Atch 07_Bldg 10203 Haz Mat Report.pdf
PDF 10 MB Posted
- Attached to
- Repair/Renovate JWEC-N Buildings 10203 & 10204
- Solicitation number
- FA4861-10-R-A045
About this file
Atch 7 HazMat Report Bldg 10203
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Macrotec Consulting, LLC.
9724 Mild Weather Ct. · Las Vegas, NV 89148 Phone: (702) 338-8213 · Fax: (702) 629-5677
Renovation Investigation Report Asbestos and Lead Based Paint Survey
Project Information:
Nellis Air Force Base Bldg. 10203
Report Info:
Macrotec Project # 10619 February 8, 2010
Prepared For:
Vince Bowers 99th Civil Engineering Squadron – CES/CEV Nellis AFB, NV 89191
Prepared By:
Dustin McAllister - Macrotec Consulting, LLC.
Table of Contents:
Introduction Scope of Services Site Description Sample Collection Methodology Sample Analysis Methodology Sample Assessment Recommendations Inspection Limitations
Appendix A Asbestos Assessment Appendix B Lead Assessment Appendix C Asbestos Sample Location Diagram Appendix C.1 Lead Sample Location Diagram Appendix D Asbestos Laboratory Report Appendix D.1 Lead Laboratory Report
ATTACHMENT #7
Asbestos / Lead Survey Macrotec Project # 10619 Nellis Air Force Base – Bldg. 10203 Page 2
INTRODUCTION
Macrotec Consulting performed an inspection for Asbestos-Containing Building Materials and Lead Based Paint on February 1 & 2, 2010. The inspection was conducted for the project defined as: Renovation of building 10203 at Nellis Air Force Base in Las Vegas, NV.
The intent of this inspection was to identify materials containing asbestos and lead based paint, within the subject site, that may be impacted during planned renovation activities. Macrotec’s inspection services were conducted at the request of Vince Bowers of the 99th Civil Engineering Squadron.
Dustin McAllister, a certified lead inspector, License No. NV-I-16781-1, and a Nevada Asbestos Abatement Consultant, License No.IM0961, and Jason McAllister, a Nevada Asbestos Abatement Consultant, License No. IM0901, conducted these services for Macrotec Consulting.
SCOPE OF SERVICES
Asbestos
Macrotec’s inspection services were conducted to identify the presence of any materials containing asbestos pursuant to the requirements of NAC 618.960 and in accordance with the inspection requirements of the EPA’s: 40 CFR Part 61 National Emission Standard for Hazardous Air Pollutants (NESHAP).
These regulations outline inspection and abatement requirements for materials containing asbestos, prior to renovation and/or demolition activities.
Lead
Macrotec collected paint chip samples to identify the presence and content level of lead for compliance with the Occupational Safety and Health Administration’s (OSHA) and the Environmental Protection Agencies (EPA) regulatory requirements pertaining to worker protection and waste disposal.
SITE DESCRIPTION
The subject site was the interior and exterior of a three-level (two stories and a basement) building.
Macrotec’s inspection was limited to the location within the site planned for renovation as described above.
Nellis Air Force Base – Bldg. 10203 Page 3
SAMPLE COLLECTION METHODOLOGY
An initial walk through of the subject site was conducted to identify homogeneous suspect materials containing asbestos and/or lead based paint, and their respective locations. This information was then used to develop a sample collection strategy.
Samples were collected by pre-wetting sample areas with water, then cutting or scraping the sample from the substrate with an appropriate sampling tool.
Whenever possible, samples were collected from areas previously damaged or deteriorating. To avoid potential contamination due to unknown asbestos and/or lead based paint content; no building systems, components, or structures were demolished to obtain samples of potentially hidden materials containing asbestos.
Each suspect bulk sample was sealed in its own zip lock plastic container and labeled with a unique identification number. Sampling tools were individually cleaned before and after each sample was collected to avoid sample cross contamination. Decontamination was accomplished using single use, pre-moistened cloths.
Samples were recorded on Macrotec’s chain-of-custody form. This form accompanied the samples to Triangle Enivronmental Service Center, Inc.
(TESC), located in Moseley, Virginia. The National Voluntary Laboratory Accreditation Program (NVLAP) accredits TESC for analysis of bulk building material samples for asbestos. The American Industrial Hygiene Association (AIHA) accredits Schneider Laboratories Inc. in Richmond Virginia, for analysis of paint chip samples for lead.
SAMPLE ANALYSIS METHODOLOGY
Asbestos
Suspect asbestos samples were subjected to analysis by polarized light microscopy (PLM). Bulk sample analysis was conducted in accordance with the EPA’s “Test Method for the Determination of Asbestos in Bulk Building Materials, EPA/600/R-93/116, 1993.
Lead
To determine lead content, the samples were submitted for analysis. Suspect paint chip samples were subjected to analysis in accordance with the EPA’s Method SW846-7420.
Nellis Air Force Base – Bldg. 10203 Page 4
SAMPLE ASSESSMENT
Asbestos
Macrotec’s inspection of the subject site found Thirty-Eight (38) separate suspect asbestos building materials, of which a total of Seventy-Four (74) samples were collected and submitted for analysis.
The sample results indicated that the suspect materials were “None Detected” for asbestos content.
See Appendix A for a listing of the materials, material locations, samples, sample locations and results for this project.
Lead
Macrotec collected Ninety-Four (94) paint samples of the predominate paint colors within the subject site.
The following table summarizes the painted surfaces that were found to be lead based paint (results above 5,000 parts per million), the locations where the painted surface is located, and laboratory result. Nellis AFB may have further regulations for the handling of materials with paint over 600 parts per million so those results are also included.
Painted Surface Description
Material Locations
Lab Result (Parts / Million)
Silver Metal Pipe Located on roof pipes. 1,079,850
Red Wood Fascia Located on the perimeter of the exterior of the building.
91,940
Red Metal Fascia Located on the perimeter of the exterior of the building.
4,211
Red Metal Handrail Located in the mechanical rooms in the basement.
21,844
Off White / Green Concrete Wall Located on the concrete walls in the basement.
(Including behind some sheet rock walls.)
6,910
Off White / Green Cinderblock Wall Located on the block walls in the three interior stairwells.
5,217
See Appendix B for a listing of the painted surfaces, samples, sample locations and results for this project.
Nellis Air Force Base – Bldg. 10203 Page 5
RECOMMENDATIONS
Asbestos
No asbestos containing materials were identified in this investigation. If suspect materials are found during renovation activities outside what was identified in this report, stop work immediately until further testing can be completed.
Lead
US EPA OSHA regulations require the implementation of worker protection if there is a potential that paint with lead in it will be disturbed during renovation activities. In accordance with these regulations Macrotec recommends:
Hiring an EPA Licensed Lead Consultant to develop a project specification based on this investigation and any other additional findings.
Hiring an EPA Licensed Lead Abatement Contractor to stabilize and/or remove all regulated lead painted materials.
Hiring an EPA Licensed Lead Consultant to monitor the removal activities and provide final clearance inspection reports.
INSPECTION LIMITATIONS
The information contained in this report is limited to those areas and suspect materials found to be visually accessible through reasonable means.
Macrotec conducted a non-destructive survey. No demolition of building materials was conducted to determine the presence of asbestos in wall cavities, chases or other inaccessible areas. Macrotec cannot warrant that these areas do not contain asbestos in locations other than those noted in this report, however, a good faith effort was made to conduct a comprehensive survey.
• Macrotec accepts no liability for additional materials or under reporting of asbestos materials that exist below other floor coverings.
• This report is not represented as, nor is it intended to be, an asbestos abatement scope of work or project specification.
• If suspect materials are discovered during future demolition operations, cease all general work activities which could impact the discovered suspect materials, until confirmation sampling can be conducted.
Nellis Air Force Base – Bldg. 10203 Page 6
Thank you for allowing Macrotec Consulting to assist you with your environmental consulting needs. Please contact me with any questions regarding this report at (702) 338-8213.
Appendix A
Appendix A - Asbestos Assessment
Macrotec Job #10619 - 10203 Renovation
The following table lists each of the materials suspected to contain asbestos at the subject site. For each material the sample number, location and laboratory result are listed. If the material was found to contain asbestos, the friablity and NESHAP classification is identified.
1 Mopped Roofing Beneath Stone This material is located on the roof of the building.
No Asbestos Detected
AB1 Exterior - Main Roof - Center of W side None Detected
AB2 Exterior - Main Roof - SE corner None Detected
AB3 Exterior - Main Roof - Center None Detected
2 Gray Roll Roofing on Vent This material is located on the roof of the building.
No Asbestos Detected
AB4 Exterior - Main Roof - E side, N end None Detected
3 Gray Roof Mastic on Vent This material is located on the roof of the building.
No Asbestos Detected
AB5 Exterior - Main Roof - E side, N end None Detected
4 Silver Paint on Pipe This material is located on the roof of the building.
No Asbestos Detected
AB6 Exterior - Main Roof - Center of E side None Detected
5 Gray Roof Mastic on Pipe This material is located on the roof of the building.
No Asbestos Detected
AB7 Exterior - Main Roof - Center of W side None Detected
6 Gray Roof Mastic on Roof Perimeter This material is located on the roof of the building.
No Asbestos Detected
AB8 Exterior - Main Roof - SW corner None Detected
7 Exterior Stucco This material is located on the exterior walls of the building.
No Asbestos Detected
AB9 Exterior - S Side - W end None Detected
Asbestos Survey
Bldg. 10203
Macrotec Job #10619
Macrotec Job #10619 - 10203 Renovation
AB10 Exterior - S Side - Center None Detected
AB11 Exterior - S Side - Adj. W overhang None Detected
AB12 Exterior - S Side - E end None Detected
AB13 Exterior - E Side - S end, adj. stairs None Detected
AB14 Exterior - N Side - Center None Detected
AB15 Exterior - W Side - Center None Detected
8 Beige Roof Seam Mastic This material is located on the three overhang roofs.
No Asbestos Detected
AB16 Exterior - SW Overhang - NE corner None Detected
9 Brown Asphalt Roll Roofing This material is located on the three overhang roofs.
No Asbestos Detected
AB17 Exterior - SW Overhang - NE corner None Detected
10 White Mud on HVAC Duct Seam This material is located on the ducts on the east and west sides of the building.
No Asbestos Detected
AB18 Exterior - W Side - N end None Detected
11 Gray Mastic on HVAC Duct Seam This material is located on the ducts on the south side of the building.
No Asbestos Detected
AB19 Exterior - S Side - W end None Detected
12 Brown Asphalt Roof Shingle This material is located on the roof of the covered patio, south of the building.
No Asbestos Detected
AB20 Exterior - Covered Patio - NW corner None Detected
13 Black Tar Paper Beneath Shingles This material is located on the roof of the covered patio, south of the building.
No Asbestos Detected
AB21 Exterior - Covered Patio - NW corner None Detected
14 Sheet Rock, Mud & Tape This material is the component of the walls and ceilings in the first floor of the building.
No Asbestos Detected
AB22 1st Floor - Lav 1 - SE corner None Detected
AB23 1st Floor - N Hall - Adj. center stairwell None Detected
AB24 1st Floor - Room 21 - SW corner None Detected
Asbestos Survey
Bldg. 10203
Macrotec Job #10619
15 Spray Texture on Walls & Ceilings This material is on the walls and ceilings in the first floor of the building.
No Asbestos Detected
AB25 1st Floor - Room 2 - S wall None Detected
AB26 1st Floor - W Hall - NW corner None Detected
AB27 1st Floor - Room 4 - N wall None Detected
AB28 1st Floor - Room 7 - E wall None Detected
AB29 1st Floor - Room 14 - N wall None Detected
AB30 1st Floor - E Stairwell - Adj. 2nd floor None Detected
AB31 1st Floor - Room 20 - E wall None Detected
16 Yellow Mastic Behind FRP This material is on the walls of the lavatories.
No Asbestos Detected
AB32 1st Floor - Lav 1 - W wall None Detected
17 Beige Mastic Behind 4" Base Cove This material is at the base of the walls within the building.
No Asbestos Detected
AB33 1st Floor - Room 1 - S wall None Detected
18 12x12 Floor Tile - White w/ Gray Streaks This material is on the floors throughout the building.
No Asbestos Detected
AB34 1st Floor - Room 2 - Center of E wall None Detected
19 Yellow Mastic Beneath 12x12 Floor Tile This material is on the floors throughout the building.
No Asbestos Detected
AB35 1st Floor - Room 2 - Center of E wall None Detected
20 12x12 Floor Tile - White w/ Beige Streaks This material is in various locations on the floors throughout the building.
No Asbestos Detected
AB36 1st Floor - Room 2 - Center of E wall None Detected
21 Gray Tile on Vertical Part of Stairs This material is on the stairs on the interior of the building.
No Asbestos Detected
AB37 1st Floor - W Stairwell - Adj. 2nd floor None Detected
Asbestos Survey
Bldg. 10203
Macrotec Job #10619
22 Yellow Mastic Beneath Rubber Stair This material is on the stairs on the interior of the building.
No Asbestos Detected
AB38 1st Floor - W Stairwell - Adj. 2nd floor None Detected
23 Black Mastic Behind Mirror This material is on the walls in the lavatories throughout the building.
No Asbestos Detected
AB39 1st Floor - Lav 4 - W wall None Detected
24 Yellow Mastic Behind Sign This material is behind various signs throughout the building.
No Asbestos Detected
AB40 1st Floor - N Hall - Adj. room 6 None Detected
25 Beige Mastic Beneath Shelf This material is in the hall of the first floor.
No Asbestos Detected
AB41 1st Floor - N Hall - Adj. room 6 None Detected
26 Black Window Putty This material is in the hall of the first floor.
No Asbestos Detected
AB42 1st Floor - N Hall - Adj. room 6 None Detected
27 Yellow Mastic Beneath Carpet This material is in the comm closet of room 11 of the first floor.
No Asbestos Detected
AB43 1st Floor - Room 11 - Comm closet None Detected
28 White Window Putty This material is in room 11 of the first floor.
No Asbestos Detected
AB44 1st Floor - Room 11 - Doorway None Detected
29 Sheet Rock, Mud & Tape This material is the component of the walls and ceilings in the 2nd floor.
No Asbestos Detected
AB45 2nd Floor - W Hall - SE corner None Detected
AB46 2nd Floor - Room 5 - S wall, adj. window None Detected
AB47 2nd Floor - Room 10 - E wall None Detected
Asbestos Survey
Bldg. 10203
Macrotec Job #10619
30 Spray Texture on Walls & Ceililngs This material is on the walls and ceilings in the 2nd floor.
No Asbestos Detected
AB48 2nd Floor - Room 2 - E wall None Detected
AB49 2nd Floor - Lav 1 - Center None Detected
AB50 2nd Floor - Room 3 - W wall None Detected
AB51 2nd Floor - Center Stairwell - Center None Detected
AB52 2nd Floor - Room 7 - N wall None Detected
AB53 2nd Floor - Room 8 - NE corner None Detected
AB54 2nd Floor - Room 9 - Center None Detected
31 Black Mastic Behind Mirror This material is on the walls in the lavatories throughout the building.
No Asbestos Detected
AB55 2nd Floor - Lav 2 - Center None Detected
32 Textured Floor Paint This material is on the floor of lavatory 3 on the 2nd floor.
No Asbestos Detected
AB56 2nd Floor - Lav 3 - Center None Detected
33 White Floor Fill Beneath Floor Tile This material is on various locations on the floors throughout the building.
No Asbestos Detected
AB57 2nd Floor - Room 8 - Center None Detected
34 Sheet Rock, Mud & Tape This material is the component of the walls and ceilings in the basement.
No Asbestos Detected
AB58 Basement - Center Stairwell - Adj. N hall None Detected
AB59 Basement - E Hall - Adj. room 20 None Detected
AB60 Basement - Room 3 - S end None Detected
35 Spray Texture on Walls & Ceilings This material is on the walls and ceilings in the basement.
No Asbestos Detected
AB61 Basement - Room 1 - N wall None Detected
AB62 Basement - Room 6 - N, center None Detected
AB63 Basement - Room 15 - E wall None Detected
AB64 Basement - E Stairwell - Adj. 1st Floor None Detected
AB65 Basement - Room 21 - E wall None Detected
Asbestos Survey
Bldg. 10203
Macrotec Job #10619
36 Spray Texture on Block and Concrete This material is on the walls in the basement and stairwells.
No Asbestos Detected
AB66 Basement - Room 3 - W wall None Detected
AB67 Basement - Room 5 - Center None Detected
AB68 Basement - Room 14 - E wall None Detected
AB69 Basement - Center Stairwell - Adj. N hall None Detected
AB70 Basement - Room 22 - E wall None Detected
AB71 1st Floor - W Stairwell - Adj. W hall None Detected
AB72 2nd Floor - E Stairwell - Adj. stairs None Detected
37 White Debris This material is in the south end of the basement hall.
No Asbestos Detected
AB73 Basement - E Hall - S end None Detected
38 Gray Mastic on HVAC Duct Seam This material is in various rooms in the basement.
No Asbestos Detected
AB74 Basement - Room 4 - W side None Detected
Asbestos Survey
Bldg. 10203
Macrotec Job #10619
Appendix B
Appendix B - Lead Assessment
Macrotec Job #10619 - 10203 Renovation
The following table lists each of the painted surfaces suspected to contain lead at the subject site. For each painted surface, the sample number, location and laboratory result are listed.
Sample
Painted Surface Description
Sample Location Description
Lab Result (Parts per Million)
L1 Exterior - N Side - Center Below Reportable LimitBeige Stucco Name Slab
L2 Exterior - N Side - Center Below Reportable LimitRed Metal Hand Rail
L3 Exterior - N Side - Entrance Below Reportable LimitBrown Metal Door
L4 Exterior - N Side - Entrance Below Reportable LimitBrown Metal Door Frame
L5 Exterior - N Side - NW corner Below Reportable LimitBeige Concrete Base
L6 Exterior - N Side - NW corner Below Reportable LimitBeige Stucco Wall
L7 Exterior - Roof - Center 1,079,850Silver Metal Pipe
L8 Exterior - Roof - SW corner 91,940Red Wood Fascia
L9 Exterior - Roof - SW corner 4,211Red Metal Fascia
L10 Exterior - W Side - SW corner Below Reportable LimitBeige Metal HVAC
L11 Exterior - S End - HVAC Area - Door 150Red Metal Gate
L12 Exterior - S End - HVAC Area - Center Below Reportable LimitPurple Metal Heater
L13 Exterior - S End - HVAC Area - Center Below Reportable LimitGreen Metal Heater
L14 Exterior - S End - HVAC Area - Center 101Yellow Metal Gas Pipe
L15 Exterior - S End - HVAC Area - Center Below Reportable LimitBeige Metal Electrical Box
L16 Exterior - S End - HVAC Area - HVAC wall
Below Reportable LimitBrown Cinderblock Wall
L17 Exterior - S End - Center Below Reportable LimitBeige Stucco Wall
L18 Exterior - Covered Patio - N end Below Reportable LimitBeige Cinderblock Wall
Lead Paint Survey
Bldg. 10203
Macrotec Job #10619
Sample
Painted Surface Description
Sample Location Description
Lab Result (Parts per Million)
L19 Exterior - Covered Patio - Center Below Reportable LimitBeige Wood Ceiling
L20 Exterior - Covered Patio - W side Below Reportable LimitBeige Wood Column
L21 Exterior - S End - E corner Below Reportable LimitBeige Metal Door
L22 Exterior - S End - E corner Below Reportable LimitBeige Metal Door Frame
L23 Exterior - S End - E side 243Beige Metal Pole
L24 Exterior - S End - E side Below Reportable LimitGray Metal HVAC Seams
L25 Exterior - S End - E stairs Below Reportable LimitRed Metal Stair Stand
L26 Exterior - S End - E stairs Below Reportable LimitRed Metal Stair Hand Rail
L27 Exterior - E End - SE corner Below Reportable LimitRed Metal Hand Rail
L28 Exterior - E End - NE corner Below Reportable LimitBeige Metal HVAC
L29 Basement - Room 2 - Adj. door Below Reportable LimitOff-white Concrete Column
L30 Basement - Room 1 - S wall Below Reportable LimitOff-white Concrete Wall
L31 Basement - Room 2 - N wall Below Reportable LimitOff-white Sheet Rock Wall
L32 Basement - W Hall - W wall Below Reportable LimitGray Metal Door
L33 Basement - W Hall - W wall Below Reportable LimitGray Metal Door Frame
L34 Basement - Room 3 - N wall 463Off-white Cinderblock Wall
L35 Basement - Room 3a - Doorway Below Reportable LimitOff-white Wood Door Frame
L36 Basement - Room 4 - Center 21,844Red Metal Handrail
L37 Basement - Room 5 - Door to W hall Below Reportable LimitBrown Metal Door
L38 Basement - Room 5 - Closet Below Reportable LimitBrown Metal Door Frame
L39 Basement - Room 12 - Adj. door 14,575Red Metal Handrail
L40 Basement - Room 6 - Door Below Reportable LimitBrown Metal Window / Door Frame
L41 Basement - Room 6 - Door Below Reportable LimitBrown Metal Window / Door
Lead Paint Survey
Bldg. 10203
Macrotec Job #10619
Sample
Painted Surface Description
Sample Location Description
Lab Result (Parts per Million)
L42 Basement - N Hall - Adj. room 6 35Off-white Cinderblock Wall
L43 Basement - Room 14 - E end Below Reportable LimitOff-white Concrete Platform
L44 Basement - E Stairwell - Adj. E hallway 5,744Off-white / Green Concrete Wall
L45 Basement - Room 19 - Adj. door 18,414Red Metal Handrail
L46 Basement - Room 23 - N wall Below Reportable LimitOff-white Sheet Rock Wall
L47 Basement - E Hall - S end Below Reportable LimitOff-white Metal Panel
L48 Basement - Room 14 - S wall 6,910Off-white Concrete Wall
L49 Basement - Room 16 - W end Below Reportable LimitWhite Metal Duct
L50 2nd Floor - W Hall - Door to exterior Below Reportable LimitBrown Metal Door Frame
L51 2nd Floor - W Hall - Door to lav 1 Below Reportable LimitBrown Metal Door
L52 2nd Floor - Room 2 - E wall Below Reportable LimitOff-white Sheet Rock Wall
L53 2nd Floor - Lav 1 - W wall Below Reportable LimitOff-white FRP wall
L54 2nd Floor - Lav 1 - N wall Below Reportable LimitOff-white - Ceramic Base Cove
L55 2nd Floor - Lav 1 - Center Below Reportable LimitTan Ceramic Floor Tile
L56 2nd Floor - W Stairwell - Adj. W hall 5,217Off-white / Green Cinderblock
L57 2nd Floor - Room 3 - Closet door Below Reportable LimitGray Metal Door / Door Frame
L58 2nd Floor - Room 3 - Center Below Reportable LimitWhite Wood Shelf
L59 2nd Floor - Lav 2 - Door Below Reportable LimitBrown Metal Door Frame
L60 2nd Floor - Center Stairwell - Center 2,271Off-white / Green Cinderblock Wall
L61 2nd Floor - Room 6 - Door to center stairs
Below Reportable LimitBrown Metal Door
L62 2nd Floor - Room 6 - W wall Below Reportable LimitOff-white Sheet Rock Wall
L63 2nd Floor - Lav 3 - Center Below Reportable LimitGray Floor Coating
L64 2nd Floor - Room 6 - SE corner Below Reportable LimitOff-white Wood Coat Rack
Lead Paint Survey
Bldg. 10203
Macrotec Job #10619
Sample
Painted Surface Description
Sample Location Description
Lab Result (Parts per Million)
L65 2nd Floor - W Stairwell - Center 4,295Off-white / Green Cinderblock Wall
L66 2nd Floor - Lav 4 - Center Below Reportable LimitGray Metal Stall Divider
L67 2nd Floor - E Hall - Center Below Reportable LimitOff-white Sheet Rock Wall
L68 2nd Floor - E Hall - Door to exterior Below Reportable LimitBrown Metal Door
L69 2nd Floor - E Hall - Door to lav 4 Below Reportable LimitBrown Metal Door Frame
L70 1st Floor - Room 18 - W wall Below Reportable LimitOff-white Sheet Rock Wall
L71 1st Floor - Lav 7 - Adj. door Below Reportable LimitWhite Ceramic Base
L72 1st Floor - Lav 8 - Adj. door Below Reportable LimitTan Ceramic Floor Tile
L73 1st Floor - E Hall - Door to exterior Below Reportable LimitBrown Metal Door
L74 1st Floor - E Hall - Door to lav 6 Below Reportable LimitBrown Metal Door Frame
L75 1st Floor - Room 16 - Closet 688Off-white Cinderblock Wall
L76 1st Floor - Room 7 - S wall Below Reportable LimitOff-white Sheet Rock Wall
L77 1st Floor - Center Hall - Door to room 5 Below Reportable LimitBrown Metal Door Frame
L78 1st Floor - Center Stairwell - Door to hall Below Reportable LimitBrown Metal Door
L79 1st Floor - Room 15 - S wall Below Reportable LimitWhite Wood Cabinet
L80 1st Floor - Room 9 - Door to room 11 Below Reportable LimitWhite Wood Door / Window Frame
L81 1st Floor - Center Stairwell - Center 3,747Off-white / Green Cinderblock Wall
L82 1st Floor - Center Stairwell - Center Below Reportable LimitGray Wood Stair
L83 1st Floor - Room 6 - Adj. door to hall Below Reportable LimitOff-white Ceramic Floor Tile
L84 1st Floor - Room 3 - Center Below Reportable LimitOff-white Wood Shelf
L85 1st Floor - W Stairwell - Center 2,636Off-white / Green Cinderblock Wall
L86 1st Floor - Lav 1 - Center Below Reportable LimitOff-white FRP Wall
L87 1st Floor - W Hall - Center Below Reportable LimitOff-white Sheet Rock Ceiling
Lead Paint Survey
Bldg. 10203
Macrotec Job #10619
Sample
Painted Surface Description
Sample Location Description
Lab Result (Parts per Million)
L88 1st Floor - W Hall - Door to lav 1 Below Reportable LimitBrown Metal Door
L89 1st Floor - W Hall - Door to exterior Below Reportable LimitBrown Metal Door Frame
L90 Basement - Room 8 - E end 137Gray Concrete Floor
L91A 1st Floor - E Stairwell - Bottom Below Reportable LimitBlack Wood Stair
L91 1st Floor - Center Stairwell - Bottom Below Reportable LimitWhite Wood Stair
L92 1st Floor - Room 15 - N wall Below Reportable LimitOff-white Metal Pole
L93 1st Floor - Room 6 - SE corner Below Reportable LimitRed Metal Box
Lead Paint Survey
Bldg. 10203
Macrotec Job #10619
Appendix C
Asbestos & Lead Based Paint Survey
Nellis AFB, Bldg. 10203
Macrotec Project # 10619
Appendix C
* Diagram Not Drawn To Scale
Sample Location Diagram N
AB3
AB1
AB2
AB4
Exterior
AB5
AB6
AB7
Asbestos
Main Roof
Covered Patio
AB8
AB9
AB10
AB11
AB12
AB13
AB14
AB15
AB16
AB17
AB18
AB19
AB20
AB21
Macrotec Project # 10619
Appendix C
* Diagram Not Drawn To Scale
Sample Location Diagram N
Basement
AB58
Room
Room
Room
Room
Room
Room
Room
Room
E Hall
W Hall
N
H a l l
E
SW
W
SW
Cen
SW
Asbestos
Rm 9
Room
Room
Room
Room
Room
Room
Room 3a
Room
Room
Room
Room
Room
Room
Room
Room
AB59
AB60
AB61
AB62
AB63
AB64
AB65
AB66
AB67
AB68
AB69
AB70
AB73
AB74
Macrotec Project # 10619
Appendix C
* Diagram Not Drawn To Scale
Sample Location Diagram N
AB22
1st Floor
Room
Room
Lav
Room
Room
Lav
Lav 3
Room
Room
Room
Lav
Room
E Hall
W Hall
N
H a l l
E
SW
W
SW
Cen
SW
Asbestos
Lav 4
Rm 7
Rm 8
Rm 10
Rm 12
Rm 13Rm 11
Rm 9
Lav 5
Room
Room
Lav
Lav
Room
Room
Room
Room
Room
AB23
AB24
AB25
AB26
AB27
AB28
AB29
AB30
AB31
AB32
AB33
AB34
AB35
AB36
AB37
AB38
AB39
AB40
AB41
AB42
AB43
AB44
AB71
Macrotec Project # 10619
Appendix C
* Diagram Not Drawn To Scale
Sample Location Diagram N
AB45
2nd Floor
Room
Room
Lav
Room
Room
Lav
Lav
Room
Room
Room
Room
Lav
Room
Room
E Hall
W Hall
N
H a l l
E
SW
W
SW
Cen
SW
Asbestos
AB46
AB47
AB48
AB49
AB50
AB51
AB52
AB53
AB54
AB55
AB56
AB57
AB72
Appendix C.1
Macrotec Project # 10619
Appendix C.1
* Diagram Not Drawn To Scale
Sample Location Diagram N
Exterior
Lead Based Paint
Main Roof
Covered Patio
L1
L2
L3
L4
L5
L6
L7
L8
L9
L10
L11
L12
L13
L14
L15
L16
L17
L18
L19
L20
L21
L22
L23
L24
L25
L26
L27
L28
Macrotec Project # 10619
Appendix C.1
* Diagram Not Drawn To Scale
Sample Location Diagram N
Basement
Room
Room
Room
Room
Room
Room
Room
Room
E Hall
W Hall
N
H a l l
E
SW
W
SW
Cen
SW
Lead Based Paint
Rm 9
Room
Room
Room
Room
Room
Room
Room 3a
Room
Room
Room
Room
Room
Room
Room
Room
L90
L91
L29
L30
L31
L32
L33
L34
L35
L36
L37
L38
L39
L40
L41
L42
L43
L44
L45
L46
L47
L48
L49
Macrotec Project # 10619
Appendix C.1
* Diagram Not Drawn To Scale
Sample Location Diagram N
1st Floor
L70
Room
Room
Lav
Room
Room
Lav
Lav 3
Room
Room
Room
Lav
Room
E Hall
W Hall
N
H a l l
E
SW
W
SW
Cen
SW
Lead Based Paint
Lav 4
Rm 7
Rm 8
Rm 10
Rm 12
Rm 13Rm 11
Rm 9
Lav 5
Room
Room
Lav
Lav
Room
Room
Room
Room
Room
L71
L72
L73
L74
L75
L76
L77
L78
L79
L80
L81
L82
L83
L84
L85
L86
L87
L88
L89
L91A
L92
L93
Macrotec Project # 10619
Appendix C.1
* Diagram Not Drawn To Scale
Sample Location Diagram N
2nd Floor
Room
Room
Lav
Room
Room
Lav
Lav
Room
Room
Room
Room
Lav
Room
Room
E Hall
W Hall
N
H a l l
E
SW
W
SW
Cen
SW
Lead Based Paint
L50
L51
L52
L53
L54
L55
L56
L57
L58
L59
L60
L61
L62
L63
L64
L65
L66
L67
L68
L69
Appendix D
Appendix D.1
Appendix E
| CCF00412009_00011 |
| CCF00412009_00012 |
File details come from the government source that posted it. Updated .