Atch 4 Technical Statement of Work Bldg 10204

View the file

Other files

Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RKMF 10-0086, Repair Building 10204 FA4861-10-B-A045

26-JUL-2010

TSOW Page 1 of 40

ATTACHMENT # 4

REPAIR AND RENOVATION OF BUILDING 10204

TECHNICAL STATEMENT OF WORK (TSOW)

PART 1 GENERAL:

1.1 Contractor shall be the architect and constructor of record on this project. The design and construction shall be an integrated approach that achieves the highest quality of operations and aesthetics in meeting the requirements of the building’s users while at the same time is cost effective and establishes economical and efficient synergy among the systems and spaces applicable to the structure as a whole. Contractor shall be responsible for the professional quality, constructability, technical accuracy and coordination of all designs, drawings, specifications and other documents or publications upon which construction is based. The design of architectural, interior design, structural, mechanical, electrical, civil and other engineering features of the work shall be accomplished, reviewed and approved by engineers, architects and interior designers who are licensed professionals to practice in their respective professional field in a state or possession of the United States. The Contractor is responsible and liable for the complete design and shall not assume that the provided design criteria and drawings in this solicitation will alleviate him from performing any additional design as required to produce a complete set of construction documents.

1.2 Life Cycle Cost. Facility should be designed with the objective of achieving the lowest life cycle cost over a 30-year period. Selection evaluations should address all aspects of the facility to include energy, utilities, building systems, and finishes.

1.3 General Facility Description. Repair project consists of the renovation of auditorium Building 10204 at Nellis AFB consisting of 3,350 square feet designed as a secure office building that contains functional program areas identified at the end of the

TSOW.

1.4 Siting Summary. The building is located off of Seymour Johnson Avenue within the confines of Area II at Nellis AFB. The Contractor is responsible for restoring areas beyond defined perimeters to their pre-construction status.

1.5 Building Construction Summary. This project will be the renovation of an existing structure. The site work will support this project. Facility set back is governed by force protection requirements. The building is organized into functional areas shown in Table 1-1. These areas are described in greater detail under functional area descriptions at the end of this TSOW. Site work includes clearing/grubbing, utilities, drainage, emergency and maintenance access, sidewalks, and force protection.

1.6 Functional Program Areas. Table 1-1 lists the areas for the JEWC program, administrative areas, and building support. They provide facility and support services to meet the general needs of all authorized users.

ATTACHMENT #4

TSOW Page 2 of 40

TABLE 1-1 FUNCTIONAL PROGRAM AREAS

Functional Area Description

Non-Secure Areas

Public restrooms Public restrooms.

Janitor Closet Cleaning storage for the building Vestibule Public entry into building

Secure Areas

Auditorium Sloped seating area.

Stage Raised stage for presentations

Support Areas

A/V Room Houses A/V equipment for presentations A/V Storage Storage for A/V equipment and materials Electrical Houses electrical panels for building Communications Communications switch location for building Fire Riser Former fire riser room to be used as storage.

1.6.1 Space Allocations. Total facility size is 3,350 square feet. This project consists of renovating 3,350 square feet of this facility.

1.6.2 Government Equipment. None.

1.6.3 Future Facility Expansion Areas

1.6.4 The design shall take into account the future expansion requirements in the basement. Expected future expansion areas include all areas not scheduled for renovation. Design shall not limit options for the future expansion areas.

PART 2 PRODUCTS: not used

PART 3 EXECUTION:

3.1 General Design Criteria

3.1.1 Designer shall use UFC 1-200-01, General Building Requirement;, and Nellis AFB Facility Excellence Guide and Standards for guidance and current building codes for design and construction of the Joint Electronic Warfare Center Auditorium. The Unified Facility Criteria library is located at:

http://www.wbdg.org/ccb/browse_cat.php?o=29&c=4. Facility design, materials, equipment, and installation shall be in accordance with the requirements of the listed

TSOW Page 3 of 40 codes and design manuals. The building will be of a noncombustible construction classification.

3.1.2 The Contractor shall generate a construction specification package that uses the Unified Facilities Guide Specifications (UFGS) appropriately edited for each aspect of the project. The UFGS can be retrieved at:

http://www.ccb.org/docs/ufgshome/UFGSToc.html. Unless noted otherwise, material specifications, equipment efficiencies, equipment listing (i.e., UL, ANSI, NEMA, etc.), testing requirements, execution, and similar requirements shall not be changed unless dictated by more stringent requirements referenced in this RFP.

3.1.2.1 Provide Government an informational copy of the completed specifications, design calculations, and drawings.

3.1.3 The Contractor is responsible for field verifying all information given. The Contractor is also responsible for obtaining all information necessary to properly design and install all work. Gathering information during design shall be coordinated through the Contracting Officer. Any survey required to provide utility locations, manhole inverts, verification of existing features, etc., shall be the responsibility of the Contractor and shall tie into the project datum.

3.2 Site

3.2.1 Site Layout. The existing building site is shown on Drawing Sheet C-002 – Site Plan. The modifications to the site shall meet the minimum provisions of all applicable references sited in these RFP documents. The Contractor shall minimize construction impact and confine proposed development to the project area as designated in these RFP documents.

The building is a former auditorium on the site of the de-activated Nellis Federal Prison within Area II. The size of the site is approximately 18,800 square feet. A shared parking area for Building 10204 and adjacent buildings exists across the Seymour Johnson Avenue from the proposed site and additional parking spaces exist across Fairchild Avenue to meet the minimum 112 parking space requirement from Table 20.2 of AFH 32-1084 (60% of occupancy).

An on-site renovation investigation report indicates that asbestos and lead may be present to an extent in some of the building materials used on site. The contractor is responsible for determining the necessary Personal Protective Equipment and reviewing any environmental studies and reports completed at the time this RFP is issued.

General site topography contours have been provided based upon an aerial topography, however, additional topographic survey is required to verify site specific details and finished floor elevations that were not provided by the aerial survey.

The site generally slopes to the west. The building foundation appears to be at a single elevation, although the interior floor slopes in theatre style. In the existing condition, TSOW Page 4 of 40 drainage is accomplished through a combination of overland surface flow to Seymour Johnson Avenue and Fairchild Avenue and infiltration through the xeriscaping. Existing ground is generally sloped away from the building for varying distances prior to draining overland to the west to protect the building from flooding. However, a low point exists in the southeast corner of the building, where water collects on the ground. The site does not appear to accept quantifiable runoff from adjacent sites, or upstream discharges.

There are no existing storm drains within the vicinity of the area.

3.2.1.1 Existing Utilities. Existing utilities serving the building are shown on Drawing Sheet C-002 – Site Plan. Contractor is to verify location, presence, condition, and capacity of adjacent mains and existing laterals and make any sizing adjustments as necessary.

3.2.1.1.1 Domestic Water. The water supply for the building is provided by the overall base water distribution system. The Area II portion of the water system is pressurized through the use of an elevated tank. Existing 10-inch cast iron mains are located in the landscaped area between Seymour Johnson Avenue and the building and between Fairchild Avenue and the building. These lines will be replaced in the future along with the entire Area II water system, per design plans by Jacobs. from February 2010. An existing 1-inch service lateral connects to the main perpendicular to Fairchild Avenue, makes a 90-degree turn, and enters the building through the north side. Currently, there is no evidence of the existence of any backflow prevention device or water meter. An existing Nellis water system model, prepared in 2008 by EarthTech Inc., indicates that the static water pressure will exceed 90 psi at the main.

3.2.1.1.2 Fire Suppression Water. The fire suppression supply for the building is also provided by the overall base water distribution system. With the replacement of the Area II water system, the fire and domestic water services will be provided through separate distribution mains. An existing 6-inch service lateral enters the building through the southeast corner into the fire riser room. A Fire Department connection exists at ground level outside the building at this on the east side of the corner. Currently, there is no evidence of the existence of an operational Position Indicating Valve for the fire service.

The existing Nellis water system model, prepared in 2008 by EarthTech Inc., indicates that the static water pressure will exceed 90 psi at the main, and approximately 1,675 gpm of flow is available to the main with a system residual pressure of 20 psi.

3.2.1.1.3 Sanitary Sewer System. The waste water from the sanitary fixtures and existing floor drains are collected by sewer pipes within the building and discharge through two 4-inch laterals to the Nellis AFB sewer system. Existing 8-inch sanitary sewer mains run parallel to both Seymour Johnson Avenue and Fairchild Avenue in the landscaped area between the street and the building. This building drains to the sewer parallel to Fairchild Avenue. External cleanouts are not present within the existing system.

3.2.1.1.4 Main Electrical Feed. The main building feed is an overhead drop feed from an overhead transformer across Fairchild Avenue.

TSOW Page 5 of 40

3.2.1.1.5 Natural Gas Supply. Natural Gas to the building is provided through the base gas distribution system. The main for the gas service to this building runs behind the building. A 1-inch gas service is provided to the rear of the building.

3.2.1.1.6 Communications. An existing communications system is provided to the building and shall be replaced with a new system.

3.2.1.1.7 Site Lighting. Street level illumination is provided through standard streetlights on overhead electrical poles running along the south side of Seymour Johnson Avenue and the east side of Fairchild Avenue.

3.2.2 Site Development. The site development for this project shall consist of the complete design and construction of the facility modifications, walkways, utilities, grading, drainage, landscaping, sidewalk replacement, and re-striping in accordance with UFC and ADA criteria.

3.2.2.1 Site Demolition. Minimal amounts of demolition are required for this site.

Contractor is to fully demolish, remove, or abandon all facilities and utilities to the extent shown on Sheet C-002 – Site Plan and as described in this RFP. Contractor must replace surface as directed by plan. In areas where no surface is specified, contractor must re-surface with ¾-inch red granite rock mulch. If demolition involves lead or asbestos, Contractor is responsible for all required PPE, permitting, and disposal in accordance with all government regulations.

Clearing and grubbing shall be required for land below proposed improvements. All rock mulch shall be removed and salvaged. Vegetation shall be removed to the roots and disposed of. Salvaged rock shall be utilized to cover areas where demolition of improvements occurs.

3.2.2.1.1 Landfill. All waste material shall be disposed of off base in accordance with all applicable local, state, and federal regulations, at Contractor’s expense.

3.2.2.1.2 Borrow Pit. The Contractor shall be responsible for bringing in fill and select fill for the construction of the project, at the Contractor’s expense.

3.2.2.3 Haul Route. The approved Haul Route is illustrated on Sheet C-001 – Haul Route and Contractor’s Staging Area. All construction equipment must enter through the Area II gate and follow the approved route to the site.

3.2.2.4 Construction Storage Yard. Contractor must store all equipment and material within the limits of the staging area shown on Sheet C-001 – Haul Route and Contractor’s Staging Area. Contractor shall restore this area in accordance with the contract or pre-construction condition based. Regardless of the area, the yard shall be fenced and screened. Contractor shall keep the fence well maintained and the site clean.

TSOW Page 6 of 40

3.2.2.5 Storm Runoff and Drainage. Subsequent to all construction activities, all areas around the building must be graded to provide positive drainage away from the building for a minimum of 10 feet. Major grade changes include raising finished grade outside the southwest corner of the building to promote drainage and remove a low spot and grading around the new entrance walk and ramp. The major grade changes are illustrated on sheet C-100 – Grading Plan. Sheet flow to the street should be utilized whenever possible;

however swales may be used to convey flow in accordance with UFC 3-210-01A – Area Planning, Site Planning, and Design. The finished grade adjacent to the building should be at least 6-inches below the adjacent finished ground floor elevation of the building unless noted or required to maintain positive drainage. In no case should the adjacent ground be less than 1-inch below the finished floor elevation. Ponding anywhere on the project site shall be controlled. There shall be no disruption of existing drainage patterns on the adjacent sites.

3.2.2.5.1 Existing/New Storm Drainage System. Per Technical Guidance on implementing the Storm water Runoff Requirements for Federal Projects under Section 438 of the Energy Independence and Security Act drainage requirements, any projects that disturb more that 5,000 square feet of land must provide means to restore pre-development hydrology. Only disturbances that alter the landscape are considered toward the 5,000 square foot limit. Concrete replacement and resurfacing are generally excluded from this calculation. It is estimated that this project will disturb approximately 3,190 square feet of land, which exempts it from the 438 Drainage Requirements. The contractor shall perform an evaluation of the design to ensure that this exemption is still met. If the exemption is not met, the Contractor shall perform a complete analysis, taking into consideration existing and proposed conditions, and design an acceptable surface storm drainage system to detain the increase in storm water runoff.

3.2.2.6 Drainage Swales. Earthen swales may be required to convey storm drainage through or around the project site, and should have a minimum slope of 1.0 percent.

3.2.3 New Utilities. A #10 tracer wire shall be installed on all non-metallic underground pipes. The wire shall be taped to the pipe every 20 feet, be continuous and accessible above ground at ALL valves and building risers. A minimum of six (6) inches of sand shall be required around all water piping and buried a minimum of 36 inches deep. Pipe type as noted on Sheet C-002 – Site Plan.

For utilities requiring meters, Contractor shall verify exact equipment and coordinate connection details with the Energy Management Control System (EMCS) personnel at Nellis AFB (99 CES personnel in Building 812). Meters shall connect to project’s Johnson Controls based EMCS. Contractor shall verify the information output from the meters is properly routed to the base-wide EMCS central connection point in Building 812.

3.2.3.1 Domestic Water. The existing fresh water lateral shall be replaced with a 1 ½ -inch NSF-61 Schedule 80 PVC lateral from the main to the building in the same location.

A ball valve, union, and reduced pressure principal assembly backflow prevention device

TSOW Page 7 of 40 shall be added to the fresh water lateral outside of the building per UFC 3-230-10A- Water Supply: Water Distribution. A McCrometer or approved equal water meter with pulse output and minimum pickup of 5 gallons per minute or less is also required on the service lateral.

3.2.3.2 Fire Suppression Water. Fire suppression for this building is not required.

The existing fire service lateral shall be removed and capped 5 feet from the main.

3.2.3.3 Sanitary Sewer System. The existing sewer lateral shall be replaced with a new 4-inch PVC lateral between the main and the building in the northernmost location. The other lateral shall be capped and removed. Exterior cleanouts shall be provided. Laterals and cleanouts must be constructed in accordance with UFC 3-240-04A – Wastewater Collection.

3.2.3.4 Main Electrical Feed. A new underground electrical service and pad mounted transformer is required for this project. The new transformer shall be provided on the west side of the building. This pad shall be fully enclosed per AT/FP requirements, and shall have two, 4-foot opposing gates for access along the front. At least three feet of clearance is required on both sides of the transformer for maintenance, and the enclosure shall extend to the building wall in the rear. An underground feeder from an existing overhead electrical pole northwest of the building to the transformer and from the transformer to the building shall be provided. A new Veris Industries advanced electric meter with display or approved equal is required for the electrical service

3.2.3.5 Natural Gas Supply. A new 2-inch natural gas service entrance with 2-inch Elster American Standard meter with pulse output or approved equal is required for this project. The service connection shall remain in the existing location

3.2.3.6 Communications. Two new 4-inch communications conduits are provided between this building and an existing manhole to the east of the building. Twenty-five pairs of copper shall be provided in one conduit. The copper shall extend from the existing manhole through existing conduits and terminate at Manhole 506. Twelve single strand fibers shall run in the other conduit Manhole 506. From Manhole 506, the fiber shall continue through existing, through Manhole 507 and 508, and terminate in Manhole

509. Maxcell interduct shall be provided in the fiber conduit per Nellis AFB Personnel.

Government shall splice all connections.

3.2.3.7 Site Lighting. No changes are proposed with this project.

3.2.4 Sidewalk. Replace sidewalk where required to meet ADA compliance requirements and where shown on Sheet C-002 – Site Plan. Provide new walkways and ramps as shown on Sheet C-002 – Site Plan. Sidewalks shall be constructed in accordance with Nellis Design Compatibility Guidelines.

3.2.5 Barriers. A new passive barrier system shall be installed along the backside of the sidewalk parallel to Seymour Johnson Avenue and Fairchild Avenue, running for a length of approximately 280 feet. This barrier system shall provide approximately 40

TSOW Page 8 of 40 feet of standoff distance between Seymour Johnson Avenue and the building and approximately 33 feet of standoff distance between Fairchild Avenue and the building.

Removable bollards shall provided at 4.0 foot center to center spacing since the width of sidewalks typically exceeds the 40-inch maximum spacing for boulders. These bollards allow for pedestrian and delivery access to the building. All barriers should be in accordance with UFC 4-010-01 - DoD Minimum Antiterrorism Standards for Buildings.

3.2.6 Mechanical Yards. A new mechanical yard is to be constructed on the east side of the building. This area shall be enclosed with CMU walls, and a gate and heavy gage bird netting is shall be installed in conformance with AT/FP requirements and UFC 4- 010-01 - DoD Minimum Antiterrorism Standards for Buildings. Size 3/4-inch Red Granite rock mulch shall surround the concrete pads in the enclosure. Additionally, HVAC units placed outside of the mechanical yard shall be fully enclosed per AT/FP requirements and shall have a minimum of three feet of maintenance area around all sides.

3.2.7 Accessibility. Two existing van accessible parking spaces shall be striped to indicate handicapped accessible spaces for compliance with ADA Accessibility Regulations.

3.2.8 Permitting. The contractor is required to obtain all permits required by the contract, federal, state, and local governments and Nellis AFB. Asbestos Containing Material (ACM)/Lead Based Paint (LBP) testing for all disturbed surfaces has been accomplished, signed manifests are required (if ACM/LBP is removed).

3.2.8.1 Clark County Dust Permit. A Clark County Dust Permit from the Clark County Department of Air Quality and Environmental Management is required for this project for trenching over 100 feet in length over two feet deep.

3.2.8.2 Storm Water Discharge Permit and Storm Water Prevention Plan. These permits are through the Nevada Department of Environmental Protection. This permit is required for project disturbances of over one acre, and will likely not be required for this project.

3.2.8.3 Authority to Construct Permit. The Clark County Department of Air Quality and Environmental Management Authority to Construct Permit is required prior to construction of certain mechanical equipment such as hot water heaters and air coolers.

3.2.8.4 Nellis AFB Digging Permit. The Nellis Digging Permit is required for all digging on Nellis AFB.

TSOW Page 9 of 40

3.3 Structure

3.3.1 Design Criteria. Structural design shall be in accordance with the latest version of the following criteria and standards:

3.2.10.1.1 International Building Code, IBC

3.2.10.1.2 ASCE7: Minimum Design Loads for Buildings and Other Structures

3.2.10.1.3 UFC 4-010-01: DOD Minimum Antiterrorism Standards for Buildings

3.2.10.1.4 ACI 318: Building Code Requirements for Structural Concrete

3.2.10.1.5 ACI 530: Building Code Requirements for Masonry Structures

3.2.10.1.6 AISC 360: Specification for Structural Steel Buildings

3.2.10.1.7 AISC Manual of Steel Construction

3.2.10.1.8 NDS: National Design Specification for Wood Construction

3.3.2 Design Loads.

3.3.2.1 Dead Loads. Dead loads shall be calculated in accordance with section 1606 of the IBC and will include the weight of all permanent building materials, interior and exterior finishes and fixed service and equipment utilities.

3.3.2.2 Live Loads. Live loads shall be calculated in accordance with section 1607 of the IBC as summarized below:

Canopy Roof .......................................................................... 20 PSF Raised Floor ......................................................................... 150 PSF

3.3.2.3 Wind Loads. Wind loads shall be calculated in accordance with section 1609 of the IBC and Chapter 6 of ASCE 7 as summarized below:

Basic Wind Speed 90 MPH Exposure Category C Importance Factor, I 1.0 Interior Partition Loads 5.0 PSF

3.3.2.4 Seismic Loads. Seismic loads on components and equipment shall be calculated in accordance with section 1613 of the IBC and Chapters 11,12 and 13 of ASCE 7 as summarized below:

SS 0.608g S1: 0.185g Site Class D Seismic Importance Factor, I 1.0

TSOW Page 10 of 40

3.3.3 Existing Conditions. The information presented below is based on field observations conducted on May 7, 2010. The contractor shall verify the accuracy of the information presented below.

The structural system of the single-story building utilizes wood and steel as its main construction materials. The exterior wall system for the building consists of wood sheathing over 2x timber stud framing. Inside of the building, steel pipe columns support the roof structure consisting of plywood sheathing supported by open web steel joists at 4’-0” O.C. The joists span in the short direction of the building.

The lateral force resisting system consists of timber shear walls surrounding the building’s exterior. The plywood sheathing at the roof serves as the building’s structural diaphragm.

The foundation system consists of shallow pad footings at all column locations and a continuous wall footing around the exterior of the building. The floor consists of a 4” thick concrete slab supported on grade. The slab is sloped to accommodate stadium seating. A current geotechnical evaluation has not been conducted for the building. The analysis of existing foundation members should utilize code minimum values for bearing pressure and other pertinent design parameters in accordance with Chapter 18 of the International Building Code (IBC), unless a geotechnical investigation is performed.

3.3.4 Scope of Work. The project will generally consist of interior improvements and modifications to building layout, architectural finishes, demolition and addition of mechanical, electrical and plumbing equipment, and structural reinforcement of windows to meet blast loading.

3.3.4.1 Openings in Bearing Stud Walls. New openings will be made in the exterior walls of the building to accommodate doors or pass mechanical ducts into the building.

At these locations, provide structural timber headers to support the roof framing above.

3.3.4.2 New Partition Walls. Provide bracing or positively attach new non-bearing partition walls to the structure to resist seismic and internal wind force pressures.

3.3.4.3 AT/FP Window Support Framing. Provide structural support for all exterior glazing panels in accordance with Standard 10 of UFC 04-010-01. Design supporting structural elements of glazing systems to resist eight times the static load resisting values determined in accordance with ASTM F2248 and ASTM E1300. Refer to the Window System Design Load Analysis report for loading.

3.3.4.4 Mechanical Equipment. New mechanical units will be located at the exterior of the building. Provide reinforced concrete pads large enough to support the loads within allowable soil bearing limits. At interior equipment, contractor to evaluate the existing framing for adequacy in supporting the units.. Provide adequate anchorage for all units to resist sliding and overturning effects when subject to lateral seismic or wind forces.

TSOW Page 11 of 40

3.3.4.5 Raised Floor Framing. Provide raised floor framing in Vestibule Room 101, A/V Room 105, Janitor Room 104, and restrooms 102 and 103. Design the framing to support the uniformly distributed live load listed in the design criteria. Deflection of the raised floor system should be minimized and kept below the span length divided by 360 for support members to enhance user comfort

3.3.4.6 Entrance Canopy. Provide structural framing to support a new stand-alone canopy at the entrance of the facility. Isolate the canopy structure from the building structure with a seismic joint to prevent load transfer between the two systems.

3.3.4.7 CMU Screen Wall. Provide structural design for a new masonry screen wall surrounding the exterior mechanical equipment yard.

3.3.4.8 Exterior Design. The exterior design of the building is to be based upon the Nellis AFB design guidelines.

3.3.4.9 Entrances/Exits. The main facility entrance to the lobby should serve as a welcome and transition point. The facility has be designed with three points of egress from the auditorium

3.3.4.10 Doors and Windows. All existing windows into the facility to be demolished.

Existing exterior doors will be either demolished or replaced with new doors. All doors going in or out of the secure area are to be alarmed. The entrance into the building will receive a storefront system that contains double doors and windows. The new storefront system is to meet AT/FP requirements.

3.3.4.11 Exterior Finishes. The exterior color, texture, and design of the new canopy should be consistent with the existing 10204 Building. Existing exterior building finishes shall be repaired as required.

3.3.4.12 Exterior Signage. The new exterior signage shall be 12” high anodized aluminum letters reading “JEWC-N”

3.3.4.13 Exterior Walls and Mold.

3.3.4.13.1 Building Systems, Materials, and Equipment. Offerors are encouraged, but not limited to, follow the construction system and materials guidance within the Design Compatibility Guidelines, Nellis AFB, August 2006.

3.3.4.13.2 Exterior wall systems

3.3.4.13.2.1 Mold. Comply with current industry standards and ETL 04-3 (Change 1):

Design Criteria for Prevention of Mold in Air Force Facility during design to help prevent the development of mold in wall systems.

TSOW Page 12 of 40

3.3.4.13.3 Roofing

3.3.14.13.3.1 Roof to remain as is.

3.4 Interior Design.

3.4.1 Construction and finishes (walls, floor, and ceiling) should support the image and theme of the facility and be consistent with the programs offered and any Installation interior standards. The interior design should offer the same interest, excitement, and professionalism that can be found in comparable commercial Facility.

3.4.2 Interior Construction.

3.4.2.1 Structural Interior Design (SID). Structural interior design services are considered a standard design requirement and, therefore, will be accomplished as a part of the basic facility design in accordance with criteria. Structural related services shall consist of, but not limited to, design and/or selection and color coordination of building surfaces, paint colors, floor coverings, built-in furniture, and similar items which are integral to or attached to the structure in accordance to UFC 3-120-10. The items shall be displayed on a color finish board.

3.4.2.2 Doors and Glass. Interior construction should be extremely durable. Use no hollow core wood doors. All interior glass must be tempered safety glass and mirrors must be made of break-resistant materials.

3.4.2.3 Casework. Counters, casework, and cabinets shall be of high-quality and durable construction. Minimum standard for casework doors, drawers, and casework faces is custom grade laminate clad millwork. Solid polymer countertops preferred. Casework in break room and kitchen areas may use standard components or wall hung units, but they must meet the user’s need requiring specific design.

3.4.2.4 Acoustical Design. Desire for enclosed rooms is to minimize sound transfer through their walls, window and door systems. Design to a minimum airborne noise reduction rating of Sound Transmission Class (STC) 45. Window assemblies shall comply with applicable Force Protection Standards. An acoustical wall treatment will be required for the auditorium to both diffuse the sound in the room as well as prevent sound from leaking outside the room.

3.4.2.5 Finishes. Finishes should take into account the intended uses, be appropriately durable, and be low maintenance. Finishes should have good acoustical, noise reducing characteristics. They must meet the requirements listed in NFPA 101, Life Safety Code.

Those areas that carry unfinished floor surfaces (exposed concrete) shall be sealed.

3.4.2.6 Interior Signage. Provide signage throughout the facility (interior, exterior, and site) in accordance with UFC 3-120-01 Air Force Sign Standard, and ADA.

TSOW Page 13 of 40

3.4.2.7 Open Storage Security Classification. Areas identified as “Open Storage” security classification shall conform to DOD 5200.1-R Information Security Program 14 JAN 97 in accordance with Air Force Instruction 31-401 Information Security Program management 1 Nov 05.

3.5 Services.

3.5.1 Utility Connections. Utility connections shall be provided for the building.

These connection locations must be verified using the criteria referenced in this specification and may require adjustment during final design. Ferrous materials for utilities are not allowed, except for fire hydrants. Contractor shall coordinate connection points with 99 CES.

3.5.2 Existing Utilities. Existing utilities are shown on Attachment 6. The existing utilities have been shown based upon a field survey, information provided by the San Antonio Water Systems, and information provided by the 99 CES. The Contractor is responsible for verifying the existence, location, size, depth and condition of existing utilities. Utilities found within the footprint of the building shall be located and marked.

Based upon current data, no utilities are affected within the proposed facility footprint.

No utility shall be removed and relocated prior to receiving approval from the 99 CES/CECC and Communication Squadron representatives. In the event there are utilities discovered within facility footprint that are not portrayed in this RFP, notify Contracting Officer for guidance.

3.6 Plumbing.

3.6.1 Codes, Standards and Regulations

IBC International Building Code, 2009 Edition.

IPC International Plumbing Code, 2009 Edition.

ASHRAE American Society of Heating, Refrigeration, and Air

Conditioning Engineers, Latest edition of handbooks and applicable standards

AWWA American Water Works Association, Latest edition of applicable standards.

NFPA National Fire Protection Association, Latest edition of

SWD-AEIM Architect and Engineer Instruction Manual, U.S. Army Corps of Engineers, Southwestern District, October 2003.

UFC 1-200-01 General Building Requirements, 2005

TSOW Page 14 of 40

UFC-3-400-01 Design: Energy Conservation 2002, with change 4 (2008)

UFC 3-420-01 Plumbing systems, 2003

UFC 4-171-01N (MIL-HDBK-1027/4A) Design: Aviation Training Facilities

ETL 04-3 (Change 1) Design Criteria for Prevention of Mold in Air Force

Facilities

ETL 94-4 Energy Budget Figures (EBF’s) for Facilities in the Military Construction Program.

Title 10 CFR 435 Federal Energy Management Planning and Programs

TI-800-01 Design Criteria.

DOD 5200.R.1_Apndx_G Physical Security Standards_Open Storage

3.6.2 Plumbing - Existing Systems Two(2) existing water closets, two (2) urinals , two (2) lavatories, and one electrical water heater are demolished. Existing 1” CW line shall be replaced with a new 1-1/2” line. Cap the existing sewer line and gas line and use new lines per the civil and plumbing drawings.

3.6.3 General Plumbing System Design Requirements. The plumbing systems shall be designed to UFC-3-420-01, Plumbing and Applicable Codes. All exterior equipment shall be protected with corrosion resistant finishes (i.e., epoxy finishes, etc.).

Manufacturers recommended minimum service clearances, code clearances, and the clearances required for removal of the equipment shall be maintained. Plumbing equipment shall be sized and selected based on the calculated peak loads for each space.

Equipment with parts requiring periodic inspection, operation, maintenance, and repair shall be readily accessible through access doors or panels. Because of maintenance availability, the Contractor shall pay special attention to the plumbing systems currently used on Nellis AFB and their level of sophistication. The contractor is responsible for obtaining all permits required for this project.

3.6.3.1 Domestic water usage and water heater calculations shall be in accordance with the current edition of the ASHRAE Handbook, HVAC Applications, 2007 and the International Plumbing Code (2009 IPC). The Contractor shall develop and verify with the user the expected internal domestic loads and associated schedules for each area.

This project shall comply with the energy efficiency standards delineated in UFC 3-400- 01, as well as water efficiency requirements selected in the Sustainable Design Section of the RFP document. UFC 3-400-01 requires the facility to be designed with the energy conservation requirements stated in ASHRAE Standard 90.1 (2004). . All plumbing fixtures shall be low flow types.

TSOW Page 15 of 40

3.6.3.2 Exterior water and waste line point-of-connections will be coordinated with the civil discipline and installation utilities personnel. Interruption of potable water service to surrounding facilities during construction shall be minimized and restricted to the hours determined by the Contracting Officer. Final domestic water hook-up to the potable system (site and all buildings) shall be disinfected.

3.6.3.3 The water service shall be brought into the room 102. The main water service shall include a ball valve followed by a union, water meter, ball valve, reduced pressure principal backflow preventer, pressure reducing valve, and hose bib before servicing the building.

3.6.3.4 Contractor shall define testing method to ensure there are no drain/sewer blockages due to construction materials or trash in the pipes. The contractor must use the testing requirements stated in the Nellis AFB Water Systems Standard Specifications for testing of sewer lines after installation from the facility to the existing sewer main.

3.6.4 Plumbing Piping. Piping shall be extended to fixtures, outlets, and equipment.

The domestic hot and cold water piping systems shall be arranged and installed to permit draining of the entire system. The supply lines to each piece of equipment or fixture, except faucets, flush valves, or other control valves that are supplied with integral stops, shall be equipped with isolation shutoff valves. Shutoff valves are required to permit repairs and maintenance without interfering with the operations of the rest of the facility.

Supply piping to fixtures, faucets, and flushing devices shall be anchored to prevent movement.

3.6.4.1 Natural Gas: Black steel piping shall be utilized to the air conditioning unit outside of the building.

3.6.4.2 Water: Type L hard copper piping above ground inside building. Type K copper piping below ground up to 5 feet outside building. All domestic hot and cold water piping shall be insulated. Follow Nellis AFB “Design Compatibility Guidelines”.

3.6.4.3 Waste: ABS piping shall be utilized inside building, below the building, and below ground up to 5 feet outside the building.

3.6.4.4 Vent: Vent piping shall be ABS.

3.6.4.5 Water hammer arrestors shall be provided at each flush valve group in accordance with PDI- WH-201 document.

3.6.4.6 A floor drain shall be provided for each toilet room area and janitor’s closet. Floor drains shall be equipped with trap primers to prevent sewer gases from entering occupied areas through dry p-traps.

3.6.5 Domestic Hot water. The domestic hot water systems shall provide quick response to point demand. Hot water at 110 °F is generated by three (3) electrical

TSOW Page 16 of 40 instantaneous water heater installed under sinks. The water heaters shall be sized and selected to meet the demand in accordance with the IPC.

3.6.6 Domestic Cold Water. All new dedicated domestic water lines shall be designed to prevent possible water hammer effects. The service connection shall be sized per demand of all fixture units. Typical pipe materials for domestic service line above ground inside the building shall be hard copper type L. Pressure and leakage test shall be per pipe manufacturer’s requirements. Fittings and appurtenances shall be per manufacturer’s requirements for installation. The new water distribution shall be connected to the mains running along the project site. The connections shall be separate.

Final points of connection (POC) shall be determined during design; however, the Contractor shall design the lateral connections as close as possible to the new facilities point-of-entry.

3.6.7 Sanitary Waste Systems. Waste from all plumbing fixtures drain directly into the sanitary sewer. Two-way cleanouts shall be provided within 5 to 10 feet of the building. Cleanouts in rooms that will be normally occupied, corridors or where access may be blocked by systems furniture, vending machines, or other equipment/furniture that is not easily moved shall be avoided. Wall cleanouts are preferable over floor cleanouts in most cases.

3.6.8 General Plumbing Fixtures. Water closets shall be wall mounted with electronic automatic flush valves, at a 15 inch rim height for non-handicapped fixtures.

A handicapped accessible water closet and lavatory shall be provided for the toilet designated for handicap use. Handicapped water closets are mounted with 17 inch rim height. Handicapped adult lavatory faucets are of gooseneck type provided with electronic occupancy sensor actuated faucets and insulated supply and drain fittings.

Plumbing systems shall meet ADA requirements.

3.6.8.1 Mop sinks shall be as shown on the plumbing drawings.

3.6.8.2 Lavatories shall be selected as wall mounted vitreous china with electronic activated controls and mounted at a 30 inch rim height.

3.6.8.3 Each janitor’s closet shall be provided with a corner floor mounted sink.

3.6.8.4 Each floor drain and each sink shall be provided with a perforated strainer with 1/4-inch diameter perforations.

3.6.8.5 Plumbing fixtures shall be as directed by Nellis AFB “Design compatibility Guideline” August 2006. The fixtures water flow shall not exceed the following guide lines:

3.6.8.5.1 water closet : 1.6 GPF,

3.6.8.5.2 urinals: 1.0. GPF

3.6.8.5.3 lavatory: 0.5 GPM

TSOW Page 17 of 40

3.6.8.5.4 shower: 2.5 GPM

3.6.9 Natural Gas Systems: Interruption of gas service to adjacent facilities during construction shall be minimized and restricted to the hours permitted by the Contracting Officer. The Contractor is responsible for relighting all pilot lights affected by service interruptions. The line shall be designed in accordance with the National Fuel Gas Code.

A gas valve shall be provided for the service line. The valve shall be polyethylene in accordance with ASTM D 3350 and ASTM D 2513, pipe designations PE 2406 and PE 3408. A valve box shall be provided for the valve and corrosion protected, as applicable.

A gas meter/regulator assembly shall be provided.

3.7 Heating, Ventilating, and Air Conditioning (HVAC).

3.7.1 Mechanical Design Criteria. Heating, ventilating, air conditioning (HVAC) and plumbing systems are designed to conform to the publications listed below.

3.7.2 Codes, Standards and Regulations

ASHRAE American Society of Heating, Refrigeration, and Air Conditioning Engineers, Latest edition of handbooks and

ASME American Society of Mechanical Engineers, Latest edition of applicable standards.

AWWA American Water Works Association, Latest edition of applicable standards.

IBC International Building Code, 2009 Edition

IMC International Mechanical Code, 20093 Edition.

NFPA National Fire Protection Association, Latest edition of

SMACNA Sheet Metal & Air Conditioning Contractors Association, Latest edition of applicable standards.

SWD-AEIM Architect and Engineer Instruction Manual, U.S. Army Corps of Engineers, Southwestern District, October 2003.

UFC-3-400-01 Design: Energy Conservation

UFC-3-400-02 Engineering Weather Data

TSOW Page 18 of 40

UFC-3-410-01FA Design: Heating, Ventilating, and Air Conditioning, 2003 with 2008 changes

UFC 3-410-02A Design: Heating, Ventilating and Air Conditioning

(HVAC) Control Systems, 2003 with 2007 changes.

UFC 3-450-01 Design: Noise and Vibration Control, 2003

ETL 04-3 (Change 1) Design Criteria for Prevention of Mold in Air Force

Facilities

ETL 94-4 Energy Budget Figures (EBF’s) for Facilities in the Military Construction Program.

Title 10 CFR 435 Federal Energy Management Planning and Programs

TI-800-01 Design Criteria.

4-171-01N (MIL-HDBK-1027/4A) Design: Aviation Training Facilities 2004

Design Compatibility Guidelines, Nellis Air Force Base Nevada, 2006

DOD 5200.R.1_Apndx_G Physical Security Standards_Open Storage

3.7.3 Introduction. Building 10204 is an existing single story auditorium building and has approximately 3,350 square feet gross area.

3.7.4 Existing Mechanical System. Two existing evaporative coolers located on the roof provide a tempered air in the summer and two gas-fired ceiling-hang unit heaters provide heating in the winter. Both systems are very old and out of their life span. The evaporative coolers and unit heaters shall be removed.

3.7.5 Outdoor Design Conditions, based on NOAA & 2009 ASHRAE Fundamental 0.4% for Nellis AFB

Summer: 109.2 °FDB /67.6 °FWB Winter: 28.2 °F DB Elevation: 1880 ft Latitude: 36.23N Longtitude: 115.03W HDD (Heating Degree Day: 2128 Per Nellis AFB “Design compatibility Guideline” August 2006, the ambient temperature shall be considered 115 °F for equipment sizing purpose. So, all outdoor mounted condensing units are sized accordingly.

TSOW Page 19 of 40

3.7.6 Indoor Design Conditions (based on UFC-3-410-01FA, TI 810-10)

Areas Provided with HVAC (Packaged unit):

Summer: 78.0°F, 50% RH Winter: 68.0°F

A/V Room and Comm Room:

Summer: 72.0°F, 50% RH Winter: 72.0°F, 50% RH

Areas Provided With Heating Only:

Winter: 55.0°F

3.7.7 Energy Sources. The available energy sources are natural gas and electricity. .

3.7.8 Design Calculations.. HVAC heating and cooling load calculations and energy calculations are performed utilizing an approved Program .

3.7.9 General HVAC zones and personnel loads.

Space Type Equipment Occupants

Auditorium & Stage: 3 W /sq.ft. 200 per architectural drawings Vestible: 3 W/sq.ft. 12 sq.ft./person Conference: 3 W/sq.ft. 12 sq.ft./person Comm Rooms: 15 W/sq.ft. 0 people A/V Room: 20 W/sq.ft. 2 people Electrical Room: 5 W/sq.ft. 0 people General Areas: 2 W/sq.ft. 7 people/1000 sq.ft.

Restrooms: 2 W/sq.ft.

3.7.10 Minimum Ventilation Quantities

General: Per ASHRAE 62.1-2007

3.7.11 Exhaust Quantities

Restrooms: 75 cfm/toilet, minimum

3.7.12 Sound Criteria

The following Noise Criteria (NC) establishes the maximum permissible ambient noise levels within the buildings:

Auditorium: NC-30

TSOW Page 20 of 40

Open Offices: NC-35 Lobbies, Corridors: NC-45 Other: NC-35

3.7.13 Energy Conservation. Energy Conservation shall be utilized in conjunction with HVAC system to create the most energy-efficient system based on first-cost budget restraints and energy budget requirements. A Life Cycle Cost Analysis shall be performed to select the most efficient system.. Heating, ventilation and air conditioning equipment shall be high efficiency type.

3.7.14 Operation Hours. The building will be occupied with operation 12 hours a day, 6 days a week.

3.7.15 Demolition. All existing roof-mounted evaporative coolers and indoor unit heaters,, gravity relief vents, ductworks and related items shall be removed from the project. The portion of the ductwork on the roof will abandon in place and capped.

3.7.16 Heating, Ventilating, and Air Conditioning (HVAC) System Descriptions

3.7.16.1 General Design Requirements. Design shall meet environmental conditions described in functional area tables at the end of the TSOW. Mechanical equipment shall be located as to maintain the manufacturers recommended minimum service clearances, code clearances, and the clearances required for removal of the equipment. Floor mounted equipment shall be placed on concrete housekeeping pad. The air conditioning system and computer room air conditioning units shall be sized and selected based on the calculated peak sensible and total loads for the building or the space served. HVAC designs shall consider the effects of elevation in sizing equipment and ductwork. The pressure classifications of ductwork shall be shown on the design drawings using the convention described in the SMACNA HVAC Systems Duct Design Manual. BMS controls shall be provided and compatible with existing energy management controls system. For exterior components, the use of corrosion resistant material, such as fiberglass louvers and treated fin coils is required.

3.7.16.2 The design of the HVAC system shall meet the requirements of paragraph 3.8.1, UFC 3-410-01FA, Heating, Ventilating, and Air Conditioning; UFC 3-410-02A, Heating, Ventilating, and Air Conditioning (HVAC) Control Systems and the energy efficiency standards delineated in UFC 3-400-01. Comply with anti-terrorism requirements in the design of the HVAC system.

3.7.16.3 The contractor is responsible for obtaining all permits required for this project.

3.7.17 Electric Cooling/Gas Heating Packaged Unit. A new constant volume horizontal discharge electric-cooling gas-fired heating single-zone packaged unit is provided for the auditorium, stage, restrooms and vestibule. The system will be located outside on the ground on housekeeping pad with an intake air duct up to the roof to meet ATFP requirement. The distribution air will be provided through two air ducts on the

TSOW Page 21 of 40 right and left side of the auditorium close to the walls. Use extended media filters with a minimum efficiency reporting value (MERV) of 8 or greater in accordance with ASHRAE 52.2. Refer to the mechanical drawings for more information.

3.7.18 The emergency HVAC shut down switch required per ATFP shall be located in an area continuously occupied

3.7.19 A/V Room and Communication Rooms. Communication rooms shall be provided with computer room air conditioning (CRAC) units. Each CRAC unit will have its dedicated outdoor mounted condensing unit. The CRAC unit is furnished with electrical reheat coil and humidification capability.

3.7.20 Electrical Room. The electrical room shall be heated utilizing electrical unit heater and shall be ventilated with wall mounted exhaust fan.

3.7.21 Sound Attenuation. The AC units, ductwork and diffusers shall be selected to minimize noise from the air handling units to the space. The supply ductwork serving Auditorium is designed for velocities less than 1200 feet. Diffusers will be selected to have noise criteria (NC) rating of less than 25. Return ductwork will be designed for velocities less than 1000 feet per minute. Where necessary to meet the prescriptive NC requirements outlined above, 2” thick duct liner shall be provided for return air sound boots. Return grilles and transfer ducts shall be acoustically lined with insulation to absorb sound.

3.7.