RKMF 10-0085, Repair Building 10203 FA4861-10-B-A045
26-JUL-2010
TSOW Page 1 of 53
Attachment #3
REPAIR AND RENOVATION OF BUILDING 10203
TECHNICAL STATEMENT OF WORK (TSOW)
PART 1 GENERAL:
1.1 Contractor shall be the architect and constructor of record on this project. The design and construction shall be an integrated approach that achieves the highest quality of operations and aesthetics in meeting the requirements of the building’s users while at the same time is cost effective and establishes economical and efficient synergy among the systems and spaces applicable to the structure as a whole. Contractor shall be responsible for the professional quality, constructability, technical accuracy and coordination of all designs, drawings, specifications and other documents or publications upon which construction is based. The design of architectural, interior design, structural, mechanical, electrical, civil and other engineering features of the work shall be accomplished, reviewed and approved by engineers, architects and interior designers who are licensed professionals to practice in their respective professional field in a state or possession of the United States.
The Contractor is responsible and liable for the complete design and shall not assume that the provided design criteria and drawings in this solicitation will alleviate him from performing any additional design as required to produce a complete set of construction documents.
1.2 Life Cycle Cost. Facility should be designed with the objective of achieving the lowest life cycle cost over a 30-year period. Selection evaluations should address all aspects of the facility to include energy, utilities, building systems, and finishes.
1.3 General Facility Description. The Joint Electronic Warfare Center Facility project consists of a renovation of the first floor, second floor and a portion of the basement of Building 10203 in Nellis AFB consisting of 24,600 square feet designed as a secure office building that contains functional program areas.
1.4 Siting Summary. The building is located off of Seymour Johnson Avenue within the confines of Area II at Nellis AFB. The Contractor is responsible for restoring areas beyond defined perimeters to their pre-construction status.
1.5 Building Construction Summary. This project will be the renovation of an existing structure. The site work will support this project. Facility set back is governed by force protection requirements. The building is organized into functional areas shown in Table 1-1. These areas are described in greater detail under functional area descriptions in Functional Area Tables. Site work includes clearing/grubbing, utilities, drainage, emergency and maintenance access, sidewalks, and force protection.
1.6 Functional Program Areas. Table 1-1 lists the areas for the JEWC program, administrative areas, and building support. They provide facility and support services to meet the general needs of all authorized users.
TSOW Page 2 of 53
TABLE 1-1 FUNCTIONAL PROGRAM AREAS
Functional Area Description
Non-Secure Areas
Public restrooms Public restrooms and showers.
Cyber Cafe Outdoor break area for personnel Break Room Break area for non-secure area Conference Room
Conference room for non-secure meetings
Offices Office space for personnel in non-secure area Secure Areas
Conference Room
Conference room for secure meetings
Offices Office space for personnel in secure area Restrooms Restrooms for the secure area of the facility.
Janitor Closet Cleaning storage for the building.
Break Room 24-hour snack area.
SCIF Area Sensitive compartmented information facility.
Server Room Server room with overhead service.
SCIF Area Sensitive compartmented information facility.
Crypto Secure room with equipment connected to Antennae outside
Support Areas
Mechanical Room Houses HVAC equipment for the building.
Electrical Room Houses electrical equipment for the building.
1.6.1 Space Allocations. Total facility size is 34,110 square feet. This project consists of renovating 24,600 square feet of this facility.
1.6.2 Government Equipment. None.
1.6.3 Future Facility Expansion Areas
1.6.4 The design shall take into account the future expansion requirements in the basement. Expected future expansion areas include all areas not scheduled for renovation.
Design shall not limit options for the future expansion areas.
PART 2 PRODUCTS: not used
TSOW Page 3 of 53
PART 3 EXECUTION:
3.1 General Design Criteria
3.1.1 Designer shall use UFC 1-200-01, General Building Requirement;, and Nellis AFB Facility Excellence Guide and Standards for guidance and current building codes for design and construction of the Joint Electronic Warfare Center. The Unified Facility Criteria library is located at: http://www.wbdg.org/ccb/browse_cat.php?o=29&c=4. Facility design, materials, equipment, and installation shall be in accordance with the requirements of the listed codes and design manuals. The building will be of a noncombustible construction classification.
3.1.2 The Contractor shall generate a construction specification package that uses the Unified Facilities Guide Specifications (UFGS) appropriately edited for each aspect of the project. The UFGS can be retrieved at:
http://www.ccb.org/docs/ufgshome/UFGSToc.html. Unless noted otherwise, material specifications, equipment efficiencies, equipment listing (i.e., UL, ANSI, NEMA, etc.), testing requirements, execution, and similar requirements shall not be changed unless dictated by more stringent requirements referenced in this RFP.
3.1.2.1 Provide Government an informational copy of the completed specifications, design calculations, and drawings.
3.1.3 The Contractor is responsible for field verifying all information given. The Contractor is also responsible for obtaining all information necessary to properly design and install all work. Gathering information during design shall be coordinated through the Contracting Officer. Any survey required to provide utility locations, manhole inverts, verification of existing features, etc., shall be the responsibility of the Contractor and shall tie into the project datum.
3.2 Site
3.2.1 Site Layout. The existing building site is shown on Drawing Sheet C-002 – Site Plan. The modifications to the site shall meet the minimum provisions of all applicable references sited in these RFP documents. The Contractor shall minimize construction impact and confine proposed development to the project area as designated in these RFP documents.
The building is a former housing unit on the site of the de-activated Nellis Federal Prison within Area II. The size of the site is approximately 62,000 square feet. A shared parking area for Building 10203 and adjacent buildings exists across the Seymour Johnson Avenue from the proposed site to meet the minimum 40 parking space requirement from Table 20.2 of AFH 32-1084 (60% of occupancy).
An on-site renovation investigation report indicates that asbestos is not expected to be encountered on site, but lead may be present to an extent in some of the building materials
TSOW Page 4 of 53 used on site. The contractor is responsible for determining the necessary Personal Protective Equipment and reviewing any environmental studies and reports completed at the time this RFP is issued.
General site topography contours have been provided based upon an aerial topography, however, additional topographic survey is required to verify site specific details and finished floor elevations that were not provided by the aerial survey.
The site generally slopes to the west. The building foundation appears to be at a single elevation, although the interior ramps up to a higher elevation than the entrances in the main wing. Emergency exit elevations are at the higher interior elevation. In the existing condition, drainage is accomplished through a combination of overland surface flow to Seymour Johnson Avenue and infiltration through the xeriscaping. Existing ground is generally sloped away from the building for varying distances prior to draining overland to the west to protect the building from flooding. Two stairwells, located on the east and west sides, exist below natural grade for emergency exit access from the building basement.
Existing grades are generally sloped away from these areas to prevent collection of runoff.
The site does not appear to accept quantifiable runoff from adjacent sites, or upstream discharges. There are no existing storm drains within the vicinity of the area.
3.2.1.1 Existing Utilities. Existing utilities serving the building are shown on Drawing Sheet C-002 – Site Plan. Contractor to verify location, presence, condition, and capacity of adjacent mains and existing laterals and make any sizing adjustments as necessary.
3.2.1.1.1 Domestic Water. The water supply for the building is provided by the overall base water distribution system. The Area II portion of the water system is pressurized through the use of an elevated tank. An existing 10-inch cast iron main is located in the landscaped area between Seymour Johnson Avenue and the building. This line will be replaced in the future along with the entire Area II water system, per design plans by Jacobs from February 2010. An existing 2.5-inch service lateral enters the building through the north side, slightly to the west of the building center, running perpendicular to the street. Currently, there is no evidence of the existence of any backflow prevention device or water meter. An existing Nellis water system model, prepared in 2008 by EarthTech Inc., indicates that the static water pressure will exceed 90 psi at the main.
3.2.1.1.2 Fire Suppression Water. The fire suppression supply for the building is also provided by the overall base water distribution system. With the replacement of the Area II water system (plans by Jacobs, February 2010), the fire and domestic water services will be provided through separate distribution mains. Two existing 6-inch service laterals enter the building through the front into the basement. The westernmost service lateral is currently capped inside the building and not used. The easternmost service lateral is connected to the existing fire suppression system. A Fire Department connection exists at ground level outside the building at this location. Currently, there is no evidence of the existence of an operational Position Indicating Valve for the fire service. The existing Nellis water system model, prepared in 2008 by EarthTech Inc., indicates that the static water pressure will exceed 90 psi at the main, and approximately 1,700 gpm of flow is available to the main with a system residual pressure of 20 psi. Based upon system modeling results from the Area II water system reconstruction design, Subsequent to the replacement of the Area II
TSOW Page 5 of 53 water system, the available fire flow subsequent to line replacement will be approximately 3,400 gpm with 20 psi residual system pressure.
3.2.1.1.3 Sanitary Sewer System. The waste water from the sanitary fixtures and existing floor drains are collected by sewer pipes within the building and discharged through a 6-inch lateral to the Nellis AFB sewer system. An existing 8-inch sanitary sewer main runs parallel to Seymour Johnson Avenue in the landscaped area between the street and the building. External cleanouts are not present within the existing system.
3.2.1.1.4 Main Electrical Feed. The main building feed runs underground into the building at the west side near the front of the building. The electrical service enters in the building basement, and connects to the main building power panels, located on both sides of the basement. The power feed runs inside the building between the panel locations.
3.2.1.1.5 Natural Gas Supply. Natural Gas to the building is provided through a 1-inch service with a 2-inch pressure regulator, which connect to a gas main running behind the building.
3.2.1.1.6 Communications. An existing communications system is provided to the building, although the extent of the system is unknown to base personnel. A telecommunications riser box is located on the southwest corner of the buildings west wing.
3.2.1.1.7 Site Lighting. Street level illumination is provided through standard streetlights on overhead electrical poles running along the south side of Seymour Johnson Avenue.
3.2.2 Site Development. The site development for this project shall consist of the complete design and construction of the facility modifications, walkways, utilities, grading, drainage, landscaping, sidewalk replacement, and re-striping in accordance with UFC and ADA criteria.
3.2.2.1 Site Demolition. Minimal amounts of demolition are required for this site.
Contractor is to fully demolish, remove, or abandon all facilities and utilities to the extent shown on Sheet C-002 – Site Plan and as described in this RFP. Contractor must replace surface as directed by plan. In areas where no surface is specified, contractor must re-surface with ¾-inch red granite rock mulch. If demolition involves lead or asbestos, Contractor is responsible for all required PPE, permitting, and disposal in accordance with all government regulations.
Clearing and grubbing shall be required for land below proposed improvements. All rock mulch shall be removed and salvaged. Vegetation shall be removed to the roots and disposed of. Salvaged rock shall be utilized to cover areas where demolition of improvements occurs.
3.2.2.1.1 Landfill. All waste material shall be disposed of off base in accordance with all applicable local, state, and federal regulations, at Contractor’s expense.
TSOW Page 6 of 53
3.2.2.2 Borrow Pit. The Contractor shall be responsible for bringing in fill and select fill for the construction of the project, at the Contractor’s expense.
3.2.2.3 Haul Route. The approved Haul Route is illustrated on Sheet C-001 – Haul Route and Contractor’s Staging Area. All construction equipment must enter through the Area II gate and follow the approved route to the site.
3.2.2.4 Construction Storage Yard. Contractor must store all equipment and material within the limits of the staging area shown on Sheet C-001 – Haul Route and Contractor’s Staging Area. Contractor shall restore this area in accordance with the contract or pre-construction condition based. Regardless of the area, the yard shall be fenced and screened.
Contractor shall keep the fence well maintained and the site clean.
3.2.2.5 Storm Runoff and Drainage. Subsequent to all construction activities, all areas around the building must be graded to provide positive drainage away from the building for a minimum of 10 feet unless otherwise directed by the plans. Major grade changes include lowering the grade adjacent to the east wing exit to below the finished floor elevation and creating a french drain sump with overflow to collect the runoff, in accordance with UFC 3-210-01A – Area Planning, Site Planning, and Design. The major grade changes are illustrated on sheet C-100 – Grading Plan. Sheet flow to the street should be utilized whenever possible; however swales may be used to convey flow. The finished grade adjacent to the building should be at least of 6-inches below the adjacent finished ground floor elevation of the building unless noted or required to maintain positive drainage. In no case should the adjacent ground be less than 1-inch below the finished floor elevation.
Ponding anywhere on the project site shall be controlled. There shall be no disruption of existing drainage patterns on the adjacent sites.
3.2.2.5.1 Existing/New Storm Drainage System. Per Technical Guidance on implementing the Storm water Runoff Requirements for Federal Projects under Section 438 of the Energy Independence and Security Act drainage requirements, any projects that disturb more that 5,000 square feet of land must provide means to restore pre-development hydrology. Only disturbances that alter the landscape are considered toward the 5,000 square foot limit. Concrete replacement and resurfacing are generally excluded from this calculation. It is estimated that this project will disturb approximately 3,180 square feet of land, which exempts it from the 438 Drainage Requirements. The contractor shall perform an evaluation of the design to ensure that this exemption is still met. If the exemption is not met, the Contractor shall perform a complete analysis, taking into consideration existing and proposed conditions, and design an acceptable surface storm drainage system to detain the increase in storm water runoff.
3.2.2.6 Drainage Swales. Earthen swales may be required to convey storm drainage through or around the project site, and should have a minimum slope of 1.0 percent.
3.2.3 New Utilities. A #10 tracer wire shall be installed on all non-metallic underground pipes. The wire shall be taped to the pipe every 20 feet, be continuous and accessible above
TSOW Page 7 of 53 ground at ALL valves and building risers. A minimum of six (6) inches of sand shall be required around all water piping and buried a minimum of 36 inches deep. Pipe type as noted on Sheet C-002 – Site Plan.
For utilities requiring meters, Contractor shall verify exact equipment and coordinate connection details with the Energy Management Control System (EMCS) personnel at Nellis AFB (99 CES personnel in Building 812). Meters shall connect to project’s Johnson Controls based EMCS. Contractor shall verify the information output from the meters is properly routed to the base-wide EMCS central connection point in Building 812.
3.2.3.1 Domestic Water. The existing fresh water lateral shall be removed and capped 5-feet from the main. A new 2 ½ -inch NSF-61 Schedule 80 PVC Service Lateral from the main to the building just east of the building center. A ball valve, union, and reduced pressure principal assembly backflow prevention device shall be added to the fresh water lateral outside of the building per UFC 3-230-10A-Water Supply: Water Distribution. A McCrometer or approved equal water meter with pulse output and minimum pickup of 5 gallons per minute or less is also required on the service lateral.
3.2.3.2 Fire Suppression Water. A new 6-inch fire suppression line shall be provided in the same location as the existing easternmost fire service and be constructed in accordance with UFC 3-600-01-Fire Protection Engineering for Facilities. The fire suppression lateral shall be a separate service from the main to the building, and shall not be shared for any other purpose. This service shall provide a new position indicating valve outside and a new fire department connection. The westernmost fire service lateral shall be removed and capped 5-feet from the main. Backflow prevention per design guide shall be included on the internal fire riser.
3.2.3.3 Sanitary Sewer System. The existing sewer lateral shall be removed. Three new sanitary sewer laterals shall serve the building. One new 4-inch PVC lateral shall exit the western wall of the building, approximately 34 feet from the front of the building.
Another 4-inch PVC sewer lateral shall exit the eastern wall of the building, approximately 36 feet from the front of the building. The third lateral is a 6-inch PVC lateral which shall exit the building from the front, just west of the building center. Exterior cleanouts shall be added to each lateral. Laterals and cleanouts must be constructed in accordance with UFC 3-240-04A – Wastewater Collection.
3.2.3.4 Main Electrical Feed. The electrical feed from the existing transformer to the building shall remain unchanged for this project. However, a new Veris Industries advanced electric meter with display or approved equal is required for the electrical service.
3.2.3.5 Natural Gas Supply. A new 2 1/2-inch natural gas service entrance with Elster American Standard meter with pulse output or approved equal is required for this project.
The service connection shall remain in the existing location.
TSOW Page 8 of 53
3.2.3.6 Communications. Two new 4-inch communications conduits are provided between this building and existing Manhole 506. In one conduit, 100 pairs of copper shall be provided. The copper shall terminate at Manhole 506. In another conduit, 12 single strand fibers shall run to existing Manhole 506. From Manhole 506, the fiber shall continue through existing conduit, through Manhole 507 and Manhole 508, and terminate in Manhole 509. Maxcell interducts shall be provided in the fiber conduits per Nellis AFB Personnel. Additionally, a 3-inch crypto conduit shall be provided from the antennae pad into the building at the request of the building end user. A 3-inch Crypto conduit shall also be provided from the antenna pad to the building. Splicing of all communications to existing systems shall be accomplished by Government.
3.2.3.7 Site Lighting. No changes are proposed with this project.
3.2.4 Sidewalk. Replace sidewalk where required to meet ADA compliance requirements and where shown on Sheet C-002 – Site Plan. Provide a new concrete pad and connecting sidewalk for rear access to the shower facilities, and new concrete walk to the new front entry. Sidewalks shall be constructed in accordance with Nellis Design Compatibility Guidelines.
3.2.5 Exterior Concrete. A new concrete mounting pad and concrete anchor pads shall be provided for the crypto antenna. Contractor shall verify requirements with antenna supplier.
3.2.6 Barriers. A new passive barrier system shall be installed along the backside of the sidewalk parallel to Seymour Johnson Avenue and Fairchild Avenue, running for a length of approximately 250 feet. This barrier system shall provide approximately 40 feet of standoff distance between Seymour Johnson Avenue and the building and approximately 33 feet of standoff distance between Fairchild Avenue and the building. Removable bollards shall provided at 4.0 foot center to center spacing since the width of sidewalks typically exceeds the 40-inch maximum spacing for boulders. These bollards allow for pedestrian and delivery access to the building. All barriers should be in accordance with UFC 4-010-01 - DoD Minimum Antiterrorism Standards for Buildings.
3.2.7 Mechanical Yards. New CMU walls shall be constructed to divide the existing mechanical yard directly south of the main building wing into two separate mechanical yards. Additionally, the west mechanical yard shall be expanded to fit all necessary equipment and maintain maintenance access to the units. Heavy gage bird netting is required to cover the all of four of the mechanical yards behind the building conformance with AT/FP requirements and UFC 4-010-01 - DoD Minimum Antiterrorism Standards for Buildings.
3.2.8 Accessibility. Contractor shall re-stripe existing parking spaces to indicate handicapped accessible spaces for compliance with ADA Accessibility Regulations.
3.2.9 Permitting. The contractor is required to obtain all permits required by the contract, federal, state, and local governments and Nellis AFB. Asbestos Containing
TSOW Page 9 of 53
Material (ACM)/Lead Based Paint (LBP) testing has been accomplished for this building, signed manifests are required (if ACM/LBP is removed).
3.2.9.1 Clark County Dust Permit. A Clark County Dust Permit from the Clark County Department of Air Quality and Environmental Management is required for this project for trenching over 100 feet in length over two feet deep.
3.2.9.2 Storm Water Discharge Permit and Storm Water Prevention Plan. These permits are issued through the Nevada Department of Environmental Protection. This permit is required for project disturbances of over one acre, and will likely not be required for this project.
3.2.9.3 Authority to Construct Permit. The Clark County Department of Air Quality and Environmental Management Authority to Construct Permit is required prior to construction of certain mechanical equipment such as hot water heaters and air coolers.
3.2.9.4 Nellis AFB Digging Permit. The Nellis Digging Permit is required for all digging on Nellis AFB.
3.3 Structure
3.3.1 Design Criteria. Structural design shall be in accordance with the latest version of the following criteria and standards:
3.3.1.1 International Building Code, IBC
3.3.1.2 ASCE7: Minimum Design Loads for Buildings and Other Structures
3.3.1.3 UFC 4-010-01: DOD Minimum Antiterrorism Standards for Buildings
3.3.1.4 ACI 318: Building Code Requirements for Structural Concrete
3.3.1.5 ACI 530: Building Code Requirements for Masonry Structures
3.3.1.6 AISC 360: Specification for Structural Steel Buildings
3.3.1.7 AISC Manual of Steel Construction
3.3.1.8 NDS: National Design Specification for Wood Construction
3.3.2 Design Loads.
3.3.2.1 Dead Loads Dead loads shall be calculated in accordance with section 1606 of the IBC and will include the weight of all permanent building materials, interior and exterior finishes and fixed service and equipment utilities.
3.3.2.2 Live Loads. Live loads shall be calculated in accordance with section 1607 of the IBC as summarized below:
Roof.................................................................... 20 PSF (Reducible)
Office ................................................................. 50 PSF (Reducible) Corridors ............................................................ 80 PSF (Reducible) Light Storage ........................................................................ 150 PSF Partitions ......................... 15 PSF (In Addition to Floor Live Loads) Raised Floor ......................................................................... 150 PSF
TSOW Page 10 of 53
3.3.2.3 Wind Loads. Wind loads shall be calculated in accordance with section 1609 of the IBC and Chapter 6 of ASCE 7 as summarized below:
Basic Wind Speed 90 MPH Exposure Category C Importance Factor, I 1.0 Interior Partition Loads 5.0 PSF
3.3.2.4 Seismic Loads. Seismic loads on components and equipment shall be calculated in accordance with section 1613 of the IBC and Chapters 11,12 and 13 of ASCE 7 as summarized below:
SS 0.608g S1: 0.185g Site Class D Seismic Importance Factor, I 1.0
3.3.3 Existing Conditions. The information presented below is based on as-built drawings dated 10/21/1954 for the identical building 10202 located adjacent to building 10203. The contractor shall verify the accuracy of the information presented below.
The structural system of the current building utilizes wood, steel, concrete and concrete masonry units (CMU) as its main construction materials. The building includes two levels above ground and a single story basement level below ground.
The exterior wall system at the basement level consists of 10” thick reinforced concrete walls surrounding the entire building perimeter. At the first and second levels, the exterior wall system consists of 1x8 diagonal wood sheathing over 2x timber stud framing.
The first floor framing system consists of 2x8 timber joists spaced 16” O.C. framing over interior concrete girders and exterior concrete bearing walls. The concrete girders are supported by concrete columns within the interior of the building. The second floor framing consists of 2x8 timber joists spaced 16” O.C. framing into bearing wood stud walls at the interior and exterior of the building. The joists frame into steel wide-flange girders at the northern corners of the building.
The roof framing system consists of 2x8 timber joists spaced 16” O.C. framing into bearing wood stud walls at the interior and exterior of the building. The joists frame into steel wide-flange girders at the northern corners of the building.
The lateral force resisting system consists of concrete walls surrounding the building’s exterior at the basement level and diagonal plywood sheathing over wood stud walls at the first and second levels. Additional force resisting capacity is provided through interior CMU and concrete shear walls at various locations on all three levels. The diaphragm at
TSOW Page 11 of 53 the roof level consists of 1” thick plywood sheathing. At the first and second floors, the diaphragm consists of 23/32” thick plywood sheathing over 1x8 diagonal wood sheathing.
The foundation system consists of continuous concrete wall footings at all bearing walls and shear walls and pad footings at all concrete columns. The basement floor consists of a 4” thick slab-on-grade system. A current geotechnical evaluation has not been conducted for the building. The analysis of existing foundation members should utilize code minimum values for bearing pressure and other pertinent design parameters in accordance with Chapter 18 of the International Building Code (IBC), unless a geotechnical investigation is performed.
3.3.4 Scope of Work. The project will generally consist of interior improvements and modifications to building layout, architectural finishes, demolition and addition of mechanical, electrical and plumbing equipment, and structural reinforcement of windows to meet blast loading.
3.3.4.1 Openings in Bearing Stud Walls and Floors. Throughout the building, new openings will be made in the bearing corridor walls and in the floors to accommodate doors, provide access between adjacent spaces, or pass mechanical ducts. At these locations, provide structural timber headers to support the floor or roof framing above.
3.3.4.2 Openings in Bearing Masonry Walls. At locations where bearing masonry walls will be penetrated for mechanical ducts, provide reinforcement to adequately transfer forces around the opening.
3.3.4.3 Building Layout. The proposed uses of the building likely differ from those for which the structure was originally designed. The contractor shall analyze the existing gravity system and confirm that the existing framing and foundations are adequate to support the new building uses. The majority of space within the building will be utilized as general office use, with some areas designated for light storage. The analysis should take into consideration the date of construction for the structure when determining existing material strengths and properties. Should analysis reveal that the existing framing is inadequate to support the new building functions, provide reinforcement methods to strengthen the structure.
3.3.4.4 New Partition Walls. Provide bracing or positively attach new non-bearing partition walls to the structure to resist seismic and internal wind force pressures.
3.3.4.5 AT/FP Window Support Framing. Provide structural support for all exterior glazing panels in accordance with Standard 10 of UFC 04-010-01. Design supporting structural elements of glazing systems to resist eight times the static load resisting values determined in accordance with ASTM F2248 and ASTM E1300. Refer to the Window System Design Load Analysis report for loading.
3.3.4.6 GPS Antenna Foundation. Provide concrete foundations for a new 40 feet tall antenna and guy wire anchors located at the exterior of the building.
TSOW Page 12 of 53
3.3.4.7 Modular SCIF System. A modular SCIF system is to be installed in the basement level of the building. Ensure that the existing slab and foundations are adequate to support the loads imposed by the SCIF assembly. SCIF design to comply with DCID 6/9.
3.3.4.8 Mechanical Equipment. Several new mechanical units will be located within the interior and exterior of the building. At exterior units supported on grade, provide reinforced concrete pads large enough to support the loads within allowable soil bearing limits. At interior equipment, contractor to evaluate the existing framing for adequacy in supporting the units. Provide reinforcement to members shown by analysis to be overstressed. Provide adequate anchorage for all units to resist sliding and overturning effects when subject to lateral seismic or wind forces.
3.3.4.9 Stairway Floor Infill Framing. Provide infill framing in the central stairway to accommodate new storage room 224. Design the framing to support light storage loads and provide attachment to the existing CMU walls surrounding the stairway.
3.3.4.10 Raised Floor Framing. Provide raised floor framing in basement room 010. The room will be used as an auditorium. Design the framing to support the uniformly distributed live load listed in the design criteria. Deflection of the raised floor system should be minimized and kept below the span length divided by 360 for support members to enhance user comfort
3.3.4.11 Open Storage Security Classification. Areas identified as “Open Storage” security classification shall conform to DOD 5200.1-R Information Security Program 14 JAN 97 in accordance with Air Force Instruction 31-401 Information Security Program management 1 Nov 05.
3.4 Exterior Design. The exterior design of the building is to remain as is.
3.4.1 Entrances/Exits. The main facility entrance to the lobby should serve as a welcome and transition point.
3.4.2 Doors and Windows. All existing windows are to be demolished. New exterior doors and windows are to meet AT/FP requirements. Existing emergency egress door are to remain as is. All doors going in or out of the secure are to be alarmed.
3.4.3 Exterior Finishes. Exterior building finishes shall be repaired as required.
3.4.4 Exterior Signage. The new exterior signage shall be 12” high anodized aluminum letters reading “JOINT ELECTRONIC WARFARE CENTER”
3.4.5 Exterior Walls and Mold.
3.4.5.1 Building Systems, Materials, and Equipment. Offerors are encouraged, but not limited to, follow the construction system and materials guidance within the Design Compatibility Guidelines, Nellis AFB, August 2006.
TSOW Page 13 of 53
3.4.5.2 Exterior wall systems:
3.4.5.2.1 Mold. Comply with current industry standards and ETL 04-3 (Change 1):
Design Criteria for Prevention of Mold in Air Force Facility during design to help prevent the development of mold in wall systems.
3.4.5.3 Roofing.
3.4.5.3.1 Roof to remain as is.
3.5 Interior Design.
3.5.1 Construction and finishes (walls, floor, and ceiling) should support the image and theme of the facility and be consistent with the programs offered and any Installation interior standards. The interior design should offer the same interest, excitement, and professionalism that can be found in comparable commercial Facility.
3.5.2 Interior Construction.
3.5.2.1 Structural Interior Design (SID). Structural interior design services are considered a standard design requirement and, therefore, will be accomplished as a part of the basic facility design in accordance with criteria. Structural related services shall consist of, but not limited to, design and/or selection and color coordination of building surfaces, paint colors, floor coverings, built-in furniture, and similar items which are integral to or attached to the structure in accordance to UFC 3-120-10. The items shall be displayed on a color finish board.
3.5.2.2 Not used.
3.5.2.3 Doors and Glass. Interior construction should be extremely durable. Use no hollow core wood doors. All interior glass must be tempered safety glass and mirrors must be made of break-resistant materials.
3.5.2.4 Casework. Counters, casework, and cabinets shall be of high-quality and durable construction. Minimum standard for casework doors, drawers, and casework faces is custom grade laminate clad millwork. Solid polymer countertops preferred. Casework in break room and kitchen areas may use standard components or wall hung units, but they must meet the user’s need requiring specific design.
3.5.2.5 Acoustical Design. Desire for enclosed offices is to minimize sound transfer through their walls, window and door systems. Design to a minimum airborne noise reduction rating of Sound Transmission Class (STC) 45. Window assemblies shall comply with applicable Force Protection Standards.
TSOW Page 14 of 53
3.5.2.6 Finishes. Finishes should take into account the intended uses, be appropriately durable, and be low maintenance. Finishes should have good acoustical, noise reducing characteristics. They must meet the requirements listed in NFPA 101, Life Safety Code.
Those areas that carry unfinished floor surfaces (exposed concrete) shall be sealed.
3.5.2.7 Interior Signage. Provide signage throughout the facility (interior, exterior, and site) in accordance with UFC 3-120-01 Air Force Sign Standard, and ADA.
3.5.2.8 Elevator. Only able-bodied military personnel are planned to occupy Basement level and Second Floor level of facility. Elevator is not required.
3.6 Services.
3.6.1 Utility Connections. Utility connections shall be provided for the building. These connection locations must be verified using the criteria referenced in this specification and may require adjustment during final design. Ferrous materials for utilities are not allowed, except for fire hydrants. Contractor shall coordinate connection points with 99 CES.
3.6.2 Existing Utilities. The existing utilities have been shown based upon a field survey, information provided by the Las Vegas Water Systems, and information provided by the 99 CES. The Contractor is responsible for verifying the existence, location, size, depth and condition of existing utilities. Utilities found within the footprint of the building shall be located and marked. Based upon current data, no utilities are affected within the proposed facility footprint. No utility shall be removed and relocated prior to receiving approval from the 99 CES/CECC and Communication Squadron representatives. In the event there are utilities discovered within facility footprint that are not portrayed in this RFP, notify Contracting Officer for guidance.
3.7 Plumbing.
3.7.1 Codes, Standards and Regulations
IBC International Building Code, 2009 Edition.
IPC International Plumbing Code, 2009 Edition.
ASHRAE American Society of Heating, Refrigeration, and Air
Conditioning Engineers, Latest edition of handbooks and applicable standards
AWWA American Water Works Association, Latest edition of applicable standards.
NFPA National Fire Protection Association, Latest edition of
SWD-AEIM Architect and Engineer Instruction Manual, U.S. Army Corps of Engineers, Southwestern District, October 2003.
TSOW Page 15 of 53
UFC 1-200-01 General Building Requirements, 2005
UFC-3-400-01 Design: Energy Conservation 2002, with change 4 (2008)
UFC 3-420-01 Plumbing systems, 2003
UFC 4-171-01N (MIL-HDBK-1027/4A) Design: Aviation Training Facilities
ETL 04-3 (Change 1) Design Criteria for Prevention of Mold in Air Force Facilities
ETL 94-4 Energy Budget Figures (EBF’s) for Facilities in the Military
Construction Program.
Title 10 CFR 435 Federal Energy Management Planning and Programs
TI-800-01 Design Criteria.
Design Compatibility Guidelines, Nellis Air Force Base Nevada, 2006
DCID 6/9 Director of Central Intelligence Directive 6/9 (SCIF)
DCID 1/21 A Quick Reference Construction Guide
DOD 5200.R.1_Apndx_G Physical Security Standards_Open Storage
3.7.2 Plumbing – Existing System. The existing Domestic Cold water main line serving the entire building is a 2-1/2 inch copper pipe at 95 psi with a pressure reducing valve. The cold water line enters the building in the basement on the north side of the building. The existing Domestic Hot Water System consists of a gas-fired boiler located outside of the south side of the building and two 200 gallon storage tanks located inside the mechanical room with a circulating pump. The existing main sewer is one (1) 8-inch pipe located on the north side of the building. The existing natural gas meter is located inside the mechanical yard on the south side of the building and serves all the packaged AC units around the building as well as the hot water boiler. The plumbing fixtures consist of drinking fountains, floor-mounted water closets, wall-mounted urinals, floor drains, service sinks, showers and counter-top lavatories on the first and second floors
3.7.3 General Plumbing System Design Requirements. The plumbing systems shall be designed to UFC-3-420-01, Plumbing and Applicable Codes. All exterior equipment shall be protected with corrosion resistant finishes (i.e., epoxy finishes, etc.). Manufacturers recommended minimum service clearances, code clearances, and the clearances required for removal of the equipment shall be maintained. Plumbing equipment shall be sized and selected based on the calculated peak loads for each space. Equipment with parts requiring periodic inspection, operation, maintenance, and repair shall be readily accessible through access doors or panels. Because of maintenance availability, the Contractor shall pay
TSOW Page 16 of 53 special attention to the plumbing systems currently used on Nellis AFB and their level of sophistication. The contractor is responsible for obtaining all permits required for this project.
3.7.3.1 Domestic water usage and water heater calculations shall be in accordance with the current edition of the ASHRAE Handbook, HVAC Applications, 2007 and the International Plumbing Code (2009 IPC). The Contractor shall develop and verify with the user the expected internal domestic loads and associated schedules for each area. This project shall comply with the energy efficiency standards delineated in UFC 3-400-01, as well as water efficiency requirements selected in the Sustainable Design Section of the RFP document. UFC 3-400-01 requires the facility to be designed with the energy conservation requirements stated in ASHRAE Standard 90.1 (2004). All plumbing fixtures shall be low flow types.
3.7.3.2 Exterior water and waste line point-of-connections will be coordinated with the civil discipline and installation utilities personnel. Interruption of potable water service to surrounding facilities during construction shall be minimized and restricted to the hours determined by the Contracting Officer. Final domestic water hook-up to the potable system (site and all buildings) shall be disinfected. The fire hydrant system shall comply with UFC 3-600-01 and the National Fire Code
3.7.3.3 The water service shall be brought into the mechanical room. The main water service shall include a ball valve followed by a union, water meter, ball valve, reduced pressure principal backflow preventer, pressure reducing valve, and hose bib before servicing the building.
3.7.3.4 Contractor shall define testing method to ensure there are no drain/sewer blockages due to construction materials or trash in the pipes. The contractor must use the testing requirements stated in the Nellis AFB Water Systems Standard Specifications for testing of sewer lines after installation from the facility to the existing sewer main.
3.7.4 Plumbing Piping. Piping shall be extended to fixtures, outlets, and equipment.
The domestic hot and cold water piping systems shall be arranged and installed to permit draining of the entire system. The supply lines to each piece of equipment or fixture, except faucets, flush valves, or other control valves that are supplied with integral stops, shall be equipped with isolation shutoff valves. Shutoff valves are required to permit repairs and maintenance without interfering with the operations of the rest of the facility.
Supply piping to fixtures, faucets, hydrants, shower heads, and flushing devices shall be anchored to prevent movement.
3.7.4.1 Natural Gas: Black steel piping shall be utilized to air handling units and water heaters inside the building and air conditioning unit outside the building.
3.7.4.2 Water: Type L hard copper piping above ground inside building. Type K copper piping below ground up to 5 feet outside building. All domestic hot and cold water, chilled
TSOW Page 17 of 53 water, and heating water piping shall be insulated. Follow Nellis AFB “Design Compatibility Guidelines”.
3.7.4.3 Waste: ABS piping shall be utilized inside building, below the building, and below ground up to 5 feet outside the building.
3.7.4.4 Vent: Vent piping shall be ABS.
3.7.4.5 Water hammer arrestors shall be provided at each flush valve group in accordance with PDI- WH-201 document.
3.7.4.6 A floor drain shall be provided for each toilet room area and janitor’s closet. Floor drains shall be provided in the mechanical room to accommodate routine maintenance and drainage of equipment. Floor drains shall be equipped with trap primers to prevent sewer gases from entering occupied areas through dry p-traps.
3.7.5 Domestic Hot water. The domestic hot water systems shall provide quick response to point demand. Hot water at 140 °F is generated from two new high-efficiency, condensing, gas-fired water heaters with 90% min. thermal efficiency. The water heaters shall be sized and selected to meet the building fixture demand in accordance with the IPC and IECC. The water heaters shall be located in the mechanical room. A three-way adjustable thermostatic mixing valve shall be utilized to provide tempered hot water at 110- 120 °F to all of the lavatories, sinks and showers. A hot water re-circulation system ensures hot water is readily available at all points of use.
3.7.6 Domestic Cold Water. All new dedicated domestic water lines shall be designed to prevent possible water hammer effects. A water meter shall be provided and installed adjacent to the mechanical room. The service connection shall be sized per demand of all fixture units. Typical pipe materials for domestic service line above ground inside the building shall be hard copper type L. Pressure and leakage test shall be per pipe manufacturer’s requirements. Fittings and appurtenances shall be per manufacturer’s requirements for installation. The new water distribution shall be connected to the mains running along the project site. The connections shall be separate. Final points of connection (POC) shall be determined during design; however, the Contractor shall design the lateral connections as close as possible to the new facilities point-of-entry.
TSOW Page 18 of 53
3.7.7 Utility General Requirement.
3.7.7.1 A minimum of six (6) inches of sand shall be required around all water piping and buried a minimum of 36 inches deep.
3.7.7.2 Sanitary Waste Systems. Waste from all plumbing fixtures drain directly into the sanitary sewer. Two-way cleanouts shall be provided within 5 to 10 feet of the building.
Cleanouts in rooms that will be normally occupied, corridors or where access may be blocked by systems furniture, vending machines, or other equipment/furniture that is not easily moved shall be avoided. Wall cleanouts are preferable over floor cleanouts in most cases.
3.7.8 General Plumbing Fixtures. Water closets shall be wall mounted with electronic automatic flush valves, at a 15 inch rim height for non-handicapped fixtures. A handicapped accessible water closet and lavatory shall be provided for the toilet designated for handicap use. Handicapped water closets are mounted with 17 inch rim height.
Handicapped adult lavatory faucets are of gooseneck type provided with electronic occupancy sensor actuated faucets and insulated supply and drain fittings. Plumbing systems shall meet ADA requirements.
3.7.8.1 Mop sinks shall be as shown on the plumbing drawings.
3.7.8.2 Lavatories shall be selected as wall mounted vitreous china with electronic activated controls and mounted at a 30 inch rim height.
3.7.8.3 Each janitor’s closet shall be provided with a corner floor mounted sink.
3.7.8.4 Each floor drain and each sink shall be provided with a perforated strainer with 1/4-inch diameter perforations.
3.7.8.5 Plumbing fixtures shall be as directed by Nellis AFB “Design compatibility Guideline” August. The fixtures water flow shall not exceed the following guide lines:
3.7.8.5.1 water closet : 1.6 GPF,
3.7.8.5.2 urinals: 1.0. GPF
3.7.8.5.3 lavatory: 0.5 GPM
3.7.8.5.4 shower: 2.5 GPM
3.7.9 Natural Gas Systems: Interruption of gas service to adjacent facilities during construction shall be minimized and restricted to the hours permitted by the Contracting Officer. The Contractor is responsible for relighting all pilot lights affected by service interruptions. The line shall be designed in accordance with the National Fuel Gas Code
TSOW Page 19 of 53
A gas valve shall be provided for the service line. The valve shall be polyethylene in accordance with ASTM D 3350 and ASTM D 2513, pipe designations PE 2406 and PE 3408. A valve box shall be provided for the valve and corrosion protected, as applicable
3.8 Heating, Ventilating, and Air Conditioning (HVAC).
3.8.1 Mechanical Design Criteria. Heating, ventilating, air conditioning (HVAC) systems are designed to conform to the publications listed below:
3.8.2 Codes, Standards and Regulations
ASHRAE American Society of Heating, Refrigeration, and Air Conditioning Engineers, Latest edition of handbooks and
ASME American Society of Mechanical Engineers, Latest edition of
AWWA American Water Works Association, Latest edition of applicable standards.
IBC International Building Code, 2009 Edition
IMC International Mechanical Code, 2009 Edition.
NFPA National Fire Protection Association, Latest edition of
SMACNA Sheet Metal & Air Conditioning Contractors Association, Latest edition of applicable standards.
SWD-AEIM Architect and Engineer Instruction Manual, U.S. Army Corps of Engineers, Southwestern District, October 2003.
UFC-3-400-01 Design: Energy Conservation, 2008
UFC-3-400-02 Engineering Weather Data, 2003
UFC-3-410-01FA Design: Heating, Ventilating, and Air Conditioning, 2003 with 2008 changes
UFC 3-410-02A Design: Heating, Ventilating and Air Conditioning (HVAC)
Control Systems, 2003 with 2007 changes.
UFC 3-450-01 Design: Noise and Vibration Control, 2003
TSOW Page 20 of 53
ETL 04-3 (Change 1) Design Criteria for Prevention of Mold in Air Force Facilities
ETL 94-4 Energy Budget Figures (EBF’s) for Facilities in the Military Construction Program.
Title 10 CFR 435 Federal Energy Management Planning and Programs
TI-800-01 Design Criteria.
DCID 6/9 Director of Central Intelligence Directive 6/9 (SCIF)
DCID 1/21 A Quick Reference Construction Guide
DOD 5200.R.1_Apndx_G Physical Security Standards_Open Storage
3.8.3 Introduction- Building 10203 is an existing three-story building built in the 1950’s and has approximately 22,700 square feet gross area for total first and second floor.
The building is divided into secured and unsecured areas, plus a SCIF area in the…