Text version
Macrotec Consulting, LLC.
9724 Mild Weather Ct. · Las Vegas, NV 89148 Phone: (702) 338-8213 · Fax: (702) 629-5677
Demolition Investigation Report Asbestos and Lead Based Paint Survey
Project Information:
Nellis Air Force Base Bldg. 436
Report Info:
Macrotec Project # 11799 July 20, 2011
Prepared For:
Vince Bowers 99th Civil Engineering Squadron – CES/CEV Nellis AFB, NV 89191
Prepared By:
Dustin McAllister - Macrotec Consulting, LLC.
Table of Contents:
Introduction Scope of Services Site Description Sample Collection Methodology Sample Analysis Methodology Sample Assessment Recommendations Inspection Limitations
Appendix A Asbestos Assessment Appendix B Lead Assessment Appendix C Asbestos Sample Location Diagram Appendix C.1 Lead Sample Location Diagram Appendix D Asbestos Laboratory Report Appendix D.1 Lead Laboratory Report
Asbestos / Lead Survey Macrotec Project # 11799 Nellis Air Force Base – Bldg. 436 Page 2
INTRODUCTION
Macrotec Consulting performed an inspection for Asbestos-Containing Building Materials and Lead Based Paint on July 7, 2011. The inspection was conducted for the project defined as: Demolition of building 436 at Nellis Air Force Base in Las Vegas, NV.
The intent of this inspection was to identify materials containing asbestos and lead based paint, within the subject site, that may be impacted during planned demolition activities. Macrotec’s inspection services were conducted at the request of Vince Bowers of the 99th Civil Engineering Squadron.
Dustin McAllister, a certified lead inspector, License No. NV-I-16781-1, and a Nevada Asbestos Abatement Consultant, License No.IM0961, and Jason McAllister, a Nevada Asbestos Abatement Consultant, License No. IM0901, conducted these services for Macrotec Consulting.
SCOPE OF SERVICES
Asbestos
Macrotec’s inspection services were conducted to identify the presence of any materials containing asbestos pursuant to the requirements of NAC 618.960 and in accordance with the inspection requirements of the EPA’s: 40 CFR Part 61 National Emission Standard for Hazardous Air Pollutants (NESHAP).
These regulations outline inspection and abatement requirements for materials containing asbestos, prior to renovation and/or demolition activities.
Lead
Macrotec collected paint chip samples to identify the presence and content level of lead for compliance with the Occupational Safety and Health Administration’s (OSHA) and the Environmental Protection Agencies (EPA) regulatory requirements pertaining to worker protection and waste disposal.
SITE DESCRIPTION
The subject site was the interior and exterior of a one-story, brick building.
Macrotec’s inspection was limited to the location within the site planned for demolition as described above.
Nellis Air Force Base – Bldg. 436 Page 3
SAMPLE COLLECTION METHODOLOGY
An initial walk through of the subject site was conducted to identify homogeneous suspect materials containing asbestos and/or lead based paint, and their respective locations. This information was then used to develop a sample collection strategy.
Samples were collected by pre-wetting sample areas with water, then cutting or scraping the sample from the substrate with an appropriate sampling tool.
Whenever possible, samples were collected from areas previously damaged or deteriorating. To avoid potential contamination due to unknown asbestos and/or lead based paint content; no building systems, components, or structures were demolished to obtain samples of potentially hidden materials containing asbestos.
Each suspect bulk sample was sealed in its own zip lock plastic container and labeled with a unique identification number. Sampling tools were individually cleaned before and after each sample was collected to avoid sample cross contamination. Decontamination was accomplished using single use, pre-moistened cloths.
Samples were recorded on Macrotec’s chain-of-custody form. This form accompanied the samples to Triangle Enivronmental Service Center, Inc.
(TESC), located in Moseley, Virginia. The National Voluntary Laboratory Accreditation Program (NVLAP) accredits TESC for analysis of bulk building material samples for asbestos. The American Industrial Hygiene Association (AIHA) accredits Schneider Laboratories Inc. in Richmond Virginia, for analysis of paint chip samples for lead.
SAMPLE ANALYSIS METHODOLOGY
Asbestos
Suspect asbestos samples were subjected to analysis by polarized light microscopy (PLM). Bulk sample analysis was conducted in accordance with the EPA’s “Test Method for the Determination of Asbestos in Bulk Building Materials, EPA/600/R-93/116, 1993.
Lead
To determine lead content, the samples were submitted for analysis. Suspect paint chip samples were subjected to analysis in accordance with the EPA’s Method SW846-7420.
Nellis Air Force Base – Bldg. 436 Page 4
SAMPLE ASSESSMENT
Asbestos
Macrotec’s inspection of the subject site found Seven (7) separate suspect asbestos building materials, of which a total of Thirteen (13) samples were collected and submitted for analysis.
The sample results indicated that the suspect materials were “None Detected” for asbestos content.
Note: The roof was not sampled during this investigation. The roof appears to have been recently renovated and covered using a vinyl roofing material. There is no way to check if there are older suspect asbestos containing materials beneath the new roofing material without destroying the integrity of the new roof.
The building is currently still in use, so the roof should be tested immediately prior to demolishing the building, when it is no longer in use.
See Appendix A for a listing of the materials, material locations, samples, sample locations and results for this project.
Lead
Macrotec collected Twenty Five (25) paint samples of the predominate paint colors within the subject site.
The following table summarizes the painted surfaces that were found to be lead based paint (results above 5,000 parts per million), the locations where the painted surface is located, and laboratory result. Nellis AFB may have further regulations for the handling of materials with paint over 600 parts per million, so those results are also included.
Painted Surface Description
Material Locations
Lab Result (Parts / Million)
Yellow Metal Handrail This material is located around the perimeter of the pit in the pump room.
9,571
Brown Metal Box This material is on the west exterior wall of the building.
See Appendix B for a listing of the painted surfaces, samples, sample locations and results for this project.
Nellis Air Force Base – Bldg. 436 Page 5
RECOMMENDATIONS
Asbestos
No asbestos containing materials were identified in this investigation. If suspect materials are found during demolition activities outside what was identified in this report, stop work immediately until further testing can be completed.
Conduct an investigation of the roof prior to demolition, but after the building is no longer in use.
Lead
US EPA OSHA regulations require the implementation of worker protection if there is a potential that paint with lead in it will be disturbed during renovation activities. In accordance with these regulations Macrotec recommends:
Hiring an EPA Licensed Lead Consultant to develop a project specification based on this investigation and any other additional findings.
Hiring an EPA Licensed Lead Abatement Contractor to stabilize and/or remove all regulated lead painted materials.
Hiring an EPA Licensed Lead Consultant to monitor the removal activities and provide final clearance inspection reports.
INSPECTION LIMITATIONS
The information contained in this report is limited to those areas and suspect materials found to be visually accessible through reasonable means.
Note: The building was occupied / in use at the time of the investigation, limiting the availability of some materials and areas.
Macrotec conducted a non-destructive survey. No demolition of building materials was conducted to determine the presence of asbestos in wall cavities, chases or other inaccessible areas. Macrotec cannot warrant that these areas do not contain asbestos in locations other than those noted in this report, however, a good faith effort was made to conduct a comprehensive survey.
• Macrotec accepts no liability for additional materials or under reporting of asbestos materials that exist below other floor coverings.
• This report is not represented as, nor is it intended to be, an asbestos abatement scope of work or project specification.
Nellis Air Force Base – Bldg. 436 Page 6
• If suspect materials are discovered during future demolition operations, cease all general work activities which could impact the discovered suspect materials, until confirmation sampling can be conducted.
Thank you for allowing Macrotec Consulting to assist you with your environmental consulting needs. Please contact me with any questions regarding this report at (702) 338-8213.
Appendix A
Appendix A - Asbestos Assessment
Macrotec Job #11799 - Bldg. 436 ; WO #17998
The following table lists each of the materials suspected to contain asbestos at the subject site. For each material the sample number, location and laboratory result are listed. If the material was found to contain asbestos, the friablity and NESHAP classification is identified.
1 Sheet Rock, Mud & Tape This material is the component of the ceiling inside the building.
No Asbestos Detected
AB1 Interior - Pump Room - NW corner None Detected
AB2 Interior - Pump Room - SW corner None Detected
AB3 Interior - Pump Room - SE corner None Detected
2 Spray Texture on Ceiling This material is on the ceiling inside the building.
No Asbestos Detected
AB4 Interior - Storage Room - Center None Detected
AB5 Interior - Pump Room - N end None Detected
AB6 Interior - Pump Room - S end None Detected
3 Brick This material is the component of the walls of the building.
No Asbestos Detected
AB7 Exterior - W Side - Center None Detected
4 Mortar This material is the component of the walls of the building.
No Asbestos Detected
AB8 Exterior - W Side - Center None Detected
5 Concrete Foundation This material is the building's foundation.
No Asbestos Detected
AB9 Exterior - W Side - Center None Detected
6 Stucco This material is on the upper exterior walls.
No Asbestos Detected
AB10 Exterior - N Side - Center None Detected
AB11 Exterior - W Side - Center None Detected
AB12 Exterior - S Side - E end None Detected
Asbestos Survey
Bldg. 436
Macrotec Job #11799
Appendix A Macrotec Job #11799 - Bldg. 436 ; WO #17998
7 Gasket on Pump This material is on the pumps in the building.
No Asbestos Detected
AB13 Interior - Pump Room - Center None Detected
Asbestos Survey
Bldg. 436
Appendix B
Appendix B - Lead Assessment
Macrotec Job #11799 - Bldg. 436 ; WO #17998
The following table lists each of the painted surfaces suspected to contain lead at the subject site. For each painted surface, the sample number, location and laboratory result are listed.
Sample
Painted Surface Description
Sample Location Description
Lab Result (Parts per Million)
L1 Interior - SE corner Below Reportable LimitWhite Brick Wall
L2 Interior - N wall Below Reportable LimitWhite Brick Wall
L3 Interior - W wall Below Reportable LimitBrown Brick Base
L4 Exterior - W doors Below Reportable LimitBrown Metal Door Frame
L5 Exterior - S doors Below Reportable LimitBrown Metal Door
L6 Interior - Door to storage Below Reportable LimitBrown Metal Door Frame
L7 Interior - Door to storage Below Reportable LimitBrown Metal Door
L8 Interior - Center Below Reportable LimitWhite Sheet Rock Ceiling
L9 Interior - Center 59Blue Concrete Floor
L10 Interior - Center 116Yellow Concrete Pit Caution
L11 Interior - Center 9,571Yellow Metal Handrail
L12 Interior - Center Below Reportable LimitYellow Metal Ladder
L13 Interior - Pit - Center 396Blue Metal Pit Pipe
L14 Interior - Pit - Center Below Reportable LimitRed Metal Pit Pump
L15 Interior - Pit - S Wall 71White Concrete Pit Wall
L16 Interior - N end 41Blue / Green Metal Pipe
L17 Interior - Storage Room - N wall 71White Metal HVAC Duct
L18 Interior - W wall Below Reportable LimitWhite Metal Pipe
Lead Paint Survey
Bldg. 436
Appendix B Macrotec Job #11799 - Bldg. 436 ; WO #17998
Sample
Painted Surface Description
Sample Location Description
Lab Result (Parts per Million)
L19 Interior - SW corner 241Brown Metal Elec Box
L20 Exterior - W side 40White Stucco Fascia
L21 Exterior - W side Below Reportable LimitBeige Metal Flashing
L22 Exterior - W side Below Reportable LimitBeige Brick Wall
L23 Exterior - W side 608Brown Metal Box
L24 Exterior - SW corner Below Reportable LimitBrown Metal Pipe
L25 Exterior - SW corner 122Tan Metal Elec Box
Lead Paint Survey
Bldg. 436
Appendix C
Asbestos & Lead Based Paint Survey
Nellis AFB, Bldg. 436
Macrotec Project # 11799
Appendix C
* Diagram Not Drawn To Scale
Sample Location Diagram
N
AB7
AB12
AB13
AB9
AB11
AB8
AB1
Pump Room
AB2 AB3
AB4
AB5
AB6
Storage Room
AB10
Asbestos & Lead Based Paint Survey
Nellis AFB, Bldg. 436
Macrotec Project # 11799
Appendix C
* Diagram Not Drawn To Scale
Sample Location Diagram
N
L1
Pump Room
Storage Room
L2
L3
L4
L5
L6
L7
L8
L9
L10
L11
L12
L13
L14
L15
L16
L17
L18
L19
L20
L21
L22
L23
L24
L23
Appendix D
File details come from the government source that posted it. Updated .