Gasket on Pump This material is on the pumps in the building.

No Asbestos Detected

AB13 Interior - Pump Room - Center None Detected

Asbestos Survey

Bldg. 436

Appendix B

Appendix B - Lead Assessment

Macrotec Job #11799 - Bldg. 436 ; WO #17998

The following table lists each of the painted surfaces suspected to contain lead at the subject site. For each painted surface, the sample number, location and laboratory result are listed.

Sample

Painted Surface Description

Sample Location Description

Lab Result (Parts per Million)

L1 Interior - SE corner Below Reportable LimitWhite Brick Wall

L2 Interior - N wall Below Reportable LimitWhite Brick Wall

L3 Interior - W wall Below Reportable LimitBrown Brick Base

L4 Exterior - W doors Below Reportable LimitBrown Metal Door Frame

L5 Exterior - S doors Below Reportable LimitBrown Metal Door

L6 Interior - Door to storage Below Reportable LimitBrown Metal Door Frame

L7 Interior - Door to storage Below Reportable LimitBrown Metal Door

L8 Interior - Center Below Reportable LimitWhite Sheet Rock Ceiling

L9 Interior - Center 59Blue Concrete Floor

L10 Interior - Center 116Yellow Concrete Pit Caution

L11 Interior - Center 9,571Yellow Metal Handrail

L12 Interior - Center Below Reportable LimitYellow Metal Ladder

L13 Interior - Pit - Center 396Blue Metal Pit Pipe

L14 Interior - Pit - Center Below Reportable LimitRed Metal Pit Pump

L15 Interior - Pit - S Wall 71White Concrete Pit Wall

L16 Interior - N end 41Blue / Green Metal Pipe

L17 Interior - Storage Room - N wall 71White Metal HVAC Duct

L18 Interior - W wall Below Reportable LimitWhite Metal Pipe

Lead Paint Survey

Bldg. 436

Appendix B Macrotec Job #11799 - Bldg. 436 ; WO #17998

Sample

Painted Surface Description

Sample Location Description

Lab Result (Parts per Million)

L19 Interior - SW corner 241Brown Metal Elec Box

L20 Exterior - W side 40White Stucco Fascia

L21 Exterior - W side Below Reportable LimitBeige Metal Flashing

L22 Exterior - W side Below Reportable LimitBeige Brick Wall

L23 Exterior - W side 608Brown Metal Box

L24 Exterior - SW corner Below Reportable LimitBrown Metal Pipe

L25 Exterior - SW corner 122Tan Metal Elec Box

Lead Paint Survey

Bldg. 436

Appendix C

Asbestos & Lead Based Paint Survey

Nellis AFB, Bldg. 436

Macrotec Project # 11799

Appendix C

* Diagram Not Drawn To Scale

Sample Location Diagram

N

AB7

AB12

AB13

AB9

AB11

AB8

AB1

Pump Room

AB2 AB3

AB4

AB5

AB6

Storage Room

AB10

Asbestos & Lead Based Paint Survey

Nellis AFB, Bldg. 436

Macrotec Project # 11799

Appendix C

* Diagram Not Drawn To Scale

Sample Location Diagram

N

L1

Pump Room

Storage Room

L2

L3

L4

L5

L6

L7

L8

L9

L10

L11

L12

L13

L14

L15

L16

L17

L18

L19

L20

L21

L22

L23

L24

L23

Appendix D

File details come from the government source that posted it. Updated .